Loading...
HomeMy WebLinkAboutWQ0038329_Regional Office Historical File 2015 to 2016FI L NALD R March 4, 2016 Ed Burchins, Town Administrator Town of Andrews P.O. Box 1210 Andrews, NC, 28901 Subject: Permit No. WQ0038329 Town of Andrews Valley Homes, LLC Wastewater Collection System Extension Pe Cherokee County Dear Mr. Burchins: it PAT MCCRORY Governor VAN DER VAART 5'ecrerarc S. JAY ZI:MMERMAN Director 'in accordance with your application received February 18, 2016, we are forwarding herewith Permit No. WQ0038329 dated March 4, 2016, to the Town of Andrews (Permittee) for. the construction and operation upon certification of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded, and shall ble subject to the conditions and limitations as specified therein. This cover letter shall be considered a part of this permit and is therefore incorporated therein by reference. Please pay particular attention to the following conditions contained within this permit: Condition 11.1: This permit shall not be automatically transferable; a request must be made and approved. Condition IIA: Requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2T .0403 or an individual system -wide collection system permit issued to the Permittee. It shall be responsibility of the Permittee to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final and binding. State of North Carolina / Environmental Quality / Water Resources 2090 U.S. Hwy. 70, Swann oa, N.C. 28778 Town Administrator Permit No. WQ0038329 If you need additional information concerning this matter, please contact Tim Heim via e-mail at tim.heim@ncdenr.gov. . Sincerely, G. Landon Davidson, P.G., Regional Superviso` Water Quality Regional Operations Section Asheville Regional Office Division of Water Resources, NCDEQ cc: T. Dean Haney, P.E. —TD Haney Consulting Engineers, LLC (electronic copy) ��A RO�Ci!>f i ce eF fi l e s Water Resources Central Files PERCS (electronic copy) G:\WR\WQ\Cherokee\Collection Systems\Andrews Collection System\WQ0038329 Valley Homes LLC.docx Page 2 of 9 .-rt,..ML 1 Environmental Quality WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to the Town of Andrews Cherokee. County for the construction and operation of approximately 2,730 linear feet of 8-inch gravity sewer to serve a new residential community of 60 single-family homes as part of the Valley Homes, LLC project, and the discharge of 21,600 gallons per day of collected domestic wastewater into the Town of Andrews existing sewerage system, pursuant to the application received February 18, 2016 and in conformity with 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design'Criteria.for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting data subsequently filed and approved by the Department of Environmental Quality and considered a part of this permit. This permit shall be effective from the date of issuance until rescinded and shall be subject to the specified conditions and limitations contained therein. G. Landon Davidson, P.G., Regional Supervisor Water Quality Regional Operations Section Asheville Regional Office Division of Water Resources, NCDEQ Permit Number: WQ0038329 Permit Issued: March 4, 2016 Page 3 of 9 SUPPLEMENT TO PERMIT COVER SHEET Town of Andrews is hereby authorized to: Construct, and then operate upon certification the aforementioned wastewater collection extension. The sewage and wastewater collected by this system shall be treated in the Town of Andrews Wastewater Treatment Facility in accordance with Permit Number NC0020800. Permitting of this project does not constitute an acceptance of any part of the project that does not meet 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable, unless specifically mentioned herein. Division approval is based on acceptance of the certification provided by a North Carolina -licensed Professional Engineer in the application. It shall be the Permittee's responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules. Construction and operation is contingent upon compliance with the Standard Conditions identified below. 1. STANDARD CONDITIONS 1. This permit shall not be transferable. In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Permittee, a formal permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may or may not be approved. [15A NCAC 02T.0104; G.S 143-215.1(d3)] 2. This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit; 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials unless specifically mentioned herein. [15A'NCAC 02T:0110] 3. This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. [15A NCAC 02T .0110] 4. The wastewater collection facilities shall be properly maintained and operated at all times. The Permittee shall maintain compliance with an individual system -wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2T .0403. If an individual permit is not required, the following performance criteria shall be met: [15A NCAC 02T .0108(b)]: a. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and to prevent any contravention of groundwater standards or surface water standards. b. A map of the sewer system shall be developed and shall be actively maintained. Page 4 of 9 eration and maintenance plan including pump,station inspection frequency, preventative aintenance schedule, spare parts inventory and overflow response has been developed and Fd. mplemented. ump stations that are not connected to a telemetry system shall be inspected every day (i.e. 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines.shall be inspected at least once per every six -months and inspections are documented. f. A general observation of the entire sewer system shall be conducted at least once per year. g. Overflows and, bypasses shall be reported to. the appropriate Division regional office in accordance with 15A NCAC 26.0506(a), and public notice shall be provided as required by North Carolina General Statute §143-215.1C. h. A Grease Control Program is in place as follows: , 1. For public owned collection systems, the Grease Control Program shall include at least biannual distribution of educational materials for both commercial and residential users and the legal means to require grease interceptors, at existing establishments. The plan shall _also include legal.means for inspections of the grease interceptors, enforcement for violators and the legal means to control grease entering the system from other public and private satellite sewer systems. . 2. For privately owned collection systems, the Grease Control Program shall include at least bi- annual distribution of grease education materials to users of the collection system by the perrnittee or its representative. 3. Grease education materials shall be distributed more often than required in Parts (1) and (2) of this Subparagraph if necessary to prevent grease -related sanitary sewer overflows. L Right-of-ways and easements shall be maintained in the full easement width for personnel and equipment accessibility. j. Documentation shall be kept for Subparagraphs (a) through (i) of this Rule for a minimum of three years with exception of the map, which shall be maintained for the life of the system. 5. The Permittee shall report by telephone to a water resources staff member at the Asheville Regional Office, telephone number (828) 296-4500, .as soon as possible, but in no case more than 24 hours, following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders, the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any SSO and/or spill over 1,000 gallons; or c. Any SSO and/or spill, regardless of volume, that reaches surface water Voice mail messages or faxed information is permissible, but this shall not be considered as the initial verbal report. Overflows and spills. occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (800) 858-0368 or (919) Page 5 of 9 733-3300. Persons reporting any of the above occurrences shall file a spill report by comp) submitting Part I of Form CS-SSO (or the most current Division approved form) within five following first knowledge of the occurrence. This report must outline the actions taken or propose to be taken to ensure that the problem does not recur. Part II of Form CS-SSO (or the most current Division approved form) can also be completed to show that the SSO was beyond control. [G.S. 143- 215.1C(a1)] 6. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. [15A NCAC 02T.0108(b)] 7. Upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form attached to this permit shall be submitted with the required supporting documents to the address provided on the form. A complete certification is one where the form `is fully executed and the supporting documents are provided as applicable. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. If the permit is issued to a private entity with an Operational Agreement, then a copy of the Articles of Incorporation, Declarations/Covenants/Restrictions, and Bylaws that have been appropriately filed with the applicable County's Register of Deeds office shall be submitted with the certification. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Supporting documentation shall include the following: a. One copy of the project construction record drawings (plan & profile views of sewer lines & force mains) of the wastewater collection system extension. Final record drawings should be clear on the plans or on digital media (CD or DVD disk) and are defined as the design drawings that are marked up or annotated with after construction information and show required buffers, separation distances, material changes, etc. b. .One copy of the supporting applicable design calculations including pipe and pump sizing, velocity, pump cycle times, and level control settings, pump station buoyancy, wet well storage, surge protection, detention time in the wet well, and force main, ability to flush low points in force mains with a pump cycle, and downstream sewer capacity analysis. If a portable power source or pump is dedicated to multiple stations, an evaluation of all the pump stations' storage capacities and. the rotation schedule of the portable power source or pump, include travel timeframes, shall be provided. c. Changes to the project that do not result in non-compliance with this permit, regulations, or the Minimum Design Criteria should be clearly identified on the record drawings, on the certification in the space provided, or in written summary form. Prior to Certification (Final or Partial): Permit modifications are required for any.changes resulting in non-compliance with this permit (including pipe length increases of 10% or greater, increased flow, pump station design capacity design increases of 5% or greater, and increases in the number/type of connections), regulations, or the Minimum Design Criteria. Requested Page 6of9 ions or variances to the Minimum Design Criteria will be reviewed on a case -by -case basis r on its own merit. Please note that variances to the Minimum Design Criteria should be and approved during the permitting process prior to construction. After -construction requests are discouraged by the Division and may not be approved, thus requiring replacement or repair prior to certification & activation. [15A NCAC 02T .0116] 8. Gravity sewers installed greater than ten percent below the minimum required slope per the Division's Gravity Sewer Minimum Design Criteria shall not be acceptable and shall not be certified until corrected. If there is an unforeseen obstacle in the field where all viable solutions have been examined, a slope variance can be requested from the Division with firm supporting documentation. This shall be done through a permit modification with fee. Such variance requests will be evaluated on a case -by -case basis. Resolution of such request shall be evident prior to completing and submitting the construction certification. [ 15A NCAC 02T.0105(n)] 9. A copy of the construction record drawings shall be ma.intained on file by the Permittee for the life of the wastewater collection facilities. [15A NCAC 02T .0116] 10. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T; the Division's Gravity Sewer Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000 as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. [15A NCAC 02T .0104; 15A NCAC 02T .0108(b-c)] 11. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. [15A NCAC 02T .0110; 15A NCAC 02T .0108(b)] 12. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by the Division any other Federal, State, or Local government agencies which have jurisdiction or obtaining other permits which maybe required by the Division or any other Federal, State, of Local government agencies. [G.S. 143-215.1(b)] Page 7 of 9 FAST TRACK SEWER ENGINEERING CERTIFICATION TOWN OF ANDREWS VOJECT: WQ0038329 VALLEY HOMES, LLC ISSUE DATE: March 4, 2016 This project shall not be considered complete nor allowed to operate in accordance with Condition 7 of this permit until the Division has received this Certification and all required supporting documentation. It should be submitted in a manner that documents the Division's receipt. Send the required documentation to the Regional Supervisor, Water Quality Regional Operations Section at the address at the bottom. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up until a final certification is received. A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted. PERMITTEE'S CERTIFICATION I, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein or portions thereof. Printed Name, Title Signature Date ENGINEERS CERTIFICATION I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (❑ periodically, ❑ weekly, ❑ full time) the construction of the Valley Homes, LLC and location as referenced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 02T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials. North Carolina Professional Engineer's Seal w/signature & date: ❑ Final �❑ Partial (include description) Certification Comments/Qualifiers (attach if necessary): NC DWR — Water Quality Regional Operations Section 2090 US Hwy 70 Swannanoa, NC 28778 Asheville Regional Office -Phone: (828)-296-4500 FAX: (828)-299-7043 l 8 3a q Final. Review Date: ~ � (/ Reviewer; _;rv, - - ' Application Fre Review Project is located in a County currently covered by the m ig oral office [:]No . Application and suppoating documentation submitted in duplicate? es QNo One Origi ial and One Copy : Correct apphcation ree submitted? G S 143 215.3D - LJN0 Ensure that a check for $480 is submitted and made out Application package is complete ` application version TA 12-12) YeCurnaPQNo . Briefproject narrative (per Section A ofFTA [JN0 Certification of Public Convenience and Neces rovided Dyes QNo (if applicable) ' Operational Agreements; signed an dated Yes []No. . le) (if applicable) Flow Tracking;/ Acceptance Frnm: 3), signed, No Flow Tracking / Acceptance Plannln s . Addend 1 Yes. QNo_ Site Map .and Street Le . Map (per S F of ) QNo Stream Classifica .` SCAS 01= . i ed" d date Dyes QNo (mustb" e C PE) PE Certificatio placation ed, seal ed by es QNo , Applicant C ed) -Zyss allo . PeOer ii o -. 1 ew Moth Does the require a pe the a �es-` []No See 'fling by'Regul 1SA"' OZT0303 forproects deemed permitted ' y Is the project eiigi the. Fast T o am? r es QNo Project not permatl tlae fast" program Requites aniEa _ ental smentper i5A NCAC 61C .0408 Is an alternative s sure sewers STEP systems, vacuum systems, etc.) Is fiuided through th _ cture Finance Section. If -the .applicant is a private, entity (Private utilit,Y) �Dyes [j TO Applicant has been designated as a public utility by the NC Utilities Cominission Hass1submitted . Certificate of Public Convenience and Necessity (CPM or Letter from the Public Staff of the NC Utilities Commission (contact Central Office) Ifthe-apphcant is a'private entity (Developer) / - []Yes, 13�0 . Has submitted an executed Operational Agreement (DEV 06-13) If the apphcant _is a Homeowner's or Property Owner's Association: �j/A--- QYes o Has submitted an executed Operational Agreement (HOA 06713) and, Copy of the Articles of Incorporation, Declarations and By-laws Has the wastewater flow volume been calculated correctly (section B.9 of FTA 12-12)? Ltffes UNo *low is calculated per 15A NCAC 02T.0114 'l'or ` If daily design flow is not based on regulations ensure that the applicant has an approved flow reduction of daily design flow rate on file with the Division. - -- or If other than 2T.0114, values must be supported with flow data per 15A NCAC 02T.0114(fl (Contact Central Office) Has submitted Flow Tracking/Acceptance Form (FTSE 06-13) [� s []No Proper certification per 15A NCAC .0106 (b) s es ❑No ❑No Form is dated within one year.of receipt of application package _ []Yes Vo Is FTSE Planning Assessment Addendum Required? Required only for projects where available pump station. capacity is < 0. Contact Central Office if needed, Additional forms (FTSE 06-13) required? ❑Yes. &X . No. Required only if the owner of downstream sewer different then .owner of W WTF ._ Design Information, Has a Stream_ Classification form been submitted (WSCAS 03 12) :. [v]'Yes []No Required if any portion of project is within'100'feet of anysprface;wateror wetlands . If no, verify separation on submitted USGS Topographic Map `- Note, 15A- NCAC 02T .0305 (fl contains minimum separations required for sewer A variance is required if.niinimum separations cannot be avoided "sealed, EI/es ONo Has been signed, and dated by an N.C. PE _ Is Project design is in accordance with (see section B. 13 of FTA,12-12) [ i'es ❑No 15ANCAC 02T. . (� a. Gravity Sewer Minimum Design Criteria (latest version) Minimum Design Criteria for Permittingof f Pump Stations and Force Mains (latest version) If no, a variance approval is require ,per the requirements of 15A NCAC 021.0105(b) Applicant must submit TWO copies of the plans, specifications, and calculations Contact the Central Office to discuss the variance request to determine a.course of action. Variance approvals are issued from the central office. If approved, the variance should be incorporated into the final permit... Project contains high priority lines (15A NCAC 02T 0402(2)) ❑Yes Qx/ 'Contact the Central Office Application Certification Hasa N.C. PE stamped, signed, and dated the application? [�s ❑No PE with active license in North Carolina? L�'Yes ❑No , Check the NCBEIS to ensure Engineer is currently registered to practice NCBELS License Lookup _ Applicant (Owner/Permittee) signature meets requirement of 15ANCAC .0106(b)? LyYes ❑No If not, is a delegation letter provided, delegating authority? ❑Yes ❑No If the owner is a corporation, is the corporation registered in N.C;? []Yes❑No N C Secretary of State (Corporation Search) . ' . 2 PA I February 12, 2016 Mr. Tim Heim Division of Water Resources Non -Discharge Permitting Unit North Carolina Department of Environment and Natural Resources 2090'US Highway 70 Swannanoa, North Carolina 28778 9E. SVEED Division of Water Resources F EB 18 2016 Water Ouality Regional Operations Ashevitie Rec�ianaf Office RE: Water and Sewer System Improvements Reagan Avenue/Valley Homes, LLC Town of Andrews Cherokee County, North Carolina Dear Mr. Heim: Please find enclosed, for your review, the following: • One (1) original and one (1) copy of the executed Fast Track Application for Gravity Sewers, Pump Stations and Force Mains, with supporting documents. • Two (2) copies of the design calculations. • Two (2) copies of the location map. • One check in the amount of $480.00. This project is located off Reagan Avenue on the western edge of the Town of Andrews and will be constructed as an extension of the Town of Andrews public waste water collection system. It will include approximately 2,730 linear feet of 8-inch gravity sewer line to serve a new residential community of sixty (60) single family homes. The estimated flow will be 21,600 gallons per day. If you have any questions, or require additional information, do not hesitate to call. Sincerely, T. D. Haney Consulting Engineers, PA T. Dean Haney, PE Enclosures 69 Jenhn5 Vallee load Alexander, North Carolina 28101 (828) 171-9219 15-102/th 12feb 16-D WQ 36 3a 9 r- JC s Z O H a O LL Z H W a 711 TO MOVE FROM FIELD TO FIELD 0 Vrli�ernmittee: Application Number: (to be completed by DWR)'-�'- own of Andrews 3 8 3 a Full Legal Name (company, municipality, HOA, utility, etc.) b. Ed Burchins - Town Administrator Signing Official Name and Title (Please review 15A NCAC 2T .0106 (b) for authorized signing officials) c. The legal entity who will own this system is: Individual ElFederal ❑ Municipality ❑ State/County ❑ Private Partnership ®C i�eFe _❑ d. PO Box 1210 11 e. Andrews I Division of Water Fesources Mailing Address City f. NC 119. 28901 State i Zip Code h. 828-321-3113 Telephone Facsimile Project (Facility) Information: 11j. E-mail "ional Opera n ` 1N ter nuagt R_q 4— fiche /ilia a. Valley Homes, LLC F2b. Cherokee Brief Project Name (permit will refer to this name) v I County Where Project is Located T Dean Haney - Engineer Name and Affiliation of Someone Who Can Answer Questions About this Application 828-777-9219 3c. Phone Number j E-mail Project is ® New ❑ Modification (of an existing permit) If Modification, Permit No.: Owner is ® Public (skip to Item B(3)) ❑ Private (go to Item 2(a)) If private, applicant will be: 1 2b• ❑ Retaining Ownership (i.e. store, church, single office, etc.) or ❑ Leasing units (lots, townhomes, etc. - skip to Item B(3)) ❑ Selling units (lots, townhomes, etc. - go to Item B(2b)) Town of Andrews Owner of Wastewater Treatment Facility (WWTF) Treating Wastewatei Town of Andrews Wastewater Treatment Plant 14 Name of WWTF If sold, facilities owned by a (must choose one ❑ Public Utility (Instruction D) ❑ Homeowner Assoc./Developer (Instruction E) WWTF Permit No. I 5b. 88" & 10 Gravity 5a. Town of Andrews 5c. Not Available 15 ❑ Force Main Owner of Downstream Sewer Receiving Sewer Size Permit # of Downstream Sewer (Instruction F) The origin of this wastewater is (check all that apply): ® Residential Subdivision ❑ Retail (Stores, shopping centers) 100% Domestic/Commercial ❑ Apartments/Condominiums ❑ Institution % Industrial ❑ Mobile Home Park El Hospital El School El Church (Attach Description) ❑ Restaurant ❑ Nursing Home % Other ❑ Office ❑ Other (specify): (Attach Description) Volume of wastewater to be allocated or permitted for this particular project: 21,600 gallons per day *Do not include future flows or previously permitted allocations If the permitted flow is zero, indicate why: ❑ Pump Station, Outfall or Interceptor Line where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit No. ❑ Rehabilitation or replacement of existing sewer with no new flow expected (see 15A NCAC 02T .0303 to determine if a permit is required) FTA 08-13 APPLICATION Page 5 of 6 W D Z_ P Z 0 U O Q O I.L Z H a Morastewater flow calculations used in determining the permitted flow in accordance with 15A NCAC 2T .0114 for in Item B(7) AND/OR the design flow for line or pump station sizing if a reduced or zero flow is being requested in B(7). Values other than that in 15A NCAC 2T .0114 (b) and (c) must be supported with actual water or wastewater use data in accordance with 15A NCAC 2T .0114 (f). 60 3 Bedroom Homes @ 360 gpd = 21,600 gpd ,r 10. Summary of Sewer Lines to be Permitted (attach additional sheets if necessary) Size (inches) New Gravity or Additional Length (feet) Force Main 8 2,732 I Gravity j i 11. Summary of Pump Stations wl associated Force Mains to be Permitted (attach additional sheets as necessary) ;Pump Station Location ID: (self chosen - as shown on plans/map for reference) i `Longitude: Latitude: 1 j Design Flow i (MGD) Power Reliability Option Operational Point ; p 1 -permanent generator w/ATS; Force Main Size ! Force Main Length GPM @TDH ' 2 - portable generator w/MTS I I Pump Station Location ID- as shown on for reference) (self chosen - plans/map !Longitude: Latitude: i j Design Flow Power Reliability Option Point (MGD) IO erational pGPM @TDH 1 -permanent generator w/ATS; Force Main Size I Force Main Length i ! 2 - portable generator w/MTS � I I 12. Will the wastewater flow in the proposed sewer lines or pump stations be able to be directed to another treatment facility? a Yes ® No If Yes, permit number of 2"d treatment facility: i (RO — if "yes" to 13,12 please contact the Central Office PERCS Unit) 113. Does the sewer system comply with the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains (latest version), the Gravity Sewer Minimum Design Criteria (latest version) and 15A NCAC Chapter 2T as applicable? ! ®Yes ❑ No If No, please reference the pertinent minimum design criteria or regulation and indicate why a } variance is requested. SUBMIT TWO COPIES OF PLANS, SPECIFICATIONS OR CALCULATIONS PERTINENT TO THE VARIANCE WITH YOUR APPLICATION I �I FTA 08-13 APPLICATION Page 6 of 6 permits/certifications been submitted for approval for the system or project to be served? Fedime tream Crossings - General Permit or 401 Certification? ❑Yes [INo ElN/A ntation and Erosion Control Plan? ❑ Yes ❑ No ® N/A Trout Buffer Waiver? ❑ Yes ❑ No ® N/A Stormwater? ❑ Yes ❑ No ® N/A 5. Does this project include any high priority lines (15A NCAC 02T .0402 (2)) involve aerial lines, siphons, or interference manholes)? These lines will be considered high priority and must be checked once every six months if Yes: ❑ and provide details: . 71. Owner/Permittee's Certification: (Signature of Signing Official and Project Name) I, Ed Burchins, Town Administrator, attest that this application for Reagan AvenueNalley Homes. LLC has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of j this application are not completed and that if all required supporting documentation and attachments are not included, this f application package is subject to being returned as incomplete. Note: In accordance with North Carolina General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or I certification in any ap . tion shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil pen W to $25, 000 per violation. Signing O cial Signature Date T ENGINEERING DESIGN DOCUMENTS MUST BE COMPLETED PRIOR TO SUBMITTAL OF THIS j APPLICATION. THESE DOCUMENTS MUST INCLUDE PLAN AND PROFILE OF SEWERS, THEIR PROXIMITY U TO OTHER UTILITIES, DESIGN CALCULATIONS, ETC. REFER TO 15A NCAC 02T .0305 z O _ H j2. Professional Engineer's Certification: (Signature of Design Engineer and Project Name) 0 1, T Dean Haney ,attest that this application for Reagan AvenueNalley Homes. LLC has been LL. reviewed by me and is accurate, complete and consistent with the information in the engineering plans, calculations, and �- all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design W Criteria for Gravity Sewers adopted February 12, 1996, and the Minimum Design Criteria for the Fast -Track Permitting of Q Pump Stations and Force Mains adopted June 1, 2000 and the watershed classification in accordance with Division guidance. Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. Note: In accordance with NC General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. ; � ,2a. T Dean Haney �aCta7 At i c a tG •. r a � � � ��L ;`�c7L J�'✓L�l Lac � l u -rat 1�;LG z "• ... Professional Engineer Name —j �2b. T D Haney Consulting Engineers, PA Engineering Firm ,2c. 69 Jenkins Valley Road Mailing Address 2d. Alexander 2 Ne C 2f. 28701 City State ( Zips rt a� /� !2h. as �b 2g. 828-777-9219 ��f� j7���Lh►"V Telephone ; Facsimile ! E-mail NC PE Seal, Signature & Date FTA 08-13 APPLICATION Page 7 of 6 State of North Carolina Department of Environment and Natural Resources Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Applications (FTSE 08-13) Project Applicant Name: Town of Andrews Project Name for which flow is being requested: Valley Homes, LLC More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Town of Andrews b. WWTP Facility Permit #: NC All flows are in MGD c. WWTP facility's permitted flow 1.5 d. Estimated obligated flow not yet tributary to the WWTP . 7Sq e. WWTP facility's actual avg. flow .711 f Total flow for this specific request 0.0216 g. Total actual and obligated flows to the facility . 7/ / h. Percent of permitted flow used! °b 11. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Average Daily Approx. Not Yet Total Current Station Firm Flow" Current Avg. Tributary Flow Plus (Name or Capacity,* (Firm / pf), Daily Flow, DailyFlow, Obligated Available Number) MGD MGD MGD MGD Flow Capacity*** MIA RECEIVED Division of water hesourOUS F FB 1 8 2016 Water Quality Regional Operations - The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0, Page 1 of 6 FTSE 08-13 Statement: I . Ed Burchins certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and H plus all attached planning assessment addendums for which I am the responsible party. Signature of this forr/indicates acceptance of this wastewater flow. Signing Official Signature Date Page 2 of 6 FTSE 08-13 State of North Carolina lepartment of Environment and Natural Resources Division of Water Quality ATERSHED CLASSIFICATION ATTACHMENT tiny cnanges made t® this form will result in the application being returned. (THIS FORM MAYBE PHOTOCOPIED FOR USE AS AN ORIGINAL) INSTRUCTIONS: To determine the classification of the watershed(s) in which the subject project will be located, you are required to submit this form, with Items 1 through 8 completed, to the appropriate Division of Water Quality Regional Office Water Quality Supervisor (see Page 2 of 2) prior to submittal of the application for review. At a minimum, you must include an 8.5" by I I" copy of the portion of a 7.5-minute USGS Topographic Map that shows the surface waters immediately downslope of the project. You must identify the location of the project and the closest downslope surface waters (waters for which you are requesting the classification) on the submitted map copy. If the facility is located in the Neuse River Basin, also include a copy of the soil survey map for the project location. The corresponding non -discharge application may not be submitted until this form is completed by the appropriate regional office and included with the submittal. 1. Applicant's name (name of the municipality, corporation, individual, etc.): ED BURCHINS, Town Administrator —TOWN of ANDREWS 2. Name and complete address of applicant:` TOWN of ANDREWS City: ANDREWS State: NC Zip: 28901 Telephone number: (828) 321-3113 Facsimile number: ( 3. Project name (name of the subdivision, facility or establishment, etc.): WATER and SEWER SYSTEM IMPROVEMENTS REAGAN AVENUE/VALLEY HOMES, LLC 4. County where project is located: CHEROKEE 5. Name(s) of closest surface waters: VALLEY RIVER 6. River basin(s) in which the project is located: HIWASSEE 7. Topographic map name and date: ANDREWS PHOTO REVI.SED..1990 8. North Carolina Professional Engineer's seal, signature, and date: co Q Ey + Ci�/,� V TO: REGIONAL OFFICE WATER QUALITY SUPERVISOR Please provide me with the classification(s) of the surface waters, watershed(s), and aappropriate river basin(s) where these activities will occur, as identified on the attached map segment: C Name(s) of surface waters and river basin(s):. Classification(s) (as established by the EMC): Proposed classification(s), if applicable: River basin buffer rules, if applicable: Signature of regional office personnel: pivis�or% Rer p a� pcerat�ons h Date: ti Wa3e� C1���litY� �E 1 FORM: WSCA 10/99 Page 1 of 2 4AME- AVERAGE DAILY FLOW Reagan AveNalley Homes, LLC, Town of Andrews 15-102 FACILITY TYPES residential Subdivision Type Unit No. Units Gallons/Unit Average Daily Flow (gpd) Average Daily Flow 9Pm) Residence 60 360 21,600 15 Total Daily Flow 21,600 15 ° °'" of Water Fe5° pivislop � Eb A. a N16 Regional OPecati�ons NWO (qua\dY ,fie( ions �shE�! REAGAN AVENUE/VALLEY HOMES, LLC TOWN of ANDREWS Mamhole Floatation Calculations MANHOLE # 4.9 Nominal Depth Concrete Wt. = 150 Ibs/cf Earth Overburden Wt. = 90 Ibs/cf Water Wt. = 62.4 Ibs/cf (A.) Inside Diameter =8 in. Volume per foot of wall height Inside Diameter = 4 % = Outside Dia. Area - Inside Dia. Area Wall Thickness = in. = 5.78 cu.ft. Outside Diameter = 58 in. Outside Diameter = 4.8 ft Weight of Manhole per foot of wall height = Volumn per foot of wall height X Concrete Wt. = 867lbs/ft Weight of Water per foot of wall height = Inside Dia. Area X Water Wt 784 lbs/ft (B•) USE WITH STANDARD MANHOLE SASE SECTION Base Thickness = ; 8 in. Volume of base = Outside Dia. Area X Base Thickness Base Thickness = 0.7 fL = 3.85 cu. ft Weight of base = Volume of Base X Concrete Wt 578 lbs. (C•) USE WITH EXTENDED EASE SECTION Extended Base Dia. 16 in. Extended Base Dia. = 5.833 ft. Extended Base Area = 26.11 sq. ft. Volume of base = Extended Base Area X Base Thickness 13.36 cu. % Base Thickness = 6; in. Base Thickness = 0.5 ft Weight of base = Volume of Base X Concrete Wt 2003 lbs. Earth Overburden Area = Extended Base Area - Outside Dia. Area 8.37` sq. ft. Earth Overburden Weight per foot of depth = Earth Overburden Area X Earth Overburden Wt 754 lbs/ft Top Elev. Invt. Elev. Depth Wt Riser Wt. Base* Earth Overburden Wt.** Total Wt. Water Wt. Add. Concrete Wt. 1721 1 1117 1 4 1 3467 1 2003 1 3014 1 8485 1 7837 1 -647 * Use Section B with Standard Manhole Section or Section C with Extended Base Section REAGAN AVENUE/VALLEY HOMES, LLC TOWN of ANDREWS Mamhoie Floatation Calculations MANHOLE # 7.9 Nominal Depth Concrete Wt. = 150 Ibs/cf Earth Overburden Wt. = 90 Ibs/cf Water Wt. = 62.4 Ibs/cf Inside Diameter = `i8. in. Volume per foot of wall height Inside Diameter = 4 ft. = Outside Dia. Area - Inside Dia. Area Wall Thickness = .. .. .'; 5 : in. = 5.78 cu.ft Outside Diameter = 58 in. Outside Diameter = 4.8 ft Weight of Manhole per foot of wall height = Volumn per foot of wall height X Concrete Wt. 867 lbs/ft Weight of Water per foot of wall height = Inside Dia. Area X Water Wt 784 lbs/ft (B.) USE WITH STANDARD MANHOLE SASE SECTION Base Thickness = '`; _:`8. in: Volume of base = Outside Dia. Area X Base Thickness Base Thickness = 0.7 ft. = 3.85 cu. ft. Weight of base = Volume of Base X Concrete Wt 578 lbs. (C•) USE WITH EXTENDED BASE SECTION Extended Base Dia. = 70s in. Extended Base Dia. = 5.833 ft. Extended Base Area = 26.71 sq. ft. Volume of base = Extended Base Area X Base Thickness 13.36 cu. ft Base Thickness = 6 in. Base Thickness = 0.5 ft Weight of base = Volume of Base X Concrete Wt 2003 lbs. Earth Overburden Area = Extended Base Area - Outside Dia. Area so. ft. Earth Overburden Weight per foot of depth = Earth Overburden Area X Earth Overburden Wt. 754 lbslft Top Elev. Invt. Elev. Depth Wt. Riser Wt. Base* Earth Overburden Total Wt. Water Wt. Add. Wt.** Concrete Wt. 1716 1709 7 6067 2003 5275 1 13346 7837 -5509 Use Section B with Standard Manhole Section or Section C with Extended Base Section ** Add Earth Overburden only with Extended Base Manholes fT2 JC0 >Ra 3 Aj L It L D B A 71- --0 PA Fk 6, Qe, Oka 1p UinY 6 ANX 06 %ff ca, V. 0 and k, fj jVWL". k f L . . . . . . . . . To Division oj�i�r'R'6_S-o`u'rces ANDREWS, NC QUADRANGLE I F E 8 18 2016 .Photorevised 1990 1 Scale 1 2000' Water QLJaVtvRFgional Operations Office �I 020 ' ! i 1 y ® Pa ! ® 63-1589/631 :I ;i y to the 4 t ! Order of��� 1 gsp rs Doll or 11 ..., a � ,: ° GOMMU ,7 6i F NITY °� e. °" Clearwater, BANK _ .,a 61 For e-