Loading...
HomeMy WebLinkAboutSW8010828_Continuing NOV & Rec for Enforcement_20191017 ROY COOPER S Governor _ a MICHAEL S.REGAN ` Secretary •�Q11M'"�� S.DANIEL SMITH NORTH CAROLINA Director Envirvmamtal Quality October 14,2019 CERTIFIED MAIL 7017 0190 0000 9526 8119 RETURN RECEIPT REQUESTED OCT i72m North Inlet, LLC Attn: Ralph Vereen, Member/Manager _ 2428 Ridge Street(Upper Unit) - North Myrtle Beach, SC 29582 Subject; NOTICE OF CONTINUING VIOLATION AND RECOMMENDATION FOR ENFORCEMENT NOV-2019-PC-0425 Devaun Park Stormwater Permit No.SW8 010828 Brunswick County Dear Mr.Vereen: On May 14,2019,Wilmington Regional Office staff of the Division of Energy, Mineral and Land Resources (DEMLR) performed a Compliance Inspection of the subject project to determine the status of compliance with Stormwater Permit Number SW8 010828.The project is located off NC 179 and Ocean Harbour Drive, at 9286 River Terrace,Calabash, Brunswick County, North Carolina. The state stormwater permit for Devaun Park was issued to you on January 8, 2019 and later corrected on January 30,2019. The permit contained conditions that required action on your part to address certain deficiencies applicable to the SCM's. This letter is to notify you that you are in continuing violation of Title 15A North Carolina Administrative Code (NCAC) 02H .1003 in accordance with North Carolina General Statute (G.S.) 143-214.7 for failure to respond to the Division's June 14, 2019 Notice of Violation by the due date and for failing to resolve the violations. On June 13, 2019,DEMLR issued a Notice of Violation (NOV- 2019-PC-0425) regarding the issues observed during a previous site inspection. The NOV was picked up at the Wilmington Regional Office on June 14, 2019. The Notice required a written plan of action to be provided to the Division by July 14, 2019. No response has been received as of this date. On August 19, 2019,the Division sent an email to you,and to Mr. David Boyette and to Mr. Hank Thomas regarding the fact that a response to the NOV was not submitted to the Division by the due date.The Division received"Delivery Receipts" from all parties,and a"Read Receipt"from Mr. Boyette. On October 2,2019,Staff of the Wilmington Regional Office performed a follow-up inspection to determine if the violations outlined in the June 14, 2019 Notice of Violation had been addressed. As a result of the follow-up site inspection and DWQ file review,the project has been found in continuing violation of Stormwater Permit Number SW8 010828, issued pursuant to the requirements of the stormwater rules,15A NCAC 2H.1000.The previous violations,as outlined in the June 13,2019 Notice of Violation,are reproduced below: 1. Failure to Operate and Maintain the StormwaterSvstem. Per Schedule of Compliance Condition II.10 of the permit,the Permittee shall provide the operation and maintenance necessary to assure the permitted stormwater system functions at design condition. The pond serving DA 8B is in need of maintenance to remove a large sediment plume from the forebay; repair the erosion of the slopes; provide vegetated stabilization. North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington.North Carolina 28405 910,796.7215 State Stormwater Permit No. SW8 010828 ' Page 2 of 2 2. Failure to construct according to the approved plan. Per Schedule of Compliance Condition HAS of the permit,the permittee shall construct, operate and maintain the approved stormwater control measures in accordance with the permit condition,the approved plans and specification and other supporting documents. a. The forebay wall for the SCM in DA 9 is not located per the approved plan. b. The spillway,berm and outlet structure for the pond serving DA 8B have not been constructed. 3. Failure to receive approval for a modification of the plans prior to construction. Per Schedule of Compliance Condition II.6 of the permit, the permittee shall submit to the Director and shall have received approval for revised plans,specifications, and calculations prior to construction, for any modification to the approved plans.The forebay wall in DA 9 was relocated without approval from the Division prior to construction. 4. Failure to certify the stormwater system. Per Design Standard Condition 1.2 of the Permit, all of the permitted SCM's must be certified by May 10, 2019.The SCM's in DA's 3, 5 and 8B have not been certified. S. Failure to Compl. Per Design Standard Condition 1.2 of the permit there shall be no lot or road construction initiated within the drainage area of any uncertified SCM until the SCM is completed and certified and a copy of the certification is provided to the Division. It is apparent that construction is on-going in these areas. Required Response This Office requires that you respond to this letter in writing within 30 calendar days of receipt of this Notice. Your response should be sent to this office at the letterhead address. Your response should address the following items: 1. Provide a written "Plan of Action"which outlines the actions you will take to correct the violation(s) noted above and a time frame for completion of those actions. 2. Maintain the SCM in Pond 8B. Remove the sediment plume,repair the eroded slopes and provide vegetated stabilization. 3. Construct the forebay wall for the pond serving DA 9 in the permitted location,or submit a revised plan showing the location of the new forebay wall with supporting volume calculations. 4. Construct the spillway,berm and outlet structure for the pond serving DA 8B as per the approved plans. 5. Complete construction of the SCM's in DA's 3,5 and 8B as per the approved plans. 6. Provide the required certifications for the SCM's in DA's 3, 5 and 8B. 7. Cease all construction activities within the drainage areas of the uncertified SCM's until the SCM is completed and certified and a copy of the certification is provided to the Division. Thank you for your immediate attention to this matter.This Office is considering an enforcement action which includes the assessment of civil penalties regarding these violations and any continuing violations that may be encountered. Your above-mentioned response to this correspondence will be considered in this process. Please be advised,these violations and any continuing or future violations are subject to a civil penalty assessment of up to$25,000.00 per day for each violation pursuant to North Carolina General Statute 143-215.6A. This office requires that the violations,as detailed above,be abated and properly resolved. Should you have any questions regarding these matters, please contact Georgette Scott at 910-796- 7215. Sincerely, r for S. Daniel Smith, Director Division of Energy, Mineral, and Land Resources GDS\arl: G:\\\Stormwater\Permits&Projects\2001\010828 HD\2019 10 NOVRE 010828 cc: David Boyette, P.E.,Stewart Engineering Brunswick County Engineering Alaina Mormon, DEMLR Wilmington Regional Office Stormwater File