Loading...
HomeMy WebLinkAboutSW4191201_C07.05-SITE DETAILS_5/18/2020Ui J Q H W 0 W 0 O U ul w 2 U) O J Il 6 U 0 0 U U) a� 0 0 c o ry 42 U 0 0 O SV W > �E U 0- N N ai O E N co O C N o>L c M Co 02 TEMPORARY FAIRCLOTH SKIMMER DIAMETER: S CONNECT FLEXIBLE PIPE TO POND DRAIN. GATE VALVE SHALL REMAIN OPEN. REMOVE SKIMMER ONCE POND IS NO LONGER UTILIZED AS TEMPORARY SEDIMENT BASIN. O FLEXIBLE PIPE PRIMARY SPILLWAY DIAMETER: Q L � �TEPS PVC DRAIN WITH GATE VALVE AND HAND WHEEL. ANCHOR TO OUTLET STRUCTURE. VAVLE TO BE OPEN DURING CONSTRUCTION. DIAMETER: R 8" I J PLAN VIEW CONCRETE SLAB MANHOLE RING AND COVER BARS 8"O.C. E.W. TOP SLAB ELEV. E �� 1 8 I �#4 1 8 11 R WETLAND OUTLET ," . ,. 1 #4 REBAR 4" O.C. E.W. . OPEN -THROAT YARD INLET I OP4N ON I- I I 1 IN EACH OPENING z --4----*Fl9t}4`31@E--4--4----- I I I I I I 1 3" RIM ELEV. D EMBANKMENT y PROVIDE TEMPORARY CAP/BLOCKING OR SLOPE GROUT AS NECESSARY TO BLOCK OUTLET CLOW STEM GUIDE ORIFICES/WEIRS UP TO ELEV- T SECONDARY SPILLWAY _ ATTACH TO RISER OUTLET INVERT ELEV.: C WITH THREADED ROD _ I FILLED WITH GROUT BARREL: K TEMPORARY FAIRCLOTH SKIMMER / / J I/EMBANKMENT DIAMETER: S PRIMARY SPILLWAY PRIMARY SPILLWAY CONTROL ELEV.: B CONTROL ELEV.: B 4"PVC SET TOP AT ELEV. • B - - - - - - --PRIMARY SPILLWAY + P 4"PVC ELBOW INVERT PRIMARY SPILLWAY ROPE FOR ACCESS TO DRILL OPENING IN END zoow ANCHOR 8" SKIMMER FOR MAINTENANCE CAP. DIAMETER: Q ; DRAWDOWN PIPE TO zoo I CONNECT FLEXIBLE PIPE STRUCTURE OUTLET + TO POND DRAIN. GATE BARREL: K VALVE SHALL REMAIN U-SHAPED STEEL OPEN. REMOVE SKIMMER BRACKET ATTACHED ONCE POND IS NO LONGER EXTEND TO SLOPE EMBANKMENT TO BASE WITH THREADED UTILIZED AS TEMPORARY ROD FILLED WITH GROUT SEDIMENT BASIN. BARREL OUTLET INVERT ELEV.: A 6" DIP 0 `� F 0 1f 8'x8' 'o _ D'` �' BOTTOM PSS= U I'24 a •o'. e.•'o' .r,• ' • _ • DID DRAIN ' ..> •7. . ' ' .> •' HANDGATE VE ANDWITH WHEEL. WETLAND MAINTENANCE SCHEDULE DESCRIPTION METHOD FREQUENCY SEASON DESCRIPTION METHOD FREQUENCY SEASON EMBANKMENT PLANTS INSPECT AND REPAIR VISUAL ANNUALLY ALL REPLACE ANY DEAD OR SEE PLANTING TWICE PER YEAR MAR 15 - APR 30 EROSION / ANIMAL NESTINGS DISEASED VEGETATION SPECIFICATIONS OCT 1 - NOV 30 CONSIDERED BEYOND OUTLET STRUCTURE TREATMENT DEBRIS / OBSTRUCTIONS BY HAND WHENEVER NEEDED ALL TREAT ALL DISEASED MECHANICAL WHENEVER NEEDED ALL PLANTS NOT TO BE REMOVED OR BY HAND FOREBAY / DEEP POOL WATER PLANT MATERIAL BY HAND IMMEDIATELY AFTER N/A AND END OF EACH DAY FOR 14 CONSECUTIVE DAYS AFTER PLANTING COMPLETION OF PROJECT SEDIMENT / DEBRIS BY HAND ONCE PER 6 MONTHS OR WHEN 1/2 FULL OF SEDIMENT ALL CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTENANCE UNTIL SUBSTANTIAL COMPLETION AT WHICH TIME OWNER WILL ASSUME MAINTENANCE RESPONSIBILITY. REPLACE SUPPORT STAKES BY HAND ONCE PER YEAR SPRING REPLACE DEFICIENT STAKES OR WIRES BY HAND WHENEVER NEEDED ALL LANDSCAPE WARRANTIES SHALL APPLY TO STORMWATER WETLAND PLANTINGS. TOP SHALLOW LAND: X4' MIN I ►j I I PERMANENT POOL TOP INTERIOR EMBANKMENT V 3 ELEV.• B WEIR ELEV. W 1 3 FOREBAY 1 ; SEE FOREBAY / WEIR SECT7ON FOREBAY BOTTOM AT ENTRANCE = 809.50 EXCAVATE SEDIMENT STORAGE TO ELEV. = 809.00 FOREBAY BOTTOM AT EXIT = 810.00 EXCAVATE SEDIMENT STORAGE TO ELEV. = 809.50 3 1� WETLAND CONSTRUCTION SEQUENCE STONE ON FILTER FABRIC EMERGENCY SPILLWAY SECTION SCALE: N.T.S. INSTALL SLOPE PROTECTION MATTING ON ALL SLOPES STEEPER THAN 6:1 12' TOP OF EMBANKMENT ELEV.: G LENGTH 2/3 LENGTH EMER. SPILLWAY I CREST ELEV.: F \ i =1 11LA 1 6 I I I=1 11 1 I I I EMERGENCY SPILLWAY I111111111 3 CUT INTO EXISTING SLOPE I1-1I1-1---------------- o 0�1 EMBANKMENT SECTION AT EMERGENCY SPILLWAY SCALE: N.T.S. 1. IF NATIVE TOPSOIL ON SITE IS TO BE UTILIZED, A SOIL ANALYSIS SHOULD BE CONDUCTED TO DETERMINE THE VIABILITY OF SOILS FOR HEALTHY VEGETATION GROWTH. IMPORTED OR IN -SITU SOILS MAY BE AMENDED WITH ORGANIC MATERIAL, DEPENDING ON SOIL ANALYSIS TO ENHANCE THE SUITABILITY AS PLANTING MEDIA. CONTRACTOR SHALL SUBMIT RESULTS OF SOIL ANALYSIS TO LANDSCAPE ARCHITECT FOR APPROVAL PRIOR TO CONSTRUCTION. 2. THE STORMWATER WETLAND SHALL BE UTILIZED AS A TEMPORARY SEDIMENT BASIN DURING CONSTRUCTION. 2.1. SCHEDULE THE FOLLOWING WORK TO COINCIDE WITH AN EXTENDED FORECAST OF NO PRECIPITATION SUCH THAT ALL WORK CAN BE COMPLETED DURING A PERIOD OF DRY WEATHER. INSTALL COFFER DAM UPSTREAM OF POND IN CASE OF ANY UNEXPECTED PRECIPITATION EVENT. UTILIZE MUD PUMP WITH FLOATING SUCTION INLET THROUGH A SEDIMENT FILTER BAG LOCATED DOWNSTREAM OF BASIN. 2.2. INSTALL WETLAND BARREL, OUTLET STRUCTURE, EMBANKMENT, EMERGENCY SPILLWAY AND OTHER WETLAND COMPONENTS. 2.3. CALL FOR SITE INSPECTION PRIOR TO BACKFILLING WETLAND BARREL. 2.4. INSTALL TEMPORARY SKIMMER ON WETLAND DRAIN. DRAIN VALVE TO REMAIN OPEN. 2.5. EXCAVATE WETLAND TO TEMPORARY SKIMMER BASIN DIMENSIONS, SEE EROSION CONTROL PLAN. 2.6. INSTALL BAFFLES AND OTHER TEMPORARY SKIMMER BASIN COMPONENTS, SEE TEMPORARY SKIMMER BASIN DETAIL. 2.7. SEED ALL DISTURBED AREAS. 3. FOLLOWING COMPLETION OF CONSTRUCTION AND STABILIZATION OF POND DRAINAGE BASIN, PERFORM THE FOLLOWING: 3.1. SCHEDULE THE FOLLOWING WORK TO COINCIDE WITH AN EXTENDED FORECAST OF NO PRECIPITATION SUCH THAT ALL WORK CAN BE COMPLETED DURING A PERIOD OF DRY WEATHER. INSTALL COFFER DAM UPSTREAM OF POND IN CASE OF ANY UNEXPECTED PRECIPITATION EVENT. UTILIZE MUD PUMP WITH FLOATING SUCTION INLET THROUGH A SEDIMENT FILTER BAG LOCATED DOWNSTREAM OF BASIN. 3.2. REMOVE TEMPORARY BAFFLES. 3.3. REMOVE ALL ACCUMULATED SEDIMENT. GRADE WETLAND INTERIOR TO SUBGRADE ELEVATIONS. 3.4. INSTALL CLAY LINER AND ARMORED SECTIONS OF FOREBAY WEIRS. 3.5. IF ADDITIONAL DE -WATERING IS NEEDED BELOW DRAIN/SKIMMER ELEVATION, UTILIZE A MUD PUMP WITH FLOATING SUCTION INLET AND DISCHARGE REMAINING WATER THROUGH A SEDIMENT FILTER BAG LOCATED OUTSIDE OF THE BASIN. MONITOR PUMPING TO ENSURE FLOW DOES NOT EXCEED THE CAPACITY OF FILTER BAG. 3.6. INSTALL AND FINE GRADE TOPSOIL TO FINISH GRADES. IF SOIL AMENDMENTS ARE REQUIRED PER THE SOIL ANALYSIS, THE SOIL IS TO BE AMENDED TO A DEPTH OF 12" PER THE STATE REQUIREMENTS. 3.7. INSTALL TEMPORARY SLOPE LININGS. 3.8. REMOVE TEMPORARY CAP/BLOCKING FROM PRIMARY SPILLWAY. 3.9. INSTALL WETLAND PLANTINGS. 3.9. FOLLOWING APPROVAL OF SURVEY, REMOVE TEMPORARY SKIMMER AND CLOSE DRAIN VALVE. 3.10. FILL POND AND MONITOR WATER SURFACE ELEVATION FOR 48 HOURS. WATER SURFACE SHALL REMAIN WITHIN ONE INCH OF PERMANENT POOL ELEVATION. IF WATER LEVEL DROPS ONE INCH, NOTIFY ARCHITECT AND INVESTIGATE OUTLET BARREL, OUTLET STRUCTURE AND EMBANKMENT FOR LEAKS OR DEFECTS. MAKE REPAIRS IF REQUIRED AND FILL POND AND REPEAT WATER ELEVATION MONITORING. IF WATER LEVEL REMAINS WITHIN TOLERANCE, NOTIFY ARCHITECT AND PERFORM DETAILED TOPOGRAPHIC SURVEY. EXCAVATE 18" DEEP PIT BELOW SKIMMER AND PROVIDE 8'x24"xl8" #57 WASHED STONE PAD TO KEEP SKIMMER FROM SETTLING IN MUD ANCHOR TO OUTLET STRUCTURE. VAVLE TO BE OPEN DURING OUTLET STRUCTURE CONSTRUCTION. SECTION Y-Y DIAMETER: R FLANGED, NRS, RESILIENT WEDGE GATE - VALVE WITH EXTENSION STEM, HAND WHEEL AND STEM GUIDES AS MANUFACTURED BY CLOW OR APPROVED EQUAL. TOP OF EMBANKMENT ELEV.: G EMER. SPILLWAY CREST ELEV.: F OUTLET STRUCTURE PROVIDE TEMPORARY CAP/BLOCKING OR GROUT AS NECESSARY TO BLOCK OUTLET ORIFICES/WEIRS UP TO ELEV- T TOP SLAB ELEV. E �I 18 I WETLAND OUTLET OPEN -THROAT YARD INLET z RIM ELEV: D SECONDARY SPILLWAY INVERT ELEV.: C PRIMARY SPILLWAY CONTROL ELEV.: B PRIMARY SPILLWAY Cc INVERT BARREL OUTLET INVERT ELEV.: A CONCRETE SLAB MANHOLE RING AND COVER �#4 BARS 8"O.C. E.W. 8R #4 REBAR 4" O.C. E.W. 11 1 I fL OP N ON'- I I I I IN EACH OPENING --W-+ +FOUR SIDES- -+--H-+-- 3" II 1 I 1 1 1 1 I 1 1 ANCHOR REBAR M TO STRUCTURE RED BLOCK MASONRY STRUCTURE \ DOWELS SHALL BE #4 BARS @ 12" CENTERS yl 0 0 I� 6" #5 BARS, 12" O.C.E. w. OUTLET STRUCTURE SECTION X-X TEMPORARY SEDIMENT BASIN NOTES: 1. INSPECT DEVICE AFTER EACH RAINFALL. REMOVE SEDIMENT WHEN SEDIMENT REACHES A DEPTH OF NO MORE THAN ONE-HALF THE HEIGHT OF THE RISER. REPAIR BAFFLES IF DAMAGED. 2. PULL SKIMMER TO SIDE OF BASIN WITH ROPE AND INSPECT REGULARLY. KEEP SKIMMER HEAD, ORIFICE AND PIPE FREE OF DEBRIS. REMOVE SEDIMENT FROM BENEATH SKIMMER AND ENUSRE VEGETATION DOES NOT INTERFERE WITH SKIMMER OPERATION. J. PROVIDE PAINT MARK ON RISER AT 12" HEIGHT. CLEAN AND REPAIR ONCE SEDIMENT REACHES MARK. 4. INSTALL ALL COMPONENTS OF POND EMBANKMENT, OUTLET STRUCTURE, SKIMMER, EMERGENCY SPILLWAY, ETC. (UNLESS NOTED) PRIOR TO BEGINING CLEARING OPERATIONS. 5. SEE SHEET C07.03 FOR TEMPORARY BAFFLE INSTALLATION. INSTALL SLOPE PROTECTION MATTING ON ALL SLOPES STEEPER THAN 6:1 I 10' EMERGENCY SPILLWAY AND FLOOR OF POND -I 11=1 I I=1 11=1 11=1 I I -I 11=1 11=1 I I -III -III- OUTLET SEED & MULCH EMBANKMENT -III=ITi="' -11=_III-" SEE SEEDING SCHEDULE INSTALL SLOPE PROTECTION MATTING ON ALL SLOPES STEEPER THAN 6:1 4' MIN. OUTLET STRUCTURE I�IlM=III- SHALLOW LAND ELEV B I~�I PERMANENT POOL SEE DETAIL THIS SHEET. i� # 57 WASHED STONE FILTER DIAPHRAGM 1 =I l i„� i i iE I I I I I I -I I I = _ - - M1I1-111= HEADWALL/FES ELEV. B CHIMNEY T "�=11I„ I I II I I- SEE GRADING PLAN ALLOW WATER: W 1 WEIR ELEV W COMPACTED INSTALL 2-FT 3 BARREL OUTLET INV IMPERVIOUS FILL FROM PIPE JOINT U ELEV.: A 8' IMPERVIOUS CLAY DEEP POOL 12' TOPSOIL LAYER LINER UNDER ALL WATER 3 - --------------------------------------------------------------- UNDER ALL WATER SURFACES ----- ------------------------------------------ SURFACES ABOVE MAX. INFILIRA710N RAZE RCP WITH RUBBER GASKET (ASTM C- 443) OUTLET BARREL: K CLAY LINER 0.01IN/HR DEEP POOL - - - - - - - - - - - - ,. .. ----------------------------- - - - - - - - - - - - - - - - - - - - - ------------------------------------------ELEV._ OUTLET I H :. ''r.;; BOTTOM= U i.„ - - - 1 NOTE CRADLE (FLOWABLE FILL) 1 L 1 U #57 WASHED STONE EMBANKMENT SHALL BE CONSTRUCTED OF CLEAN STRUCTURAL SOIL, FREE OF ROOTS, SEE DETAIL THIS SHEET 1 1 FILTER DIAPHRAGM SEE DETAIL THIS SHEET VEGETATION, ROCKS & OTHER OBJECTIONABLE MATERIAL. SCARIFY SURFACES BEFORE I 4 I T Y PLACING FILL. PLACE FILL IN 6-8 INCH LOOSE LIFTS. COMPACT TO AT LEAST 957 OF THE I 7 STANDARD PROCTOR DENSITY. OUTLET PROTECTION 18" THICK CLASS 'A' STONE ON FILTER FABRIC 4' TOE OF SLOPE UUILLI JIKUGIUKL NUILJ: 1. ALL STRUCTURES OVER Y-6" IN DEPTH TO BE PROVIDED WITH STEPS 1'-2" ON CENTERS. STEPS SHALL BE IN ACCORDANCE WITH STANDARD 840.66. 2. LOCATE MANHOLE OVER STEPS. 3. CLASS "A" (3,000 PSI) CONCRETE TO BE USED. 4. ALL MOTOR JOINTS ARE 1/2" f 1/8". 5. GROUT SHALL BE NON -SHRINK (ASTM-C1107) 6. CONCRETE BLOCK SHALL MEET NCDOT SPECIFICATIONS SECTION 1040-2. 7. BLOCK SHALL BE RED IN COLOR AND SUBSTANTIALLY FREE FROM CHIPS AND CRACKS AS -BUILT SURVEY REQUIREMENTS NOTE: CONTRACTOR SHALL PROVIDE AS -BUILT TOPOGRAPHIC SURVEY PERFORMED BY A PROFESSIONAL LAND SURVEYOR CERTIFYING WETLAND AREA DIMENSIONS AND ELEVATIONS OF THE FOLLOWING: 1. OUTLET STRUCTURE TOPS AND INVERTS, ORIFICE/WEIR DIAMETERS, BARREL PIPE SIZES AND INVERTS AND STRUCTURE HEIGHT & WIDTH DIMENSIONS. 2. EMERGENCY SPILLWAY ELEVATION AND DIMENSIONS. J. TOPOGRAPHY THAT EXTENDS 20 FEET OUTSIDE LIMITS OF POND WATER SURFACE AND EMBANKMENT. 4. CONTRACTOR PROVIDE TEST RESULTS OF CLAY LINER. 5. CONTRACTOR TO PROVIDE PHOTOS OF INSTALLATION OF BARREL, OUTLET STRUCTURE AND EMBANKMENT. 2-FT DEEP CUT OFF TRENCH. EXCAVATE TRENCH ALONG CENTERLINE OF EMBANKMENT AND EXTEND INTO BOTH ABUTMENTS TO AT LEAST THE ELEVATION OF THE RISER CREST. INSTALL SLOPE PROTECTION MATTING ON ALL SLOPES STEEPER THAN 6:1 6' TOP INTERIOR EMBANKMENT • V IMPERVIOUS LAYER TO BE INSTALLED UNDER ALL WATER SURFACES. IMPERVIOUS LAYER TO CONSIST OF CLAYEY OR SILTY SOIL MIXTURES CAPABLE OF COMPACTING TO A DENSE STATE WITH AN MAXIMUM PERMEABILITY OF 0.01 IN/HR COMPACTED TO AT LEAST 987. OF THE MAXIMUM DRY DENSITY PER ASTM D-698. ASTM D 2487 SOIL CLASSIFICATION GROUPS CH, CL, SC, MH, AND ML; FREE OF ROCK, BRUSH, ROOTS, AND OTHER ORGANIC MATERIAL SUBJECT TO DECOMPOSITION. POND AND EMBANKMENT SECTION STONE ON FILTER FABRIC FOREBAY WEIR SECTION WETLAND SCHEDULE SCM NUMBER SCM 2 DESCRIPTION SCM NUMBER SCM 2 DESCRIPTION A (FT) 809.50 BARREL OUTLET ELEVATION Q (IN) 314 PRIMARY SPILLWAY ORIFICE B (FT) 812.00 PRIMARY SPILLWAY CONTROL ELEVATION R (IN) 4 DRAIN VALVE DIAMETER C (FT) 813.00 SECONDARY SPILLWAY ELEVATION S (IN) 1-1/2 & 5/8 SKIMMER DIAMETER & ORIFICE DIAMETER D (FT) 814.00 RIM ELEVATION T (FT) 813.50 TEMPORARY SEDIMENT STORAGE ELEVA71ON E (FT) 815.50 TOP SLAB ELEVATION U (FT) 810.001809.50 SCM BOTTOM ELEV./BOTTOM OF SEDIMENT STORAGE F (FT) 815.00 EMERGENCY SPILLWAY CREST ELEVATION V (FT) 812.50 TOP INTERIOR EMBANKMENT G (FT) 816.00 TOP OF EMBANKMENT ELEVATION W (FT) 811.50 SHALLOW WATER BOTTOM ELEV. H (FT) 808.00 INVERT OUT OF BARREL X (FT) 813.00 SHALLOW LAND TOP ELEV. 1 (FT) 3 OUTLET STRUCTURE INTERIOR WIDTH J (FT) 3 OUTLET STRUCTURE INTERIOR LENGTH 1-YR STORM ELEV. 813.03' K 54 LF 15"RCP OUTLET BARREL 2-YR STORM ELEV. 813.14' L (FT) 8 EMERGENCY SPILLWAY WIDTH 10-YR STORM ELEV. 813.80' M (IN) 12 SECONDARY SPILLWAY WIDTH 100-YR STORM ELEV. 814.40' N (IN) 12 THROAT OPENING HEIGHT 0 (IN) 6 CONCRETE BASE EXTENSION WIDTH SHWT ELEV. N/A SEASONAL HIGH WATER TABLE ELEVATION P (IN) 6 CONCRETE BASE EXTENSION THICKNESS CLAY LINER YES CLAY LINER REQUIRED SHALLOW WATER #57 WASHED STONE WRAPPEL IN FILTER FABRI I' 24" �l r SEE GRADING PLAN. BARREL 12" MIN. I 12" MIN. z CRADLE (FLOWABLE FILL) can z �v SECTION S-S #57 WASHED STONE WRAPPED IN FILTER FABRI( SECTION U-U CRADLE (FLOWABLE FILL) EXTEND TO DOWNSTREAM EDGE OF EMBANKMENT FILTER DIAPHRAGM SCM 2 WETLAND/TEMPORARY SEDIMENT BASIN N.TS SPRING LINE SECTION T- T #57 WASHED STONE WRAPPED IN FILTER FABRIC Piedmont Leaf Lofts 404 East 4th Street, Winston-Salem, NC 27101 Phone 336 722 6152 Fax 336 722 6192 www.mckissickassociates.com Consultants: Consultant Name Civil/Structural/MEP Seal: ISSUE LOG Distribution CLH DESIGN, P.A. 400 Regency Forest Drive Suite 120 Cary, North Carolina 27518 Phone: (919)319-6716 Fax: (919)319-7516 LA: C-106, PE: C-1595 ,,.�` 0 CA1BQ'�.,,, ��7Q ��ssr.N`iy9 =q SEA Ir,y. A+ 'ft4ff1111��(j�49 I � ivy Client: WINSTON-SALEM FORSYTH COUNTY SCHOOLS LEWISVILLE MIDDLE SCHOOL Date No. Drawing Title: SITE DETAILS Bid Documents Issue Date NOVEMBER 8, 2019 Project Number: Drawn by: 201 7-8 RP/I<L Drawing Number C07005