Loading...
HomeMy WebLinkAboutSW4191201_C07.04-SITE DETAILS_5/18/2020TEMPORARY FAIRCLOTH SKIMMER DIAMETER: S CONNECT FLEXIBLE PIPE TO POND DRAIN. GATE VALVE SHALL REMAIN OPEN. REMOVE SKIMMER ONCE POND IS NO LONGER UTILIZED AS TEMPORARY SEDIMENT BASIN. O FLEXIBLE PIPE PRIMARY SPILLWAY DIAMETER: Q TEMPORARY SEDIMENT BASIN NOTES: 1. INSPECT DEVICE AFTER EACH RAINFALL. REMOVE SEDIMENT WHEN SEDIMENT REACHES A DEPTH OF NO MORE THAN ONE-HALF THE HEIGHT OF THE RISER. REPAIR BAFFLES IF DAMAGED. 2. PULL SKIMMER TO SIDE OF BASIN WITH ROPE AND INSPECT REGULARLY. KEEP SKIMMER HEAD, ORIFICE AND PIPE FREE OF DEBRIS. REMOVE SEDIMENT FROM BENEATH SKIMMER AND ENUSRE VEGETATION DOES NOT INTERFERE WITH SKIMMER OPERATION. 3. PROVIDE PAINT MARK ON RISER AT 12" HEIGHT. CLEAN AND REPAIR ONCE SEDIMENT REACHES MARK. 4. INSTALL ALL COMPONENTS OF POND EMBANKMENT, OUTLET STRUCTURE, SKIMMER, EMERGENCY SPILLWAY, ETC. (UNLESS NOTED) PRIOR TO BEGINING CLEARING OPERATIONS 5. SEE SHEET COZ05 FOR TEMPORARY BAFFLE INSTALLATION. EMERGENCY SPILLWAY SECTION SCALE: N.T.S. INSTALL SLOPE PROTECTION MATTING ON ALL SLOPES STEEPER THAN 6:1 10' TOP OF EMBANKMENT ELEV.: G LENGTH I 3/j LENGTH 3 \/\I/\I/ EMER. SPILLWkY CREST ELEV.: FEMERGEN\ \/ CUT INTO OEXISTING SLOPE L _ I= _ - „lIIIIIIII_ EMBANKMENT SECTION AT EMERGENCY SPILLWAY SCALE: N.T.S. OUTSIDE EDGE OF SHELF SHALL BE 6-IN ABOVE PERMANENT POOL ELEV.: W 6' VEG. SHELF 3 1\ 6:1 SLOPE TOWARDS POND EXTEND CLAY LINER TO 6" ABOVE PERM. POOL ELEV. U) J_ Q F- w 0 w 0 O U 6 H w ul 2 U) F- O J n 0 U 0 0 0 U) 0 0 7- 0 0 0 rY U a� 0 L a 0 N W �E U Q- N N � O E N M O C N 0) Ln C � T M Co 02 STONE ON FILTER FABRIC 3 �1 INSIDE EDGE OF SHELF SHALL BE 6-IN BELOW PERMANENT POOL ELEV.: X - PERMANENT POOL ELEV: B FOREBAY FOREBAY BOTTOM AT ENTRANCE = 821.50 J EXCAVATE SEDIMENT STORAGE TO ELEV. = 821.00 J/ FOREBAY BOTTOM AT EXIT = 822.00 EXCAVATE SEDIMENT STORAGE TO ELEV. = 821.50 �I �EPS I PVC DRAIN WITH GATE _ VALVE AND HAND WHEEL. ANCHOR TO OUTLET STRUCTURE. VAVLE TO BE OPEN DURING CONSTRUCTION. DIAMETER: R 8" I J 18" THICK CLASS 'A' STONE ON FILTER FABRIC PLAN VIEW 4' TOE OF SLOPE Y OUTLET - BARREL: K POND SCHEDULE SCM NUMBER 1 DESCRIPTION SCM NUMBER 1 DESCRIPTION A (FT) 823.50 BARREL OUTLET ELEVATION Q (IN) 2.5 PRIMARY SPILLWAY ORIFICE B (FT) 826.50 PRIMARY SPILLWAY CONTROL ELEVATION R (IN) 6 DRAIN VALVE DIAMETER C (FT) 828.50 SECONDARY SPILLWAY ELEVATION S (IN) 4 & 4 SKIMMER DIAMETER & ORIFICE DIAMETER D (FT) 829.50 RIM ELEVATION T (FT) 826.50 TEMPORARY SEDIMENT STORAGE ELEVATION E (FT) 831.00 TOP SLAB ELEVATION U (FT) 822.50 POND SEDIMENT STORAGE BOTTOM ELEV. F (FT) 830.00 EMERGENCY SPILLWAY CREST ELEVATION V (FT) SEE SECTION VIEW THIS SHEET. FOREBAY SEDIMENT STORAGE BOTTOM ELEV. G (FT) 832.00 TOP OF EMBANKMENT ELEVATION W (FT) 827.00 TOP OF VEGETATIVE SHELF H (FT) 823.20 INVERT OUT OF BARREL X (FT) 826.00 BOTTOM OF VEGETATIVE SHELF 1 (FT) 5 OUTLET STRUCTURE INTERIOR WIDTH J (FT) 4 OUTLET STRUCTURE INTERIOR LENGTH 1-YR STORM ELEVV, 827.74' K 62 LF 30"RCP OUTLET BARREL 2-YR STORM ELEVV, 828.00' L (FT) 10 EMERGENCY SPILLWAY WIDTH 10-YR STORM ELEV. 828.86' M (IN) 12 SECONDARY SPILLWAY WIDTH 100-YR STORM ELEV. 830.18' N (IN) 12 THROAT OPENING HEIGHT SHWT ELEV. N/A SEASONAL HIGH WATER TABLE ELEVATION 0 (IN) 6 CONCRETE BASE EXTENSION WIDTH CLAY LINER YES CLAY LINER REQUIRED P (IN) 12 CONCRETE BASE EXTENSION THICKNESS UU 1 LL I J I KUC;1 UFCL NU 1 LJ: 1. ALL STRUCTURES OVER X-6" IN DEPTH TO BE PROVIDED WITH STEPS 1'-2" ON CENTERS. STEPS SHALL BE IN ACCORDANCE WITH STANDARD 840.66. 2. LOCATE MANHOLE OVER STEPS. J. CLASS "A" (3, 000 PSI) CONCRETE TO BE USED. 4. ALL MOTOR JOINTS ARE 1/2" t 1/8". 5. GROUT SHALL BE NON -SHRINK (ASTM-C1107) 6. CONCRETE BLOCK SHALL MEET NCDOT SPECIFICATIONS SECTION 1040-2. 7. BLOCK SHALL BE RED IN COLOR AND SUBSTANTIALLY FREE FROM CHIPS AND CRACKS TEMPORARY FAIRCLOTH SKIMMER DIAMETER & ORIFICE DIAMETER: S BOTTOM PSS= U TOP SLAB ELEV. • E WET POND OUTLET OPEN -THROAT YARD INLET z RIM ELEV: D PROVIDE TEMPORARY PRE-TREATED WOOD OR GROUT AS NECESSARY TO BLOCK ORIFICE/WEIR UP PVC PIPE TO ELEV- T DIAMETER: M SECONDARY SPILLWAY INVERT ELEV.: C i PRIMARY SPILLWAY CONTROL ELEV.: B N PRIMARY SPILLWAY INVERT PRIMARY SPILLWAY Q DRILL OPENING IN END °p CAP. DIAMETER: Q CONNECT FLEXIBLE PIPE TO POND DRAIN. GATE VALVE CONCRETE SLAB MANHOLE RING AND COVER #4 BARS 8"O.C. E.W. I I I OPEN ON- I I I -----I--iFBi}fi1.131--4--♦---4- I 1 I I I I I I CLOW STEM GUIDE ATTACH TO RISER WITH THREADED ROD FILLED WITH GROUT J PRIMARY SPILLWAY CONTROL ELEV.: B 4"PVC SET TOP AT ELEV: B 4"PVC PIPE & 4"PVC ELBOW SHALL REMAIN OPEN. U-SHAPED STEEL REMOVE SKIMMER ONCE POND EXTEND TO SLOPE // BRACKET ATTACHED IS NO LONGER UTILIZED AS EMBANKMENT TO BASE WITH THREADED TEMPORARY SEDIMENT BASIN. ROD FILLED WITH GROUT BARREL OUTLET INVERT ELEV.: A 6" DIP 0 8'x8' o . DIP DRAIN WITH GATE VALVE AND HAND WHEEL. ANCHOR TO OUTLET STRUCTURE. VAVLE TO BE OPEN DURING OUTLET STRUCTURE EXCAVATE 18" DEEP PIT BELOW CONSTRUCTION. DIAMETER R SECTION Y-Y SKIMMER AND PROVIDE 8'x24"xl8" #57 WASHED STONE PAD TO KEEP SKIMMER FLANGED, NRS, RESILIENT WEDGE GATE FROM SETTLING IN MUD VALVE WITH EXTENSION STEM, HAND WHEEL AND STEM GUIDES AS MANUFACTURED BY CLOW OR APPROVED EQUAL. TOP OF EMBANKMENT ELEV.: G INSTALL SLOPE PROTECTION MATTING ON ALL SLOPES STEEPER THAN 6:1 AND FLOOR OF POND OUTLET STRUCTURE TO BE LOCATED OUTLET 10' MIN. FROM EDGE OF PERMANENT POOL WATER EDGE. EMER SPILLWAY CREST ELEV • F MEN #4 REBAR 4" O.C. E. W. IN EACH OPENI EMBANKMENT SLOPE -/ EMBANKMENT OUTLET BARREL: K VET POND CONSTRUCTION SEQUENCE 1. THE WET DETENTION POND SHALL BE UTILIZED AS A TEMPORARY SEDIMENT BASIN DURING CONSTRUCTION. 1.1. SCHEDULE THE FOLLOWING WORK TO COINCIDE WITH AN EXTENDED FORECAST OF NO PRECIPITATION SUCH THAT ALL WORK CAN BE COMPLETED DURING A PERIOD OF DRY WEATHER. INSTALL COFFER DAM UPSTREAM OF POND IN CASE OF ANY UNEXPECTED PRECIPITATION EVENT. UTILIZE MUD PUMP WITH FLOATING SUCTION INLET THROUGH A SEDIMENT FILTER BAG LOCATED DOWNSTREAM OF BASIN. 1.2. INSTALL POND BARREL, OUTLET STRUCTURE, EMBANKMENT, EMERGENCY SPILLWAY AND OTHER POND COMPONENTS. 1.3. CALL FOR SITE INSPECTION PRIOR TO BACKFILLING POND BARREL. 1.4. INSTALL TEMPORARY SKIMMER ON POND DRAIN. DRAIN VALVE TO REMAIN OPEN. 1.5. EXCAVATE POND TO TEMPORARY SKIMMER BASIN DIMENSIONS, SEE EROSION CONTROL PLAN. USE RECP TO STABILIZE BASIN SIDE SLOPES. 1.6. INSTALL BAFFLES AND OTHER TEMPORARY SKIMMER BASIN COMPONENTS, SEE TEMPORARY SKIMMER BASIN DETAIL. 1.7. SEED ALL DISTURBED AREAS. 2. FOLLOWING COMPLETION OF CONSTRUCTION AND STABILIZATION OF POND DRAINAGE BASIN, PERFORM THE FOLLOWING: 2.1. SCHEDULE THE FOLLOWING WORK TO COINCIDE WITH AN EXTENDED FORECAST OF NO PRECIPITATION SUCH THAT ALL WORK CAN BE COMPLETED DURING A PERIOD OF DRY WEATHER. INSTALL COFFER DAM UPSTREAM OF POND IN CASE OF ANY UNEXPECTED PRECIPITATION EVENT. UTILIZE MUD PUMP WITH FLOATING SUCTION INLET THROUGH A SEDIMENT FILTER BAG LOCATED DOWNSTREAM OF BASIN. 2.2. REMOVE TEMPORARY BAFFLES. 2.3. REMOVE ALL ACCUMULATED SEDIMENT. GRADE POND INTERIOR TO SUBGRADE ELEVATIONS. 2.4. INSTALL CLAY LINER AND ARMORED SECTIONS OF FOREBAY WEIRS. 2.5. IF ADDITIONAL DE -WATERING IS NEEDED BELOW DRAIN/SKIMMER ELEVATION, UTILIZE A MUD PUMP WITH FLOATING SUCTION INLET AND DISCHARGE REMAINING WATER THROUGH A SEDIMENT FILTER BAG LOCATED OUTSIDE OF THE BASIN. MONITOR PUMPING TO ENSURE FLOW DOES NOT EXCEED THE CAPACITY OF FILTER BAG. 2.6. INSTALL AND FINE GRADE TOPSOIL TO FINISH GRADES. 2.7. INSTALL TEMPORARY SLOPE LININGS. 2.8. REMOVE TEMPORARY CAP/BLOCKING FROM PRIMARY SPILLWAY. 2.7. INSTALL SHELF PLANTINGS. 2.8. REMOVE TEMPORARY SKIMMER AND CLOSE DRAIN VALVE. 2.9. FILL POND AND MONITOR WATER SURFACE ELEVATION FOR 48 HOURS. WATER SURFACE SHALL REMAIN WITHIN ONE INCH OF PERMANENT POOL ELEVATION. IF WATER LEVEL DROPS ONE INCH, NOTIFY ARCHITECT AND INVESTIGATE OUTLET BARREL, OUTLET STRUCTURE AND EMBANKMENT FOR LEAKS OR DEFECTS. MAKE REPAIRS IF REQUIRED AND FILL POND AND REPEAT WATER ELEVATION MONITORING. IF WATER LEVEL REMAINS WITHIN TOLERANCE, NOTIFY ARCHITECT AND PERFORM DETAILED TOPOGRAPHIC SURVEY. PROVIDE TEMPORARY PRE-TREATED WOOD OR GROUT AS NECESSARY TO BLOCK ORIFICE/WEIR UP TO ELEV: T TOP SLAB ELEV: E 1 8 1 WET POND OUTLET OPEN -THROAT YARD INLET - Z RIM ELEV: D SECONDARY SPILLWAY INVERT ELEV.: C PRIMARY SPILLWAY CONTROL ELEV.: B �v PRIMARY SPILLWAY INVERT BARREL OUTLET INVERT ELEV.: A 0 OUTLET STRUCTURE #5 BARS, 12" O.C.E.W.- CONCRETE SLAB MANHOLE RING AND COVER #4 BARS 8 "O. C. E. W. 8, 1 0?, #4 REBAR 4" O.C. E. W. SLOPN Oy I I I I IN EACH OPENING --I--+--I--rtFOUR SIDES -+--I--+-- 3" I I I I I I I I I I 1 r ANCHOR REBAR TO STRUCTURE I IM I EMERGENCY SPILLWAY SEED & MULCH EMBANKMENT SEE SEEDING SCHEDULE OUTLET STRUCTURE SECTION X-X INSTALL SLOPE PROTECTION MATTING ON ALL SLOPES STEEPER THAN 6:1 RED BLOCK MASONRY STRUCTURE DOWELS SHALL BE #4 BARS ® 12" CENTERS 0 1- PERMANENT BAFFLE g5.7_WAcHFn STnNF N CLASS 'B' STONE 22" OUTLET STRUCTURE 1 3 FILTER DIAPHRAGM jl 3 HEADWALL/FES 4' THICK ON FILTER FABRIC SEE DETAIL THIS 6' SHELF CHIMNEY T -III 1 III,, d i-I I I SEE GRADING PLAN ~� . SHEET. PERMANENT POOL _ 10:1 OUTSIDE EDGE OF SHELF= ELEV. W COMPACTED IMPERVIOUS FILL INSTALL 2-FT FROM PIPE JOINT U -III Illi III 1jIII=III= -- �11=III= ELEV: 8 INSIDE EDGE OF SHELF= ELEV. X S MAIN BARREL OUTLET - ----------------------------------------- 1� o 1 INVERT ELEV.: A BARREL OUTLE INV RCP WITH RUBBER GASKET C-443 ASTM ( ) OUTLET BARREL: K POND BOTTOM PSS= U ELEV.: A -'-- OUTLET I ---------- ------------------------------------------------ l.y :i• .f`,,;: •'� :'. •.�.' •I t. '�1",' �l' 5. .4 "l:. 'Y --- - - - - - - - - ------------------------------------------ ELEV.: - - - - - 4" TOPSOIL UNDER S CRADLE 1 1 U 8" IMPERVIOUS FILL ALL WATER SURFACES (FLOWABLE FILL) 1 STNE FILTER57 ADIAPHRA GM SEE DETAIL THIS SHEET LAYER UNDER ALL NOTE SEE DETAIL THIS SHEET T Y WATER SURFACES SEASONAL HIGH WATER TABLE (SHWT) SEE CHART 4' EMBANKMENT SHALL BE CONSTRUCTED OF CLEAN STRUCTURAL SOIL, FREE OF ROOTS, VEGETATION, ROCKS & OTHER OBJECTIONABLE MATERIAL. SCARIFY SURFACES BEFORE OUTLET PROTECTION PLACING FILL_ PLACE FILL IN 6-8 INCH LOOSE LIFTS. COMPACT TO AT LEAST 95Y. OF THE 2-FT DEEP CUT OFF TRENCH. SEE GRADING PLAN. WET DETENTION BASIN MAINTENANCE SCHEDULE DESCRIPTION METHOD FREQUENCY SEASON EMBANKMENT INSPECT AND REPAIR EROSION / ANIMAL NESTINGS VISUAL ONCE PER YEAR ALL INSPECT AND RESEED GRASS COVERAGE VISUAL WHENEVER NEEDED ALL OUTLET STRUCTURE DEBRIS / OBSTRUCTIONS BY HAND WHENEVER NEEDED ALL OPERATE POND DRAIN VALVE BY HAND ONCE PER YEAR ALL EROSION AT OUTLET DISCHARGE VISUAL ONCE PER YEAR ALL FOREBAY / MAIN POOL SEDIMENT / DEBRIS BY HAND ONCE PER YEAR ALL REMOVE TRASH BY HAND WHENEVER NEEDED ALL CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTENANCE UNTIL SUBSTANTIAL COMPLETION AT WHICH TIME OWNER WILL ASSUME MAINTENANCE RESPONSIBILITY. IMPERVIOUS LAYER TO BE INSTALLED UNDER ALL WATER SURFACES. IMPERVIOUS LAYER TO CONSIST OF CLAYEY OR SILTY SOIL MIXTURES CAPABLE OF COMPACTING TO A DENSE STATE WITH AN MAXIMUM PERMEABILITY OF 0.01 IN/HR COMPACTED TO AT LEAST 987. OF THE MAXIMUM DRY DENSITY PER ASTM D-698. ASTM D 2487 SOIL CLASSIFICATION GROUPS CH, CL, SC, MH, AND ML; FREE OF ROCK, BRUSH, ROOTS, AND OTHER ORGANIC MATERIAL SUBJECT TO DECOMPOSITION. POND AND EMBANKMENT SECTION AS -BUILT SURVEY REQUIREMENTS NOTE CONTRACTOR SHALL PROVIDE AS -BUILT TOPOGRAPHIC SURVEY PERFORMED BY A PROFESSIONAL LAND SURVEYOR CERTIFYING WET POND AREA DIMENSIONS AND ELEVATIONS OF THE FOLLOWING: 1. OUTLET STRUCTURE TOPS AND INVERTS, ORIFICE/WEIR DIAMETERS, BARREL PIPE SIZES AND INVERTS AND STRUCTURE HEIGHT & WIDTH DIMENSIONS. 2. EMERGENCY SPILLWAY ELEVATION AND DIMENSIONS. J. TOPOGRAPHY THAT EXTENDS 20 FEET OUTSIDE LIMITS OF POND WATER SURFACE AND EMBANKMENT. 4. CONTRACTOR PROVIDE TEST RESULTS OF CLAY LINER. 5. CONTRACTOR TO PROVIDE PHOTOS OF INSTALLATION OF BARREL, OUTLET STRUCTURE AND EMBANKMENT. BARREL 12" MIN. _ 11� #57 WASHED w STONE WRAPPED z CRADLE IN FILTER FABRIC z (FLOWABLE FILL) C0 z N SECTION S-S CRADLE (FLOWABLE FILL) EXCAVATE TRENCH ALONG CENTERLINE OF EMBANKMENT AND EXTEND INTO BOTH ABUTMENTS TO AT LEAST THE ELEVATION OF THE RISER CREST. SECTION U-U SPRING LINE #57 WASHED STONE WRAPPEL IN FILTER FABRI T 24 r EXTEND TO ` DOWNSTREAM EDGE OF EMBANKMENT FILTER DIAPHRAGM SECTION T- T #57 WASHED STONE WRAPPED IN FILTER FABRIC SCM 1 WET POND/TEMPORARY SEDIMENT BASIN N. T.S Piedmont Leaf Lofts 404 East 4th Street, Winston-Salem, NC 27101 Phone 336 722 6152 Fax 336 722 6192 www.mckissickassociates.com Consultants: Consultant Name Civil/Structural/MEP Seal: CLH DESIGN, P.A. 400 Regency Forest Drive Suite 120 Cary, North Carolina 27518 Phone: (919)319-6716 Fax: (919)319-7516 LA: C-106, PE: C-1595 ,,. 'o LA18Q'•.,•• 0 .-Essr.N`ry9 SEA L, ell. G `•,'�,.�[ INFER<'s'�. fell, A. �rt1111111" Q if i I7 ISSUE LOG Distribution Client: WINSTON-SALEM FORSYTH COUNTY SCHOOLS LEWISVILLE MIDDLE SCHOOL Date No. Drawing Title: SITE DETAILS Bid Documents Issue Date NOVEMBER 8, 2019 Project Number: Drawn by: 201 7-8 RP/I<L Drawing Number C07004