Loading...
HomeMy WebLinkAbout20200667 Ver 1_U-5887_Permit Drawings_5-8-2020_edits 5 14 2020_20200520• • See Sheet IA For Index of Sheets See Sheet I B For Standard Symbology Sheet 'as 1780 ° o Spartan 1 4 NDERSO ILLE Heights 176 1935 END T PROJECT U-5 7 1 z9 1937 �p N Y 783 3 1937 m 3(i t^ ' \ i 1819 1936 1820 Chickadee o 05 � Nmae� —1935 Cy�9 1825 Oakdale Cemetery 1821 i PRO 182 BEGIN T 887 a ° '�S sI VICINITY MAP (1V T.S) STATE OF NORTH CAROI ILA PERMIT DRAWING DIVISION OF HIGHWAYS SHEET 1 OF 10 HENDERSON COUNTY LOCATION: SR 1783 (NORTH HIGHLAND LAKE ROAD) FROM NC225 TO WEST OF US 176 TYPE OF WORK: GRADING, DRAINAGE, PAVING, SIGNALS, SIGNING, AND RETAINING WALLS WETLAND AND SURFACE WATER IMPACTS PERMIT —Y6— HIGHLAND GOLF DR. —Y5— HIGHLAND GOLF DR. I —Y4— PARK ENTRANCE s —L— NORTH HIGHLAND LAKE ROAD N (SR 1783) I " PATH— MULTI —USE PATH —Y1— NC225 GREENVILLE HIGHWAY BEGIN TIP PROJECT U-5887 —L— STA.10 + 00.00 GRAPHIC SCALES 50 25 0 50 100 PLANS 50 25 0 50 100 PROFILE (HORIZONTAL) 10 5 0 10 20 PROFILE (VERTICAL) DESIGN DATA ADT 2010 = 6700 ADT 2040 = 7200 T - 5 % V 35 MPH * TTST =2 DUAL 3 FUNC CLASS = RURAL COLLECTOR —Y7— JAMES ST. SR 1820 —IRK— BLUE RIDGE SOL —Y3— HIGHLAND PARK . SR 1823 —14— Lll V11LL1L AIL LL L1�1i Ll\. SR 1825 Portions of this project are within the Village of Flat Rock and the City of Hendersonville. Design exceptions on this project for horizontal and vertical curves. Clearing on this project shall be performed to the limits established by method II. 9TATB BTATB PRO]RC1' RBPRRRNCR N0. BRSET NO. TOTAL BI@RT8 N.C. U-5887 i e TR PROI.NO .6PR01. D&9CR�'CION 44634.1.1 1VA PE ❑B VM ❑ m b ❑ a Yaugr�&Mellon s'e sa 1� (� Cons�AS esrs ❑ Asr,vul /J• goono ❑ • No—oilna -a¢sxsisnB ❑ M ❑ ❑ c see s„ 9«s oa ,s, oaea ❑ - —Y8— US 176 SPARTANBURG HIGHWAY \END TIP PROJECT U-5887 —L— STA. 66+16.58 'THERN RAILROAD 2D. DESIGN EXCEPTION FOR HORIZONTAL AND VERTICAL CURVES REQUIRED PRELIMINARY PLANS DO NOT USE MR CONSTRUCTION INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PROJECT LENGTH Prepared In the Office of.. HYDRAULICS ENGINEER VA UGHN & MELTON, INC. 1318-F PATTON AVENUE ASHEVILLE, NC 28806 PHONE (828)253-2796 LENGTH ROADWAY TIP PROJECT U-5887 = 1.064 MILES 2018 STANDARD SPECIFICATIONS P8 TOTAL LENGTH OF TIP PROJECT U-5887 — 1.064 MILES SIGNATURE. RIGHT OF WAY DATE: REECE M. SCHULER, P.E., P.L.S PROJECT ENGINEER ROADWAY DESIGN ENGINEER CONTACT: JONATHAN WOODARD, PE DIVISION 14 SENIOR PROJECT ENGINEER LETTING DATE: JPHILPOT PROJECCTTDESIGN ENGINEER P.E. SEE NOTE 1 TEMP. IMPACTS IN SURFACE WATER - IMPACTS IN SURFACE WATER (28' x 6' CONSPAN ARCH) IMPACTS IN TEMP. IMPACTS IN TRUSTEES OF PINECREST SURFACE WATER SURFACE WATER PRESBYTERIAN CHURCH (BANK STABILIZATION) PERMIT -L- PC Sto23+27,90 SITE #1 PERMIT SITE #2 -L- PT StoJ8+6292 E LACE OF LAT ROCK \ -3 ELEV. �9° LT. MEN/NGER BM y, ' -BL- STA. 16+06.22 BL, pOPLA T BASE �F 48 NAIL, \ "" - ,1,ER�� CL I S KING CREEK 50 T SYGF PUE " EST IAE91NGER CREEK _ NSP N S P CL B P m Z FG ESTRIP 3 RAP SO PUE REMOVE PIPE m �eE :; RCPAII CB PERMIT DRAWING SHEET 2 OF 10 IMPACTS IN SURFACE WATER (18" PIPE OUTLET AND DITCH) _1 1♦ �F Si F - EXIST } l2' O xoeE w F °—f /M'f '"+ J TO BE REMOV V N w \\ _ O o X . Ih IMPACTS IN _ \ N W _F�I IMPACTS IN aUMP - SF I \ rn SURFACE WATK s°'L —SURFACE WATER rn -- (BANK STABILIMION) is RT dl� / (28' x 6' CONSPAN ARCH) -L- ST_ 22+29A3 1 ` RT \ o -L- STA22+58.70 �g I ADDISON BROWN JOSEPH WYBANK — (3 TE 1v&T \ C C DAM / \ / HIGHLAND LAX Yr / \ / / KERRY P. LINDSEY / ® IMPACTS IN PERMANENT WATERS NOTE 1: ® TEMPORARY IMPACTS IN SURFACE WATERS NATIVE MATERIAL CONSISTS OF MATERIAL THAT IS EXCAVATED z FROM THE STREAM BED OR FLOODPLAIN AT THE PROJECT SITE DURING CULVERT CONSTRUCTION. RIP RAP MAY BE USED TO SUPPLEMENT THE NATIVE MATERIAL. IF RIP RAP IS USED, NATIVE MATERIAL SHOULD BE PLACED ON TOP TO FILL VOIDS AND PROVIDE A FLAT SURFACE FOR ANIMAL PASSAGE. NATIVE MATERIAL IS SUBJECT TO APPROVAL BY THE ENGINEER AND MAY BE SUBJECT TO PERMIT CONDITIONS. ME PROJECT REFERENCE NO. SHEET NO. U-5887 5A INN SHEET NO. ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER INCOMPL]E FE PLANS DO NOT USE MR / W ACQUISITION PRELIMINARY DO NOT USE FO FLANS t CONSTRUCTION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED THE VILLAGE OF FLAT ROCK Co RIP RAP EST 10 TON�yy EST 28 SYG 31 \F (0 E - O NARROW SLOT \ t� [7 v V Sta. =24+72-28+74 Q=4.350 cfs V-2.173 fps o �G� d=1.001 ft �Q s = 0.00765 ftRt n = 0.035 Liner= Vegetative SEE SHEET 9 FOR -L- PROFILE SEE SHEET 14 FOR -PATH- PROFILE JER LIZA' r- ® IMPACTS IN PERMANENT WATERS ® TEMPORARY IMPACTS IN SURFACE WATERS NOTE 1: NATIVE MATERIAL CONSISTS OF MATERIAL THAT IS EXCAVATED FROM THE STREAM BED OR FLOODPLAIN AT THE PROJECT SITE DURING CULVERT CONSTRUCTION. RIP RAP MAY BE USED TO SUPPLEMENT THE NATIVE MATERIAL. z IF RIP RAP IS USED, NATIVE MATERIAL o SHOULD BE PLACED ON TOP TO FILL VOIDS AND PROVIDE A FLAT SURFACE w� FOR ANIMAL PASSAGE. NATIVE MATERIAL IS SUBJECT TO APPROVAL BY >� THE ENGINEER AND MAY BE SUBJECT TO PERMIT CONDITIONS. zro PROJECT REFERENCE NO. SHEET NO. U-5887 5B PERMIT DRAWING RN✓ SHEET NO. ROADWAY DESIGN HYDRAULICS SHEET3 OF 10 ENGINEER ENGINEER v� - F� g Y DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED \ / ME INC®N)<I�L]E ]E PLANS DO NOT USE MR VW ACQUISITION 1�1I81ELINidN DO NOT USE FO RY FLANS CONSTRUCTION QV `RIP RAP °8e EST 10 TON EST 28 YG (0 2 \F � �B��F 4O R4 E\ V v Sta. = 24 + 72-28 + 74 Q=4.350 cfs V=2.173 fps d=1.001 ft s = 0.00765 ftRt n = 0.035 Liner= Vegetative SEE SHEET 9 FOR -L- PROFILE SEE SHEET 14 FOR -PATH- PROFILE SHEET NO. ME MENNEN so 0 MENEM so MENNEN so MENNEN so MENNEN so MENNEN so MENNEN so MENNEN so MENNEN PROJECT REFERENCE NO. SHEET NO. U-5887 6A PERMIT DRAWING RN✓ SHEET NO. ROADWAY DESIGN HYDRAULICS SHEET5 OF 10 ENGINEER ENGINEER IINC®N> P L1E ]E PLANS 00 NOT USE FOR f W ACOUISITION Sta. = 33 + 28-34 + 03 Q=22.932 cfs V = 2.6788 fps rd=1.628 DETAIL 3 S=0.0044 ftft /ls N r STANDARD BASE DITCH O n = 0.035 N Liner=Vegetative DOCUMENT NOT CONSIDERED FINAL NoNrol \Nrouml UNLESS ALL SIGNATURES COMPLETED D co/l Min. D=2 Ft. o �51 EST. DDE-73 CV \\ POND FROM -L- STA. 33+28 LT. TO -L- STA. 34+03 LT. ' Q V Z \ \ 061 SE ADETAIL SEE 3H ^4 k/ \ BM ELEV. 2111.19' -BL- STA. 27+43.77 29.4 LT. NAIL SET IN BASE OF 15' POPLAR / d� D �X iRN%i CL B R RAPS \ ES T 14 SYGF _ E-E V\ E so r- F IMPACTS IN SURFACE WATER (95" x 67" ARCH PIPE CULVERT) THE VILLAGE OF FLAT ROCK DB 1538 PG 202 � MECHANIZED TIE TO EXISTING PATH CLEARING IN WETLANDS any + 3 _ E # + _ F POND '. moo V ., �� ? R \ \ �, - �1\ �� FILL IN -L- PRC Sto.32+15.06\\` S WETLANDS `e COIROFIBER M \ \ PERMIT \ \\ F ITI ye vqq� 3fl ` SITE #4 F o n \ In -L- PT Sio34+62A7 '�F rn Fast\\\ Fes_ 2z HW �/ � FILL IN rnq r-scat ^F 6 :;: \ 11DDOS WETLANDS _i \ F \ /j NX a ` \\ �y' RCP -II B (31 614 KERRY P. LINDSEY d T. DB 1499 PG 564 F'1 " �\\ \ ry — � — t asf DB 82G 95 �.- 3 P -L - PC Sta 38+ 6.4.P / ' \� y� 1 9567" -II ARCH PIPE'w4 j, �-A RET 1' '. �q Al �/ CULVERT \ ---WOODS 'Y1 - STA 40+18,35= �q`< \ HIGHLAND LAKE INC. / -Y2� POT 5%gjO- '.00AO ©° F DB 999 PG 99 -Y2- PC SIoJl+5692 DEXTER THWPSON DB 492 PG 609 F DB 479 PG 188 -Y2- POT SfoJO+18 SO�— IS FD \ \\ -Y2- PC StoJO+32.68 L�' - \ \\ \ wD QUMO ARTER ON. LLC EXCAVATION ® IN WETLANDS DB 1156 PG 599 \\ \ \. \\\\\� TEMP. IMPACTS IN . 2S F BUS FILL IN WETLANDS SURFACE WATER \ y� IMPACTS IN PERMANENT WATERS \I� —J -Y2- PT StoJ2+9968 N TRUSTEE$$ OF TS TEMPORARY IMPACTS IN SURFACE WATERS END COIySTRUCTION THE LOAD FAMILY TRUST 1 I M -Y2- 510.1/+175DB 1273 PG 773 S` 1 Fnq� I 8' PVC INV=2113.35' ®MECHANIZED CLEARING 6 1 GR 1 G \ DBA PG 238 i ' �� L N" ST IS FD 1 %lilt\ I INV=2118.45' -Y2- POT S/oJ3+4732 EA 1 1 \ \ \ V=2123.68' A�A TERRY JACKSON icR� A DB 757 PG 369 1 \ 1 1 \ is F'dom. •• AMun A ����� i, m vor SHEET NO. ME MENNEN so 0 MENEM so MENNEN so MENNEN so MENNEN so MENNEN so MENNEN so MENNEN so MENNEN he PROJECT REFERENCE NO. SHEET NO. U-5887 6B PERMIT DRAWING DES SHEET NO. ROADWAY DESIGN HYDRAULICS / SHEET 6 OF 10 ENGINEER ENGINEER �z DO NOT USE FOR f W ACQUISITION Sta. = 33 + 28-34 + 03 Q=22.932 cfs r �) V=2.6788 fps rd=1.621.628 DETAIL s=0.0044 ftft /ls N 3 r 1( STANDARD BASED CH Q `�� n = 0.035 N Liner=Vegetative DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 1' r\'BIB Min. D Ff. D CIDB FL" : T. STDOE 3 CV POND 2°a FROM — . 33+28 LT. TO —L STA. Y `ss0 061 2' BASE ITCH ' SEE DETA 3 �{, 4/ ) EV. 2111.19' A- ST * 27+43.7 29.4 LT. �l e e NAIL SET IBASE OF 15" POPLAR s CL B R RAP —'i W p1xIN0 '� E 14 SY EST $ � IMPACTS IN SURFACE WATER ' A rerz VILLAGE OF K oil (95 x 67 ARCH PIPE CULVERT) 1538 PG —WHIyG PATH MECHANIZED CLEARING IN WETLANDS IT o A < S 93 �� PERMIT O tN �� SITE #4 \ C) I rnz D FILL IN 2w \ \ SOFIBE WETLANDS F co SQ1� FILL IN WETLANDS ° KER Y P. LI DB PG 564 DEI 823 PG e \ 6 0 S i HIGHLAND L E INC. L DB 9" PG D rP B F � BRANCH s 'ms ® EXCAVATION IN WETLANDS E � a II� FILL IN WETLANDS � ® IMPACTS IN PERMANENT WATERS �' b � - PT StoJ2+99.68 TS TEMPORARY IMPACTS IN SURFACE WATERS F" TRUST ,Q z�2 e"0'2 ` 1 Vol m 8'PVC INV=2113.35' MECHANIZED CLEARING ST FD �' INV=2118.45' -Y2- POT StoJ3+47J2 \ r TERRY JACKSON IGRI x� DB 757 PG 369 1 ��