Loading...
HomeMy WebLinkAboutWQ0041628_Application (FTSE)_20200413State of North Carolina DWR Department of Environmental Quality Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources FTA 04-16 & SUPPORTING DOCUMENTATION Application Number: (to be completed by DWR) All items must be com leted or the anplication will be returned I. APPLICANT INFORMATION: 1. Applicant's name: Johnston County (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ P&r4p d Public Uti it Qealit nvrronmen�a� ❑ Federal ® StateVounty El Municipal El Other 3. Signature authority's name: Chandra Farmer per 15A NCAC 02T .0106 b APR i 12020 Title: Public Utilities Director 4. Applicant's mailing address: P.O. Box 2263 Raleigh Regional office City: Smithfield State: NC Zip: 27577 5. Applicant's contact information: Phone number: (919) 98975075 Email Address: chandra.farmer@iohnstonnc.com II. PROJECT INFORMATION: I. Project name: Johnston County - Buffalo Creels WWPS Upgrade and Force Main - Phase II 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: WQ00.._ and issued date: If new construction but part of a master plan, provide the existing permit number: WQ00 3. County where project is located: Johnston 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.518516 = Longitude:-78.344539' 5. Parcel ID (if applicable): 15009005A (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: I . Professional Engineer: M. Blaine Humphrey License Number: 22987 Firm: Rivers and Associates. Inc. Mailing address: P.O. Box 929 City: Greenville State: North Carolina Zip: 27835- Phone number: 252 7524135 Email Address: bhumphrey.(@riversandassociates.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: Central Johnston County Regional Wastewater Facilities Permit Number: NCO030716 Owner Name: Johnston County V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): I. Permit Number(s): WO_ Downstream (Receiving) Sewer Size: SEE NARRATIVE inch System Wide Collection System Permit Number(s) (if apPlicabWQCS. Owner Name(s): FORM: FTA04-16 Page 1 of VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes [:]No ®N: A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Upern tional Acreement A RM: DF.V) been attached? ❑ Yes ❑No ERN -A 3. If the Applicant is a Home Property Owners' Association, has an -Operational Agreement (FORM: HOA) been attached? ❑ Yes ❑No ®N.-A 4. Origin of wastewater: (check all that apply): ® Residential Owned ® Retail (stores, centers, malls) ® Car Wash ® Residential Leased ® Retail with food preparation/service ® Hotel and/or Motels ® School r preschool i day care ® Medical 1 dental / veterinary facilities ® Swimming Pool 'Clubhouse ® Food and drink facilities ® Church ® Swimming Pool/Filter Backwash ® Businesses/ offices.' factories ® Nursing Home ❑ Other (Explain in Attachment) 5. Nature of wastewater: 62 % Domestic. -Commercial 3 % Commercial 35 % Industrial See 15A NCAC Q?T .0103120)1 ' 1Is there a Pretreatment Program in effect? ® Yes ❑ No 6. Has a flow reduction been approved under 15A NCAC 02T .01 14 ? ❑ Yes ❑ No ➢ If yes, Provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see 011.01141i11 Daily Design Flow a.b No. of Units Flow NIA gall 0 GPD gall GPD gall GPD gall GAD gal/ GPD gal/ GPD Total GPD a See I5A NCAC 02T .0114(b), (d), (e)(1) ana 2 for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0I 14(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01141 shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 0 GPD (per 15A NCAC 02T .0114 ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ® Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ® Flow has already been allocated in Permit Number: Numerous Permits Related to Upstream Flow ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: FTA 04-16 Page 2 of VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers); 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 36 1140 PVC 12 5 PVC ➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VII1. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T ,0305 & MDC(Pump Stations/Force Mains: COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT I. Pump station number or name: Various Pump Stations -See Narrative 2. Approximate Coordinates (Decimal Degrees): Latitude: ,` Longitude: 3. Design flow of the pump station: millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): gallons per minute at feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 4 30 PVC 10 200 PVC 12 137 PVC 16 1560 PVC 6. Power reliability in accordance with 15A NCAC 02T ,0305(hX1): ❑ Standby power source or pump with automatic activation and telemetry - I5A NCAC 02T .0305(h)(1)(B); ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(I)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 IX. SETBACKS & SEPARATIONS -- (02B .0200 & 15A NCAC 02T .0305(f)): 1. Does the project comply with all separations found in 15A NCAC 02T .{1305(f) & f e) ➢ 15A NCAC 02T.0305ft) contains minimum separations that shall he nrnvided for cower cvgi-mc• ® Yes ❑ No Setback Parameter* Separation Required Storm sewers and other utilities not listed below vertical 24 inches Water mains vertical -water over sewer including in benched trenches 18 inches Water mains horizontal 10 feet Reclaimed water lines vertical - reclaimed over sewer 18 inches Reclaimed water lines horizontal - reclaimed over sewer 2 feet **Any private or public water supply source, including any wells, WS-1 waters of Class I or Class II impounded reservoirs used as a source of drinking water 100 feet **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water or tide elevation and wetlands see item IX.2 50 feet **Any other stream, Iake, impoundment, or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet Any basement 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage s stems and interceptor drains 5 feet Any swimming ools 10 feet Final earth grade vertical 36 inches ➢ 15A NCAC 02T.0305(e) contains alternatives where separations in 02T.0305(fl cannot be achieved. ➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications weboaae ➢ If noncompliance with 02T.0305(f) or (g), see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ®Yes ❑ No ❑ N'A ➢ See the Division's draft separation requirements for situations where separation cannot be meet No variance is required if the alternative design criteria specified is utilized in design and construction ➢ As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per I SA NCAC 0213.0200? ® Yes ❑ No [:]NA ➢ This would include Trout Buffered Streams per 15A NCAC 213.0202 4. Does the project require covemge;'authorization under a 404 Nationwide or ❑ Yes ® No individual permits or 40I Water Quality Certifications? ➢ Information can be obtained from the 401 & Buffer Permitting Branch 5. Does project comply with 1.5A NCAC 02-i--0105(c](6) (additional permitslcertiftcations)? ® Yes ❑ No Per 15A NCAC 02T.0105(c)t6), directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ❑ Yes ® No ❑ N.-'A ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location) High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 X. CERTIFICATIONS: I. Does the submitted system comply with 15A NCAC 02T, the Minimum Desian Criteria for the Permitting of Pume Stations and Force Mains (latest vL�rsion), and the Gravitv Sewer Minimum Design Criterig {latest version as applicable? ® Yes ❑ No If No, complete and submit the Variance.'Alternative Design Request application (VADC 10-14) and supporting documents for review. Anyroval of the request is re uired Prior to submittal of the Fast Track A lication and supporting documents. 2. ProfessionaI Engineer's Certification: I, M - �nl U M>pl}t1:1 _ _attest that this application for (Professional Engineer's name from Application Item III.1.) has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE - In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. �4641zs1 ......... ....`... -terr . . North Carolina Professional Engineer's seal, signature, and date: i ��,� °°..�• ��� .� g Ft~S3 •° .r �e .r d� • ..GINS.,: N HU�Q y;}%� 1101)1111110%% 3. Applicant's Certification per 15A NCAC 02T .0106(b): I, Y attest that this application for (Signature Authority's name & title from Application Item I.3.) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. t Signature: Date FORM: FTA 04-16 Page 5 of 5 State of North Carolina 'DWR Department of Environmental Quality Division of Water Resources 15A NCAC 02T ,0300 - FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION This application is for sewer extensions involving gravity sewers, pump stations and force mains, or any combination that has been certified by a professional engineer and the applicant that the project meets the requirements of 15A NCAC 02T and the Division's Minimum Design Criteria and that plans, specifications and supporting documents have been prepared in accordance with, 15A NCAC 02L 15A NCAC 02T .0300, Division voliciLs and good engineering ractices. While no upfront engineering design documents are required for submittal, in accordance with 15A NCAC 02T .0305(b), design documents must be prepared prior to submittal of a fast track permit application to the Division. This would include plans, design calculations, and project specifications referenced in 15A NCAC 02T .0305 and the applicable minimum design criteria. These documents shall be available upon request by the Division. Projects that are deemed permitted (do not require a permit from the Division) are explained in I5A NCAC 02T.0303 Projects not eligible for review via the fast track process (must be submitted for full technical review): ➢ Projects that require an environmental assessment in accordance with 15A NCAC 1C .0100; ➢ Projects that do not meet any part of the minimum design criteria (MDC) document; ➢ Projects that involve a variance from the requirements of I5A NCAC 2T; ➢ Pressure sewer systems utilizing septic tank -effluent pumps (STEPs) or simplex grinder pumps; ➢ STEP or simplex grinder pumps connecting to pressurized systems (e.g. force mains); ➢ Vacuum sewer systems. General - When submitting an application, please use the following instructions as a checklist in order to ensure all required items are submitted. Adherence to these instructions and checking the provided boxes will help produce a quicker review time and reduce the amount of requested additional information. Failure to submit all required items will necessitate additional processing and review time, and may result in return of the application. Unless otherwise noted, the Applicant shall submit one original and one copy of the application and supporting documentation. A. One Original and One Copy of Application and Supporting Documents ® Required unless otherwise noted B. Cover Letter (Required for All Application Packages): ® List all items included in the application package, as well as a brief description of the requested permitting action. ➢ Be specific as to the system type, number of homes served, flow allocation required, etc. ➢ If necessary for clarity, include attachments to the application form. C. Application Fee (All New and Major Modification Application Packages): ® Submit a check or money order in the amount of $480.00 dated within 90 days of application submittal. ➢ Payable to North Carolina Department of Environmental Quality (NCDEQ) D. Fast Track (Form: FTA 04-16) Application (Required for All Application Packages): ® Submit the completed and appropriately executed application. ➢ If necessary for clarity or due to space restrictions, attachments to the application may be made. ❑ If the Applicant Type in Item 1.2 is a corporation or company, provide documentation it is registered for business with the North Carolina Secretaryof State. ❑ If the Applicant Type in Item 1.2 is a partnership or dlb/a, enclose a copy of the certificate filed with the Register of Deeds in the county of business. ❑ The Project Name in Item IL 1 shall be consistent with the project name on the flow acceptance letters, agreements, etc. ❑ The Professional Engineer's Certification on Page 5 of the application shall be signed, sealed and dated by a North Carolina licensed Professional Engineer. ❑ The Applicant's Certification on Page 5 of the application shall be signed in accordance with 15A NCAC 02T .0106M). Per 15A NCAC 02T .0106(c), an alternate person may be designated as the signing official if a delegation letter is provided from a person who meets the criteria in 15A NCAC 02T .0106(b). INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION Page] of 3 E. Flow Tracking/Acceptance Form (Form: FTSE 04-I6) (If Applicable): ❑ Submit the completed and executed FTSE form from the owners of the downstream sewers and treatment facility. ➢ MuItiple forms maybe required where the downstream sewer owner and wastewater treatment facility are different. D The flow acceptance indicated in form FTSE must not expire prior to permit issuance and must be dated less than one year prior to the application date. D Submittal of this application and form FTSE indicates that owner has adequate capacity and will not violate G.S. I43- 215.67(a). D Intergovernmental agreements or other contracts will not be accepted in lieu of a project -specific FTSE. F. Site Maps (All Application Packages): ® Submit an 8.5-inch x I 1-inch color copy of a USGS Topographic Map of sufficient scale to identify the entire project area and closest surface waters. ➢ Location of the project (gravity sewer, pump stations & force main) D Downstream connection points and permit number (if known) for the receiving sewer ® Include a street level map (aerial) showing general project area so that Division staff can easily locate it in the field. G. Existing Permit (All Modification Packages): ❑ Submit the most recently issued existing permit. ❑ Provide a list of any items within the permit the Applicant would like the Division to address during the permit modification (i.e., permit description, flow allocation, treatment facility, etc.). H. Power Reliability Plan (Required if portable reliability option utilized for Pump Station): ❑ Per 15A NCAC 02T .0305(h)(1). submit documentation of power reliability for pumping stations. ➢ This alternative is only available for average daily flows less than 15,000 gallons per day ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant and is compatible with the station. The Division will accept a letter signed by the applicant (see 1 SA NCAC 02T .0106(b)) or proposed contractor, stating that "the portable power generation unit or portable, independently -powered pumping units, associated appurtenances and personnel are available for distribution and operation of this pump station." ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. (Required at time of certification) I. Certificate of Public Convenience and Necessity (All Application Packages for Privately -Owned Public Utilities): ❑ Per 15A NCAC 02T_0115(a)(1) provide the Certificate of Public Convenience and Necessity from the North Carolina Utilities Commission demonstrating the Applicant is authorized to hold the utility franchise for the area to be served by the sewer extension, or ❑ Provide a letter from the North Carolina Utilities Commission's Water and Sewer Division Public Staff stating an application for a franchise has been received and that the service area is contiguous to an existing franchised area or that franchise approval is expected. J. Operational Agreements (Applications from HOA/POA and Developers for lots to be sold): ❑ Home/Property Owners' Associations ❑ Per I SA NCAC 02T .0115(c), submit the properly executed Operational Agreement (FORM: HOA). ❑ Per 15A NCAC 02T .0115(c), submit a copy of the Articles of Incorporation, Declarations and By-laws. ❑ Developers of lots to be sold ❑ Per 15A NCAC 02T .0115(b), submit the properly executed O erationaI Agreement FORM: DEV . For more information, visit the Division's collection systems ivebsite INSTRUCTIONS FOR 1'0RM: FTA 04-16 & SUPPORTING DOCUMENTATION Page 2 of 3 THE COMPLETED APPLICATION PACKAGE INCLDING ALL SUPPORTING INFORMATION AND MATERIALS, SHOULD BE SENT TO THE APPROPRIATE REGIONAL OFFICE: REGIONAL OFFICE ADDRESS COUNTIES SERVED Asheville Regional Office 2090 US Highway 70 Avery, Buncombe, Burke, Caldwell, Cherokee, Water Quality Section Swannanoa, North Carolina 28778 Clay, Graham, Haywood, Henderson, Jackson, (828) 296-4500 Macon, Madison, McDowell, Mitchell, Polk, (828) 299-7043 Fax Rutherford, Swain, Transylvania, Yancey Fayetteville Regional Office 225 Green Street Suite 714 Anson, Bladen, Cumberland, Harnett, Hoke, Water Quality Section Fayetteville, North Carolina 28301-5094 Montgomery, Moore, Robeson, Richmond, (910) 433-3300 Sampson, Scotland (910) 486-0707 Fax Mooresville Regional Office 610 E. Center Avenue Alexander, Cabarrus, Catawba, Cleveland, Water Quality Section Mooresville, North Carolina 28115 Gaston, Iredell, Lincoln, Mecklenburg, Rowan, (704) 663-1699 Stanly, Union (704) 663-6040 Fax Raleigh Regional Office Water Quality Section Washington Regional Office Water Quality Section 1628 Mail Service Center Raleigh, North Carolina 27699-1628 (919) 791-4200 (919) 788-7159 Fax 943 Washington Square Mail Washington, North Carolina 27889 (252) 946-6481 (252) 975-3716 Fax Chatham, Durham, Edgecombe, Franklin, Granville, Halifax, Johnston, Lee, Nash, Northampton, Orange, Person, Vance, Wake, Warren, Wilson Beaufort, Bertie, Camden, Chowan, Craven, Currituck, Dare, Gates, Greene, Hertford, Hyde, Jones, Lenoir, Martin, Pamlico, Pasquotank, Perquimans, Pitt, Tyrrell, Washington, Wayne Wilmington Regional Office 127 Cardinal Drive Extension Brunswick, Carteret, Columbus, Duplin, New Water Quality Section Wilmington, North Carolina 28405 Hanover, Onslow, Pender (910) 796-7215 (910) 350-2004 Fax Winston-Salem Regional Office 450 W. Hanes Mill Road Alamance, Allegheny, Ashe, Caswell, Davidson, Water Quality Section Suite 300 Davie, Forsyth, Guilford, Rockingham, Randolph, Winston-Salem, North Carolina 27105 Stokes, Surry, Watauga, Wilkes, Yadkin (336) 776-9800 INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION Page 3 of 3 11 44-4 Pti�� � ENOINEEAS PLANNERS 3 ASSOCIATES, INC. MEMORANDUM TO: DWR - Raleigh Regional Office CC: Kim Rineer, P.F.., Johnston County Blaine Humphrey, P..E., Rivers and Associates FROM: Kevin Cooper, E.I. DATE: April, 9rh 2020 Revised: May, 15" 2020 SUBJECT: Fast -Track Application Narrative Johnston County Buffalo WWPS and FM File 2017068 D SURVEYORS LANDSCAPE ARCHITECTS The purpose of this memorandum is to provide a narrative of Johnston County's proposed Buffalo WWPS and FM Upgrade project to accompany the projects Fast -Track Applications. To allow for better clarity and a more streamlined application process, the County has opted to divide the 1°ast--Track application into two Phases. Phase I refers to the improvements to the currently existing WWPS and FM at the Buffalo W1VPS near Smithfield. Phase Il refers to the various F,vI tie-ins and gravity sewer located near Reedy Branch and the Johnston County Airport. The general Phase I improvements to be permitted include approximately 3305 LF of 16" PVC FM, 875 LF of Fusible PVC FM, 300 LF of 16" DIP FM, and an increase in the pump station cornpacity to 4800 GPM. These improvements are mainly rehabilitative in nature and no new flow is expected nor needed to be permitted at the time of the project. Phase I was previously permitted in October of 2018 and the previously approved permit is included in this application. The general Phase fI improvements to be permitted include approximately 1 136 U, of 36" PVC gravity sewer, 5 LF of 12" PVC gravity sewer, 30 LF of 4" PVC FM, 200 LF of I0" PVC FM, 1507 LF of 12" PVC FM, and 165 1,F of 16" PVC FM. These new lines are being constructed to prepare for a pump station and Wastewater Treatment Plant which will be built in a future project. No pump station capacity upgrades are being requested in Phase II, nor are any existing force mains being abandoned. These proposed lines shall remain dry until the future pump station and NVWTP are built. When the lines are eventually put into service, there is no new flow expected from the various pump stations only a redirection of existing flow to the new proposed pump station_ Both Phase I and Phase Il will help to improve the Johnston County Sanitary Sewer System by rehabilitating current FMs and preparing the county for future improvements that will be needed based on projected population growth. 107 E. Second Street, Greenville, NC 27658 • PO Box 929, Greenville, NC 27835 • Phorte: 252-752-4135 ■ Fax: 252-752-3974 NCBELS Lic. No. F-0334 wvm,rive rsandassociates.com NCBOLA Lic, No. C-312 , I m F �m : a O T A r fl 1- IL 3 f I i H W-si` / . 0p1ty:s FORCEMAIN PROFILE �i7 WILTON PLACE/ HOLLY CREEK APARTMENTS µ- FOR WILTON PLACE LP . car. e. ewrrauoo. aurc�w<<r nr�r awamvnar co Nawr.. e.•a�+. O rm -1N . 11 r: I 41. F. nN Sr GRAVTY SD','FR PROPILES 0 PVv&g c .16 WILTON PLACEI HOLLY CREEK APARTMENTS 5 oR FOR WILTON PLACE, LP A -Po rl".1111.1111 a-1111c, �A­ , - to dov� - MUSGS$-D"MTMWOrlMxwff R —FOW"TMQuAb"w.Lr us Op US Top YFJiN r 1Y 4 4 Y —7' qE� r � sm L IL V-p 3) -7 L S. 7- - I q ..... . . . . . r W % 2. % A L u d r ri r n V =1110 ............... MPOYMATAK WC Robinson, Jason From: Robinson, Jason Sent: Monday, May 18, 2020 12:38 PM To: Kevin Cooper; Blaine Humphrey, Chandra Farmer Cc: Kim Rineer, Mike Keen; Cashion, Ted; Deck, Erin M Subject: RE: [External] Re: Sewer Extension - Buffalo Creek WWPS Upgrades Phase II Thanks Kevin, For historical purposes: After talking with Blaine & Kevin on the phone, it was explained that Phase II of this project was not upgrading any pump stations, nor abandoning any existing lines, and therefore will be issued as a new permit, and not modifications to existing permits. -Jason ------------ Jason T. Robinson, P.E. Raleigh Regional Office Water Quality Regional Operations NC Division of Water Resources, DEQ 919-791-4200 "Subscribe to Collection System & Sewer Permitting Updates" E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: Kevin Cooper [mailto:kcooper@riversandassociates,com] Sent: Friday, May 15, 20201:57 PM To: Blaine Humphrey<bhumphrey@rive rsandassociates.com>; Robinson, Jason <jason.t.robinson@ncdenr.gov>; Chandra Farmer <chandra.farmer@johnstonnc.com> Cc: Kim Rineer <kim.rineer@johnstonnc.com>; Mike Keen <mike.keen@johnstonnc.com>; Cashion, Ted <ted.cashion @ncdenr.gov>; Deck, Erin M <erin.deck@ncdenr.gov> Subject: [External] Re: Sewer Extension - Buffalo Creek WWPS Upgrades Phase II • External emaH:. Do not, 4114c:llgits oe open attachments unless you verify. Send atl°sfispialous email: as an at#aohmeotcto [rl�,sfiern�nc.sov _ _ Jason, Attached is the updated Narrative for the Buffalo WWPS and FM project fast track application. The edits are in regards to the general Phase II improvements. Please let us know if this clarifies what we discussed. Would you like us to send you an original paper copy in the mail as well? Thank you, Kevin D. Cooper Design Engineer/ W: 252.752.4135 x251 Rivers & Associates Inc friversondas5ociates.com 144ftivelS %A:,:- al I.: From: Blaine Humphrey<bhumphrev@riversandassociates.com> Sent: Thursday, May 14, 2020 4:38 PM To: Robinson, Jason <1ason.t.robinson@ncdenr.eov>; Chandra Farmer <chandra.farmer@iohnstonnc.com> Cc: Kim Rineer <kim.rineer@iohnstonnc.com>; Mike Keen <mike.keen 'ohnstonnc.com>; Cashion, Ted <ted.cashion ncdenr. ov>; Deck, Erin M <erin.deck@ncdenr.eov>; Kevin Cooper <kcoo er riversandassociates.com> Subject: Re: Sewer Extension - Buffalo Creek WWPS Upgrades Phase 11 Jason, Please give me a call at the office to discuss. Thanks. Blaine M. Blaine Humphrey, P.E. Project Manager Rivers and Associates, Inc. 107 E. Second Street Greenville, NC 27834 (252)752-4135 Phone, ext. 226 (252)752-3974 Fax (252)341-2899 Cell website: www.riversandassociates.com friversandassociates.coml Celebrating 100 years of service! 1918-2018 "You're either part of the solution, or part of the problem." - Eldridge Cleaver From: Robinson, Jason <iason.t.robinson ncdenr. ov> Sent: Thursday, May 14, 2020 4:30 PM To: Chandra Farmer<chandra.farmer@iohnstonnc.com>; Blaine Humphrey<bhumphrey.@riversandassociates.com> Cc: Kim Rineer <kim.rineer iohnstonnc.com>; Mike Keen < mike. keen iohnstonnc.com>; Cashion, Ted <ted.cashion ncdenr. ov>; Deck, Erin M <erin.deck@ncdenr.gov> Subject: Sewer Extension - Buffalo Creek WWPS Upgrades Phase 11 HI Blaine & Chandra, We've just started reviewing the referenced sewer extension application. The application says this is a proposed (new permit) application (Item 11.2). However, the narrative states that it's primarily a modification to existing permits from various pump stations throughout Johnston County. We certainly don't want to make this complicated, but I'm afraid it might be (or maybe I'm misunderstanding). If this is a modification to other permits, and lines in those permits are being abandoned because of these new lines that will be going in (or existing lines will be extended), then those permits need to be modified to remove the lines that will be abandoned. Please let me know if that's the case, and we'll go from there. -Jason ------------ Jason T. Robinson, P.E. Raleigh Regional Office Water Quality Regional Operations NC Division of Water Resources, DEQ 919-791-4200 "Subscribe to Collection System & Sewer Permitting Updates" E-mail correspondence to and from this address may be subject to the North Carolino Public Records Low and may be disclosed to third parties. Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time.