HomeMy WebLinkAbout20090049 Ver 1_Repair As-Built Memo_2020_20200520ID#* 20090049 Version* 1 Select Reviewer:* Mac Haupt Initial Review Completed Date 05/20/2020 Mitigation Project Submittal - 5/20/2020 Is this a Prospectus, Technical Proposal or a New Site?* r Yes r No Type of Mitigation Project:* V Stream Pr Wetlands r- Buffer r` Nutrient Offset (Select all that apply) Project Contact Information Contact Name:* Paul Wiesner Project Information .................................................................................................................................................................. ID#:* 20090049 Existing IDY Project Type: r DMS r Mitigation Bank Project Name: Glade Creek II County: Alleghany Document Information Email Address:* paul.Wesner@ncdenr.gov Version: *1 Existing Version Mitigation Document Type:* Mitigation Information File Upload: Glade Cr. II_92343_Repair As -Built Memo_2020.pdf 1.15MB Rease upload only one RDFcf the conplete file that needs to be subnitted... Signature Print Name:* Paul Wiesner Signature:* �X/ I �;" -;-I 1 Glade Creek II Stream Restoration Repairs  Page 1  As‐Built Memorandum    As‐Built Memorandum  Prepared for: North Carolina Division of Mitigation Services (NC DMS)  Project Title: Glade Creek II Restoration Project Repairs  Project No: DMS No. 92343  Wildlands No. W02188   Date: May 8, 2020    The Glade Creek II Restoration Project was constructed in 2015.  During the 2019 IRT post‐construction field  review of the site, several areas were determined in need of repair.  These areas included:  1. Wetland B: outlet headcut (approximate Glade Creek as‐built stream station 22+75) and poor woody  stem growth (0.74 acres)  2. Undercut brush mattress (approximate Glade Creek as‐built stream station 22+95 to 23+50)  3. Left bank hillslope erosion (approximate Glade Creek as‐built stream 24+25 to 24+75)  Wildlands Engineering, Inc. (Wildlands) submitted a repair plan for the above areas to NC DMS on April 7, 2020  and received plan approval on April 14, 2020.  Wildlands Construction mobilized to the site on April 15, 2020 and  demobilized on April 17, 2020.  Wildlands installed live stakes on April 22, 2020 and Bruton Natural Systems, Inc.  planted tublings, containers, and bare root species on April 25, 2020.    Changes made to the construction plans are detailed on the attached As‐Built plan set.  Planted woody species  deviated from the plan based on nursery availability.  Installed species by area and quantity are detailed below.    Riparian Area  Scientific Name Common Name Type Quantity  Nyssa sylvatica Black gum Bare Root 10  Diospyros virginiana Persimmon Bare Root 30  Hamamelis virginiana Witch hazel Bare Root 25  Acer rubrum Red maple Bare Root 40  Betula nigra River birch Bare Root 40  Platanus occidentalis Sycamore Bare Root 40  Container 5  Salix nigra Black willow Bare Root 15  Live stake 60‐80  Liriodendron tulipifera Yellow poplar Container 5  Fraxinus pennsylvanica Green ash Container 5  Sambucus canadensis Elderberry Container 5  Cornus amomum Silky dogwood Container 5  Wetland Area  Scientific Name Common Name Type Quantity  Viburnum nudum Possumhaw viburnum Tubling 76  Alnus serrulata Tag Alder Tubling 76  Cephalanthus occidentalis Buttonbush Tubling 76  Cornus amomum Silky dogwood Tubling 77  Sambucus canadensis Elderberry Tubling 45  Glade Creek II Stream Restoration Repairs  Page 2  As‐Built Memorandum     Brush toe geolift repair, left bank looking downstream Brush toe geolift repair area from right bank, looking  downstream      Wetland B outlet steps Point bar grading and hillslope repair     Wetland B planting Construction access route stabilization    Glade Creek II Stream Restoration Repairs  Page 3  As‐Built Memorandum  Appendix A:    As‐Built Plan Sheets  SheetChecked By:Job Number:Drawn By:Project Engineer:Date:Revisions:1430 South Mint Street, Suite 104Charlotte, NC 28203Tel: 704.332.7754License No. F-08310'40' 80' 120'(HORIZONTAL)NX:\Shared\Projects\W02188_Glade_Repair\Cadd\Reference\02188-Design.dwgApril 7, 2020Planting ListScientific NameCommon NameSpecies TypeAcer rubrum*Red MapleTreeAlnus serrulataTag AlderShrub TreeCarpinus carolinianaAmerican Hornbeam Shrub TreeCercis canadensisEastern Redbud Shrub TreeCornus amomumSilky DogwoodShrub TreeDiospyros virginianaAmerican PersimmonTreeFraxinus pennsylvanica*Green AshTreeHamamelis virginianaWitch-hazel Shrub TreeLirodendron tulipiferaTulip PoplarTreeNyssa sylvaticaBlack GumTreePhysocarpus opulifoliusNine Bark Shrub TreePlatanus occidentalisSycamoreTreeQuercus rubraRed OakTreeSalixWillowTreeSambucus canadensisCommon ElderberryShrub Tree*No more than 5% of plantingPlanting shall be a mix of bare root and up to 25 container plants within the limits of disturbance.Supplemental plants in the wetland area shall be bare roots.W02188JCKCDBEGR1April 8, 200Glade Creek II RepairAlleghany County, North CarolinaDetailsNote:Permanent Riparian seeding inall disturbed areas withinConservation EasementBuffer Planting ZoneSpeciesCommon Name StratumDensity (lbs/acre)Panicum rigidulumRedtop PanicgrassHerb1Chasmanthium latifoliumRiver Oats Herb1Elymus virginianaVirginia Wild RyeHerb 3Dichanthelium clandestinumDeertongueHerb 3Sorghastrum nutansIndiangrassHerb 3Schizachyrium scopariumLittle Bluestem Herb2Panicum virgatumSwitchgrassHerb1Rudbeckia hirtaBlackeyed SusanHerb1Bidens aristosaShowy TickseedSunflower Herb1Helianthus angustifoliusNarrowleaf Sunflower Herb 0.6Coreopsis lanceolataLanceleaf CoreopsisHerb1Chamaecrista fasciculataPartridge PeaHerb1Heliopsis helianthoides var.helianthoidesOxeye SunflowerHerb1Juncus tenuisPath Rush Herb 0.4Approved DateTypePlanting Rate(lbs/acre)Jan 1 - May 1Rye Grain (Secale cereale)120Ground AgriculturalLimestone200010-10-10 Fertilizer750Straw Mulch4000May 1 - Aug 15German Millet (Setariaitalica)40Ground AgriculturalLimestone200010-10-10 Fertilizer750Straw Mulch4000Aug 15 - Dec 30Rye Grain (Secale cereale)120Ground AgriculturalLimestone200010-10-10 Fertilizer1000Straw Mulch4000OUOUOUOUOUOUOUOUOUUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOUEOACCESS ROADSUPPLEMENTAL PLANTINGIN WETLAND AREA.SEE LIST THIS SHEETTIMBER LARGE TREES ON HILL SLOPE.TERRACE HILLSIDE SLOPE FAILURE.SEE DETAIL 2, SHEET 2REPLACE BRUSH MATTRESSWITH BRUSH TOE TOPPEDWITH VEGETATED GEOLIFTSEE DETAIL 3, SHEET 2REPAIR ROCK SILLS.SEE DETAIL 4, SHEET 2GRADE POINT BAR AT 5:1TRIM OVERHANGING VEGETATION.USE VEGETATION IN BRUSH TOE REPAIR.FILL AREA BEHINDLOG VANEINSTALL CONSTRUCTION ENTRANCESEE DETAIL 1, SHEET 2Tree removedScour hole in bankbackfilled withstoneArea gradedreduced slightly toavoid vegetationplot 62 log sills replacedupper 2 rock sillsdue to materialavailabilitySee as-builtmemorandum forinstalled species listAs Built Redlines - 5/8/20 SheetChecked By:Job Number:Drawn By:Project Engineer:Date:Revisions:1430 South Mint Street, Suite 104Charlotte, NC 28203Tel: 704.332.7754License No. F-0831X:\Shared\Projects\W02188_Glade_Repair\Cadd\Reference\02188-Design.dwgApril 7, 2020W02188JCKCDBEGR2April 8, 200Glade Creek II RepairAlleghany County, North CarolinaDetailsNOTES:1. OVEREXCAVATE 3' OUTSIDE OF TOP OF BANK (BANKFULL).2. INSTALL BASE LOGS PERPENDICULAR TO FLOW ATINTERVALS ALONG BANK, RESTING ON TOP OF PARALLELBASE LOGS. BASE LOGS SHALL BE 4"-6” DIAMETER.3. INSTALL A DENSE LAYER OF BRUSH/WOODY DEBRIS,WHICH SHALL CONSIST OF SMALL BRANCHES AND ROOTSCOLLECTED ON-SITE AND SOIL TO FILL ANY VOID SPACE.LIGHTLY COMPACT BRUSH/WOODY DEBRIS LAYER.4. BRUSH SHOULD BE ALIGNED SO STEMS ARE ROUGHLYPARALLEL AND IS INSTALLED POINTING SLIGHTLYUPSTREAM.5. INSTALL FILTER FABRIC OVER BRUSH/WOODY DEBRIS.6. INSTALL A LAYER OF LIVE WHIPS ABOVE BRUSH.7. BOTTOM OF FIRST COMPACTED EARTH LIFT TO BE PLACED6" ABOVE NORMAL BASEFLOW.8. NUMBER OF COMPACTED EARTH LIFTS TO VARYDEPENDING ON DESIGN TOP OF BANK HEIGHT.9. SEED, MULCH AND INSTALL EROSION CONTROL MATTINGAND BANK STABILIZATION PER PLANS.Plan ViewTOP OF BANK (BANKFULL)Section A-A'BASE LOG4"-6" DIAMETERDENSELY PACKED BRUSH, WOODY DEBRIS AND SOILEROSION CONTROL MATTINGBACKFILL IN 12" LIFTS.WRAP MATTING AT EACH LIFTDENSELY PACK BRUSH, WOODY DEBRIS AND SOILIN BETWEEN BASE LOGSBASE LOGS PERPENDICULAR TO FLOWTOE OF SLOPE2' MIN5'BRUSH MATERIAL TO BEINSTALLED FLUSHWITH BANKFLOWAA'EROSION CONTROL MATTINGTOP OF BANK (TYP)TOE OF SLOPE (TYP)TOE OF SLOPE (TYP)TOP OF BANK (TYP)BASE LOGS PARALLEL TO FLOWBACKFILLNATIVE SOILELEV. 6" BELOWPOOL DEPTHELEV. 1' ABOVEDOWNSTREAMRIFFLE INVERTFILTER FABRICWIDTH PER TYPICAL SECTIONS6"Brush ToeNot to Scale3250'16'PUBLIC ROADCLASS A STONE8" MIN. DEPTHNOTES:1. PROVIDE TURNING RADIUS SUFFICIENT TOACCOMMODATE LARGE TRUCKS.5. LOCATE CONSTRUCTION ENTRANCE AT ALL POINTS OFINGRESS AND EGRESS UNTIL SITE IS STABILIZED.PROVIDE FREQUENT CHECKS OF THE DEVICE ANDTIMELY MAINTENANCE.6. MUST BE MAINTAINED IN A CONDITION WHICH WILLPREVENT TRACKING OR DIRECT FLOW OF MUD ONTOSTREETS. PERIODIC TOP DRESSING WITH STONE WILLBE NECESSARY.7. ANY MATERIAL TRACKED ONTO THE ROADWAY MUSTBE CLEANED IMMEDIATELY.8. USE CLASS A STONE OR OTHER COARSE AGGREGATEAPPROVED BY THE ENGINEER.9. PLACE FILTER FABRIC BENEATH STONE.12Construction EntranceNot to Scale22Terrace SlopeNot to ScalePROPOSED GRADETO BE TERRACED PERENGINEER'S DIRECTIONEXISTING GROUNDEXISTING WATER LINETIMBERED LOGS TOBE EMBEDDED AT EACHTERRACEFLOWTOE OF SLOPE (TYP)Plan ViewAA'BB'Profile A-A'EMBED 5'INTOBANK (TYP)Section B-B'SILL ELEVATIONPER PROFILETOP OF BANK (TYP)SILL ELEVATION PER PROFILETOP OF BANK5'FILTER FABRICEXTEND FILTERFABRIC 5' MIN.UPSTREAMCLASS 2 HEADER STONEFOOTER BOULDERCAN BE SUBSTITUTED WITH MIX OFBALLAST,No. 57, CLASS A/B/I MATERIALWITH ENGINEER'S APPROVALSection B-B'6" SALVAGED ONSITECOBBLE/GRAVELBED MATERIALENSURE BOULDERSOR ROCK BACKFILLTRAVELS UP BANK SLOPEA MINIMUM OF 1'1' MINMIXED STONE TOE OR BRUSH PACKIF DEEMED NECESSARY BY THE ENGINEERIN THE FIELDBANKS SHALL BE RAKED,SEEDED WITH A TEMPORARY MIXOF PEARL HEADED MILLET ANDFESCUE, AMENDED WITH FERTILIZERAND THAN MATTED OVER WITH700G EROSION CONTROL MATTING42Rock SillNot to ScaleRow of alder transplantsinstalled along top.As Built Redlines - 5/8/20