HomeMy WebLinkAbout20000145 Ver 1_Complete File_20050909QF W AT?9
.p? QG
U '<
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Alan W. Klimek, P.E. Director
Division of Water Quality
September 9, 2005
Brunswick County
DWQ No. 000145
Mr. Philip S. Harris, III, P.E., Manager
North Carolina Department of Transportation
Project Development & Environmental Analysis
Natural Environment Unit
1548 Mail Service Center
Raleigh, North Carolina 27699-1548
RE: Hood Creek Bridge Mitigation Site, Brunswick County, TIP No. B-2513
Dear Mr. Harris:
This correspondence is in reference to your letter dated August 10, 2004, regarding the Hood Creek Bridge
Mitigation site located in Brunswick County, North Carolina. This site is being utilized by the North Carolina
Department of Transportation as compensatory mitigation for wetland impacts associated with project B-2513.
By copy of this letter, we are notifying you that no further monitoring of the site will be required since the
construction and success criteria for the mitigation site has been met.
Thank you for your time and cooperation. If you have any questions, please contact Brian Wrenn at
919-733-5715.
Si ly,
Alan W. Klimek, P.E.
JEH/njt
cc: Wilmington District, US Army Corps of Engineers
Mr. Dave Timpy, US Army Corps of Engineers, Wilmington Field Office
Mr. Gary Jordan, USFWS
Mr. Chris Militscher, USEPA
Mr. Travis Wilson, WRC
Mr. Ken Averitte, NCDWQ Fayetteville Regional Office
Mr. H. Allen Pope, P.E., Division 3 Engineer, 124 Division Dr., Wilmington, NC 28401
Mr. Mason Herndon, Division 3 Environmental Officer, 124 Division Dr., Wilmington, NC 28401
Central Files
File Copy
ne Carolina
?tura!!r?
Transportation Permitting Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone: 919-733-1786 / FAX 919-733-6893 / Internet: htti):Hh2o enr state.nc.us/ncwetlands
An Equal Opportunity/Affirmative Action Employer-500/6 Recycled/100/6 Post Consumer Paper
of
µ SfAlg o
r.a
STATE OF NORTH CAROLINA
DEPARZNENT OF TRANSPORTATION
MICHAEL F. EASLEY
GOVERNOR
Mr. Doug Huggett
NC Division of Coastal Management
Parker Lincoln Building
2728 Capital Boulevard
Raleigh, NC 27604
August 1.0, 2004
IANQS140
lN?r
AEG , GROr?p
W14 2004
?16RQIJAC/ryseCr/®A1
LYNDO TIPPETT
SECRETARY
Re: Hood Creek Bridge Mitigation Site, Brunswick County, State Project No.
8.2231501, TIP No.13-2513, USACE Action ID No. 200000872, DWQ Project No. 000145,
CAMA Project No. 116-00
Mr. Doug Huggett,
As you are aware, the Department has monitored the Hood Creek Bridge Mitigation Site since its
construction in March of 2002. Located in Brunswick County, this site is designed to provide
approximately 0.25 acres of mitigation restoration for wetland and streambank impacts
associated with project B-2513. Vegetative monitoring commenced in December of 2002.
NCDOT proposed to monitor the Hood Creek Bridge site for at least three years; only vegetation
monitoring was conducted each year. After each growing season, annual monitoring reports were
submitted to the appropriate regulatory agencies.
There were approximately 0.25 acres of streambank and wetland restoration proposed for the
site. During construction, NCDOT and USACOE personnel made adjustments in design, which
resulted in eliminating anticipated impacts. Therefore no monitoring was required.
During the annual monitoring report meeting on April 29, 2004, NCDOT and resource agencies
agreed that the Hood Creek Bridge Mitigation Site could be closed and that monitoring could be
discontinued. A site review was held on August 04, 2004 with representatives from NCDOT,
CAMA, USCOE, WRC, USFWS, and EPA. It was decided at this site review that the Hood
Creek Bridge Mitigation Site could be closed and monitoring discontinued. NCDOT requests
that the appropriate resource agencies provide documentation stating that no further monitoring
is required and that the site is closed. If you have any questions about this project, please contact
Mr. Randy Griffin at (919) 715-1425.
MAILING ADDRESS:
NC DEPARTMENT OF TRANSPORTATION
PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS
1598 MAIL SERVICE CENTER
RALEIGH NC 27699-1598
TELEPHONE: 919-715-1500 LOCATION:
FAX: 919-715-1501 PARKER LINCOLN BUILDING
2728 CAPITAL BOULEVARD
WEBSITE. WWW.NCDOT.ORG RALEIGH NC
Sincerely,
Philip S. arris, III, P.E., CPM
PDEA- Office of Natural Environment
cc: Mr. John Hennessy, NCDWQ
Ms. Nicole Thomson, NCDWQ
Mr. Dave Timpy, USACOE
Mr. Travis Wilson, WRC
Mr. Chris Militscher, EPA
Mr. Gary Jordan, USFWS
Mr. Bill Arrington, CAMA
Ms. Cathy Brittingham, CAMA
Mr. Tommy Douglas, NCDOT
Mr. Jason Elliot, NCDOT
Mr. Mason Herndon, NCDOT
r
?d +paup
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
MICHAEL F. EASLEY
GOVERNOR
August 10, 2004
Mr. Doug Huggett
NC Division of Coastal Management
Parker Lincoln Building
2728 Capital Boulevard
Raleigh, NC 27604
WETLANDS / 401 GROUP
AUG 12 2004
WATER QUALITY SECTION
LYNDO TIPPETT
SECRETARY
Re: Hood Creek Bridge Mitigation Site, Brunswick County, State Project No.
8.2231501, TIP No.13-2513, USACE Action ID No. 200000872, DWQ Project No. 000145,
CAMA Project No. 116-00
Mr. Doug Huggett,
As you are aware, the Department has monitored the Hood Creek Bridge Mitigation Site since its
construction in March of 2002. Located in Brunswick County, this site is designed to provide
approximately 0.25 acres of mitigation restoration for wetland and streambank impacts
associated with project B-2513. Vegetative monitoring commenced in December of 2002.
NCDOT proposed to monitor the Hood Creek Bridge site for at least three years; only vegetation
monitoring was conducted each year. After each growing season, annual monitoring reports were
submitted to the appropriate regulatory agencies.
There were approximately 0.25 acres of streambank and wetland restoration proposed for the
site. During construction, NCDOT and USACOE personnel made adjustments in design, which
resulted in eliminating anticipated impacts. Therefore no monitoring was required.
During the annual monitoring report meeting on April 29, 2004, NCDOT and resource agencies
agreed that the Hood Creek Bridge Mitigation Site could be closed and that monitoring could be
discontinued. A site review was held on August 04, 2004 with representatives from NCDOT,
CAMA, USCCE, WRC, USFWS, and EPA. It was decided at this site review that the Hood
Creek Bridge Mitigation Site could be closed and monitoring discontinued. NCDOT requests
that the appropriate resource agencies provide documentation stating that no further monitoring
is required and that the site is closed. If you have any questions about this project, please contact
Mr. Randy Griffin at (919) 715-1425.
MAILING ADDRESS:
NC DEPARTMENT OF TRANSPORTATION
PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS
1598 MAIL SERVICE CENTER
RALEIGH NC 27699-1598
TELEPHONE: 919-715-1500
FAX: 919-715-1501
WEBSITE: WWW.NCDOT.ORG
LOCATION:
PARKER LINCOLN BUILDING
2728 CAPITAL BOULEVARD
RALEIGH NC
r
Sincerely,
Philip S. 1 I, P.E., CPM
PDEA- Office of Natural Environment
cc: Mr. John Hennessy, NCDWQ
Ms. Nicole Thomson, NCDWQ
Mr. Dave Timpy, USACOE
Mr. Travis Wilson, WRC
Mr. Chris Militscher, EPA
Mr. Gary Jordan, USFWS
Mr. Bill Arrington, CAMA
Ms. Cathy Brittingham, CAMA
Mr. Tommy Douglas, NCDOT
Mr. Jason Elliot, NCDOT
Mr. Mason Herndon, NCDOT