Loading...
HomeMy WebLinkAbout20000145 Ver 1_Complete File_20050909QF W AT?9 .p? QG U '< Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality September 9, 2005 Brunswick County DWQ No. 000145 Mr. Philip S. Harris, III, P.E., Manager North Carolina Department of Transportation Project Development & Environmental Analysis Natural Environment Unit 1548 Mail Service Center Raleigh, North Carolina 27699-1548 RE: Hood Creek Bridge Mitigation Site, Brunswick County, TIP No. B-2513 Dear Mr. Harris: This correspondence is in reference to your letter dated August 10, 2004, regarding the Hood Creek Bridge Mitigation site located in Brunswick County, North Carolina. This site is being utilized by the North Carolina Department of Transportation as compensatory mitigation for wetland impacts associated with project B-2513. By copy of this letter, we are notifying you that no further monitoring of the site will be required since the construction and success criteria for the mitigation site has been met. Thank you for your time and cooperation. If you have any questions, please contact Brian Wrenn at 919-733-5715. Si ly, Alan W. Klimek, P.E. JEH/njt cc: Wilmington District, US Army Corps of Engineers Mr. Dave Timpy, US Army Corps of Engineers, Wilmington Field Office Mr. Gary Jordan, USFWS Mr. Chris Militscher, USEPA Mr. Travis Wilson, WRC Mr. Ken Averitte, NCDWQ Fayetteville Regional Office Mr. H. Allen Pope, P.E., Division 3 Engineer, 124 Division Dr., Wilmington, NC 28401 Mr. Mason Herndon, Division 3 Environmental Officer, 124 Division Dr., Wilmington, NC 28401 Central Files File Copy ne Carolina ?tura!!r? Transportation Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 / FAX 919-733-6893 / Internet: htti):Hh2o enr state.nc.us/ncwetlands An Equal Opportunity/Affirmative Action Employer-500/6 Recycled/100/6 Post Consumer Paper of µ SfAlg o r.a STATE OF NORTH CAROLINA DEPARZNENT OF TRANSPORTATION MICHAEL F. EASLEY GOVERNOR Mr. Doug Huggett NC Division of Coastal Management Parker Lincoln Building 2728 Capital Boulevard Raleigh, NC 27604 August 1.0, 2004 IANQS140 lN?r AEG , GROr?p W14 2004 ?16RQIJAC/ryseCr/®A1 LYNDO TIPPETT SECRETARY Re: Hood Creek Bridge Mitigation Site, Brunswick County, State Project No. 8.2231501, TIP No.13-2513, USACE Action ID No. 200000872, DWQ Project No. 000145, CAMA Project No. 116-00 Mr. Doug Huggett, As you are aware, the Department has monitored the Hood Creek Bridge Mitigation Site since its construction in March of 2002. Located in Brunswick County, this site is designed to provide approximately 0.25 acres of mitigation restoration for wetland and streambank impacts associated with project B-2513. Vegetative monitoring commenced in December of 2002. NCDOT proposed to monitor the Hood Creek Bridge site for at least three years; only vegetation monitoring was conducted each year. After each growing season, annual monitoring reports were submitted to the appropriate regulatory agencies. There were approximately 0.25 acres of streambank and wetland restoration proposed for the site. During construction, NCDOT and USACOE personnel made adjustments in design, which resulted in eliminating anticipated impacts. Therefore no monitoring was required. During the annual monitoring report meeting on April 29, 2004, NCDOT and resource agencies agreed that the Hood Creek Bridge Mitigation Site could be closed and that monitoring could be discontinued. A site review was held on August 04, 2004 with representatives from NCDOT, CAMA, USCOE, WRC, USFWS, and EPA. It was decided at this site review that the Hood Creek Bridge Mitigation Site could be closed and monitoring discontinued. NCDOT requests that the appropriate resource agencies provide documentation stating that no further monitoring is required and that the site is closed. If you have any questions about this project, please contact Mr. Randy Griffin at (919) 715-1425. MAILING ADDRESS: NC DEPARTMENT OF TRANSPORTATION PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS 1598 MAIL SERVICE CENTER RALEIGH NC 27699-1598 TELEPHONE: 919-715-1500 LOCATION: FAX: 919-715-1501 PARKER LINCOLN BUILDING 2728 CAPITAL BOULEVARD WEBSITE. WWW.NCDOT.ORG RALEIGH NC Sincerely, Philip S. arris, III, P.E., CPM PDEA- Office of Natural Environment cc: Mr. John Hennessy, NCDWQ Ms. Nicole Thomson, NCDWQ Mr. Dave Timpy, USACOE Mr. Travis Wilson, WRC Mr. Chris Militscher, EPA Mr. Gary Jordan, USFWS Mr. Bill Arrington, CAMA Ms. Cathy Brittingham, CAMA Mr. Tommy Douglas, NCDOT Mr. Jason Elliot, NCDOT Mr. Mason Herndon, NCDOT r ?d +paup STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY GOVERNOR August 10, 2004 Mr. Doug Huggett NC Division of Coastal Management Parker Lincoln Building 2728 Capital Boulevard Raleigh, NC 27604 WETLANDS / 401 GROUP AUG 12 2004 WATER QUALITY SECTION LYNDO TIPPETT SECRETARY Re: Hood Creek Bridge Mitigation Site, Brunswick County, State Project No. 8.2231501, TIP No.13-2513, USACE Action ID No. 200000872, DWQ Project No. 000145, CAMA Project No. 116-00 Mr. Doug Huggett, As you are aware, the Department has monitored the Hood Creek Bridge Mitigation Site since its construction in March of 2002. Located in Brunswick County, this site is designed to provide approximately 0.25 acres of mitigation restoration for wetland and streambank impacts associated with project B-2513. Vegetative monitoring commenced in December of 2002. NCDOT proposed to monitor the Hood Creek Bridge site for at least three years; only vegetation monitoring was conducted each year. After each growing season, annual monitoring reports were submitted to the appropriate regulatory agencies. There were approximately 0.25 acres of streambank and wetland restoration proposed for the site. During construction, NCDOT and USACOE personnel made adjustments in design, which resulted in eliminating anticipated impacts. Therefore no monitoring was required. During the annual monitoring report meeting on April 29, 2004, NCDOT and resource agencies agreed that the Hood Creek Bridge Mitigation Site could be closed and that monitoring could be discontinued. A site review was held on August 04, 2004 with representatives from NCDOT, CAMA, USCCE, WRC, USFWS, and EPA. It was decided at this site review that the Hood Creek Bridge Mitigation Site could be closed and monitoring discontinued. NCDOT requests that the appropriate resource agencies provide documentation stating that no further monitoring is required and that the site is closed. If you have any questions about this project, please contact Mr. Randy Griffin at (919) 715-1425. MAILING ADDRESS: NC DEPARTMENT OF TRANSPORTATION PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS 1598 MAIL SERVICE CENTER RALEIGH NC 27699-1598 TELEPHONE: 919-715-1500 FAX: 919-715-1501 WEBSITE: WWW.NCDOT.ORG LOCATION: PARKER LINCOLN BUILDING 2728 CAPITAL BOULEVARD RALEIGH NC r Sincerely, Philip S. 1 I, P.E., CPM PDEA- Office of Natural Environment cc: Mr. John Hennessy, NCDWQ Ms. Nicole Thomson, NCDWQ Mr. Dave Timpy, USACOE Mr. Travis Wilson, WRC Mr. Chris Militscher, EPA Mr. Gary Jordan, USFWS Mr. Bill Arrington, CAMA Ms. Cathy Brittingham, CAMA Mr. Tommy Douglas, NCDOT Mr. Jason Elliot, NCDOT Mr. Mason Herndon, NCDOT