HomeMy WebLinkAbout20200632 Ver 1_Merrimont-SuppEZ-2018_20200519ID#* 20200632 Version* 1
Select Reviewer:*
Katie Merritt
Initial Review Completed Date 05/19/2020
Mitigation Project Submittal - 5/19/2020
Is this a Prospectus, Technical Proposal or a New Site?* r Yes r No
Type of Mitigation Project:*
r" Stream r- Wetlands r` Buffer V Nutrient Offset
(Select all that apply)
Project Contact Information
Company/Owner:* McAdams
Contact Name:*
Rebecca Stubbs
Project Information
Project Type: r DMS r Mitigation Bank
Project Name: 2020-0632
County: Wilson
Document Information
Email Address:*
rstubbs@mcadamsco.com
Mitigation Document Type:*
Mitigation Plans
File Upload: Merrimont-SuppEZ-2018.pdf 504.69KB
Rease upload only one RDF of the corrplete file that needs to be subrritted...
Signature
Print Name:* Rebecca Stubbs
Signature:*
�urr�>em�ev t -r-e. t-puvam rKur-
FORMS LOADED
ROJECT INFORMATION
1
Project Name a rm.
Mefrimont Park
23.8
--- - - - --- -- ---
2
Project Area ac
3
Coastal Wetland Area ac
4
Surface Water Area ac
5
Is this project High or Low Density?
High
6
Does this project use an off -site SCM?
No
02H .
8 JVVill the vegetated setback remain
9 Als SUA other that as listed in.100<10Is streambank stabilization propos
UMBER AND TYPE OF SCMs:
11 Infiltration System 0
12 Bioretention Cell 0
13 Wet Pond _ 7
14 SWrrnwatr--r Wetland 0
15 Permeable Pavement 0
16 Sand Filter 0
17 Rainwater Harvesti R 0
18 Green Roof fl _
19 Level Spreader -Filter ShJ LS-FS 0
20 Disconnected Im rvious Surface f31S 0 _
.. __... --
21 Treatment Swale 0
22 Dry Porte# 0
23 StormFiller
24 Silva Cell Q
25 Bayfilter
26 Filters 0
1 (feet) NIA
getated? Yes
I(c-d) out of the setback? - --- — Yes
on this oroiect? No
FORMS LOADED
27 I Name and Title: Original: P. Sokalski, PE; Modified: R. Stubbs, PE
28 O anization-, Originat Green Enriineerin% PL.LC, Mod-MNcAdams
29 Istreet address A±ICAdams: 2905 Meridian
-Parkvra�r
30 City. State. Zin: - - Durham. North Carolina 27713
B34
Certification Statement
I I:ertify, under penalty of law that this Supplement EZ form and all supporting information were prepared under my direction or
supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and
that the engineering plans, specifications, operation and maintenance agreements andother supporting information are consistent
with the information provided here.
uesrgner 111i!
\\ C
ES /9
49073
LCCAS
I"111111111\\
FOV VhOotiked s a ' CM
Signature of Designe
4 - I � .2-02-0
Date
DRAINAGE AREAS
1 Is this a high density project?Yes
2 If so, number of drainage areas/SCMs 1
3
Is all/part of this project subject to previous rule
versions?Yes
CLICK TO LOAD FORM
Entire Site 1
4 Type of SCM
Wet Detention
Pond
Wet Detention
Pond
5 Total BUA in project (sq ft)378660 sf 378660 sf
6
New BUA on subdivided lots (subject to permitting)
(sq ft)0 0
7
New BUA outside of subdivided lots (subject to
permitting) (sf)0 0
8 Offsite - total area (sq ft)0 0
9 Offsite BUA (sq ft)0 0
10 Breakdown of new BUA outside subdivided lots:
- Parking (sq ft)
- Sidewalk (sq ft)
- Roof (sq ft)1430 sf 1430 sf
- Roadway (sq ft)377230 sf 377230 sf
- Future (sq ft)
- Other, please specify in the comment box
below (sq ft)
11
New infiltrating permeable pavement on
subdivided lots (sq ft)
12
New infiltrating permeable pavement outside of
subdivided lots (sq ft)
13
Exisitng BUA that will remain (not subject to
permitting) (sq ft)378660 sf 378660 sf
14 Existing BUA that is already permitted (sq ft)378660 sf 378660 sf
15 Existing BUA that will be removed (sq ft)
16 Percent BUA 37%37%
17 Design storm (inches)1 in 1 in
18 Design volume of SCM (cu ft)32719 cf 32719 cf
19 Calculation method for design volume WQV=P*RV*A/12 WQV=P*RV*A/12
20
DRAINAGE AREA INFORMATION
ADDITIONAL INFORMATION
The entirety of the drainage area is considered onsite. The 'roadway' BUA
category includes driveway, parking, and sidewalk to coincide with the
breakdown in the original design.
Please use this space to provide any additional information about the
drainage area(s):
WET POND
1 Drainage area number 1
2 Design volume of SCM (cu ft)32719 cf
3 Is the SCM sized to treat the SW from all surfaces at build-out?Yes
4 Is the SCM located away from contaminated soils?Yes
5 What are the side slopes of the SCM (H:V)?3:1
6
Does the SCM have retaining walls, gabion walls or other engineered
side slopes? No
7
Are the inlets, outlets, and receiving stream protected from erosion
(10-year storm)? Yes
8
Is there an overflow or bypass for inflow volume in excess of the
design volume? Yes
9 What is the method for dewatering the SCM for maintenance?Pump (preferred)
10 If applicable, will the SCM be cleaned out after construction?Yes
11 Does the maintenance access comply with General MDC (8)?Yes
12 Does the drainage easement comply with General MDC (9)?Yes
13
If the SCM is on a single family lot, does (will?) the plat comply with
General MDC (10)? No
14 Is there an O&M Agreement that complies with General MDC (11)? Yes
15 Is there an O&M Plan that complies with General MDC (12)?Yes
16 Does the SCM follow the device specific MDC?Yes
17 Was the SCM designed by an NC licensed professional?Yes
18 Method used SA/DA
19 Has a stage/storage table been provided in the calculations?Yes
20
Elevation of the excavated main pool depth (bottom of sediment
removal) (fmsl) 118.00
21 Elevation of the main pool bottom (top of sediment removal) (fmsl) 119.00
22 Elevation of the bottom of the vegetated shelf (fmsl)122.50
23 Elevation of the permanent pool (fmsl)123.00
24 Elevation of the top of the vegetated shelf (fmsl)123.50
25 Elevation of the temporary pool (fmsl)124.50
26 Surface area of the main permanent pool (square feet)92691 sf
27 Volume of the main permanent pool (cubic feet)322189 cf
28 Average depth of the main pool (feet)3.48 ft
29 Average depth equation used Equation 2
30 If using equation 3, main pool perimeter (feet)
31 If using equation 3, width of submerged veg. shelf (feet)
32 Volume of the forebay (cubic feet)42518 cf
33 Is this 15-20% of the volume in the main pool?No
34 Clean-out depth for forebay (inches)12 in
35 Design volume of SCM (cu ft)32719 cf
36 Is the outlet an orifice or a weir?Orifice
37 If orifice, orifice diameter (inches)6 in
38 If weir, weir height (inches)
39 If weir, weir length (inches)
40 Drawdown time for the temporary pool (days)4.68
41
Are the inlet(s) and outlet located in a manner that avoids short-
circuiting? Yes
42 Are berms or baffles provided to improve the flow path?No
43 Depth of forebay at entrance (inches)48 in
44 Depth of forebay at exit (inches)48 in
45 Does water flow out of the forebay in a non-erosive manner?Yes
46 Width of the vegetated shelf (feet)10 ft
47 Slope of vegetated shelf (H:V)10:1
48
Does the orifice drawdown from below the top surface of the
permanent pool? Yes
49
Does the pond minimize impacts to the receiving channel from the 1-
yr, 24-hr storm? Yes
50
Are fountains proposed? (If Y, please provide documentation that
MDC(9) is met.) No
51 Is a trash rack or other device provided to protect the outlet system? Yes
52 Are the dam and embankment planted in non-clumping turf grass? Yes
53 Species of turf that will be used on the dam and embankment Tall Fescue
54 Has a planting plan been provided for the vegetated shelf?Yes
55
Please use this space to provide any additional information about the
wet pond(s):
WET POND MDC FROM 02H .1053
GENERAL MDC FROM 02H .1050
ADDITIONAL INFORMATION
Wet Pond 3 5:55 PM 4/8/2020