Loading...
HomeMy WebLinkAboutNCC202072_ESC Approval Submitted_20200519ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Acting Director NORTH CAROLINA Environmental Quality, . May 15, 2020 LETTER OF APPROVAL WITH PERFORMANCE RESERVATION Piedmont Natural Gas Company, Inc. ATTN: Mr. Arshad Khan 4720 Piedmont Row Drive Charlotte, NC 28210 RE: Project Name: Piedmont Natural Gas - Line 291-1149 Natural Gas Pipeline Project Acres Approved: 23 Project ID: BURKE-2020-015 County: Burke City: Morganton Address: Bethel Road River Basin: Catawba Stream Classification: WS-IV Submitted By: Mr. Alex Darr Date Received by LQS: May 13, 2020 Plan Type: Utility Construction Dear Mr. Khan, This office has reviewed the subject revised erosion and sedimentation control plan and hereby issues this Letter of Approval with Performance Reservation. The performance reservation is attached. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. Should the plan not perform adequately, a revised plan will be required (G.S. 113A-54.1) (b). As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is received, you will receive the COC via email. You MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at M E Q�� North Carolina Department of Environmental Quality ! Division of Energy, Mineral and Land Resources Asheville Regional Office j 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 C"O.'.. ntulE n 828.296A500 oapanmentot envimnmun�al Ouall�y Letter of Approval with Performance Reservation Piedmont Natural Gas Company, Inc. ATTN: Mr. Arshad Khan May 15, 2020 Page 2 of 3 deq.nc.gov/NCG01. PIease direct questions about the eNOI form to Annette Lucas at Annette.11ucasC@ncdenr.goy or Paul Clark at, Paul. clarkencdenr.g_ov. If the owner/operator of this project changes in the future, the new responsible party is required to apply for his/her own COC. Title 1SA NCAC 413.0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the CDC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land - disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. I ' Kerelth gional Engineer Land Quality Section Letter of Approval with Performance Reservation Piedmont Natural Gas Company, Inc. ATTN: Mr. Arshad Khan May 15, 2020 Page 3 of 3 Enclosures: Certificate of Approval NPDES NCG01 Fact Sheet Performance Reservation ec: Mr. Alex Darr DarrA@pondco.com Mr. Flint Barksdale BarksdaleF@PondCo.com cc: Regional Office file PERFORMANCE RESERVATION Please note that the developer is responsible for the control of sediment on -site. If the approved erosion and sediment control measures prove insufficient, the developer must take those additional steps necessary to stop sediment from leaving this site. Each sediment storage device must be inspected after each storm event. Maintenance and/or clean out is necessary anytime the device is at 50% capacity. {G.S.113A-57[3]}. Ref: G.S. 113A-54.1 through G.S.113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities