Loading...
HomeMy WebLinkAboutNCC202072_NOI Application_20200519Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 5/18/2020 9:13:48 AM (NCG01 NOI Submission) Approve by Clark, Paul 5/18/2020 10:50:21 AM (Review- Construction NOI 25720) • The task was assigned to Clark, Paul by round robin distribution 5/18/2020 9:14 AM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: May 20, 2020 5:00 PM. The priority is: High 5/18/2020 9:14 AM Submit by Garcia, Lauren V 5/19/2020 3:07:20 PM (Payment Verification for NCC202072) * Kenneth Darr • Garcia, Lauren V assigned the task to Garcia, Lauren V 5/19/2020 3:05 PM The task was assigned to DEMLR NCG01 Payment Team. The due date is: June 29, 2020 5:00 PM. The priority is: High 5/18/2020 10:50 AM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information Are you submitting IT No an NOI that was r Yes rejected before? 1a. Project Name * Piedmont Natural Gas - Line 291-1149 Natural Gas Pipeline Project 1 b. Specific Lot This field nay be used to list specifc lot nunbers. Numbers N/A- Temporary and permanent Piedmont Natural Gas utility easements. 2. County* Burke 3. Highway or Street Bethel Road Address * Street narre only is acceptable if no address nunber assigned yet 4. City or Township* Morganton 5. State * NC 6. Zip Code * 28655 7. Latitude * Enter the latitude in decinal degrees 35.7319 8. Longitude* Enter the longitude in decinal degrees (M. ST be negative) -81.6428 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 05/18/2020 Estinated Construction Project Start Cate 10. Date to End* 01/01/2021 Estimated Construction Project End Cute 11. SIC (Primary) * Other (9999) Standard Industrial aassification for Ceveloprrent 12. Acres to be 23.00 disturbed* (including off -site borrow and waste areas) 13. Total site area 23.00 (acres) * 14. Post- 0.11 construction (Estimated) impervious area (acres) * NCC Project NCC-BURKE-2020-Piedmont Natural Gas - Line 291-1149 Natural Tracking ID Gas Pipeline Project Assigned autorratically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving East Prong Hunting Creek Wate rbodY * %rre of waterbody into which storrrwater runoff will discharge 15b. Waterbody 11-36-1 Index No.* NCWaterbody Index Number Stormwater rJ No discharges will flow r- Yes to additional wate rs * 16a. Is this project r Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ Fbrnittee Inforrration - Legally Fbsponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Legally Responsible Entity Name * Piedmont Natural Gas Company, Inc. It pernittee is an individual (i.e., organization does not apply), enter first and last narre in this field. 2. First Name * Arshad If Corporation, enter Registered Agent First %rre 3. Last Name* Khan It Corporation, enter F;bgistered Agent Last %ne 3b. Title Project Manager 4. Permitee E-mail Arshad.Khan@Duke-Energy.com Address* 5. Permittee (980) 244-0028 Telephone No.* 6. Permittee Mailing Street Address Address* 4720 Piedmont Row Drive Address Line 2 City State / Rovince / F;bgion Charlotte NC Fbstal / Zip Code Country 28210 us Check box if the V Yes street address the same as mailing address 7. Permittee Street Street Address Address* 4720 Piedmont Row Drive Address Line 2 City State / Frovince / Region Charlotte NC Fbstal / Zip Code Country 28210 us 8. Type of Non -Government Ownership* C. Site Contact Information Part C. Roject Site Contact Inforrration .................................................................................................................................................................................................... 1. Primary Site Arshad Contact - First Name * 2. Primary Site Khan Contact - Last Name * 3. Title Project Manager 4. Site Contact E- Arshad.Khan@Duke-Energy.com mail Address* 5. Site Contact (980) 244-0028 Telephone No. 6. Organization Piedmont Natural Gas Company, Inc. Name 7. Site Contact Street Address Mailing Address* 4720 Piedmont Row Drive Address Line 2 City Charlotte Postal / Zip Code 28210 8. Consultant Name (Optional) Alex Darr First and Last narre 9. Consultant E-mail Darra@Pondco.com This person will be copied on all correspondence. 10. Consultant (336) 899-9806 Telephone No. State / Province / Region NC Country us D. E&SC Plan Part D. ^ Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 05/15/2020 Approved * 2. E&SC Plan Project BURKE-2020-015 Number/ID * Assigned by agency or local program 3. E&SC Plan r State DEQ Office Approved by* r Local Program 4. State DEQ Office * Asheville (ARO) Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. For linear projects, please also upload a site map showing the overall extent of the project or include the beginning point and end point coordinates in the "Notes" box below. 5. E&SC Plan LOAwPR & CORA 5-15-2020.pdf 114.38KB Approval letter or Mast beRDFformat Grading Permit 6. Site Location Map Helpful for linear project review (Optional) Fig ure_3_WaterResources.pdf 4.22MB Mast be RDF format. Rease do not upload entire set of E&SCplans. 7. Notes (Optional) Rovide any additional information that night help the reviewer better understand how uploaded docurrents support the application. Include additional waterbodies for linear projects if necessary. 8. NOI Certification NCG01-eNO1-Certification-Form-AK.pdf 729.82KB Form Wst be RDF formal This is an Express f No Review Project* r Yes E. Certification North Carolina General Statute 143-215.6E (i) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Artcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent f Authorized Responsible Person* Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name * Arhad Khan Title Project Manager Organization Legally Flesponsible Entity Piedmont Natural Gas Company, Inc. Date * 05/18/2020 F. Tracking and COC Info NOI Tracking No. 25720 NC Reference No. NCG01-2020-2072 Uses 'count number' variable (incremrented by SP) Certificate of NCC202072 Coverage (COC) Uses 'count number' variable (incremented by SP) No.* Count Number 2072 Sequential number for submittal that is incremented by Stored Frocedure COC Year 2020 Year of date reviewed (used to assign YY digits after "NOC' in COCno.)