HomeMy WebLinkAbout19960460 Ver 1_Complete File_19960708? ? -?1sw
S? 't f xo?? -52%-I
y?
IMPORTANT
To
Date Time
On
M_ PeaQc
1-1
Phc 4?D
TE, > i 5 P
CP
W ?
Mess
- -? JJ
Signed
N.C. Dept. of Environment. Health, and Natural Resources
State of North Carolina
• Department of Environment,
Health and Natural Resources
Division of Water Quality
James B. Hunt,Jr., Governor
Jonathan B. Howes,Secretary
A. Preston Howard, Jr., P.E., Director
APPROVAL of 401 Water Quality Certification
Deaton Yacht Services, Inc.
200 Neuse Drive
Oriental, NC 28571
Dear Sirs:
A LT.RMAI
IT
E) E-= F=1
July 8, 1996
Pamlico County
DWQ Project # 960460
You have our approval to develop a marina at 200 Neuse Drive, as you described in your-application
dated 3 May 1996. After reviewing your application, we have decided that this fill is covered by General
Water Quality Certification Number 3025.
This approval is only valid for the purpose and design that you described in your application. If you
change your project, you must notify us and you may be required to send us a new application. For this
approval to be valid, you must follow the conditions listed in the attached certification. In addition, you
should get any other federal, state or local permits before you go ahead with your project.
If you do not accept any of the conditions of this certification, you may ask for an adjudicatory
hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a
written petition which conforms to Chapter 150B of the North Carolina General Statutes'to the Office of
Administrative Hearings, P.O. Box 27447, Raleigh, N.C. 27611-7447. This certification and its
conditions are final and binding unless you ask for a hearing.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean
Water Act. If you have any questions, please telephone John Dorney at 919-733-1786.
Sincerely,
G ton How , Jr. P.E.
Attachment
cc: Wilmington District Corps of Engineers
Corps of Engineers Washington Field Office
Washington DWQ Regional Office
Mr. John Dorney
Central Files
Doug Huggett
960460.1tr
Division of Water Quality • Environmental Sciences Branch
Environmental Sciences Branch, 4401 Reedy Creek Rd., Raleigh, NO 27607 Telephone 919-733-1786 FAX # 733-9959
An Equal Opportunity Aff irmative Action Employer • 50% recycled/10% post consumer paper
MEMORANDUM
TO: John Parker
FROM: M. Ted Tyndall
RECENED
WASHINGTON OFFICE
MAY 0 71996
&LIL
SUBJECT: Changes to Deaton Yacht Service, Inc. Major Permit Application -- Oriental,
Pamlico County
DATE: May 3, 1996
As you recall, back on August 22, 1995 Bob Deaton submitted a Major CAMA
Permit Application for the expansion of Deaton Yacht Service, Inc. in Oriental, Pamlico
County. And as you recall, the project was deemed subject to review under the North
Carolina Environmental Policy Act (NCEPA). On September 8, 1995 the application was
placed on hold pending the submittal of an environmental assessment (EA) and subsequent
letter of compliance with the NCEPA. Since that time, the appropriate EA has been
submitted, received clearance under internal review, and successful proceeded through the N.
C. State Clearinghouse (see attached letter from Ms. Chris Baggett).
The application has now been taken off hold and as a result of the above process, Mr.
Deaton has submitted a modified application that addresses a couple of points that were noted
during the EA process. These changes essentially involve formally defining two additional
slips located on the landward side of the docking facility and include the installation of three
additional pilings. Two additional parking spaces have been added as a result. These limited
changes are being forwarded to you for your review.
I have also enclosed the compliance letter from the Town of Oriental for the
additional parking along with the return receipt "green cards". If you have any questions,
please give me a call.
Attachments
cc: Charles Jones - DCM, Morehead City
Raleigh Bland - COE, Washington Regulatory Field Office
Preston Howard, P.E., Director - Division of Environmental Management
William A McNeil, Director - Division of Community Assistance
Charles Gardner, Director - Division of Land Resources
Bruce L. Freeman, Director - Division of Marine Fisheries
MAY7M-'9E T}iU 12:58 ID: TEL hdt7: k4536 F01
4
A.
4 - sµ Ayy W
li ? ^
North Carolina
Department of Administration
J=w B. Hunt. Jr., C sur > G Dowa, ?
April 3?, 1995
Mr. John Parker
N.C. DcpmImcnt of Environment, Health,
and Natural Resources
Division of Coastal Management
Parker-Lincoln $uildiug
Rslcigh, North Carolina 27,611
Dear Mr. Parker:
Re: SCH File #96-E-4300-0586;
EAJFONSI - Proposed 6 Slip Expmion of an Existing
Marina on Whitaker creek in Oriet"l, NO
The above referenced environmental impact information has been reviewed through the State
Clearinghouse under the provisions of the North Carolina. Enviromnentai Policy Act.
Attached to this letter are comments made by agencies in the course of this review. Because of
the nature of the comments, it has heart determined that no farther State Clearinghouse review
action on your part is needed for compliance with the North Carona Environmental Policy Act
The attached comments should be taken into consideration in project development.
Best regards.
Sincerely,
4W 2-05yq-W
Ms- Cllrys Baggett, Director
State Clearinghouse
CBrf
Attachments
cc: Region P
?-r
1MAY 1211996
C(,, JAL
?AksClilEldY
116 West Jones Street + R?&i It• Noah Cant i
? ina 276034Mp3 + Telephone 91 -
StWe Courier 51-014X
An Fquat (W_unr7 ( A(in=j,,clltaon ?P
W
Please type or print. Carefully describe all anticipated
development activities, including construction, excava-
tion, filling, paving, land clearing, and stormwater con-
trol. If the requested information is not relevant to your
project, write N/A (not applicable). Items 1-4 and 8-9
must be completed for all projects.
1 APPLICANT
a. Name Deaton Yacht Service, ? Inc.
Address 200 Neuse Drive
City Oriental State N.C.
Zip 28571 Dayphone 919-249-1 180
X Landowner or Authorized agent
b. Project name (if any) None
c. If the applicant is not the landowner, also give the
owner's name and address.
?.....--------------------?
If you plan to build a marina, also complete and
attach Form DCM-MP-2.
b. Is the proposed activity maintenance of an
existing project, new work, or both?
New Work
c. Will the project be for community, private, or
commercial use?
Private & Commercial
d. Describe the planned use of the project.
The six slips will provide
additional boat storage spaces
4 LAND AND WATER
CHARACTERISTICS
a. Size of entire tract 1.40 Acres
b. Size of individual lot(s) All one l o t
c. Elevation of tract above mean sea level or
National Geodetic Vertical Datum
2 LOCATION OF PROPOSED +s . s Average
PROJECT
a. Street addressor secondaryroad numbcr
200 Neuse Drive e. Vegetation ontract_ Trees and lawn grass
b. City, town, community, or landmark
Oriental, NC 28571
d. Soil type(s) and texture(s) of tract
Sandy clay _
f.
Man-made features now on tract Bulkhead, piers,
sewer, water.
What is the CAMA Land Use Plan Classification of
the site? (Consult the local land use plan.)
c. County Pamlico g
d. Is proposed work within city limits or planning
jurisdiction? Yes
e. Name of body of water nearest project
Whittaker Creek - Western Branch
3 DESCRIPTION AND PLANNED USE
OF PROPOSED PROJECT
Conservation Transitional
X Developed Community
Rural Other
h. How is the tract zoned by local goverment?
No zonina
i. How are adjacent waters classified?
S A a., .
a. Describe all development activities you propose (for j. Hasa professional archaeological survey been
example, building a home, motel, marina, bulkhead,
ed out €er N-0- -If sQ, whom?
or pier)._ Pier with six slips and j
_ finger Qiers. IRII. L!
UG 1 +
2 '
3/91 =,F=TrTT7_"9, ?i,
5 UPLAND DEVELOPMENT
Complete this section if the project includes any land
development.
a. Type and number of buildings, facilities, or
structures proposed P a r k i n g- a r e a vy i t h
marl surface with 5. Parkinn
areas
b. Number of lots or parcels 2
c. Density (Give the number of residential units and the
units per acre.) N/A
d. Size of area to be Zraded or disturbed
60' x 60'
e. If the proposed project will disturb more than one
acre of land, the Division of Land Resources must
receive an erosion and sedimentation control plan at
least 30 days before land disturbing activity begins.
If applicable, has a sedimentation and erosion
control plan been cuhmitted to the Division of Land
Resources? N / A
f. Give the percentage of the tract within 75 feet of
mean high water to be covered by impermeable
surfaces, such as pavement, buildings, rooftops.
None
g. List the materials, such as marl, paver stone, asphalt,
or concrete, to be used for paved surfaces.
Marl
behind work shed on south side.
Water runs over 85' of grass
surface before entering into.
marsh area.
m. Water supply source r i f- j water
n. If the project is oceanfront development, describe
the steps that will be taken to maintain established
public beach accessways or provide new access.
N/A
o. If the project is on the oceanfront, what will be the
elevation above mean sea level of the first habitable
floor? NIA
6 EXCAVATION AND FILL
INFORMATION
a. Describe below the purpose of proposed excavation
or fill activities (excluding bulkheads, which are
covered in Section 7).
Length Width Depth
Access channel
(MLW) or (NWL)
Boat basin
h. If applicable, has a stormwater management plan Other (break-
been submitted to the Division of Environmental wate pier,
Management? N/A boat ramp,
rock jetty)
i. Describe proposed sewage disposal and/or waste
water treatment facilities. Fill placed in
P r o o e r t y is s e.r vi-ce.d h y -_r_i t y_ wetland or below
sewer. Ho1dino tank umpont MHW
is available -
j. Have these facilities received state or local approval? Upland fill
Yes areas
w
b. Amount of material to be excavated from below
k. Describe existing treatment facilities. water level in cubic yards None
City sewer
c. Type of material N/A
d. Does the area to be excavated i lude marshland,
1. Describe location and type of discharges to waters of swamps, or other wetlands? 5 , . I P
the state (for example, surface runoff, sanitaryakR '
wastewater, industrial/commercial effluent, "wn tion, i
down"). One point source discharge e. Highgro an cub ea>t rli j.?
I,i L1 U
V • _
2 U?..-
L?
f. Dimensions of spoil disposal area c. Shoreline erosion during preceding 12 months, in
N/A feet N/A
g. Location of spoil disposal area Ni a d. Type of bulkhead material N/A
h. Do you claim title to the disposal area? N/A
If not, attach a letter granting permission from the
owner.
L Will a disposal area be available for future
maintenance? N/A
If so, where?
j. Does the disposal area include any marshland,
swamps, or water areas?
N/A
k. Will the fill material be placed below mean high
water? N/A
1. Amount of fill in cubic yards _ N / a
m. Type of fill material N/A
n. Source of fill material N / A
o. Will fill material be placed on marsh or other
wetlands? N/A
p. Dimensions of the wetland to be filled
N/A
e. Amount of fill, in cubic ya/ as, to be placed below
mean high water iN`1
f. Type of fill material N/A
8 ADDITIONAL INFORMATION NOT
APPLICABLE
In addition to the completed application form, the follow-
ing items must be submitted:
A'copy of the deed (with state application only) or other
instrument under which the applicant claims title to the
affected property. If the applicant is not claiming to be
the owner of said property, then forward a copy of the
deed or other instrument under which the owner claims
title, plus written permission from the owner to cant' out
the project.
An accurate work plat (including plan view and cross
sectional drawings) drawn to scale in black ink on an 8
1/2 x 11 white paper. (Refer to Coastal Resources
-- Commission Rule 7J.0203 for a detailed description.)
q. How will excavated or fill material be kept on site
and erosion controlled? Please note that original drawings are preferred and
N/A only high quality copies will be accepted. Blue-line
prints or other larger plats are acceptable only if 18 high
quality copies are provided by applicant. (Contact the
U.S. Army Corps of Engineers regarding that agency's
r. What type of construction equipment will be used use of larger drawings.) A site or location map is a part
(for example, dragline, backhoe, or hydraulic
dredge). Barge with crane and pile of plat requirements and it must be sufficiently detailed
.
driver to guide agency personnel unfamiliar 1m 'ro'tP1 °
y . , C
site. Include county road (SR) numbe ° landmarks; and ` ;
s. Will wetlands be crossed in transporting equipment the like.
to project site? If yes, explain steps that will .? ? F,
be taken to lessen environmental impacts. A stormwater management plan, if ppicable, that M
N/A 3
may have been developed in consultat
Division of Environmental Management--- - "-ftse -04040
A list of the names and complete addresses of the
adjacent waterfront (riparian) landowners. These
individuals have 30 days in which to submit comments
7 SHORELINE STABILIZATION NOT on the proposed project to the Division of Coastal
A P P L I C A B Management and should be advised by the applicant of
a. Length of bulkhead or riprap
b. Average distance waterward of mean high water or
normal water level N/A
thatop?ortunity.
LiE
3191 ,. ?ij t,{............a..«?r..+?...
Name Mr. Ben Craven
Address 2806 Watauga Drive
Greensboro, NC
Name Hank FCscue
Address 4700 Slabask Street
Pensacola, FL 32504
Name
Address
A list of previous state or federal permits issued for
work on the project tract. Include permit numbers,
permittee, and issuing dates.
160-90
A check for $250 made payable to the Department of
Environment, Health, and Natural Resources to cover
the costs of processing the application.
A signed AEC hazard notice for projects in oceanfront
and inlet areas. ,
A statement on the use of public funds. If the project
involves the expenditure of public funds, attach a state-
ment documenting compliance with the North Carolina
Environmental Policy Act (N.C.G.S. 113A-1 to 10).
?11 Lt"Ci - !?? i??
9 CERTIFICATION AND PERMISSION
TO ENTER ON LAND
Any permit issued in response to this application will
allow only the development described in the application.
The project will be subject to conditions and restrictions
contained in the permit.
I certify that to the best of my knowledge, the proposed
activity complies with the State of North Carolina's ap-
proved Coastal Management Program and will be con-
ducted in a manner consistent with such program.
I further. certify that I am authorized to grant, and do in
fact, grant permission to representatives of state and
federal review agencies to enter on the aforementioned
lands in connection with evaluating information related
to this permit application and follow-up monitoring of
project.
This is the day of , 19
X
Landowner or Authorized agent
O
ALI
t t?
gWtaaria?..?.•o u •? ?•?uu?ca aas.K5ldi!
s `
U ftu• ?-/ Lw L/
i1?N? ? •??Ni???bi?i
4 3/91
Form DCM-MP-2
MAPdNA
DEVELOPMENT
APR 2 5 1C-95
06-00"G o e so b totem" -!W-9-
AUG 1 S b
Attach this form to Joint Application for CAMA Major
Permit. Be sure to complete all other sections of the
Joint Application which relate to this proposed project,
including upland areas, even if duplicative. All shore-
based facilities must be included in application and work
plats.
1 MARINA CHARACTERISTICS
a. Check below the type of marina proposed.
X Commercial Public Residential
b. Will the marina be open to the general public?
Yes
c. If there is residential development associated with
the marina, how many units or lots are planned?
None
d.
Check all of the types of service to be provided.
X Full service, including travel lift and/or rail
Dockage, fuel, and marine supplies
Dockage ("wet slips") only
Number of slips Current - 2 0
Dry storage Proposed - 6
Number of boats
Boat ramp(s)
Other (describe)
11
f. Describe the typi?IJIKL. at ttsA_ r dample,
open runabout, charter boats, sail boats, mined
types). sailboats and motorboats
g
Typical boat length 25' - 50'
h. Maximum boat length 651
i.
Are any floating buildings planned? N o
If so, describe.
2 MARINA OPERATIONS
a. Check each of the following sanitary facilities which
will be included in the proposed project.
X Office toilets
-__X Toilets for patrons
Number 2
Location Off i c e
X Showers
X Boat holding tank pumpout
Typeandlocation Electric pumpout and
manual. Located by travellift
b. Describe treatment type and location for all sanitary
wastewater. Town sewer system
e. Check below the proposed type of siting.
Land cut and access channel
Open water with dredging for basin
and/or channel
X Open water, no dredging required
3/'91
c. Describe solid waste, fish offal, and trash disposal.
Trash pickuo by Town of Oriental
Other (describe)
in
MWlYlwrww..wi.. u?xw. ar+w 5
d. How will overboard discharge of sewage from boats i. Give the location of fuel handling facilities and
be controlled? describe the safety measures planned to protect area
Marina enforces locked head waterquality. _ No fuel sales
policy
e.
Give the location and number of "No Sewage
Discharge" signs proposed.
One by travellift slip
f. Describe the special design, if applicable, for
containing industrial type pollutants, such as paint,
- sandblasting waste, and petroleum products.
Waste oil and paint drums
serviced by commercial
disposal company
g. Where will residue be disposed of? Town
h. Give the number of channel markers and "No Wake"
signs proposed. None
Note: Regulatory signs such as these require additional
approval by the N.C. Wildlife Resources Commission.
j. Describe design measures that promote boat basin
flushing or circulation and reduce water quality
impacts. Proposed docks shouldn't
cause a roblem with flushing
or circulation
k. What will be the marina policy on overnight and
live-board dockage? , Overnight d o c k a o e
will be perms tt ed. Ltve aboards
will not be allowed
1. Is the proposed marina located near any shellfish
leases? Np_ If so, give the name and address of
theleaseholder.
m. If this project is an expansion of an existing marina,
what types of services are currently provided?
Yes - travellift and full
service boatyard.
n. How many slips are now available? 10
p.?i
t ,
i r
r7r
ease
6 3/91
,
os YACHT S.
Bob Deaton
PRESIDENT
ORIENTAL
NORTH CAROLINA
John Deaton
VICE-PRESIDENT
February 29, 1996
Office of Coastal Management
P.O. Box 769
Morehead City, NC 28557
Dear Ted,
I have enclosed the letter of compliance for the
additional two boat slips. This letter is part of the
application that is currently under review. Would you
please add this to my application.
If you have any questions, please give me a call.
i
Best regards,
'` Bob'Deaton
RKD/lsm
enclosure
Q
irr r V V Y M ??Jr?1Y6??.Fr)Vw
200 Neuse Drive
Oriental, North Carolina 28571
(919) 249-1180
0 ENTy?
0-
CA 9TN
February 7, 1996
TOWN OF ORIENTAL
Post Office Box 472
Oriental, North Carolina 28571
(919) 249-0555 Fax: (919) 249-0208
Mr. Bob Deaton
Deaton's Yacht Service
200 Neuse Drive
Oriental, NC 28571
Dear Bob:
The Oriental Town Board has reviewed your proposal to add two
new boat slips at Deaton's Yacht Service and found it to be in
compliance with the Oriental Growth Ordinance. Attached are copies
of the Application for letter of Compliance, an elevation drawing
and a plot drawing. Future changes which are not in accordance
with the Growth Management Ordinance could void this permit.
Sincerely,
Karen Brashear
Town Manager
Enc.
M
F?4co D 4 frri
??i?3?i?i5iiill?r7li?iiiii _
0 printed on recycled paper
(-J Z ? 0
Q l7" <
?. _ W
LLJ
(-0
(-)
U ?C
o V)
:D (Y u
? jz?
w ..
_ 0
i ?.
w
LIJ
Z
o
p-
f-
r-
v
? <
v• Z
cc
IL
h
IU
n
1
1
1?1
z
U1
oz
0
r
U)
N
J
ND TIDE -??
uL
L ?
m (Jj
OC 1 ? '?
I- V
?J IyJ a
Z 2
Q
o
- O
L a-
U CC
a CL
? o
o
1 ?
M 2
vi
v'
Z
J
IJ
w
GY