HomeMy WebLinkAbout20050104 Ver 1_Complete File_20050209lvu . J.ivi. lvlius, r.r,.
February 9, 2005
DWQ# 05-0104
Page 4
DWQ Project No.: ?s v County:. [
Applicant: V L M.,
Project Name:"AI-\t::I,?
Date of Issuance of 401 Water Quality Certification:
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any
subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina
Division of Water Quality, 1621 Mail Service Center, Raleigh, NC, 27699-1621. This form may be returned to DWQ by
the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of
these.
Applicant's rtifi ation
I, X (' , hereby state that, to the best of my abilities, due care and diligence was - . 61 1 k4 used in th o s rv tion of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and
other supporting ma als.
Signatur . Date:
Agent'slCertificatj6n
I, , hereby state that, to the best of my abilities, due care and diligence was
used in t e ob ervation of the construction such that the construction was observed to be built within substantial
complianc and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and
other supporting materials.
Signature:
Engineer's Certification
Date:
Partial Final
I, , as a duly registered Professional Engineer in the State of North
Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project,for the
Peimittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the
construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water
Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials.
Signature
Date
Registration No.
? rt
NOV 200?
7
micnaei v-. eamey, uovemor
William Q. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Alan W. Klimek, P.E., Director
Division of Water Quality
a
DWQ ProjectNo.: 0JC? (7 County: A(A,l 1kid
Applicant:
_ ._Project Name:
Date of Issuance of 401 Water Quality Certification: Jv 1 Gt u1 1 .1a2 ?:4
Certificate of Completion
J
Upon- completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and. any
subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina
Division of Water Quality, 1621 Mail Service Center, Raleigh, NC, 27699-1621. 'This. form may be returned to DWQ
by the. applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from
all of these.
Applicant's CerrIftcation
I, /? 1''' •? hereby state that, to the tiest'of my abilities, due care and diligence
was used in the observation of the construction • such that the construction was observed to be built within substantial.
compliance 'and intent of the. 401 Water Quality Certification and Buffer Rules, the approved plans and. specifications,
and other
Signatui Date:,
Agent's
hereby state that, to the best of my abilities, -due care and diligence
was used in -the observation .of the construction such that the construction was observed to. be built -within- substantial
.compliance-and-intent of the-401- Water Quality Certifeatiotrand-Buffer •Rules;-the-•approved-plans-ihd`-specifieations,•:f -
and other supporting materials:
Signature:
N. C. Division of Water Quality, 401 Wetlands Certification Unit,
1650 Mail. Service Center, Raleigh, NC 27699-1650 (Mailing Address)
2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location)
(919) 733-1788 (phone), 919-733.6893 (fax), (httpJ/h2o.enr.state.nc.us/newetlands
If this project was designed by a Certi, fled Professional
Date:
I; as "a duly registered Professional (i.e., Engineer,
Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically;
weekly, full time) the construction of the -project, for. the Perbiittee hereby state that, to the best of my, abilities, due . .
care and diligence was used in the observation of the construction such that the construction was'observed-to be built
within substantial. compliance and intent of ifie 401 Water Quality. Certification and Buffer Rules, the approved plans
and specifications, and .other supporting materials.
Signature: Registration No. Date
!li i
ivp V Q P 2007. .
k0 AL;i;
iVir. J.1V1. 1V1111s, r.r,.
February 9, 2005
DWQ# 05-0103
Page 4
Or-
DWQ Project No.:
County:
Applicant: - ?u
Project Name: an
Date of Issuance of 401 Water Quality Certification:
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any
subsequent modifications, the applicant is required to return this certificate to the 40l/Wetlands Unit, North Carolina
Division of Water Quality, 1621 Mail Service Center, Raleigh, NC, 27699-1621. This form may be returned to DWQ by
the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of
these.
Applicant's ertif cation?/?`
I, ,/?( , hereby state that, to the best of my abilities, due care and diligence was
used in th observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and
other supporting in als.
Signatur : Date: ?cY3
Agent's,CertificaJ,%n
I, , hereby state that, to the best of my abilities, due care and diligence was
used in the o servation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and
other supporting materials.
Signature:
Engineer's Certification
Date:
Partial Final
I, , as a duly registered Professional Engineer in the State of North
Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project,for the
Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the.
construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water
Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials.
Signature
Date
Registration No.
j i
'VOV 0 2
00
;(y?c rvor[n uarouna vepaimmin u, c1wuvuu1a1u 011u
Alan W. Klimek, P.E., Director
Division of Water Quality
A ? -
DWQ Project No.:
Iv)?0 25-6 County:
Applicant:
Project Name:
Date of Issuance of 401 Water.Quality Certification
- Certificate of Completion
Upon completion- of all work approved -within the 401 Water Quality Certification and Buffer Rules, and any
subsequent modifications, the applicant is required to returnthis certificate to the-401/Wetlands Unit, North Carolina
Division of Water Quality, 1621 Mail Service Center, Raleigh, NC, 27699-1621. This form may.be returned to DWQ
by the applicant, the_applicant's authorized agent, or the project engineer: Tt is not necessary to send certificates from
all of these,.,. -: - .. ...__ .. _.. _:
Applicant's Certification:
I, hereby Mate that, .to. the best of my abilities, due care and diligence..
was used in the observation of the construction such that the construction was observed to be built within substantial
coin liance and intent of the 401 Water uali Certification and Buffer Rules, the- approved plans and specifications,:
-
and other supporting materials. .
Signature: Dater
If this project was designed by a Certified Professional
- - , as a duiyregistered Professional (i.e., Engineer, ,
Landscape.Architect, Surveyor, etc.) in the State of North Carolina, having been- authorized to observe (periodically,
weekly, full-time) the construction of the project, for the Permittee hereby state that, to the best of my abilities; due
care and diligence was used in the observation of the construction such that the construction was observed to be built
within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans
and specifications; and other supporting materials.
Signature:
Registration No.
N. C. Division of Water Quality, 401 Wetlands Certification Unit,
1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address)
2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location)
(919) 733-1786 (phone), 919-733-6893 (fax), (http://h2b.enr.state.no.us/newetiands
Date
4
i? O V 0.2 . 2007
4
;rr? s 7; > q vP,ax ? rf Araca;
Mr. J.M. Mills, P.E.
March 14, 2005
DWQ# 05-0379
Page 4
DWQ Project No
Applicant:
Project Name:
as?3w
Date of Issuance of 401 Water Quality Certification:
County:
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any
subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina
Division of Water Quality, 1621 Mail Service Center, Raleigh, NC, 27699-1621. This form may be returned to DWQ by
the applicant, the applicant's authorized agent, or the project engineer. 'It is not necessary to send certificates from all of
these.
Applic is Certification
I, l ` l , hereby state that, to the best of my abilities, due care and diligence was
used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and
other supporting materials.
Signature: Date: . JO 2? Q?
Agent's Ce riffica
hereby state that, to.the best of my abilities, due care and diligence was
used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and
other supporting materials.
Signature: Date:
Engineer's Certification
Partial Final
1, , as a. duly registered Professional Engineer in the State of North
Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project,for the
Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the
construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water
Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials.
Signature Registration No.
Date
a
NO V 0 P 2007