Loading...
HomeMy WebLinkAbout20060447 Ver 3_HLE18020-Stream Relocation Plan_20200518ZSTREAM-CL-NEWGRAPHIC SCALE 0 5 10 20 1 inch = 10 ft. UT TO BIG BRANCH C5.00 UT TO BIG BRANCH HLE18020-P1 1"=10' / 1"=4' STA. 0+00 THRU STA. 2+30 DESIGN BANKFULL = 0.0196 FT/FT EXISTING GROUND (TYP.) TYPICAL RIFFLE TYPICAL POOL SITE LEGEND X:\Projects\HLE\HLE-18020\Storm\Stream Relocation\Current Drawings\HLE18020-P1.dwg, 5/16/2020 10:58:21 AM, Stubbs, RebeccaCLIENT REVISIONS PROJECT NO.HLE-18020 FILENAME DATE 05.15.2020 The John R. McAdams Company, Inc. 2905 Meridian Parkway Durham, NC 27713 phone 919. 361. 5000 fax 919. 361. 2269 license number: C-0293, C-187 www.mcadamsco.com PLAN INFORMATION HALLE BUILDING GROUP 56 HUNTER STREET, SUITE 110 APEX, NORTH CAROLINA 27502 PHONE: 919. 387. 1885 FINAL DRAWING - NOT RELEASED FOR CONSTRUCTION OLDE TOWNE - PHASE 1 SUBDIVISION STREAM RELOCATION RALEIGH, NORTH CAROLINA CHECKED BY DRAWN BY SCALE NB RAS PROPOSED GROUND (TYP.) LOG SILL #2 TOP OF HEADER LOG = 194.61 BOTTOM OF FOOTER LOG = 192.61 12" DIAMETER LOGS PLAN AND PROFILE LOG SILL #2 POOL CONTROL POINT LOG SILL #1 TO BE INSTALLED WITHIN PROPOSED CHANNEL WALL. SEE DETAIL ON SHEET C5.03 TREE LEGEND *CONTRACTOR TO PROTECT ALL TREES SHOWN ON THIS PLAN AND NOT CLEARLY SPECIFIED TO BE REMOVED. ANY GRADING ACTIVITIES SHALL WORK AROUND SHOWN TREES TO REMAIN. RIFFLE SECTION (TYP.) ZSTREAM-CL-NEW PROPOSED GROUND (TYP.) GRAPHIC SCALE 0 5 10 20 1 inch = 10 ft. UT TO BIG BRANCH C5.01 UT TO BIG BRANCH HLE18020-P1 1"=10' / 1"=4' STA. 2+00 THRU STA. 3+78MATCH LINE - SEE SHEET 5.00DESIGN BANKFULL = 0.0196 FT/FTEXISTING GROUND (TYP.) SITE LEGEND X:\Projects\HLE\HLE-18020\Storm\Stream Relocation\Current Drawings\HLE18020-P1.dwg, 5/16/2020 11:01:44 AM, Stubbs, RebeccaCLIENT REVISIONS PROJECT NO.HLE-18020 FILENAME DATE 05.15.2020 The John R. McAdams Company, Inc. 2905 Meridian Parkway Durham, NC 27713 phone 919. 361. 5000 fax 919. 361. 2269 license number: C-0293, C-187 www.mcadamsco.com PLAN INFORMATION HALLE BUILDING GROUP 56 HUNTER STREET, SUITE 110 APEX, NORTH CAROLINA 27502 PHONE: 919. 387. 1885 FINAL DRAWING - NOT RELEASED FOR CONSTRUCTION OLDE TOWNE - PHASE 1 SUBDIVISION STREAM RELOCATION RALEIGH, NORTH CAROLINA CHECKED BY DRAWN BY SCALE NB RAS LOG SILL #3 TOP OF HEADER LOG = 189.00 BOTTOM OF FOOTER LOG = 187.00 12" DIAMETER LOGS PLAN AND PROFILE TREE LEGEND LOG SILL #3 POOL CONTROL POINT RIFFLE TO BE LINED WITH NCDOT CLASS 'B' RIPRAP OR RIVER COBBLE OF EQUIVALENT SIZE. TOP OF STONE SHALL MATCH PROPOSED GRADE. *CONTRACTOR TO PROTECT ALL TREES SHOWN ON THIS PLAN AND NOT CLEARLY SPECIFIED TO BE REMOVED. ANY GRADING ACTIVITIES SHALL WORK AROUND SHOWN TREES TO REMAIN. TYPICAL RIFFLE TYPICAL POOL GRAPHIC SCALE 0 10 20 40 1 inch = 20 ft. C5.02 UT TO BIG BRANCH HLE18020-P1 1"=20' SITE LEGEND X:\Projects\HLE\HLE-18020\Storm\Stream Relocation\Current Drawings\HLE18020-P1.dwg, 5/16/2020 11:05:31 AM, Stubbs, RebeccaCLIENT REVISIONS PROJECT NO.HLE-18020 FILENAME DATE 05.15.2020 The John R. McAdams Company, Inc. 2905 Meridian Parkway Durham, NC 27713 phone 919. 361. 5000 fax 919. 361. 2269 license number: C-0293, C-187 www.mcadamsco.com PLAN INFORMATION HALLE BUILDING GROUP 56 HUNTER STREET, SUITE 110 APEX, NORTH CAROLINA 27502 PHONE: 919. 387. 1885 FINAL DRAWING - NOT RELEASED FOR CONSTRUCTION OLDE TOWNE - PHASE 1 SUBDIVISION STREAM RELOCATION RALEIGH, NORTH CAROLINA CHECKED BY DRAWN BY SCALE NB RAS TEMPORARY SEEDING SCHEDULE: TEMPORARY SEEDING SHALL BE APPLIED AS NEEDED DURING CONSTRUCTION TO STABILIZE BARE OR DISTURBED AREAS OF SOIL AND AT THE COMPLETION OR ALL GRADING AND EARTHWORK ACTIVITIES WITHIN A PARTICULAR AREA OF THE SITE. PERMANENT SEED MAY BE DISTRIBUTED WITH TEMPORARY SEED UPON THE FINAL APPLICATION OF TEMPORARY SEED. SEEDING DATE SEEDING MIXTURE APPLICATION RATE AUG 15 - MAY 1 RYE (GRAIN) 30 LBS/AC AUG 15 - MAY 1 WHEAT 30 LBS/AC MAY 1 - AUG 15 GERMAN MILLET 10 LBS/AC MAY 1 - AUG 15 BROWNTOP MILLET 10 LBS/AC SEEDING METHODS 1.EVENLY APPLY SEED USING A CYCLONE SEEDER, DRILL, CULTIPACKER SEEDER, OR HYDROSEEDER. THIS MUST BE DONE WITHIN 48 HOURS OF LAND DISTURBING ACTIVITIES. 2.MULCH WITH CLEAN WHEAT STRAW. 3.AFTER SEEDING, APPLY MULCH TO AREAS UNDER HARSH CONDITIONS SUCH AS AREAS THAT HAVE BEEN GRADED, OR THOSE WHICH WILL RECEIVE CONCENTRATED FLOWS. AREAS CONSIDERED TO BE UNDER HARSH CONDITIONS WILL BE CONSIDERED THE AREAS GRADED FOR THE WETLAND VALLEY. 4.RESEED AND MULCH AREAS WHERE SEEDLING EMERGENCE IS LESS THAN 80% COVERAGE, OR WHERE EROSION OCCURS, AS SOON AS POSSIBLE. DO NOT MOW. PROTECT FROM TRAFFIC AS MUCH AS POSSIBLE. NOTES 1.TEMPORARY ANNUAL SEED SELECTION SHOULD BE BASED ON SEASON OF PROJECT INSTALLATION. 2.A SINGLE SPECIES FOR TEMPORARY COVER IS ACCEPTABLE 3.IN SOME CASES WHERE SEASONS OVERLAP, A MIXTURE OF TWO OR MORE SPECIES MAY BE NECESSARY. HOWEVER, APPLICATION RATES SHOULD NOT EXCEED THE TOTAL RECOMMENDED RATE PER ACRE. 4.TEMPORARY SEED SHOULD BE MIXED AND APPLIED SIMULTANEOUSLY WITH THE PERMANENT SEED MIX IF OPTIMAL PLANTING DATES ALLOW. PERMANENT SEEDING SCHEDULE: PLANT MATERIAL SELECTION 1.REFER TO TABLE 6.24C BELOW FOR APPROPRIATE SELECTIONS OF NATIVE PERMANENT SEEDS. 2.PERMANENT SEED INCLUSION IN THE MIXTURE SHOULD TOTAL 15 LBS OF PURE LIVE SEED (PLS) PER ACRE DRILLED OR 15-20 LBS pls/AC BROADCAST APPLIED. 3.AT LEAST 4 SPECIES SHOULD BE SELECTED FOR THE MIXTURE INCLUDING ONE SPECIES FROM EACH TYPE (WARM SEASON, COLD SEASON, WETLAND). SELECTION OF MORE THAN 4 SPECIES IS RECOMMENDED FOR INCREASING CHANCES OF SUCCESSFUL VEGETATION ESTABLISHMENT. 4.IF OTHER SPECIES SUCH AS WILDFLOWERS ARE ADDED TO THE MIX, THEY SHOULD NOT BE COUNTED IN THE MINIMUM SEEDING RATE FOR GRASSES. SEEDBED PREPARATION 1.DISTURBED SOILS WITHIN RIPARIAN AREAS MUST BE AMENDED TO PROVIDE AN OPTIMUM ENVIRONMENT FOR SEED GERMINATION AND SEEDLING GROWTH. 2.THE pH OF THE SOIL MUST BE SUCH THAT IT IS NOT TOXIC AND NUTRIENTS ARE AVAILABLE. 3.SOIL ANALYSIS SHOULD BE PERFORMED TO DETERMINE NUTRIENT AND LIME NEEDS OF EACH SITE. 4.APPROPRIATE pH LEVELS ARE BETWEEN 5.5 - 7. 5.RIPARIAN BUFFERS REGULATED FOR NUTRIENT MANAGEMENT MAY BE LIMITED TO A SINGLE APPLICATION OF FERTILIZER. 6.SUITABLE MECHANICAL MEANS SUCH AS DISKING, RAKING, OR HARROWING MUST BE EMPLOYED TO LOOSEN COMPACTED SOIL PRIOR TO SEEDING. PLANTING 1.APPLY SEED UNIFORMLY WITH A CYCLONE SEEDER, DROP-TYPE SPREADER, DRILL, OR HYDROSEEDER ON A FIRM, FRIABLE SEEDBED. 2.IN FINE SOILS, SEEDS SHOULD BE DRILLED 0.25 - 0.5 INCHES. IN COARSE SANDY SOILS, SEEDS SHOULD BE PLANTED NO DEEPER THAN 0.75 INCHES. MULCH 1.MULCH ALL PLANTINGS IMMEDIATELY AFTER SEEDING. 2.IF PLANTING ON STREAM BANKS STEEPER THAN 10% OR AREAS SUBJECT TO FLOODING, A BIODEGRADABLE ROLLED EROSION CONTROL PRODUCT IS RECOMMENDED TO HOLD SEED AND SOIL IN PLACE. MAINTENANCE 1.THE RECOMMENDED PERMANENT GRASS SPECIES MAY REQUIRE TWO YEARS FOR ESTABLISHMENT, DEPENDING ON SITE CONDITIONS. 2.INSPECT SEEDED AREAS FOR FAILURE AND MAKE NECESSARY REPAIRS, SOIL AMENDMENTS, AND RE-SEEDINGS. 3.IF WEEDY EXOTIC SPECIES HAVE TAKEN OVER THE AREAS AFTER THE FIRST GROWING SEASON, THE INVASIVE SPECIES MUST BE ERADICATED TO ALLOW NATIVE SPECIES TO GROW. 4.MONITOR THE SITE UNTIL LONG-TERM STABILITY HAS BEEN ESTABLISHED. SEEDBED PREPARATION 1.CHISEL COMPACTED AREAS AND SPREAD TOPSOIL 3-4 INCHES DEEP OVER ADVERSE SOIL CONDITIONS. TOPSOIL SHOULD BE INCORPORATED INTO THE FINAL GRADING OF THE BASIN SIDE SLOPES AND SHALLOW LAND AND SHALLOW WATER AREAS. CONTRACTOR SHOULD SCARIFY THE TOP 3-4 INCHES OF THE COMPACTED FILL TO PROMOTE BONDING WITH TOPSOIL. 2.RIP THE ENTIRE AREA TO 6 INCHES DEPTH. 3.REMOVE ALL LOOSE ROCK, ROOTS, AND OTHER OBSTRUCTIONS LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM. 4.PER ONE TIME ONLY, APPLY AGRICULTURAL LIME, FERTILIZER, AND SUPERPHOSPHATE UNIFORMLY AND MIX WITH SOIL. 5.CONTINUE TILLAGE UNTIL A WELL-PULVERIZED, FIRM REASONABLY UNIFORM SEEDBED IS PREPARED 4 TO 6 INCHES DEEP. 6.SEED ON A FRESHLY PREPARED SEEDBED AND COVER. 7.ONCE SEED MIX HAS BEEN APPROPRIATELY APPLIED TO THE AREA, COVER WITH EROSION CONTROL BLANKET IMMEDIATELY (SEE DETAIL SHEET C9.2). 8.INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR RESEEDINGS WITHIN THE PLANTING SEASON, IF POSSIBLE. AFTER PERMANENT COVER IS ESTABLISHED. 9.CONSULT CONSERVATION INSPECTOR ON MAINTENANCE TREATMENT. PLANTING INSTRUCTIONS PLANTING TECHNIQUES A.INSURE THAT ROOTS, ONCE REMOVED FROM POT, ARE STRAIGHTENED AND FACE DOWNWARD. B.CREATE PLANTING AREA FOR EACH PLANT AND EXCAVATE PIT. C.PLACE PLANTS IN PIT INSURING ROOTS ARE FACING COMPLETELY DOWNWARD. D.HEEL IN SOIL AROUND PLANT AND PROCEED TO NEXT PLANTING LOCATION. E.NEWLY PLANTED PLANTS NEED TO BE FASTENED TO THE SUBSTRATE FOR THE ESTABLISHMENT OF NEW ROOTS. F.ROOTS SHALL BE SPREAD IN THEIR NORMAL POSITION. ALL BROKEN OR FRAYED ROOTS HALL BE CUT OFF CLEANLY. G.THE DIAMETER OF THE PITS FOR ALL VEGETATIVE STOCK SHALL BE AT LEAST THREE TIMES THE DIAMETER OF THE ROOT MASS. PLANT PIT WALL SHALL BE SCARIFIED PRIOR TO PLANT INSTALLATION. H.SET THE PLANTS UPRIGHT, IN THE CENTER OF THE PIT. THE BOTTOM OF THE ROOT MASS SHOULD BE RESTING ON UNDISTURBED SOIL. I.PLACE THE BACKFILL AROUND THE BASE AND SIDES OF THE ROOT MASS, AND WORK EACH LAYER TO SETTLE BACKFILL AND TO ELIMINATE VOIDS AND AIR POCKETS. WHEN PIT IS APPROXIMATELY 2/3 FULL, WATER THOROUGHLY BEFORE PLACING REMAINDER OF THE BACKFILL. WATER AGAIN AFTER PLACING FINAL LAYER OF BACKFILL. J.BROKEN OR DAMAGED PARTS WILL BE CUT BACK TO UNDAMAGED TISSUE, LEAVING AS MUCH GREEN BASAL TISSUE AS POSSIBLE ABOVE THE ROOTS. IF MORE THAN FIFTY PERCENT (50%) OF THE PLANT IS DAMAGED THEN CONTRACTOR SHALL REPLACE THE PLANT. CONTAINER STOCK / BARE ROOT A.STOCK SHALL HAVE BEEN GROWN IN A CONTAINER LONG ENOUGH FOR THE ROOT SYSTEM TO HAVE DEVELOPED SUFFICIENTLY TO HOLD ITS SOIL TOGETHER ONCE REMOVED FROM THE CONTAINER. B.CONTAINER PLANTS WILL NEED TO BE WATERED REGULARLY AND PLACED IN SHADY CONDITIONS UNTIL PLANTING OCCURS. C.BARE ROOT PLANTS ARE FOR IMMEDIATE PLANTING, OTHERWISE SEE D) BELOW. D.IF BARE ROOTS SPECIMENS ARE NOT TO BE PLANTED WITHIN FOUR (4) DAYS, TEMPORARY HOLDING OF BARE ROOT SPECIMENS ARE TO BE COVERED ENTIRELY BY A SUITABLE MEDIUM (ETC. SOIL, SAWDUST, MULCH OR THE LIKE) AND WATERED REGULARLY SO AS TO NOT DRY OUT. PLANT LOCATIONS A.NEW PLANTINGS SHALL BE LOCATED WHERE SHOWN ON PLAN EXCEPT WHERE CHANGES HAVE BEEN MADE IN PROPOSED CONSTRUCTION. B.NECESSARY ADJUSTMENTS SHALL BE MADE ONLY AFTER APPROVAL BY THE OWNER OR THE OWNER'S REPRESENTATIVE. WATER WATER SHALL BE POTABLE AND SHALL NOT CONTAIN ELEMENTS TOXIC TO PLANT LIFE. PLANTING PLAN WETLAND SEED MIX: RECOMMENDED APPLICATION RATE: 20 TO 25 LBS PER ACRE RIPARIAN BUFFER SEED MIX: RECOMMENDED APPLICATION RATE: 20 TO 25 LBS PER ACRE C5.03 HLE18020-D1 RAS NB N.T.S. STREAMDETAILS CLIENT REVISIONS PROJECT NO.HLE-18020 FILENAME CHECKED BY DRAWN BY SCALE DATE 05. 06. 2019 X:\Projects\HLE\HLE-18020\Storm\Stream Relocation\Current Drawings\HLE18020-D1.dwg, 5/13/2020 5:27:26 PM, Stubbs, RebeccaThe John R. McAdams Company, Inc. 2905 Meridian Parkway Durham, NC 27713 phone 919. 361. 5000 fax 919. 361. 2269 license number: C-0293 www.mcadamsco.com OLDE TOWNE - PHASE 1 SUBDIVISIONSTREAM RELOCATIONRALEIGH, NORTH CAROLINASHEET PLAN INFORMATION HALLE BUILDING GROUP 56 HUNTER STREET, SUITE 110 APEX, NORTH CAROLINA 27502 PHONE: 919. 387. 1885 PRELIMINARY DRAWING - NOT RELEASED FOR CONSTRUCTION CROSS-SECTION VIEW N.T.S. EROSION CONTROL BLANKET DETAILS NOTES: 1.AN EROSION CONTROL BLANKET SHALL BE USED TO STABILIZE THE NEWLY CONSTRUCTED CHANNEL FROM THE TOP OF BANK TO TOE OF SLOPE AND SHALL BE 100% BIODEGRADABLE. 2.THE CHANNEL SIDE SLOPES SHALL BE FINE GRADED, SEEDED, FERTILIZED, AND LIMED PRIOR TO INSTALLING THE EROSION CONTROL BLANKET. REMOVE ROOTS, TWIGS, AND OTHER DEBRIS WHICH WOULD CAUSE BULGES IN THE MATTING AS WELL AS PREVENT THE MATTING FROM BEING LAID FLUSH TO THE FINISHED SURFACE. 3.KEY-IN EDGES OF MATTING A MINIMUM OF 6 INCHES INTO FINISHED GRADE. LAY MATTING SHINGLED DOWNSTREAM TO UPSTREAM, OVERLAPPING AT EDGES A MINIMUM OF 1 FOOT. 4.INSTALL STAKES TO ENSURE GOOD GROUND CONTACT OF THE MATTING TO WITHSTAND MEDIUM TO HIGH FLOWS. STAKES SHALL BE 100% BIODEGRADABLE AND INSTALLED PER THE MANUFACTURER'S SPECIFICATIONS INCLUDING, BUT NOT LIMITED TO, THE MANUFACTURER'S RECOMMENDED DENSITY AND PATTERN. 5.KEY-IN EDGES OF MATTING A MINIMUM OF 6 INCHES, PARTICULARLY NEAR RESTORATION STRUCTURES, BOULDERS, LOGS, ETC. CHECK MATTING FOR LOOSE ENDS, FLAPS, OR OTHER WEAKNESSES OR DAMAGE WHICH MAY CAUSE IT TO BECOME LOOSE UNDER FLOW CONDITIONS. 6.THE EROSION CONTROL BLANKET SHALL CONSIST OF A MACHINE-PRODUCED BLANKET MADE OF COCONUT FIBER AND BE EQUIVALENT OR BETTER THAN THE FOLLOWING SPECIFICATION. SOIL STABILIZATION MATTING WHICH USES PLASTICS, METALS, OR OTHER MAN-MADE MATERIALS IN THE CONSTRUCTION OF THE MATERIAL WILL NOT BE PERMITTED. WEIGHT = 13.6 OZ/SY TENSILE STRENGTH DRY (ASTM D 4595) = 780 LBS/FT MACHINE DIRECTION 744 LBS/FT CROSS DIRECTION TENSILE STRENGTH WET (ASTM D 4595) = 672 LBS/FT MACHINE DIRECTION 648 LBS/FT CROSS DIRECTION ELONGATION FAILURE WET (ASTM D 4595) = 30% MACHINE DIRECTION 28% CROSS DIRECTION OPEN AREA = 65% RECOMMENDED SHEAR STRESS = 3LBS/SQ.FT. RECOMMENDED FLOW = 8FT/S RECOMMENDED SLOPE </= 1:1 MINIMUM TWINE COUNT PER FOOT = 15X14 SLOPE APPLICATION ISOMETRIC VIEW NOTES: 1.AREAS NOTED AS LIVE STAKES WITHIN THE PLANTING ZONE SHALL BE PLANTED WITH RIVER BIRCH (BETULA NIGRA). 2.ONE LIVE STAKE SPECIES PER LIVE STAKE AREA. ALTERNATE SPECIES PER LIVE STAKE AREA. 3.ALL LIVE STAKES SHALL BE DORMANT AT TIME OF ACQUISITION AND PLANTING. 4.LIVE STAKES SHALL BE 1/2-2” IN DIAMETER. LIVE STAKES SHALL ALSO BE 2 - 4 FEET IN LENGTH. 5.DURING PREPARATION, THE BASAL ENDS OF THE LIVE STAKES SHALL BE CLEANLY CUT AT AN ANGLE TO FACILITATE EASY INSERTION INTO THE SOIL, WHILE THE TOPS SHALL BE CUT SQUARE OR BLUNT FOR TAMPING. ALL LIMBS SHALL BE REMOVED FROM THE SIDES OF THE LIVE CUTTING PRIOR TO INSTALLATION. 6.CUTTINGS FOR LIVE STAKES SHALL BE HARVESTED IN A MANNER SUCH THAT THEY ARE CUT, IMMEDIATELY PUT INTO WATER TO BE SOAKED FOR 10 DAYS, AND THEN PLANTED IMMEDIATELY AFTER THE 10 DAYS ARE COMPLETED. CUTTINGS SHALL REMAIN WET UNTIL THEY ARE PLANTED. OUTSIDE STORAGE LOCATIONS SHOULD BE CONTINUALLY SHADED AND PROTECTED FROM WIND AND DIRECT SUNLIGHT. 7.LIVE STAKES SHALL BE TAMPED AT AN ANGLE INTO THE GROUND SURFACE WITH A DEAD BLOW HAMMER, WITH BUDS ORIENTED IN AN UPWARD DIRECTION. STAKES SHOULD BE TAMPED UNTIL APPROXIMATELY 3/4 OF THE STAKE LENGTH IS WITHIN THE GROUND. ANY STAKES THAT ARE SPLIT OR DAMAGED DURING INSTALLATION SHALL BE REMOVED AND REPLACED. 8.THE AREA AROUND EACH LIVE STAKE SHALL BE COMPACTED BY FOOT AFTER THE LIVE STAKE HAS BEEN INSTALLED. 9.ONE TO TWO INCHES SHALL BE CUT CLEANLY OFF OF THE TOP OF EACH LIVE STAKE (WITH LOPPERS) AT AN ANGLE OF APPROXIMATELY 15 DEGREES FOLLOWING INSTALLATION. LIVE STAKE DETAIL N.T.S. GENERAL NOTES: 1.A LOG SILL MAY BE USED ALONE OR IN COMBINATION WITH A CONSTRUCTED RIFFLE. 2.AN ELEVATION CONTROL POINT SHALL BE DESIGNATED AT THE CENTER OF THE SILL TO ESTABLISH PART OF THE PROFILE. POOL ELEVATION CONTROL POINTS OR EXCAVATION TO A SPECIFIED MAXIMUM POOL DEPTH SHALL BE DESIGNATED TO ESTABLISH THE REMAINING PROFILE. SURVEY OF CONTROL POINTS SHALL BE REQUIRED TO ESTABLISH ACCURATE INSTALLATION WITHIN THE TOLERANCE SPECIFIED BY THE DESIGNER. 3.NO PART OF THE SILL SHALL BE PLACED ABOVE THE ELEVATION OF THE STREAM BED. 4.REFER TO THE PLAN-PROFILE FOUND ON SHEETS C5.00 AND C5.01 FOR THE STATION LOCATIONS AND CONTROL POINT ELEVATIONS OF EACH LOG SILL SPECIFIED FOR THE PROJECT. 5.LOGS SHALL BE OF A LENGTH AND DIAMETER SPECIFIED BY THE DESIGNER AND BE ROT-RESISTANT, RELATIVELY STRAIGHT HARDWOOD, RECENTLY HARVESTED. THE LENGTH OF THE SILL EMBEDDED INTO EACH BANK SHALL EQUAL OR EXCEED THE DIMENSIONS SHOWN IN SECTION B'-B' OF THIS DETAIL. 6.A SINGLE LOG MAY BE USED IN LIEU OF A HEADER/FOOTER LOG COMBINATION. 7.FILTER FABRIC OF A TYPE AND SIZE SPECIFIED BY THE DESIGNER SHALL BE USED TO SEAL THE GAPS BETWEEN THE LOG(S) AND THE STREAM BED, UNDER THE COARSE BACKFILL MATERIAL. THE FABRIC SHALL BE NAILED TO THE ENTIRE LENGTH HEADER LOG USING A GALVANIZED NAIL WITH A PLASTIC CAP. THE SIZE AND GAGE OF NAIL AND NAIL SPACING SHALL BE SPECIFIED BY THE DESIGNER. THERE SHALL BE NO FILTER FABRIC VISIBLE IN THE FINISHED WORK; EDGES SHALL BE FOLDED, TUCKED, OR TRIMMED AS NEEDED. 8.COARSE BACKFILL OF THE LOG SILL SHALL BE OF A TYPE, SIZE, AND GRADATION AS SPECIFIED BY THE DESIGNER. COARSE BACKFILL SHALL BE PLACED TO A THICKNESS EQUAL TO THE DEPTH OF THE HEADER (AND ANY FOOTER) LOGS AND SHALL EXTEND UPSTREAM FROM THE SILL A DISTANCE SPECIFIED BY THE DESIGNER. IN-STREAM LOG SILL DETAIL CONSTRUCTION GUIDELINES: 1.STREAM SHALL BE DIVERTED AWAY FROM THE WORK AREA AND THE SITE SHALL BE DEWATERED. 2.OVER-EXCAVATE STREAM BED TO A DEPTH EQUAL TO THE TOTAL THICKNESS AND LENGTH OF THE HEADER (AND FOOTER IF SPECIFIED) LOGS. 3.PLACE FOOTER LOGS, IF SPECIFIED, PERPENDICULAR TO THE PROPOSED CHANNEL WITHIN THE EXCAVATED TRENCH. A LAYER OF BEDDING MATERIAL UNDER THE FOOTER LOG MAY BE SPECIFIED BY THE DESIGNER. 4.INSTALL HEADER LOG ON TOP OF THE FOOTER LOG. HEADER LOG MAY BE SET FORWARD OR BACK FROM FOOTER LOG AS AN OPTION. THE TOP OF THE HEADER LOG SHALL CONFORM TO THE STREAM BED ELEVATION AT THE LOCATION WHICH IT IS PLACED. 5.SECURE LOG(S) WITH ANCHORS AT MAXIMUM SPACING OF 2 FEET ON CENTER. ANCHORS SHALL BE 1 4" DIAMETER MINIMUM REBAR OR DRIFT PIN. ANCHOR MUST HAVE SUFFICIENT LENGTH TO PASS THROUGH BOTH LOGS AND ENTER THE GROUND AT LEAST 6 INCHES. 6.PLACE FILTER FABRIC BEHIND LOG SILL AND ALONG THE BOTTOM OF THE STREAM BED. NAIL FILTER FABRIC TO THE HEADER LOG. 7.PLACE COARSE BACKFILL BEHIND LOG(S) ENSURING THAT ANY VOIDS BETWEEN THE LOGS ARE FILLED. 8.TRIM ANY EXPOSED FILTER FABRIC AROUND THE SILL INSTALLATION. CHECK PROPER FUNCTINO/FLOW PATH BY OBSERVING FLOW OVER STRUCTURE. REPAIR AS NEEDED TO ENSURE PROPER FUNCTION. 9.ENSURE NO LEAKAGE/FLOW UNDER OR AROUND STRUCTURE BY PROPERLY GRADING, SEALING, AND COMPACTING UNDER AND AROUND THE STRUCTURE. 10.EROSION CONTROL BLANKET SHALL BE INSTALLED IN AREAS SHOWN ON THIS DETAIL AND IN COMPLIANCE WITH INSTALLATION INSTRUCTIONS ON THE EROSION CONTROL DETAIL ON SHEET C5.03. CHANNEL PLUG NOTES: 1.CHANNEL PLUGS TO BE LOCATED AS SHOWN ON PLAN SHEETS C5.01 AND AT OTHER LOCATIONS AS DIRECTED BY THE CONSTRUCTION MANAGER. 2.CHANNEL PLUG MATERIAL SHALL BE CLAY SOIL HARVESTED ON SITE OR BROUGHT INTO THE SITE AS WELL AS MATERIAL USED IN REMOVED ROCK CHECK DAMS IF SUITABLE. 3.CHANNEL MATERIAL SHALL BE FREE OF ALL VISIBLE ORGANIC DEBRIS SUCH AS ROOTS AND LIMBS. SOILS WITH ORGANIC MATTER CONTENT EXCEEDING 5% BY WEIGHT SHALL NOT BE USED. 4.ROCKS AND STONES WITH A DIAMETER GREATER THAN 3 INCHES (IN ANY DIRECTION) SHALL BE REMOVED FROM FILL PRIOR TO COMPACTION. 5.FILL MATERIAL PLACED AT DENSITIES LOWER THAN SPECIFIED MINIMUM DENSITIES OR AT MOISTURE CONTENTS OUTSIDE THE SPECIFIED RANGES OR OTHERWISE NOT CONFORMING TO THE SPECIFIED REQUIREMENTS SHALL BE REMOVED AND REWORKED AND REPLACED WITH ACCEPTABLE MATERIALS. 6.TOPSOIL SHALL BE PLACED ON TOP OF THE SOIL LIFTS IN THE SAME MANOR AS THE REST OF THE GRADED CONSTRUCTION SITE 7.CHANNEL PLUGS WILL BE PLANTED ACCORDING TO THE PLANTING PLAN ON SHEETS C5.02. N.T.S. IMPERVIOUS CHANNEL PLUG DETAILS SECTION A-A' SECTION B-B' PLAN VIEW N.T.S. LOG SILL TOE GENERAL NOTES: 1.NO PART OF THE SILL SHALL BE PLACED ABOVE THE ELEVATION OF THE STREAM BANK. 2.REFER TO THE PLAN-PROFILE FOUND ON SHEET C5.00 FOR THE STATION LOCATIONS AND ELEVATIONS OF EACH LOG SILL TOE SPECIFIED FOR THE PROJECT. 3.LOGS SHALL BE OF A LENGTH AND DIAMETER SPECIFIED BY THE DESIGNER AND BE ROT-RESISTANT, RELATIVELY STRAIGHT HARDWOOD, RECENTLY HARVESTED. THE LENGTH OF THE SILL EMBEDDED INTO EACH BANK SHALL EQUAL OR EXCEED THE DIMENSIONS SHOWN IN SECTION A'-A' OF THIS DETAIL. CONSTRUCTION GUIDELINES: 1.STREAM SHALL BE DIVERTED AWAY FROM THE WORK AREA AND THE SITE SHALL BE DEWATERED. 2.OVER-EXCAVATE OLD STREAM BED TO A DEPTH EQUAL TO THE TOTAL THICKNESS AND LENGTH OF THE SPECIFIED LOGS. 3.PLACE LOG(S), PERPENDICULAR TO THE OLD CHANNEL WITHIN THE EXCAVATED TRENCH. A LAYER OF BEDDING MATERIAL UNDER THE FOOTER LOG MAY BE SPECIFIED BY THE DESIGNER. 4.THE TOP OF THE LOG SHALL CONFORM TO THE STREAM BED ELEVATION AT THE LOCATION WHICH IT IS PLACED. 5.SECURE LOG(S) WITH ANCHORS AT MAXIMUM SPACING OF 2 FEET ON CENTER. ANCHORS SHALL BE 1 4" DIAMETER MINIMUM REBAR OR DRIFT PIN. ANCHOR MUST HAVE SUFFICIENT LENGTH TO PASS THROUGH BOTH LOGS AND ENTER THE GROUND AT LEAST 6 INCHES. 6.CHECK PROPER FUNCTION/FLOW PATH BY OBSERVING FLOW PAST STRUCTURE. REPAIR AS NEEDED TO ENSURE PROPER FUNCTION. 7.ENSURE NO LEAKAGE/FLOW UNDER OR AROUND STRUCTURE BY PROPERLY GRADING, SEALING, AND COMPACTING UNDER AND AROUND THE STRUCTURE. 8.EROSION CONTROL BLANKET SHALL BE INSTALLED IN AREAS SHOWN ON THIS DETAIL AND IN COMPLIANCE WITH INSTALLATION INSTRUCTIONS ON THE EROSION CONTROL DETAIL ON SHEET C5.03. GRAPHIC SCALE 0 10 20 40 1 inch = 20 ft. C5.04 HLE18020-S1 1" = 20' PROPOSED STORMWATER CONTROL MEASURE PERMANENT CLIENT REVISIONS PROJECT NO.HLE-18020 FILENAME CHECKED BY DRAWN BY SCALE DATE 05. 15. 2020 X:\Projects\HLE\HLE-18020\Storm\Stream Relocation\Current Drawings\HLE18020-S1.dwg, 5/16/2020 11:31:11 AM, Stubbs, RebeccaThe John R. McAdams Company, Inc. 2905 Meridian Parkway Durham, NC 27713 phone 919. 361. 5000 fax 919. 361. 2269 license number: C-0293 www.mcadamsco.com OLDE TOWNE - PHASE 1 SUBDIVISIONSTREAM RELOCATIONRALEIGH, NORTH CAROLINASHEET PLAN INFORMATION HALLE BUILDING GROUP 56 HUNTER STREET, SUITE 110 APEX, NORTH CAROLINA 27502 PHONE: 919. 387. 1885 FINAL DRAWING - NOT RELEASED FOR CONSTRUCTION CONSERVATION AREA RAS RAS SITE LEGEND TREE LEGEND