Loading...
HomeMy WebLinkAbout20180260 Ver 2_USACE Permit_20200518DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403-1343 May 18, 2020 Regulatory Division Action ID No. SAW-2017-02514 and State Permit No. 67-18 City of Jacksonville c/o Ms. Pat Donovan-Bradenburg Post Office Box 128 Jacksonville, North Carolina 28540 Pdonovan-Bradenburg_gi acksonvillenc. gov Ms. Donovan-Bradenburg: Reference the application of the City of Jacksonville to construct Phase II of the New River Oyster Highway project by construction of six additional oyster/fish reefs in waters of Farnell Bay and Morgan Bay, in the New River. The NRE is in the White Oak River Basin, the projects are located at the following locations: Reef #7 centered at 34' 41'51" N, 77' 22'27" W, Reef #8 centered at 34' 37'52" N, 77' 20'49" W, Reef #9 centered at 34' 37' 12" N, 77' 23'06" W, Reef #10 centered at 34' 37'25" N, 77' 22'33" W, Reef #11 centered at 34' 40'48" N, 77' 24'01" W, Reef #12 centered at 34' 43'08" N, 77' 25'51" W. Your proposal has been reviewed and found to be consistent with the provisions and objectives of the CAMA-Corps Programmatic Permit process (copy attached) for construction activities that receive authorization from the State of North Carolina. Therefore, you may commence construction activity in strict accordance with applicable State authorization, attached Federal special conditions, and the approved plan. Failure to comply with the State authorization or conditions of the Federal permit could result in civil and/or administrative penalties. If any change in your work is required because of unforeseen or altered conditions or for any other reason, plans revised to show the change must be sent promptly to this office and the North Carolina Division of Coastal Management prior to performing any such change or alteration. Such action is necessary as revised plans must be reviewed and the authorization modified. Your Department of the Army permit will expire on December 31, 2021. Questions or comments may be addressed to Ms. Liz Hair, Wilmington Field Office, Regulatory Branch, telephone 910-251-4049 or by email sarah.e.hair@usace.army.mil. Sincerely, igitally signed by HAI(R.SARAKE DAIR.SARAH EA.11054693512 ALiz Ha14g351jectM Date- 0.05.1811:58:20 Wilmington Regulatory Field Office -2- Enclosures: Special Conditions Plans GP 291 conditions CAMA permit Manatee Guidelines Sea Turtle and small sawtooth construction conditions Electronic Copies Furnished (without enclosures): Mr. Paul Wojoski Division of Water Resources North Carolina Department of Environmental Quality Mr. Pete Benjamin/Mr. John Ellis U.S. Fish and Wildlife Service Fish and Wildlife Enhancement Mr. Fritz Rohde/Ms. Twyla Cheatwood/ Dr. Pace Wilber National Marine Fisheries Service Habitat Conservation Division Mr. Todd Allen Bowers US EPA Region 4 Life Scientist Water Protection Division Mr. Robb Mairs Division of Water Resources North Carolina Department of Environmental Quality Mr. Gregg Bodnar Division of Coastal Management North Carolina Department of Environmental Quality