HomeMy WebLinkAbout20181041 Ver 4_USACE Permit_20200518U.S. ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Action Id. SAW-2017-02329 County: Alamance U.S.G.S. Quad: NC -Mebane
GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION
Permittee:
Desco Holdings, LLC
Attn: Eric Dischinger
Address:
600 Market Street
Chanel Hill, NC 27516
Size (acres)
233.89
Nearest Waterway
Haw Creek
USGS HUC
03030002
Nearest Town Mebane
River Basin Cane Fear
Coordinates 36.045224 N,-79.294381 W
Location description: The pro aect area is located between the eastern terminus of Rock Bridge Drive and the western terminus
of Burgess Drive, in Mebane, Alamance County, North Carolina.
Description of projects area and activity: This verification authorizes the permanent discharge of fill material into 124 linear feet
of stream channel (94 linear feet of which constitute a permanent loss of waters), and the temporary discharge of dredged or
fill material into 20 linear feet of stream channel necessary to construct access and infrastructure for phase 2 of the
Cambridge Park residential subdivision.
Applicable Law(s): ® Section 404 (Clean Water Act, 33 USC 1344)
❑ Section 10 (Rivers and Harbors Act, 33 USC 403)
Authorization: NWP 29. Residential Developments
REMARKS: See also NW 29 permit verification dated 5/22/2019 for an earlier phase of the Cambridge Park single and
complete project.
SEE ATTACHED NWP GENERAL, REGIONAL, AND/OR SPECIAL CONDITIONS
Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the enclosed
Conditions, your application signed and dated 1/21/2020, and the enclosed plans "Cambridge Park -Phase 2 Stream Wetland
Impacts 11-12" "Overall'. "Impact-11 (Stream Impact)'. "Imuact-11 (Wetlands -A Impact)", and "Detail Sheet" dated
1/20/2020. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop
work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action.
This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified, suspended
or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/or modified, this
verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified
nationwide permit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would
no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction)
or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed
within twelve months of the date of the nationwide permit's expiration, modification or revocation, unless discretionary authority has
been exercised on a case -by -case basis to modify, suspend or revoke the authorization.
Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You
should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements.
For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (LAMA), prior
to beginning work you must contact the N.C. Division of Coastal Management.
This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State
or local approvals/permits.
If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program,
please contact David E. Bailey at (919) 554-4884 X 30 or David.E.Bailey2(&usace.army.mil.
Date: 2020.02.06 12:14:55-05'00'
Corps Regulatory Official: Date: 02/06/2020
Expiration Date of Verification: 03/18/2022
SAW-2017-02329
SPECIAL CONDITIONS
1. In order to compensate for impacts associated with this permit, mitigation shall be provided in
accordance with the provisions outlined on the most recent version of the attached Compensatory
Mitigation Responsibility Transfer Form. The requirements of this form, including any special
conditions listed on this form, are hereby incorporated as special conditions of this permit
authorization.
2. Rip rap placed for the rip rap dissipator pad shown downstream of the 48" RCP on the plan sheet
labeled Impact-11 (Stream Impact), Cambridge Park -Phase 2 Stream/Wetland Impacts 11-12
must be "keyed -in" to the stream bed, and generally follow the existing stream bank contours
within the footprint shown on the plan sheet out to 5 feet beyond the top of bank of the north
stream bank.
3. Please note that future impacts and/or phases of the Cambridge Park development project and
related activities associated with Corps Action ID: SAW-2017-02329 will be considered part of a
single and complete project; these impacts will be considered cumulative with impacts permitted
during earlier phases regarding compensatory mitigation and Nationwide Permit thresholds.
Current cumulative impacts to aquatic resources for this single and complete project include
permanent impacts to 309 feet (0.03 acre) of stream channel (184 linear feet [0.02 acre] of which
are considered a loss) and 0.015 acre of wetlands, and temporary impacts to 160 linear feet (0.022
acre) of stream channel. This amounts to a total loss of potential waters of the US of 184 linear feet
(0.02 acre) of stream channel and 0.015 acre of wetlands, or 0.017 acre of total waters of the US.
/ Date: 2020.02.06
12:14:42-05'00'
Corps Regulatory Official:
Expiration Date of Verification: 3/18/2022
Date: 02/06/2020
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so,
please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.gM.mil/cm_apex/Pp=136:4:0.
Copy furnished:
Brad Luckey, Pilot Environmental, Inc. P.O. Box 128, Kernersville, NC 27285
Sue Homewood, NCDEQ-DWR, 450 W. Hanes Mill Rd, Suite 300, Winston-Salem, NC 27105
Compensatory Mitigation Responsibility Transfer Form
Permittee: Desco Holdings, LLC (Attn: Eric Dischinger! Action ID: SAW-2017-02329
Project Name: Cambridge Park / Turner Road / Mebane / Alamance County / residential County: Alamance
Instructions to Permittee: The Permittee must provide a copy of this form to the Mitigation Sponsor, either an approved
Mitigation Bank or the North Carolina Division of Mitigation Services (NCDMS), who will then sign the form to verify the
transfer of the mitigation responsibility. Once the Sponsor has signed this form, it is the Permittee's responsibility to ensure
that to the U.S. Army Corps of Engineers (USACE) Project Manager identified on page two is in receipt of a signed copy of this
form before conducting authorized impacts, unless otherwise specified below. If more than one mitigation Sponsor will be
used to provide the mitigation associated with the permit, or if the impacts and/or the mitigation will occur in more than one
8-digit Hydrologic Unit Code (HUC), multiple forms will be attached to the permit, and the separate forms for each Sponsor
and/or HUC must be provided to the appropriate mitigation Sponsors.
Instructions to Sponsor: The Sponsor must verify that the mitigation requirements (credits) shown below are available at the
identified site. By signing below, the Sponsor is accepting full responsibility for the identified mitigation, regardless of
whether or not they have received payment from the Permittee. Once the form is signed, the Sponsor must update the bank
ledger and provide a copy of the signed form and the updated bank ledger to the Permittee, the USACE Project Manager, and
the Wilmington District Mitigation Office (see contact information on page 2). The Sponsor must also comply with all
reporting requirements established in their authorizing instrument.
Permitted Impacts and Compensatory Mitigation Requirements:
Permitted Impacts Requiring Mitigation* 8-digit HUC and Basin: 03030002, Cape Fear River Basin
Stream Impacts linear feet)
Wetland Impacts (acres)
Warm
Cool
Cold
RiparianRiverine
Riparian Non-Riverine
Non -Riparian
Coastal
94
*If more than one mitigation sponsor will be used for the permit, only include impacts to be mitigated by this sponsor.
Compensatory Mitigation Requirements: 8-digit HUC and Basin: 03030002, Cape Fear River Basin
Stream Mitigation (credits)
Wetland Mitigation (credits)
Warm
Cool
Cold
Riparian
Riparian Non -
Non -Riparian
Coastal
Riverine
Riverine
188
Mitigation Site Debited: Restoration Systems - Cape Fear 02 Umbrella Mitigation Bank (Motes Creek site)
(List the name of the bank to be debited. For umbrella banks, also list the specific site. For NCDMS, list NCDMS. If the NCDMS
acceptance letter identifies a specific site, also list the specific site to be debited).
Section to be completed by the Mitigation Sponsor
Statement of Mitigation Liability Acceptance: I, the undersigned, verify that I am authorized to approve mitigation
transactions for the Mitigation Sponsor shown below, and I certify that the Sponsor agrees to accept full responsibility for
providing the mitigation identified in this document (see the table above), associated with the USACE Permittee and Action
ID number shown. I also verify that released credits (and/or advance credits for NCDMS), as approved by the USACE, are
currently available at the mitigation site identified above. Further, I understand that if the Sponsor fails to provide the
required compensatory mitigation, the USACE Wilmington District Engineer may pursue measures against the Sponsor to
ensure compliance associated with the mitigation requirements.
Mitigation Sponsor Name:
Name of Sponsor's Authorized Representative:
Signature of Sponsor's Authorized Representative Date of Signature
Conditions for Transfer of Compensatory Mitigation Credit:
• Once this document has been signed by the Mitigation Sponsor and the USACE is in receipt of the signed form, the
Permittee is no longer responsible for providing the mitigation identified in this form, though the Permittee remains
responsible for any other mitigation requirements stated in the permit conditions.
• Construction within jurisdictional areas authorized by the permit identified on page one of this form can begin only after
the USACE is in receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor has accepted
responsibility for providing the mitigation requirements listed herein. For authorized impacts conducted by the North
Carolina Department of Transportation (NCDOT), construction within jurisdictional areas may proceed upon permit
issuance; however, a copy of this form signed by the Sponsor must be provided to the USACE within 30 days of permit
issuance. NCDOT remains fully responsible for the mitigation until the USACE has received this form, confirming that the
Sponsor has accepted responsibility for providing the mitigation requirements listed herein.
• Signed copies of this document must be retained by the Permittee, Mitigation Sponsor, and in the USACE administrative
records for both the permit and the Bank/ILF Instrument. It is the Permittee's responsibility to ensure that the USACE
Project Manager (address below) is provided with a signed copy of this form.
• If changes are proposed to the type, amount, or location of mitigation after this form has been signed and returned to
the USACE, the Sponsor must obtain case -by -case approval from the USACE Project Manager and/or North Carolina
Interagency Review Team (NCIRT). If approved, higher mitigation ratios may be applied, as per current District guidance
and a new version of this form must be completed and included in the USACE administrative records for both the permit
and the Bank/ILF Instrument.
Comments/Additional Conditions: A email, dated 5/14/2020, was received from Restoration Systems confirming they are
willing and able to accept the applicant's compensatory mitigation responsibility.
This form is not valid unless signed below by the USACE Project Manager and by the Mitigation Sponsor on Page 1. Once
signed, the Sponsor should provide copies of this form along with an updated bank ledger to:1) the Permittee, 2) the USACE
Project Manager at the address below, and 3) the Wilmington District Mitigation Office, Attn: Todd Tugwell, 11405 Falls
of Neuse Road, Wake Forest, NC27587 (email: todd.tugwell@usace.army.mil). Questions regarding this form or any of the
permit conditions may be directed to the USACE Project Manager below.
USACE Project Manager: David E. Bailey
USACE Field Office: Raleigh Regulatory Office
US Army Corps of Engineers
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Email: David.E.Bailey2@usace.army.mil
Date: 2020.05.18
08:26:54-04'00'
USACE Project Manager Signature
5/18/2020
Date of Signature
Current Wilmington District mitigation guidance, including information on mitigation ratios, functional assessments, and
mitigation bank location and availability, and credit classifications (including stream temperature and wetland groupings) is
available at http://ribits.usace.army.mil
�7'Lu is. Jyq r I \ 2sgv
N59'S1'42'E
274.82'
/
'E
1. E 0 143.07' TO
N59SI46359'51'03E L-29�� 36-
'E 176.63L ORHITE
32.30AX
/
qy Pip
—
O I fip ^7 ci
/���u� FUTURE
wd
PHASE -NOT
s
DESIGNED
/J oo lV
I I y
Z47 B'W I I �w
S60'45-20-y/ 563:14•3.W
\ / 138.9, 247,04' Op S662'14-W PROPOSED WET
S7, DETENTION
POND-F
P,S IEEX
[\ ljA NI y N
B, 71 PC.
9�BfP L
ICRETE N
IMPACT-2
'
I
�•i �
I�
1 ��x4� vc:�x 'x x x
=j _ PREVIOUSLY
eb'Z6. PERMITTED
l` 37g9 B,W
l S7z71
36�54?'Iv
1
NOTE: OFFSITE BUFFER IMPACTS
8-10 HAVE BEEN PREVIOUSLY
PERMITTED. (NOT SHOWN)
r
iAAAAA�
♦♦ AAA♦
.�A� ►AAA♦
►�A�A��A�; � AAAAA�A�A� t
°, ._,�AAAAAAAAAAAAAAAA��A�A�
AAAA� �
A�
I pli
ell
IN
7
5 <.
L_ 2(�. L-34\t-J6 L-36
IMPACT-3
)REVIOUSLY
PERMITTED
FUTURE
PHASES -CONCEPTUAL
PROPOSED WET -
DETENTION
POND-E
's
°e
J0
lAk`<477a ° z�''W
'Io BBJ76 ",C
Jg9 rB
77
0
EXISTING WET
DETENTION
POND -A
WEBSTER GROVE SUBDIVISION `J /
P.B. 38 PG. 46
i SEWER _ 6 L
56' \?
CONNECTION L59
�95
POINT FOR PH2 }
IMPACT-4 n
` I PL�47 HASE 2
12 Li 4$...i
PREVIOUSLY
PERMITTED
PHASE 2 W1 '" " "
EXIST.
PHASE 1A
IMPACT-11
u
WETLANDS -A
PHASE 2
/ / nFrr
IMPACT-12
WETLANDS-B
FUTURE
PHASES-CONCEPTUAL
JN
SEWER
CONNECTION
POINT FOR PH2
EXISTING SEWER
OUTFALL
PROPOSED WET
DETENTION
POND-D
JAAIES D, BURGESS A/W
CHERYA P. BURGESS
D.B. 441 PG, 438
PARCEL ID 163231
OLD TAX MAP 10-25-33 - -
' N0.4y.6'75-E �A
-7 ' 55
IMPACT31
SHEET 1 OF 5
PREVIOUSLY BENEG. u11 33;W^RT
" PERMITTED NI PARCEL ID 0-254
OLO TAX MAP 10-25-338
is =-x1 x x x m
/\ /\ /\ i37.1Y\ \ / ESCO MEBANE PARTNERS, LLC
EVIXO-f:FDUC SL JYC D.B. EL I PC. 635
P.B. 45 PG. 163
PARCEL ID 10 253
OlD TAX MAP 10-25-fi0
PERMITTED23.369 ACRES
�! w ,
' /RIEd01 1�0140
1 r.
EXISTING WET
DETENTION
— POND-B
11 INIw w'
EXIST.
PHASE 113
F
ti
IMPACT-6
IAw m o
11�r x ANZ
N
N� 1
slam
�1
S5ofi.6D 41'49'4$'W Op 1
N CA R0�
=OoFESS/0"'
Q �o SZo
SEAL-
= A 18914 4: _
OAF �NGINe
�'
''
OVERALL
CAMBRIDGE PARK-
STREAM/WETLAND IMPACTS 11-12
MELVILLE TOWNSHIP—ALAMANCE COUNTY
MEBANE—NORTH CAROLINA
JANUARY 20, 2020
400 0 200 400 800
1 inch =400ft
1E Vans
Vngineerling, Inc.
—Since 1974—
Engineers Surveyors Planners
4609 Dundas Drive
Greensboro,
North Carolina 27407
Fax 336-854-8876
Phone 336.854-8877
Firm License No.: C-0168
PARK PH2—WULAND IMPACTS—CMUD.DWG
SHEET 2 OF 5
THIS AREA WAS PREVIOUSLY
PERMITTED AS BUFFER --T
IMPACT-7
SLOPES TO BE MATTED
PLACE RIP=R-AP-_5°-BEYOND-
_ 1TOP OF BANK ON NORTH
SIDE ONLY
!QP BANK
IN
- ` /
SEE SHEET 3 FOR
WETLANDS DE_T,4J_ --
" i
i
#J
STREAM IMPACTS:
TEMP. STREAM IMPACT FOR PIPE PUMP AROUND: 20 LF
PERM. STREAM IMPACT - CULVERT & FILL: 94 LF
- KEYED -IN RIP RAP: 30 LF
BUFFER IMPACTS:
ZONE 1 IMPACT: 7,532 SF
ZONE 2 IMPACT: 3,938 SF
SCALE:
PLAN: 1 "=40'
SECTION: HOR.-1 "=40'
VERT.-1 "=4'
CAr�ii��i,,��
I
r _ l
I -� ZONE 2
N /
-_,,,_ZONE -
0
M
F-7 -----
o ZONE 1
o ZONE 2
------- "
' ---TEMP. STREAM IMPACT:
SAND BAGS, #57_STON€-&-H0S€-FOR--
.PIPE PUMP AROUND (CHANNEL MUST BE
'! RESTORED' TO EXISTING CONDITION UPON
COMPLETION}--------
ZONE 1 BUFFER _ ---------
IMPACT -
'r
ZONE"2 BUFFER _ ----
IMPACT - 2,914 SF
IMPACT-11 (STREAM IMPACT)
CAMBRIDGE PARK - PHASE 2
STREAM/WETLAND IMPACTS 11-12
MELVILLE TOWNSHIP-ALAMANCE COUNTY
MEBANE-NORTH CAROLINA
JANUARY 20, 2020
40 0 20 40 80
1 inch =40ft.
SEAL +E vans
70 = 18914 - � _ -----}----
+E)ngineering, Inc,3.
O� / `'' FNG INE��
�� ���ii i�i� �`�� ��� -Since 1974—
I Engineers Surveyors Planners
4609 Dundas Drive
Greensboro,
North Carolina 27407
Fax 336-854.8876
Phone 336.854-8877
Firm License No.: C-0168
PARK PH2-WETLAND IMPACTS-CMUD.DWG
/ool i' F /
-----Ar
--- -� _ , , , _ - , _ - =
TO R
OF --BA / 4
i /
\1�—WC-1
WC-4 \, WETLANDS AR/EA—A /
— cw ZONE 2 \�
WETLANDS AREA —A
PROPOSED FILL —
/
/
/
"This certifies that this copy of this plat accurately depicts the boundary of the jurisdiction
of Section 404 of the Clean Water Act as determined by the undersigned on this date.
Unless there is a change in the law or our published regulations, this determination of
Section 404 jurisdiction may be relied upon for a period not to exceed five years from
this date. This determination was made utilizing the 1987 Corps of Engineers Wetlands
Name: +``r� Gi 7�'wi1�YL \��`�` N CARS
Title: i%J+C�ltO(Jtiis �- ,..
Date: U1 7�•2-� =O, Fess/p y '
2 SEALS
18914
LINE
BEARING
DISTANCE
W-1
N60.32 29 E
5.97
W-2
S24'15 51 E
75.60
W-3
S41.31 20 W
11.72
W-4
N20'51 46
80.00
W-5
44 E
N4$%4
9.37
W-6
S215 51 E
37.19
W-7
I N20'51 46 W
1 38.02
WETLAND AREA -A
TOTAL WETLAND AREA SHOWN: 640 SF
WETLAND AREA FILLED: 354 SF
WETLAND AREA NOT FILLED INDIRECT IMPACT: 286 SF
IMPACT-11 (WETLANDS —A IMPACT)
CAMBRIDGE PARK - PHASE 2
STREAM/WETLAND IMPACTS 11-12
MELVILLE TOWNSHIP—ALAMANCE COUNTY
MEBANE—NORTH CAROLINA
JANUARY 20, 2020
—Since 1974 —
Surveyors Planners
4609 Dundas Drive
Greensboro,
North Carolina 27407
Fax 336.854-8876
Phone 336-854-8877
Firm License No.: C-0168
SHEET 4 OF 5
"This certifies that this copy
of Section 404 of the Clean
Unless there is a change in
Section 404 jurisdiction may
this date. This determinatio
n
of this plat accurately depicts the boundary of the jurisdiction
Water Act as determined by the undersigned on this date.
the law or our published regulations, this determination of
y be relied upon for a period not to exceed five years from
was made utilizing the 1987 Corps of Engineers Wetlands
Name: "eO-T
Title: QO 212kV
Date: O 1• 1017-Q
WETLAND AREA-B
TOTAL WETLAND AREA SHOWN: 3,820 SF
WETLAND AREA FILLED: 3,820 SF
CAR
?O` Q�oFESS/0
\ �0
SEAL 1%%-
18914
;0= 4;
IMPACT-12 (WETLANDS-B IMPACT)
CAMBRIDGE PARK - PHASE 2
STREAM/WETLAND IMPACTS 11-12
MELVILLE TOWNSHIP—ALAMANCE COUNTY
MEBANE—NORTH CAROLINA
JANUARY 20, 2020
30 0 15 30 60
1 inch =30ft.
���� 4609 Dundas Drive
Greensboro,
IncNorth Carolina 27407
E ngineeringy Fax 336-854.8876
—Since 1974— Phone 336-854.8877
Engineers Surveyors Planners Firm License No.: C-0168
PARK PH2-WE LAND IMPACTS-CIM OD.DWG
SHEET 5 OF 5
PROPOSED PUMP
PIPE PROPOSED
S LT FENCE
O TEMPORARY CONSTRUCTION (�.)
STREAM CROSSIN CLASS 'I•
FLOW—� RIP RAP
5'
IN
o�
A A
RIP RAP
7 STONE
OUND
PIPE INLET
STREAM
FLOW
5
MIN
SAND BAGS
PROPOSED DISTURBANCE LIMITS
SILT FENCE PLAN
(TT'P•)
3' 3'
MIN. MIN. FROM
TO TOP OF :1:4Z14P
PUMP BANK
STREAT—
FLOW
EX INV.
CREEEX TEMPORARY
STONE DAM
REMOVE ENOUGH SANDBAGS TO ALLOW FLOW POLTETHYLENE FABRIC ON
THROUGH WHEN NOT PUMPING MOUND. FACE (B ML THICK)
SECTION A -A
TEMPORARY "PIPE CROSSING - PUMP AROUND"
FOR PIPE INSTALLATION
NOTES
1) EROSION STONE TO BE -CLASS I- RIP —RAP UNLESS DESIGNATED DIFFERENTLY ON
CONSTRUCTION PLAN.
2) PUMP AND LINE SIZE TO BE DETERMINED BY THE CONTRACTOR USING THE BASE FLOW
SHOWN ON THE CONSTRUCTION PLANS
3) MATERIAL SPECIFICATIONS
SANDBAGS: SANDBAGS SHALL CONSIST OF MATERIALS WHICH ARE RESISTANT TO
ULTRAVIOLET RADIATION, TEARING AND PUNCTURE, AND WOVEN TIGHTLY ENOUGH TO
PREVENT LEAKAGE OF FILL MATERIAL (i.e. SAND, FINE GRAVEL, ETC.)
CONSTRUCTION SEOUENCE FOR PIPE CROSSING —PUMP AROUND
1)INSTALL PUMP AND LINE TO PUMP FLOW FROM AREA UPSTREAM OF TEMPORARY
STREAM CROSSING TO AREA DOWNSTREAM OF CONSTRUCTION AREA. BEGIN PUMPING AND
CONTINUING PUMPING WHILE WORKING WITHIN THE STREAM.
2)INSTALL DOWNSTREAM TEMPORARY STONE DAM AND FILTER FABRIC TO PREVENT
BACKFLOW INTO CONSTRUCTION AREA.
3) INSTALL PROPOSED SILT FENCE ALONG TOP OF BANK EACH SIDE OF THE
CONSTRUCTION AREA.
4) UPON CONSTRUCTION COMPLETION, REMOVE TEMPORARY DAMS, FILTER FABRIC.
DEPRESS TEMPORARY DAM BOTTOMS INTO STREAM BED UNTIL TOP OF RIP RAP IS LEVEL
WITH STREAM BOTTOM.
5) UPON STABILIZATION OF CLEARED AREAS, REMOVE TEMPORARY EARTH BERM, SEDIMENT
TRAP, AND DEWATERING BASIN.
=O , oF1rSSi0'' ;' '�
QQ--
SEAL 0� _
7p 18914
061 F�yG I Ne ' �040
DETAIL SHEET
CAMBRIDGE PARK - PHASE 2
STREAM/WETLANDS IMPACTS 11-12
MELVILLE TOWNSHIP-ALAMANCE COUNTY
MEBANE-NORTH CAROLINA
JANUARY 20, 2020
SCALE: AS INDICATED
E moans 4609 Dundas Drive
Greensboro,
North Carolina 27407
Yngineering, Ivaco Fax 336.854-8876
—Since 1974— Phone 336.854-8877
Engineers Surveyors Planners Firm License No.: C-0168
DESCO\TURNER
PARK PH2—WETLAND IMPACTS—CML3D.DWG
Action ID Number: SAW-2017-02329
Permittee: Desco Holdings, LLC (Attn: Eric Dischinger)
County: Alamance
Project Name: Cambridge Park / Turner Road / Mebane / Alamance County / residential
Date Verification Issued: 02/06/2020
Project Manager: David E. Bailey
Upon completion of the activity authorized by this permit and any mitigation required by the permit,
sign this certification and return it to the following address:
US ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Attn: David E. Bailey
Raleigh Regulatory Office
U.S Army Corps of Engineers
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
or
David.E.Bailey2@usace.army.mil
Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of
Engineers representative. Failure to comply with any terms or conditions of this authorization may
result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I
administrative penalty, or initiating other appropriate legal action.
I hereby certify that the work authorized by the above referenced permit has been completed in
accordance with the terms and condition of the said permit, and required mitigation was completed in
accordance with the permit conditions.
Signature of Permittee
Date
SAW-2017-02329
Determination of Jurisdiction:
A. ❑ There are WATERS on the above described project area that may be subject to Section 404 of the Clean Water Act (CWA)
(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). This preliminary determination is not
an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). However, you
may request an approved JD, which is an appealable action, by contacting the Corps district for further instruction. Please note, if
work is authorized by either a general or nationwide permit, and you wish to request an appeal of an approved JD, the appeal must
be received by the Corps and the appeal process concluded prior to the commencement of any work in waters of the United States
and prior to any work that could alter the hydrology of waters of the United States.
B. ❑ There are Navigable Waters of the United States within the above described project area subject to the permit requirements of
Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act (CWA) (33 USC §
1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to
exceed five years from the date of this notification.
C. ❑ There are WATERS within the above described project area that are subject to the permit requirements of Section 404 of the
Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations, this determination
may be relied upon for a period not to exceed five years from the date of this notification.
D. ® The jurisdictional areas within the above described project area have been identified under a previous action. Please
reference jurisdictional determination issued 06/01/2018. Action ID: SAW-2017-02329.
/�;�i� Date: 2020.02.0612:13:42
Corps Regulatory Official:-05-00'
David E. Bailey
Date of JD: 06/01/2018 Expiration Date of JD: See previously issued JD