Loading...
HomeMy WebLinkAboutNCC202050_NOI Application_20200518Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 5/14/2020 12:06:43 PM (NCG01 NOI Submission) Approve by Morman, Alaina 5/15/2020 1:10:17 PM (Review- Construction NOI 25627) • The task was assigned to Morman, Alaina by round robin distribution 5/14/2020 12:06 PM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: May 18, 2020 5:00 PM 5/14/2020 12:06 PM Submit by McCoy, Suzanne 5/18/2020 6:58:29 AM (Payment Verification for NCC202050) * Sara S Kent • McCoy, Suzanne assigned the task to McCoy, Suzanne 5/18/2020 6:57 AM The task was assigned to DEMLR NCG01 Payment Team. The due date is: June 26, 2020 5:00 PM 5/15/2020 1:10 PM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information Are you submitting IT No an NOI that was r Yes rejected before? 1a. Project Name * Fayetteville Outer Loop, Lines 90 and 5 Relocation 1 b. Specific Lot This field may be used to list specifc lot numbers. Numbers Deed Book #9152 Page 821-822, Deed Book #3988 Page 355, Deed Book #3617 Page 578-580, Deed Book #10292 Page 106-108, Deed Book #7974 Page 05-06, Deed Book #10180 Page 639-641, Deed Book #2454 Page 107-109, Deed Book #9526 Page 847-849, Deed Book #7696 Page 679-680, Deed Book #10261 Page 404-405, Deed Book #7037 Page 485-486, Deed Book #5890 Page 599-600, Deed Book #6010 Page 210-211, Deed Book #4719 Page 403-404, Deed Book #4719 Page 405-406, Deed Book #8363 Page 484-485, Deed Book #6293 Page 242, Deed Book #6297 Page 230, Deed Book #8763 Page 770-772, Deed Book#9721 Page 139-141, Deed Book #2574 Page 202, Deed Book #5371 Page 475-476 Deed Book #9650 Page 656-658 Deed Book #9917 Page 662-663, Deed Book #9667 Page 257-261, Deed Book #8017 Page 233-235 2. County* Cumberland 3. Highway or Street Grimes Road, Stoney Point Road, Doda Drive, Camden Road Address * Street narre only is acceptable if no address number assigned yet 4. CityorTownship* Fayetteville 5. State * NC 6. Zip Code* 28306 7. Latitude* Enter the latitude in decimal degrees 34.9991 8. Longitude * Enter the longitude in decimal degrees (MJST be negative) -79.0338 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 08/01/2020 Estimated Construction Project Start Rate 10. Date to End * 08/01 /2021 Estimated Construction Project End Cate 11. SIC (Primary)* Industrial (1541) Standard Industrial aassification for Developrnent 12. Acres to be 10.84 disturbed* (including off -site borrow and waste areas) 13. Total site area 10.84 (acres) * 14. Post- 0.00 construction (Estimated) impervious area (acres) * NCC Project NCC-CUMBE-2020-Fayetteville Outer Loop, Lines 90 and 5 Tracking ID Relocation Assigned automatically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Stewarts Creek Waterbody * %rre of waterbody into which storrrwater runoff will discharge 15b. Waterbody 18-31-21 Index No.* NCWaterbody Index Number Stormwater r No discharges will flow pr Yes to additional wate rs * 15c. Additional Rockfish Creek Receiving Waterbodynarre Waterbody 15d. Waterbody 18-31-(18) Index No. NCWaterbody Index Narrber 15e. Additional Lakewood Lake Receiving Waterbody narre Waterbody 15f. Waterbody Index No. 18-31-24-3.5 NC Waterbody Index Narrber 16a. Is this project subject to the NC Sediment Pollution Control Act?* r Yes r No, not subject to NC SPCA B. Permittee Information Part B. ^ Fbrnittee Inforrration - Legally Fbsponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Legally %sponsible Entity Name * Piedmont Natural Gas Co. Inc. It pernittee is an individual (i.e., organization does not apply), enter first and last narre in this field. 2. First Name * Dave If Corporation, enter Faegistered Agent First %rre 3. Last Name* Vena It Corporation, enter F;bgistered Agent Last %ne 3b. Title Project Manager 4. Permitee E-mail Dave.Vena@duke-energy.com Address* 5. Permittee 704-731-4496 Telephone No.* 6. Permittee Mailing Street Address Address* P.O. Box33068 Address Line 2 City State / Rovince / F;bgion Charlotte NC Fbstal / Zip Code Country 28233 United States Check box if the V Yes street address the same as mailing address 7. Permittee Street Street Address Address* 4720 Piedmont Row Drive Address Line 2 City State / Frovince / Region Charlotte NC Fbstal / Zip Code Country 28210 US 8. Type of Non -Government Ownership* C. Site Contact Information Part C. Roject Site Contact Inforrration .................................................................................................................................................................................................... 1. Primary Site Eddie Contact - First Name * 2. Primary Site Oglesby Contact - Last Name * 3. Title Site Superintendent 4. Site Contact E- john.oglesby2@duke-energy.com mail Address* 5. Site Contact 864-490-9946 Telephone No. 6. Organization Piedmont Natural Gas Co. Inc. Name 7. Site Contact Street Address Mailing Address* P.O. Box33068 Address Line 2 city Charlotte Fbstal / Zip Code 22801 8. Consultant Name (Optional) Anthony McMullan First and Last nacre 9. Consultant E-mail camcmullan@burnsmcd.com This person will be copied on all correspondence. 10. Consultant 770.365.3996 Telephone No. State / Rovince / Region NC Country United States D. E&SC Plan Part D. ^ Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 05/12/2020 Approved * 2. E&SC Plan Project CUMBE-2020-169 Number/ID * Assigned by agency or local program 3. E&SC Plan r State DEQ Office Approved by* r Local Program 4. State DEQ Office * Fayetteville (FRO) Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. For linear projects, please also upload a site map showing the overall extent of the project or include the beginning point and end point coordinates in the "Notes" box below. 5. E&SC Plan cumbe-2020-169_Letter of Approval.pdf 84.28KB Approval letter or Mist beRDFformat Grading Permit 6. Site Location Map Helpful for linear project review (Optional) APPB1-FvilleDOT_TopoMaster_8x11_port.pdf 1.71MB Mast be RDF format. Rease do not upload entire set of E&SCplans. 7. Notes (Optional) Frovide any additional information that night help the reviewer better understand how uploaded docurrents support the application. Include additional waterbodies for linear projects if necessary. 8. NOI Certification Fayetteville DOT NOI Cert Form_signed.pdf 44.65KB Form Mast be RDF formal This is an Express r No Review Project* r Yes E. Certification North Carolina General Statute 143-215.6E (i) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Artcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent r Authorized Responsible Person* Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name * Dave Vena Title Project Manager Organization Legally Flesponsible Entity Piedmont Natural Gas Co. Inc. Date * 05/14/2020 F. Tracking and COC Info NOI Tracking No. 25627 NC Reference No. NCG01-2020-2050 Uses 'count number' variable (incremrented by SP) Certificate of NCC202050 Coverage (COC) Uses 'count number' variable (incremented by SP) No.* Count Number 2050 Sequential number for submittal that is incremented by Stored Frocedure COC Year 2020 Year of date reviewed (used to assign YY digits after "NOC' in COCno.)