Loading...
HomeMy WebLinkAboutNCC201998_ESC Approval Submitted_20200518ROY COOPER Governor MICHAEL S.REGAN Secretary BRAN WRENN Acting Dfrector NORTH CAROLINA Environmental Quality April 14, 2020 LETTER OF APPROVAL WITH MODIFICATIONS Par 5 Development Group, LLC Joseph Bland, EVP 2075 Juniper Lake Road West End, NC 27376 RE: Project Name: Hope Mills S. Mains St. Dollar General Acres Approved: 2.5 Project ID: CUMBE-2020-144 County: Cumberland City: Hope Mills Address: Main Street River Basin: Cape Fear Stream Classification. Other Submitted by: Scott Brown Date Received by LQS: April 27, 2020 Plan Type: Commercial Dear Mr. Bland: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan shall expire three (3) years following the date of approval, if no land disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent CNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted and COC issued prior to the commencement of any land disturbing activity on the above -named project. The NOI form may be accessed at deq.nc.goyZNCG01. the NOI form to Annette Lucas at Annette.lucasC-ncdenr.gov or Paul Clark at Paul.clark ncdenr. ov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit. However, a $100 fee will soon be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. DENorth Carolina Department of Environmental Quality I Division of Energy. Mineral and Land Resources Fayetteville Regional Office 1226 Green Street, Suite 7141 Fayetteville, North carolina 28301 NCRrA eAROLI oq-e.n w e,. ft /� 910.433.3300 Title 15A NCAC 413 .0118(a) and the NCGO1 permit require that the following documentation be Dept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan, including the use of equipment and technology owned and operated by the Department, (e.g., survey equipment, vehicles, unmanned aerial vehicles, etc.). Unless this office hears otherwise .from you, this correspondence serves as your authorization for DEMLR to utilize equipment and/or technology on your property for inspection purposes. Title 15A NCAC 413 .0118(a) requires that a copy of the approved erosion control plan be on file at the job site. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county.ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, Chris Baker Assistant Regional Engineer DEMLR - Fayetteville Regional Office Enclosures: Certificate of Approval cc: Scott Brown, P. E., 4D Site Solutions, Inc. — electronic copy Michael Naylor, Cumberland County Inspections Office -- electronic copy Fayetteville Regional Office CHECKLIST OF REQUIRED MODIFICATIONS In order for this office to complete its review of the referenced project in accordance with GS 1.13A-50 to 66 of the Sedimentation Pollution Control Act of 1973 and associated administrative rules Title 15A, North Carolina Administrative Code (NCAC), Chapter 4, please provide the additional or revised information in accordance with the following comments: 1. Include a construction drawing, specifications and maintenance requirements for the energy dissipater. Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities