Loading...
HomeMy WebLinkAboutSW3191204_Application_20200515IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Stormwater will be conveyed through a combination of storm sewers and sheet drainage to two wet ponds, where water will be treated for both quality and quanity before being discharged off site along the northern oronerty line. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW - 1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the Yadkin Pee Dee River basin. 4. Total Property Area: 10.40 acres 5. Total Coastal Wetlands Area: 0.00 acres 6. Total Surface Water Area: 0.00 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area':10.40 acres + Total project area shall be calculated to exclude the following: the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal High Water (NHM line or Mean High Water (MHVv) line, and coastal wetlands landward from the NHW (or MHM line. The resultant project area is used to calculate overall percent built upon area (B UA). Non -coastal wetlands landward of the NHW (or MHW) line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 59.0 9. How many drainage areas does the project have?1 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area W Drainage Area 1E Drainage Area _ Drainage Area _ Receiving Stream Name South Fork Crooked Creek South Fork Crooked Creek Stream Class C C Stream Index Number * 13-17-20-2 13-17-20-2 Total Drainage Area (sf) 222,329 167,250 On -site Drainage Area (sf) 222,329 167,250 Off -site Drainage Area (sf) 0 0 Proposed Impervious Area** (sf) 133,961 109,625 Impervious Area** (total) 60.3 65.5 Impervious- Surface Area Drainage Area 1 Drainage Area 2 Drainage Area _ Drainage Area _ On -site Buildings/Lots (sf) 53,455 41,525 On -site Streets (sf) 0 0 On -site Parking (sf) 58,616 57,526 On -site Sidewalks (sf) 11,860 10,574 Other on -site (sf) 10,030 0 Future (sf) 0 Off -site (sf) 0 0 Existing BUA*** (sf) 0 0 Total (sf): 1 133,961 1 109,625 * Stream Class and Index Number can be determined at: http.Z&ortal.ncdenr.or web/wg&s/csu/classi{ications Form SWU-101 Version Oct. 31, 2013 Page 3 of 6