U.S. Department Southern Region Atlanta Airports District Office
of Transportation 1701 Columbia Ave., Campus Bldg. 2-260
Federal Aviation College Park, Georgia 30337
Administration 404-305-7150 FAX: 404-305-7155
Internet email:
7-ASO-ATL-ADO@faa.gov
December 13, 2005
Ms. Cynthia Van Der Wiele
NC Dept. of Environment & Natural Resources
Division of Water Quality
1621 Mail Service Center
Raleigh, NC 27699-1621
Subject: Charlotte/ Douglas International Airport (CLT)
FAA Written Re-Evaluation of the Final Environmental Impact Statement for the
Master Plan and FAR Part 150 Noise Compatibility Plan Update
Dear Ms. Van Der Wiele:
In 1999, the Federal Aviation Administration (FAA) completed a Final Environmental Impact Statement (FEIS)
and in 2000 issued a Record of Decision (ROD) approving various development projects at Charlotte/Douglas
International Airport (CLT). One element of the preferred alternative was the construction and operation of a
third north/south parallel runway located 3,700 feet west of existing Runway 18R/36L. Exhibit 1 (enclosed)
depicts the preferred alternative as approved in the ROD.
The preferred alternative was chosen, in part, because the runway separation allowed for triple simultaneous
arrivals while minimizing taxi times for aircraft; however, that separation required technological advances and
changes in air traffic control procedures that have not yet come to fruition. Therefore, because triple
simultaneous arrivals are necessary to accommodate the demand at CLT, the separation between the existing
Runway 18R/36L and the planned third north/south parallel runway needs to be increased to 4,300 feet (see
enclosed Exhibit 2). Since the FEIS analyzed a runway alternative with this separation, the FAA has determined
that a Written Re-evaluation of the FEIS and ROD will be prepared to assess the potential environmental impacts
of this change.
The FAA and the airport are jointly hosting an informational workshop on January 9, 2006, to update the
environmental regulatory agencies on the status of the runway project and to solicit input regarding the scope of
the Written Re-Evaluation. The workshop will be held from 1:00 p.m. to 3:00 p.m. in Charlotte at the following
address: Adam Service Center, 4150 Wilkinson Boulevard, Charlotte, North Carolina 28208.
Please contact Bonnie Baskin at (404) 305-7152 or at Bonnie.Baskin@faa.gov to RSVP. If you have any
questions prior to the meeting please give her a call
The FAA and the airport greatly appreciate your participation and assistance to date and we look forward to
continuing that relationship as the Written Re-Evaluation moves forward.
Sincerely,
jco?ff_
Scott L. Seritt
Manager
7 5
1, 75 flji
'005
DES
DENR - y?
t??jl?lht, PNIP
Enclosures
•t: ?1+
.A G •
FUTURE AIRPORT LAYOUT PLAN "°"`""°°" °""
m
P WITH RUNWAY@ 3,700 FT. SEPARATION Charlotte-Douglas
.•?•? INTF0. NAilON AI AIRPORT
.:?' ?' •.4''; • ? _ L • . 1.1
46
:? /neon - r ?;? ? ! ? ,
w\•?wsc a vn EAwitw •rM d r '^' o,a•; oe t ,'t syru,ac.r I i f y
? .•cccss ao cu • 0oq i v ? - dew „?
r Originally Approved
Third North/South t 11l
Parallel Runway `-:, .,44 • `'.? ?'
.?
?? .. ._'_ II S .{:. ' 2,i? •??iy .._. _t Ill
%
3,700 Feet
pAs
' - .. _ .. I It"r?' ? ? •_..._?r?-. _."• ..: it 1
oval*, 41
\\ ' 1 --
%
_ _& oru.c vnn,i?1" t
?' ? n• P.OVO3EOw WE?r^/Y °'? ?:? ? '.?
3
V mr•J as
S?A? e
f, , v
< >ooae ?'? Yt •4 • ?17. t1 ,^ `•i q } • .. i L 3$ •} 1-i.
? . _- ... $. ? , a?"•.? ..;-1} ! .' Y• M?>•-v ,?.-?. ? ? t man I '??? t
`_ fit- j. iro,Q6P t.R r I fir{.-.• _1 ,,a ••'."'':•?'•\• ,l
-atop u »ar„
L
%
A J.,
Proposed
--" ' Third North/South V
_ Parallel Runway ?? ??"? `? • ???"' '
rr !
%
----------------------
?• s a
jil . 4.300 Feet ! .., 4 y f r' f
•Jj. t, •9
r
aM
• ;? ' %•
?+i r<I 1 i I At < 1• .
tr ;L' 1 INI?r. ?? .,.? f? X1`1 !t`Ill y T :L ? •• . •'?•' ?I
t,q
..ua>ex• r..
?.= ESTayO
W 1 r -?? ??i?R•?- ,
41
MMOSF?O a ,• • ,'??
07
" ?
m FUTURE AIRPORT LAYOUT PLAN
N Q WITH RUNWAY@ 4,300 FT. SEPARATION
Charlotte-Douglas
IN TF RN47IO NAl AIA?ORT