Loading...
HomeMy WebLinkAboutNCG070191_NOD_20200518 mE STAIE y ROY COOPER Governor L MICHAEL S.REGAN ` a Secretary BRIAN WRENN NORTH CAROLINA Acting Director Environmental Quality May 18, 2020 Nick Waycaster Stone Company Attn: Kenneth Waycaster 5455 Highway 221 North Marion, North Carolina 28752 Subject: NOTICE OF DEFICIENCY(NOD-2020-PC-0097) NPDES Stormwater General Permit NCG070000 Certificate of Coverage NCG070191 Nick Waycaster Stone Company McDowell County Dear Mr.Waycaster: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection 1 conducted at the subject facility on May 13, 2020. The report should be self-explanatory; however, should you have any questions concerning this report,please do not hesitate to contact me at (828) 296-4500 or by email at Isaiah.reed@ncdenr.gov. Sincere y Isaiah Reed, CPS CEPSCI, MS4C/C1' Environmental Specialist Land Quality Section Enclosure: Inspection Report D_EQ� North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources Asheville Regional Office 1 2090 U.S.Highway 70 1 Swannanoa,North Carolina 28778 828.296.4500 Compliance Inspection Report Permit:NCG070191 Effective: 06/01/18 Expiration: 05/31/23 Owner: Nick Waycaster Stone Company SOC: Effective: Expiration: Facility: Nick Waycaster Stone Company County: McDowell 5455 Hwy 221 N Region: Asheville Marion NC 28752 Contact Person:Kenny Waycaster Title: Phone:828-756-4011 Directions to Facility: System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On-Site Representative(s): Related Permits: Inspection Date: 05/13/2020 Entry Time 11:OOAM Exit Time: 12:OOPM Primary Inspector:Isaiah L Reed Phone: 828-296-4614 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Stone, Clay, Glass, and Concrete Products Stormwater Discharge COC Facility Status: ❑ Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG070191 Owner-Facility:Nick Waycaster Stone Company Inspection Date: 05/13/2020 Inspection Type:Compliance Evaluation Reason for Visit: Routine Inspection Summary: On May 13, 2020 this facility was inspected to determine if adequate progress has been made in response to the previously issued Notice of Deficiency. I met with Kenneth Waycaster and Mitch Gillespie on site. During the inspection, it was determined that the Stormwater Pollution Prevention Plan is not complete and that further revision and improvement is needed. Improvements were discussed on site. The permittee is directed to complete the Stormwater Pollution Prevention Plan as outlined in the NCG070000 General Permit as soon as possible. A re-inspection will be performed at a future date to confirm that all required improvements have been made. If you have any questions, please do not hesitate to contact this office at(828)296-4614 Page 2 of 3 Permit: NCG070191 Owner-Facility:Nick Waycaster Stone Company Inspection Date: 05/13/2020 Inspection Type:Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ #Does the Plan include a General Location(USGS)map? ❑ E ❑ ❑ #Does the Plan include a"Narrative Description of Practices'? 0 ❑ ❑ ❑ #Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ 0 ❑ ❑ #Does the Plan include a list of significant spills occurring during the past 3 years? ❑ 0 ❑ ❑ #Has the facility evaluated feasible alternatives to current practices? ❑ 0 ❑ ❑ #Does the facility provide all necessary secondary containment? 0 ❑ ❑ ❑ #Does the Plan include a BMP summary? 0 ❑ ❑ ❑ #Does the Plan include a Spill Prevention and Response Plan(SPRP)? ❑ 0 ❑ ❑ #Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ 0 ❑ ❑ #Does the facility provide and document Employee Training? ❑ 0 ❑ ❑ #Does the Plan include a list of Responsible Party(s)? N ❑ ❑ ❑ #Is the Plan reviewed and updated annually? ❑ 0 ❑ ❑ #Does the Plan include a Stormwater Facility Inspection Program? N ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ E ❑ ❑ Comment: See summary for more information. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ ❑ ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ ❑ ❑ #Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ❑ Comment: Permit and Outfalls Yes No NA NE #Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ 0 ❑ ❑ #Were all outfalls observed during the inspection? E ❑ ❑ ❑ #If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ 0 ❑ #Has the facility evaluated all illicit(non stormwater)discharges? ❑ 0 ❑ ❑ Comment: Page 3 of 3