HomeMy WebLinkAbout19910118 All Versions_Complete File_19911029[Doi
0 P ,pv`SZ?C? - r?'dC (l1'ISi tP tiU.t c`giGVt
I o _
70
f v W=5 J ?1 I) C ov??a?r ?? L{) c y? rt C?i1 ???t ?t
l J
Y)d"A-S J _
I n
?Jo dais 1 GzfoO wl 10 C.rzws C > ?1EtS?
0
i W? DDS CWlv 1?1?.trt+1 f P55 ?1
m (P? -?)ul?C+ b fl?? ?3
ct?l
(,---F uts? 1 =? < ? (C ?
a _
,,11 , ti r
U; e Q moo- 5 A'?1, ((, S X1,1 ? L-C5
t t
V
u
CIA -S -
y o
CAJK-
oyk
VVVV
<< ;?, a tc^ clill7
U U
1 v
r
Wright Memorial Bridge
Construction of New Bridge Parallel to Existing Bridge
US 158 over Currituck Sound; State Project No. 6.041005
(T.I.P. No. R-2418)
Permit Coordination Meeting
November 5, 1991
Meeting Agenda
10:00 AM I. Introduction: Mr. Jack Ward, P.E.
Manager, Planning & Environmental
Branch, NCDOT
Mr. J. Tommy Peacock, P.E.
Chief Engineer, Preconst-il-Trion
NCDOT
10:10 II. Recognition of Participants/Agencies:
10:15 III. Importance of Submerged Aquatic
Vegetation Beds:
Mr. Mark Fonseca, Ph.D.
National Marine Fisheries
Beaufort, N. C.
10:30 IV. Permit Action:
- History/Coordination:
Ms. Cyndi Bell.
NCDOT Environmental Specialist
10.45 - Potential Construction Methods:
Mr. William J. Rogers
Asst. State Bridge Design Engineer
NCDOT
11.05 - Potential Mitigation:
Mr.-Barr-ey O'Quinn, P.E.
Assistant Manager, Planning &
Environmental, NCDOT
11:15 - Coordination with COE,
Waterways Experiment Station
Vicksburg, Mississippi:
Mr. Archie Hankins, P.E.
Head, Hydraulics Unit, NCDOT
11:30 V. BREAK
11:40 VI. Discussion
12:15 VII. Wetland Mitigation:
Mr. Barney O'Quinn, P.E.
Assistant Manager, Planning &
Environmental, NCDOT
COPY -- NCDOT
PROJECT HISTORY
November 5, 1991
SUBJECT: Currituck/Dare Counties - Construction of New
Bridge Parallel to Existing Wright Memorial Bridge
(US 158) over Currituck Sound; State Project No.
6.041005 (T.I.P. No. R-2418)
November 6, 1989 - State Environmental Assessment approved.
December 1, 1989 - Slate Environmental Assessment circuiated
to review agencies.
February 28, 1990 - Combined location and design public
hearing.
August ::9, 1990 - State :finding of No Significant Impact
approved.
December 7, 1990 - CAMA/DOA Permit Application and request
for 401 Water Quality Certification submitted.
December 7, 1990 - U.S. Coast Guard Permit Application
submitted.
January 7, 1991 - CAMA Permit Application returned to NCDOT
for revisions. The main issue of concern was the need
for information regarding the construction access
channel and spoil disposal area.
January 25, 1.991 - U.S. Army Corps of Engineers issued Bridge
General Permit No. CESAW-CO82-N-000-0031.
March 22, 1991 - 401 Water Quality Certification (No. 2581)
issued by Division of Environmental Management.
May 9, 1991 - Decatur Partnership agrees to allow NCDOT to
deposit construction spoil on their property located at
the southeast approach to Wright Memorial Bridge. As a
condition of this agreement, Decatur Partnership will
allow spoil deposition only if NCDOT constructs an
access channel to said property.
COPY -- NCOOT
June 5, 1991 - U.S. Fish and Wildlife service recommends
denial of permit until impacts to Submerged Aquatic
Vegetation (SAV) and estuarine marsh are addressed.
June 26, 1991 - Preliminary survey of SAV growth in
construction channel by NCDOT Dive Team and staff
biologists.
July 15, 1991 - Preliminary meeting with National Marine
Fisheries Service (NMFS) to discuss SAV survey
methodology and avoidance/mitigation measures. NMFS
suggests that NCDOT investigate possibility of back-
filling of construction channel, to be followed by
sprigging of SAV from adjacent areas of Currituck Sound.
July 30, 1991 •- Quantification and mapping of SP.V beds it;
bridge construction channei and spoil site access
channel, in accordance with NMFS' recommended
methodology, by NCDOT Dive Team and staff biologists.
August 13, 1991 - NMFS advises NCDOT that they will oppose
construction of an access channel to Decatur Partnership
property.
September 9, 1991 - NMFS and NCDOT meet to discuss results of
SAV survey. NMFS states that minimization of SAV
impacts should be investigated, i.e. alternative
construction techniques which would eliminate need for
dredging of construction channel in areas of SAV growth.
September 20, 1991 - DEM recommends that NCDOT should not
pursue plan to back-fill construction channel due to
potential impacts to water quality.
a aX,,V°o- 21fl-tJ ?j a? G? wQ ?d I
COPY -- NCOOT
A is STATF o
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
P.O. BOX 25201
RALEIGH 27611-5201
JAMES G. MARTIN
GOVERNOR
THOMAS J. HARRELSON
SECRETARY
October 29, 1991
Division of Coastal Management
Department of Environment, Health
and Natural Resources
P.O. Box 27637
Raleigh, NC, 27611
ATTENTION: Mr. John Parker
Dear Sir:
DIVISION OF HIGHWAYS
WILLIAM G. MARLEY, JR., P.E.
STATE HIGHWAY ADMINISTRATOR
? J
??-? 1gg1 cA
Co
r.CF??1 ?'?Tl o
SUBJECT: Currituck/Dare Counties, Construction of New Bridge
Parallel to Existing Wright Memorial Bridge (US
158) over Currituck Sound (R-2418)
The North Carolina Department of Transportation
submitted a permit application for the subject project on
October 2, 1991. The permit drawings depict an access canal
to the Decatur Partnership tract on the southeast approach to
the bridge. This site was to be used for the disposal of
construction spoil, but has been rejected by NMFS and NCDOT
due to anticipated environmental impacts. The attached
sheets reflect revisions to the spoil disposal plan. NCDOT
now proposes to deposit construction spoil at the Moore-
Griggs site in Currituck County. Sheets 28 and 28A
illustrate the location and survey boundaries of this
property. The access channel to the Decatur Partnership
tract has been removed from revised Sheets 13 and 14. A copy
of the lease agreement for use of the Moore-Griggs property
will be forwarded to you upon completion of Right-of-way
negotiations with the owners.
An Equal Opportunity/Affirmative Action Employer
r
If you have any questions, please contact Cyndi Bell at
(919) 733-9770.
Sincerely,
ip"A
L.R. Goode, Ph.D.,
Director, Programs,
Enclosures
P. E.
Policy & Budget
cc: Mr. Ralph Thompson, P.E., USCOE
viipr'. John Dorney, DEM, DEHNR
Mr. Kelly Barger, P.E., Project Management Unit
Mr. G.T. Shearin, P.E., Roadway Design
Mr. Don Morton, P.E., Highway Design Branch
Mr. A.L. Hankins, P.E., Hydraulics
Mr. John Smith, P.E., Structure Design
Mr. C.O. White, P.E., Division 1 Engineer
Mr. Dennis Pipkin, P.E., Planning and Environmental
Mr. N.L. Graf, P.E., FHWA
Mr. W.D. Johnson, Roadside Environmental
Mr. Jimmy Lee, P.E., Bridge Maintenance
C= Cn C-3 Cr%
d t:n . r .., .-.
r r v t= LU .
a z c .a Cr-' C-2 r7
t:n
c c?
c -T--
w
t:n
q -
om
tz ¢ c? = .
t
}-- A O O • Q I
C z ; rv)
LL. ` -"2- W Q 1 lu
o z O U3 LL-
c::) += - A A Q
r cn ? t? ? M ? i
tz.. .-. F-- r w Q . ?
? W C.n ?
q r
-. GC r
p tx ? IZ W
Q t= O W
V V t? ? S
0
n
N
i
MATCH - K -
9st
OSI
2
Sbi
f I 0 bl
W
o?
t
?U
L'1
V
-i-HXVW
H
Z ? -• W Q
Q r 2 lam] I a J [n
C= -cc
Lj- C=
U ry,f +ti? l l? l l O Q O A A' O
1--- en ? C= A
w =3. I--• c-.) cn tc?c
"? I I ra •-• w r.
=3 o o LAJ
U' r ?.I I I- Ih cv L.] x
• r? a .? Il?l;al I. I I I 2 0..G' cn .
4--- ? ' , ? r r I I V ? ?
Q• r•! as ..r. •i`= ? , I I ?'? .I . ? ?a
091
h: I O t ( ? v ?
•? 11 ?' ? ?
ss I -HZ)idw
0 0? o
7Z yU
EARTH QUANTITIES
TOTAL: FILL IN WETLANDS AC.
FILL BELOW 0. H. W. ___7-6 -___ C.Y.
TOTAL FILL C.Y.
8o' 70/ Go' .5o' 4o' 3o' .2o' /D ? .l4 Ao'
to
.2.2
EXISTING. 801 1 OM So °A" 9,49K
BOTTOM LIMIT
-to OF DREDQ I NG
CONSTRUCTION ACCESS CHANNEL' TYPICAL SECTION -
N.C. DEPT. OF TRANSPORTATION
DIVISION OF HIGHWAYS
CURRITUCK/DARE COUNTIES
PROJECT E.041005 {R-2418A)
PROP. BRIDGE OVER CURRITUCK:
SOUND ON U. S. 158
SHEET A7 OF JQ OCT.,1990
RZ ?. oc7: 4/
T) 1: N .F
Y.
D.EC•? ?'c??. .0.,- CA ,E.C.e'Y = /4:x
r
M,h.'N! = -f-,Z..Z ? /1?1,?YY - •f•? 0.5 Soc/nll? .__..- •:? "`•=;:
43,077
4507-7ZV 1 E,C. = -10.0
--JD
l/ERr
NC AZ07:' OF TI?ANSPO.QT?4T/ •--
?
BK/oG.E RUNS P,¢,q,4L.CEL ... • , . •. _r?.,
. PFtGt/,EcT ?.o4/DOS.. •..?Rt4l??1? _r?=.
4',48ot/,?-/T EXCEPT-4T PROP. BR/L+b?' oYE.Q .•CvRR!T?=
Sol
.Yv_ one lJSJ58
N,4$116,4TioN...? AN,E'.5,
?Y,EyY o.ECK /s z ' '?BayE .shr ,,5T .27A ,C' .30
lip-
•7YId1Cl'M01701wwo,7 AN
Y0AIAYA /•7 '
i6N ?g a QI'14A/ AYVION
r •. 1 ?
'Y 4411 •,IV V 0 •1V74 ONV 'IIY?V / AVQ'YIIg pIH1?lV74 YodwVli ?1v01,tdb QNV
4NVH AN 4/7N11M •030MARV OV 01-1} •6•4 N11M -Vogl WOMWO 1000 ati1041 47YIIAYV4I%4 ONV 474nlIlvYVAs 019071MON11ovNONV•AVG Si A N119w Iva 74 A7YV7daw mvNosmad
) 6V A/ YAlIOV NV NOYld 7w7AS NMVYQ Y0?01V13YOA 71V1I QNV1AlNA 0 0YawlN Y01'1 na AIt v10H V 1
a?IN All A7AY
IVM 41VO $INAAV N1 AdIlY70 •MP'IINVYD•d•d'I AINAOO NOWM O VNI10YV0 N1YON„
q?}Y ; 0?'N. a jJ ?O •
•
• ? u
o
d .
. otg
• d
, ?Y
'M4
n
.. 1
? r
O Q y.:k
+ N p z
? ?
, 1 . ?
.
'
i ' ?i
•v
Y
I • I >E o?
L6 69 ;: p
a
oil 11 41119 Y1
3,fiY?oYY1 9H
-
r
Lik
lay
a or a '
• ?
t ? P6.1
k i
,
? r
LA
Z w }
u
I ti
at Q&
? I??YVZ9•I I a
ha
? dl
O
? I
-Ital.
a°
a
It,gIfoo?a
a70.0•If
n
O
/Y ? ^1
_ a
11 all
s 69 2 3.Pv.IO 000 8
3167'7
p07VW 0 %*1
1941 WIN 1i/1•d Iola Imdage I gild 099 id7a
1 f•1
i i,
HA
Is$7 -S .7-M -M.41YMYMOU'd ,0018„/ 37VO9
0.96Z i/aa VN A j N n o o mon-iiauno
•d M1 HONVU9 UV7dod •0•N'l1O01lVH 1NIOd
S31dd3dONd S991,UJ -3YOON
1 ---777
1
T 'SOO 0E 30 WZ LaaHS
89T sa No aNnOS
NOMIEUn0 xsno SJaIUS asSOdOHd
(K8Ttz-21) 500ZVO * 9 Sosrctud
SSISNnoo Seta/xonsiuxno
SAVMHJIH 3o NOISInIa
HOISKS2i0dS Fl2iI 30 *1d a 10 IN
\
I
SGV£ o
3 q.,
STATE OF NORTH CAR?I?INA
r DEPARTMENT OF TRANSPORTAT,i.GN
P.O. BOX 25201
RALEIGH 27611-5201
ATIN January 23, 1992
p
RELSON
trict Engineer
Army Corps of Engineers
"Box 1890
,imington, North Carolina 28402
ON: Regulatory Branch
.'V
L, J'k?a
DIVISION OF HIGHWAYS
WILLIAM G. MARLEY, JR., P.E.
STATE HIGHWAY ADMINISTRATOR
y +FVtA
11
jUBJECT: Currituck\Dare Counties - Construction of New
Wright Memorial Bridge on US 158 over Currituck
Sound; State Project No. 6.041005 (T.I.P. R-2418)
On January 14, 1992, we received correspondence from
your agency indicating that Bridge General Permit No. CESAW-
C082-N-000-0291 was applicable to this revised project. On
.'January 25, 1991, Bridge General Permit No. CESAW-CO82-N-
000-0031 had also been issued for this same project. on
!January 14, 1992, we also received a request for information
regarding avoidance, minimization, and mitigation of wetland
., mpacts. It is the opinion of the North Carolina Department
r?"of Transportation that these issues have been thoroughly
'addressed in the permitting and coordination process carried
'*ut for this project. At present, the Division of Coastal
anagement is reviewing our CAMA permit application, and is
I kely to issue a decision within the first half of 1992.
If you have any questions, please contact Cyndi Bell in
sleigh at (919) 733-9770.
Si c rely,
a.: B. J. 'Qui P. E.
A ar- Manager
1,Planning & Environmental Branch
An Equal Opportunity/Attirmative Action E=mployer