Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW3200201_Calcs_20200511
BREC, P.A. Dollar General – Store #21867 1 DOLLAR GENERAL – STORE #21867 NEWTON, NC HYDROLOGIC AND HYDRAULIC ANALYSIS REPORT Prepared By: BREC, P.A. 1520 Meadowview Drive Wilkesboro, NC 28697 NCBELS Firm #C-3448 (336) 844-4088 justin@brec.biz Prepared For: Teramore Development, LLC Joe Strickland, Dir. of Ops., NC 214 Klumac Rd., Ste. 101 Salisbury, NC 28144 (704) 224-7364 jstrickland@teramore.net Project Site: TBD Providence Mill Road Newton, NC 4 May 2020 Justin Church, PE Principal Engineer BREC, P.A. Dollar General – Store #21867 2 Table of Contents 1.0 General Information ........................................................................................ 3 2.0 Methodology ................................................................................................... 3 2.1 Curve Number Calculations 3 2.2 Time of Concentration Calculations 4 2.3 Rainfall Data 5 2.4 Pipe Design 6 2.4.1 Outlet Design 6 2.5 Hydrology Calculations 7 2.6 Modified Curve Number Calculations 8 2.7 Sand Filter Design 8 2.7.1 Chamber and Filter Sizing 9 2.7.2 Underdrain Sizing 9 2.7.3 Anti-floatation Calculations 10 3.0 Results .......................................................................................................... 11 Appendix ............................................................................................................. 12 List of Figures Figure 1 - System Storage of First Flush ............................................................ 11 List of Tables Table 1 - Pre-Construction Drainage Area ............................................................ 3 Table 2 - Post-Construction Drainage Areas ........................................................ 4 Table 3 - Pre-Construction ToC ............................................................................ 5 Table 4 - Post-Construction ToC ........................................................................... 5 Table 5 - NOAA Rainfall Depths ........................................................................... 5 Table 6 - NOAA Rainfall Intensity ......................................................................... 5 Table 7 - Composite Rational Coefficients ............................................................ 6 Table 8 - Pipe Design Summary ........................................................................... 6 Table 9 - Riprap Outlet Stone Sizing ..................................................................... 7 Table 10 - Riprap Apron Dimensions .................................................................... 7 Table 11 - Modified SCS Curve Numbers ............................................................. 8 Table 12 - Sand Filter State-Storage .................................................................... 9 Table 13 - Pipe Design Table ............................................................................. 12 BREC, P.A. Dollar General – Store #21867 3 1.0 General Information This document contains hydrologic and hydraulic calculations demonstrating compliance with post-construction state and local stormwater regulations for the construction of a 9,100 𝑓𝑡ଶ Dollar General retail store at the intersection of Providence Mill Road and NC Highway 16 in Newton, NC. Specifically, regulations for this area require water quality treatment of the first flush ሺ1"ሻ storm. The subject tract is composed of a partially wooded vacant lot. No jurisdictional features are present on the site. The site is almost entirely composed of CaB soils which are hydrologic soil group A. Post construction stormwater requirements will be satisfied with an above ground sand filter which is approved by NCDEQ as a primary stormwater control measure (SCM). 2.0 Methodology One pre-construction drainage area and six post-construction drainage areas covering the subject tract and adjacent off-site areas were identified. See plansheets for delineation. The pre-construction drainage area outlets at OUTFALL-1 located at an existing NCDOT drainage ditch in the northeast corner of the site. All proposed impervious areas are routed to the sand filter for treatment prior to discharge. Two drainage areas, POST-CON:4 and POST-CON:6, are not routed to the sand filter due to topographic limitations. 2.1 Curve Number Calculations Composite SCS curve numbers were calculated as weighted averages using values of 49 for fair grass coverage (pre-construction) and 39 for good grass coverage (post-construction, maintained), 30 for wooded areas, and 98 for impervious surfaces in HSG A soils. For pre-construction drainage areas, the composite curve number is calculated as: 𝐶𝑁ೝ ൌ ሺ𝐴 𝑥 98 𝐴௦௦ 𝑥 49 𝐴௪ௗௗ 𝑥 30ሻ 𝐴௧௧ Table 1 - Pre-Construction Drainage Area Name 𝑨𝒕𝒐𝒕𝒂𝒍 (acres) 𝑨𝒊𝒎𝒑 (acres) 𝑨𝒈𝒓𝒂𝒔𝒔 (acres) 𝑨𝒘𝒐𝒐𝒅𝒆𝒅 (acres) 𝑪𝑵𝒄𝒐𝒎𝒑𝒑𝒓𝒆 PRE-CON:1 2.62 0.19 1.42 1.01 45.3 BREC, P.A. Dollar General – Store #21867 4 For post-construction drainage areas, the composite curve number is calculated as: 𝐶𝑁௦௧ೞ ൌ ሺ𝐴 𝑥 98 𝐴௦௦ 𝑥 39 𝐴௪ௗௗ 𝑥 30ሻ 𝐴௧௧ Table 2 - Post-Construction Drainage Areas Name 𝑨𝒕𝒐𝒕𝒂𝒍 (acres) 𝑨𝒊𝒎𝒑 (acres) 𝑨𝒈𝒓𝒂𝒔𝒔 (acres) 𝑨𝒘𝒐𝒐𝒅𝒆𝒅 (acres) 𝑪𝑵𝒄𝒐𝒎𝒑𝒑𝒐𝒔𝒕 POST-CON:1+ 0.21 0.21 0.00 0.00 98.0 POST-CON:2+ 0.28 0.19 0.09 0.00 79.6 POST-CON:3+ 0.30 0.28 0.02 0.00 93.5 POST-CON:4+ 0.20 0.00 0.20 0.00 39.0 POST-CON:5 0.95 0.13 0.82 0.00 47.2 POST-CON:6 1.48 0.07 1.41 0.00 41.6 + Routed through sand filter prior to discharge. 2.2 Time of Concentration Calculations Time of concentration values for vegetated drainage areas were evaluated using the segmental, lag, and FAA equations with a design value selected from the range produced by these equations. All majority impervious drainage areas less than one acre were assigned a design time of concentration value of five minutes. 𝑇ೌ ሺሻ ൌ 𝑙.଼ ሺ𝑆1ሻ. 1,140√𝑌 𝑙ൌ𝑓𝑙𝑜𝑤 𝑙𝑒𝑛𝑔𝑡ℎ ሺ𝑓𝑡ሻ 𝑌ൌ𝑎𝑣𝑔.𝑤𝑎𝑡𝑒𝑟𝑠ℎ𝑒𝑑 𝑙𝑎𝑛𝑑 𝑠𝑙𝑜𝑝𝑒 ሺ%ሻ 𝑆ൌ𝑚𝑎𝑥 𝑟𝑒𝑡𝑒𝑛𝑡𝑖𝑜𝑛 𝑝𝑜𝑡𝑒𝑛𝑡𝑖𝑎𝑙 ൌ ൬1,000 𝐶𝑁൰ െ 10 𝑇ಷಲಲሺሻ ൌ ൫1.8ሺ1.1 െ𝑐ሻ√𝑙൯ 𝑌ଵ ଷ 𝑐ൌ𝑟𝑎𝑡𝑖𝑜𝑛𝑎𝑙 𝑐𝑜𝑒𝑓𝑓𝑖𝑐𝑖𝑒𝑛𝑡 𝑇 ௦௧ ሺℎ𝑟ሻ ൌ𝑇௦௧ 𝑇௦ 𝑇௦௧ ൌ 0.007ሺ𝑛𝑙ሻ.଼ ඥ𝑃ଶ𝑆.ସ BREC, P.A. Dollar General – Store #21867 5 𝑛 ൌ 𝑀𝑎𝑛𝑛𝑖𝑛𝑔 ᇱ 𝑠 𝑐𝑜𝑒𝑓𝑓𝑖𝑐𝑖𝑒𝑛𝑡 𝑃ଶ ൌ 2𝑦𝑟,24 ℎ𝑟 𝑟𝑎𝑖𝑛𝑓𝑎𝑙𝑙 ሺ𝑖𝑛ሻ 𝑆ൌ𝑠𝑙𝑜𝑝𝑒 ൬𝑓𝑡 𝑓𝑡൰ 𝑇௦ ൌ 𝑙 3,600𝑉 𝑉 ൌ 𝑠ℎ𝑎𝑙𝑙𝑜𝑤 𝑐𝑜𝑛𝑐𝑒𝑛𝑡𝑟𝑎𝑡𝑒𝑑 𝑓𝑙𝑜𝑤 𝑣𝑒𝑙𝑜𝑐𝑖𝑡𝑦 ൬𝑓𝑡 𝑠൰ Table 3 - Pre-Construction ToC Name 𝑳𝒆𝒏𝒈𝒕𝒉 ሺ𝒇𝒕ሻ 𝑺𝒍𝒐𝒑𝒆 ሺ𝒇𝒕ሻ 𝑻𝒄ି𝒄𝒂𝒍𝒄 ሺ𝒎𝒊𝒏ሻ 𝑻𝒄ି𝒂𝒔𝒔𝒖𝒎𝒆𝒅 ሺ𝒎𝒊𝒏ሻ PRE-CON:1 190 0.02 14-18 16 Table 4 - Post-Construction ToC Name 𝑳𝒆𝒏𝒈𝒕𝒉 ሺ𝒇𝒕ሻ 𝑺𝒍𝒐𝒑𝒆 ሺ𝒇𝒕ሻ 𝑻𝒄ି𝒄𝒂𝒍𝒄 ሺ𝒎𝒊𝒏ሻ 𝑻𝒄ି𝒂𝒔𝒔𝒖𝒎𝒆𝒅 ሺ𝒎𝒊𝒏ሻ POST-CON:1 - - - 5 POST-CON:2 - - - 5 POST-CON:3 - - - 5 POST-CON:4 - - - 5 POST-CON:5 135 0.02 9-15 11 POST-CON:6 - - - 5 2.3 Rainfall Data Rainfall data was taken from NOAA Atlas 14, Volume 2, Version 3 for Concord, NC. Rainfall depths for each design storm are summarized below. Table 5 - NOAA Rainfall Depths Storm 𝑹𝒂𝒊𝒏𝒇𝒂𝒍𝒍 𝑫𝒆𝒑𝒕𝒉 ሺ𝒊𝒏ሻ First Flush 1.00 1 Year, 24 Hour 2.92 Table 6 - NOAA Rainfall Intensity Storm 𝑹𝒂𝒊𝒏𝒇𝒂𝒍𝒍 𝑰𝒏𝒕𝒆𝒏𝒔𝒊𝒕𝒚 ሺ𝒊𝒏/𝒉𝒓ሻ 10 Year, 5 Min 7.01 BREC, P.A. Dollar General – Store #21867 6 2.4 Pipe Design A composite post-construction rational coefficient was also assigned to each post construction drainage area as needed for pipe design. The composite rational coefficients were calculated using individual coefficients of 0.86 for impervious surfaces, 0.10 for grass surfaces, and 0.08 for wooded areas in HSG A soils. 𝐶 ൌ 𝐴 𝑥 0.86 𝐴௦௦ 𝑥 0.10 𝐴௪ௗௗ 𝑥 0.08 𝐴௧௧ Table 7 - Composite Rational Coefficients Name 𝑪𝒄𝒐𝒎𝒑 𝑸𝟏𝟎 ቆ𝒇𝒕𝟑 𝒔ቇ POST-CONSTRUCTION:1 0.86 1.27 POST-CONSTRUCTION:2 0.62 1.22 POST-CONSTRUCTION:3 0.80 1.68 POST-CONSTRUCTION:4 0.10 0.14 POST-CONSTRUCTION:5 0.21 1.08 POST-CONSTRUCTION:6 0.13 1.35 The 10 year rational discharges were used to size pipes by solving Manning’s equation iteratively for the normal depth. Table 8 - Pipe Design Summary NAME 𝑫𝑰𝑨 ሺ𝒊𝒏ሻ 𝑸ௗ௦ ቀ𝒇𝒕𝟑 ௦ ቁ 𝑽𝒅𝒆𝒔𝒊𝒈𝒏 ൬𝑓𝑡 𝑠൰ PIPE‐1 15 1.1 5.1 PIPE‐2 15 1.2 5.6 PIPE‐3 15 2.9 4.2 PIPE‐4 18 4.3 4.9 See Appendix for complete pipe design table. 2.4.1 Outlet Design Outlet design for PIPE-1, PIPE-3, and PIPE-4 was taken from Chapter 10 of HEC- 14. Riprap 𝐷ହ was calculated as: 𝐷ହ ൌ 0.2𝐷ቆ𝑄ௗ௦ ඥ𝑔𝐷ଶ.ହ ቇ ସ ଷ ൬ 𝐷 𝑇𝑊൰ Where, BREC, P.A. Dollar General – Store #21867 7 𝐷ହ ൌ𝑟𝑖𝑝𝑟𝑎𝑝 𝑠𝑖𝑧𝑒,ሺ𝑓𝑡ሻ 𝑄ௗ௦ ൌ 𝐷𝑒𝑠𝑖𝑔𝑛 𝑑𝑖𝑠𝑐ℎ𝑎𝑟𝑔𝑒 ቆ𝑓𝑡ଷ 𝑠ቇ 𝐷ൌ𝑃𝑖𝑝𝑒 𝑑𝑖𝑎𝑚𝑒𝑡𝑒𝑟,ሺ𝑓𝑡ሻ 𝑇𝑊 ൌ 𝑇𝑎𝑖𝑙𝑤𝑎𝑡𝑒𝑟 𝑑𝑒𝑝𝑡ℎ,ሺ𝑓𝑡ሻ 𝑔 ൌ 𝑔𝑟𝑎𝑣𝑖𝑡𝑎𝑡𝑖𝑜𝑛𝑎𝑙 𝑎𝑐𝑐𝑒𝑙𝑒𝑟𝑎𝑡𝑖𝑜𝑛 ൬32.2 𝑓𝑡 𝑠ଶ ൰ Substituting the corresponding pipe diameters and design discharges into the equation above for PIPE-1, PIPE-3, and PIPE-4 yields: Table 9 - Riprap Outlet Stone Sizing NAME 𝑫𝑰𝑨 ሺ𝒊𝒏ሻ 𝑸𝒅𝒆𝒔𝒊𝒈𝒏 ቀ𝒇𝒕𝟑 𝒔ቁ 𝑫𝟓𝟎𝒄𝒂𝒍𝒄 ሺ𝒊𝒏ሻ 𝑫𝟓𝟎𝒅𝒆𝒔𝒊𝒈𝒏 ሺ𝒊𝒏ሻ PIPE‐1 15 1.1 0.60 5.0 PIPE‐3 15 2.9 2.30 5.0 PIPE‐4 18 4.3 3.60 5.0 A minimum 𝐷ହ of 5 𝑖𝑛𝑐ℎ𝑒𝑠 was chosen for each pipe which corresponds to NCDOT Class A stone. Given the design 𝐷ହ , the dimensions of the apron were taken from Table 10.1 equations from HEC 141. 𝐿 ൌ𝐴𝑝𝑟𝑜𝑛 𝑙𝑒𝑛𝑔𝑡ℎ ሺ𝑓𝑡ሻ ൌ 4𝐷 𝐷 ൌ𝐴𝑝𝑟𝑜𝑛 𝑑𝑒𝑝𝑡ℎ ሺ𝑓𝑡ሻ ൌ 3.5𝐷ହ 𝑊ଵ ൌ 𝑈𝑝𝑝𝑒𝑟 𝑤𝑖𝑑𝑡ℎ ሺ𝑓𝑡ሻ ൌ 3𝐷 𝑊ଶ ൌ𝐿𝑜𝑤𝑒𝑟 𝑤𝑖𝑑𝑡ℎ ሺ𝑓𝑡ሻ ൌ 3𝐷൬2 3൰ 𝐿 Table 10 - Riprap Apron Dimensions NAME 𝑫𝑰𝑨 ሺ𝒊𝒏ሻ 𝑳𝒂 ሺ𝒇𝒕ሻ 𝑫𝒂 ሺ𝒇𝒕ሻ 𝑾𝟏 ሺ𝒇𝒕ሻ 𝑾𝟐 ሺ𝒇𝒕ሻ PIPE‐1 15 5.0 1.5 3.8 7.1 PIPE‐3 15 5.0 1.5 3.8 7.1 PIPE‐4 18 6.0 1.5 4.5 8.5 2.5 Hydrology Calculations The water quality volume ሺ𝑊𝑄𝑉ሻ required to be treated from the first flush was calculated using the Schueler method outlined in the NCDEQ Stormwater Design Manual2. The Schueler method utilizes the following equations: 1 http://www.fhwa.dot.gov/engineering/hydraulics/pubs/06086/hec14ch10.cfm 2 https://deq.nc.gov/sw-bmp-manual BREC, P.A. Dollar General – Store #21867 8 𝑅௩ ൌ 0.05 0.9𝐼 𝑊𝑄𝑉 ൌ 3630𝑅 𝑅௩ 𝐴 Where 𝐼 is the impervious fraction of the drainage area, 𝑅௩ is a runoff coefficient, 𝑅 is the rainfall depth, 𝐴 is the drainage area, and 𝑊𝑄௩ is the runoff volume. The following parameters are used for the drainage routed to the sand filter. 𝐼 ൌ 0.69 𝑅௩ ൌ 0.05 0.9ሺ0.43ሻ ൌ 0.67 𝑅 ൌ 1.0 𝑖𝑛𝑐ℎ 𝐴ൌ0.99 𝑎𝑐𝑟𝑒𝑠 𝑊𝑄𝑉 ൌ 3,630ሺ1.0ሻሺ0.67ሻሺ0.99ሻ ൌ 2,392 𝑓𝑡ଷ 𝑊𝑄𝑉ௗ ൌ 0.75𝑊𝑄௩ ൌ 0.75ሺ2,392ሻ ൌ 1,794 𝑓𝑡ଷ 2.6 Modified Curve Number Calculations To route the 𝑊𝑄𝑉 through the sand filter, it is necessary to calculate a modified SCS curve number to avoid underrepresenting the first flush. The modified curve number is calculated as follows: 𝐶𝑁 ൌ 1000/ቂ10 5𝑅 10𝑅௩ െ 10ඥ𝑅௩ଶ 1.25𝑅௩ 𝑅 ቃ The modified curve numbers were used to route the first flush using an SCS 6 hour balanced storm distribution. The remaining design storms were routed with standard curve numbers and an SCS type II 24 hour storm distribution. Table 11 - Modified SCS Curve Numbers Name 𝑹𝒗 𝑪𝑵𝒎𝒐𝒅 POST-CON:1 0.95 99.57 POST-CON:2 0.67 96.54 POST-CON:3 0.88 98.94 POST-CON:4 0.05 77.22 POST-CON:5 0.18 85.08 POST-CON:6 0.09 80.47 2.7 Sand Filter Design The combined area of the sediment chamber and sand chamber is determined from the relationship of the max water depth observed during the water quality event, 𝐻௫ , and the adjusted water quality volume. The design value for 𝐻௫ was chosen as 1.0 𝑓𝑡. When coupled with the adjusted water quality volume, BREC, P.A. Dollar General – Store #21867 9 𝑊𝑄𝑉ௗ ൌ 0.75𝑊𝑄𝑉 ൌ 1,794 𝑓𝑡ଷ , the resulting stage storage for the sand filter is summarized below. Table 12 - Sand Filter State-Storage 𝑺𝒕𝒂𝒈𝒆 ሺ𝒇𝒕ሻ 𝑬𝒍𝒆𝒗𝒂𝒕𝒊𝒐𝒏 ሺ𝒇𝒕ሻ 𝑨𝒓𝒆𝒂 ൫𝒇𝒕𝟐൯ 𝑺𝒆𝒅𝒊𝒎𝒆𝒏𝒕 𝑽𝒐𝒍 ൫𝒇𝒕𝟑൯ 𝑭𝒊𝒍𝒕𝒆𝒓 𝑽𝒐𝒍 ൫𝒇𝒕𝟑൯ 𝑻𝒐𝒕𝒂𝒍 𝑽𝒐𝒍 ൫𝒇𝒕𝟑൯ 0.0 1032 1,776 0 0 0 1.0 1033 2,423 1,049 1,051 2,100 2.0 1034 3,151 2,440 2,446 4,887 3.0 1035 3,960 4,216 4,226 8,442 4.0 1036 4,850 6,416 6,43` 12,847 At 𝐸𝑙𝑒𝑣𝑎𝑡𝑖𝑜𝑛 ൌ 1033 𝑓𝑡,𝐻௫ ൌ 1.0 𝑓𝑡, 𝑊𝑄𝑉௩ௗௗ ൌ 2,100 𝑓𝑡ଷ 𝑊𝑄𝑉ௗ . 2.7.1 Chamber and Filter Sizing The sediment chamber and filter chamber are equally sized. The sediment chamber has an additional 1.0 𝑓𝑡 depression to assist with maintenance and primary sediment deposition; however, this added volume is not considered in calculations to meet minimum design criteria requirements. Given the filter chamber area, the sand media area, 𝐴௦ௗ , was selected as 375 𝑓𝑡ଶ . This value maximizes the available filter chamber area and preserves an easily installable geometric shape for the sand media while providing space for installation of the outlet structure outside of the sand media and preventing the sand media from being installed adjacent to the toe of slope grading. Discharge through the sand media is governed by Darcy’s Law. 𝑄௦ௗ ൌ 𝐴௦ௗ 𝑘൫ℎ 𝑑 ൯ 𝑑 Where, 𝐴௦ௗ ൌ𝑆𝑎𝑛𝑑 𝑚𝑒𝑑𝑖𝑎 𝑠𝑢𝑟𝑓𝑎𝑐𝑒 𝑎𝑟𝑒𝑎 ሺ𝑓𝑡ଶ ሻ ൌ 375 𝑓𝑡ଶ 𝑘ൌ𝑆𝑎𝑛𝑑 𝑚𝑒𝑑𝑖𝑎 𝑝𝑒𝑟𝑚𝑒𝑎𝑏𝑖𝑙𝑖𝑡𝑦 ൬ 𝑓𝑡 𝑑𝑎𝑦൰ ൌ 4.0 𝑓𝑡 𝑑𝑎𝑦 𝑑 ൌ𝑆𝑎𝑛𝑑 𝑚𝑒𝑑𝑖𝑎 𝑑𝑒𝑝𝑡ℎ ሺ𝑓𝑡ሻ ൌ 1.5 𝑓𝑡 ℎ ൌ𝐻𝑒𝑖𝑔ℎ𝑡 𝑜𝑓 𝑤𝑎𝑡𝑒𝑟 𝑎𝑏𝑜𝑣𝑒 𝑠𝑎𝑛𝑑 𝑚𝑒𝑑𝑖𝑎 2.7.2 Underdrain Sizing Drawdown time is calculated as: 𝑡ൌ 𝑊𝑄𝑉𝑑 𝑘൫ℎ 𝑑 ൯𝐴௦ௗ ൌ 2,392ሺ1.5ሻ 4.0ሺ0.5 1.5ሻ375 ൌ 28.7 ℎ𝑜𝑢𝑟𝑠 BREC, P.A. Dollar General – Store #21867 10 Discharge rate is calculated as: 𝑄௨ௗௗ ൌ 𝑊𝑄𝑉 𝑡ൌ 2,392 28.7 ൌ 0.023 𝑓𝑡ଷ 𝑠 After applying a safety factor of 10, 𝑄௦ௗ ൌ 10𝑄௨ௗௗ ൌ 0.23 𝑓𝑡ଷ 𝑠 The diameter of a single pipe is calculated as: 𝐷ൌ16 ൬𝑛𝑄௦ௗ √𝑆൰ ଷ ଼ Where, 𝑛 ൌ 𝑀𝑎𝑛𝑛𝑖𝑛𝑔 ᇱ 𝑠 𝑟𝑜𝑢𝑔ℎ𝑛𝑒𝑠𝑠 𝑓𝑜𝑟 𝑝𝑖𝑝𝑒 𝑆 ൌ 𝑝𝑖𝑝𝑒 𝑠𝑙𝑜𝑝𝑒 𝐷ൌ16 ቆ0.011ሺ0.23ሻ √0.005 ቇ ଷ ଼ ൌ 4.6 𝑖𝑛𝑐ℎ𝑒𝑠 Per Table 1 of Section A-5 of the NCDEQ Stormwater Design Manual, use (2) 4 inch pipes. 2.7.3 Anti‐floatation Calculations The outlet structure is a 5.0 𝑓𝑡 tall 3 𝑓𝑡 𝑥 3 𝑓𝑡 precast concrete box with 6 𝑖𝑛 side and bottom wall thicknesses. Including concrete and reinforcing steel, the structure has an empty mass of 𝑀௨௧௧ ൌ 5,184 𝑙𝑏. Assuming the total height of the box is exposed to buoyant forces, the volume of water displaced by the box is calculated from the outside dimensions. 𝑉௫ೢೌೝ ൌ 4.0 𝑓𝑡 𝑥 4.0 𝑓𝑡 𝑥 5.50 𝑓𝑡 ൌ 88.0 𝑓𝑡ଷ The buoyant force on the box is defined from the hydraulic forces acting 𝐹 ൌ𝑉௫ೢೌೝ 𝜌௪ ൌ 88.0 𝑓𝑡ଷ 𝑥 62.4 𝑙𝑏 𝑓𝑡ଷ ൌ 5,491 𝑙𝑏 BREC, P.A. Dollar General – Store #21867 11 Additional mass was added to the outlet structure by pouring a 6 𝑖𝑛 concrete slab over the bottom. 𝑀௨௧௧ೌ ൌ 5,184 𝑙𝑏 ሺ3 𝑓𝑡ሻሺ3 𝑓𝑡ሻሺ0.5 𝑓𝑡ሻ ൬150 𝑙𝑏 𝑓𝑡ଷ ൰ ൌ 5,895 𝑙𝑏 𝐹 3.0 Results The first flush ሺ1"ሻ storm is routed through the sand filter and reaches a max storage depth of 0.93 𝑓𝑡 which does not exceed the design 𝐻௫ ൌ 1.0 𝑓𝑡. The water quality volume is discharged over a period of 30.0 ℎ𝑜𝑢𝑟𝑠. Figure 1 - System Storage of First Flush Storage: System (POST-CON-ROUTING-BALANCED 2020-01-28 16:27:58)Storage (ft³)2100 2000 1900 1800 1700 1600 1500 1400 1300 1200 1100 1000 900 800 700 600 500 400 300 200 100 0 Time (hrs) 454035302520151050 BREC, P.A. Dollar General – Store #21867 12 Appendix Table 133 - Pipe Design Table NAME DIA (IN) INV UP HGL UP INV DOWN HGL DOWN LEN (FT) S (FT/FT) n Q MAX (CFS) Q DESIGN (CFS) V DESIGN (FT/S) PIPE‐1 15 1036.0 1036.3 1034.6 1034.9 79.1 0.018 0.012 9.3 1.1 5.1 PIPE‐2 15 1036.1 1036.4 1034.6 1034.9 71.0 0.021 0.012 10.2 1.2 5.6 PIPE‐3 15 1034.5 1035.2 1033.5 1034.2 196.7 0.005 0.012 5.0 2.9 4.2 PIPE‐4 18 1028.8 1029.5 1028.5 1029.3 43.8 0.006 0.012 8.6 4.3 4.9 Post -construction First Flush BREC, P.A. Dollar General — Store #21867 12 Project Description File Name.................................................................. POST-CON-ROUTING-BALANCED.SPF Description---------------------------------------------------------------- R:\Shared Folders\PROJECTS\BREC\PROJ ECTS\316_TERAMORE_DEVELOPM ENT\3160622019_DOLLAR_GE Project Options FlowUnits------------------------------------------------------------------ CFS Elevation Type Elevation Hydrology Method . SCS TR-55 Time of Concentration (TOC) Method . User -Defined Link Routing Method Kinematic Wave Enable Overflow Ponding at Nodes YES Skip Steady State Analysis Time Periods NO Analysis Options Start Analysis On . Jan 28, 2020 00-00-00 End Analysis On . Jan 30, 2020 00-00-00 Start Reporting On . Jan 28, 2020 00-00-00 Antecedent Dry Days 0 days Runoff (Dry Weather) Time Step ------------------------------ 0 01-00-00 days hh:mm:ss Runoff (Wet Weather) Time Step ----------------------------- 0 00-05-00 days hh:mm:ss Reporting Time Step ------------------------------------------------- 0 00-00-15 days hh:mm:ss Routing Time Step ---------------------------------------------------- 15 seconds Number of Elements Qty Rain Gages 1 Subbasins 6 Nodes 4 Junctions 2 Outfalls 1 Flow Diversions 0 Inlets 0 Storage Nodes 1 Links 5 Channels 0 Pipes 2 Pumps 0 Orifices 1 Weirs 1 Outlets 1 Pollutants 0 Land Uses 0 Rainfall Details SN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 1 NEWTON Time Series 11N-6HR-BALANCED Cumulative inches 0.00 Subbasin Summary SN Subbasin Area Peak Rate Weighted Total Total Total Peak Time of ID Factor Curve Rainfall Runoff Runoff Runoff Concentration Number Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 {POST-CON}.POST-CON : 1 021 484.00 99.57 1.00 0.95 0.19 0.43 0 00-05-00 2 {POST-CON}.POST-CON : 2 028 484.00 96.54 1.00 0.67 0.19 0.47 0 00-05-00 3 {POST-CON}.POST-CON : 3 0.30 484.00 98.94 1.00 0.88 026 0.61 0 00-05-00 4 {POST-CON}.POST-CON : 4 020 484.00 7722 1.00 0.05 0.01 0.01 0 00-05-00 5 {POST-CON}.POST-CON : 5 0.95 484.00 85.08 1.00 0.17 0.16 028 0 00-10-00 6 {POST-CON}.POST-CON : 6 1.48 484.00 80.47 1.00 0.09 0.13 0.18 0 00-05-00 Node Summary SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak Max HGL Max Min Time of ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Elevation Elevation Attained Depth Attained Flooding Attained Occurrence (ft) (ft) (ft) (ft) (ft') (cfs) (ft) (ft) (ft) (days hh:mm) 1 SCM-RISER Junction 1028.75 1036.00 1028.75 0.00 0.00 0.03 1028.81 0.00 7.19 0 00:00 2 SITE -JUNCTION -VIRTUAL Junction 1028.50 1036.00 1028.50 0.00 0.00 0.49 1028.59 0.00 7.41 0 00:00 3 OUTFALL Outfall 1022.00 0.49 1022.09 4 SAND -FILTER Storage Node 1032.00 1036.00 1032.00 0.00 1.51 1032.93 Link Summary SN Element Element From To (Outlet) Length Inlet Outlet Average Diameter or Manning's Peak Design Flow Peak Flow/ Peak Flow Peak Flow Peak Flow Total Time Reported ID Type (Inlet) Node Invert Invert Slope Height Roughness Flow Capacity Design Flow Velocity Depth Depth/ Surcharged Condition Node Elevation Elevation Ratio Total Depth Ratio (ft) (ft) (ft) ( % ) (in) (cfs) (cfs) (ft/sec) (ft) (min) 1 SCM-BARREL Pipe SCM-RISER SITE -JUNCTION -VIRTUAL 45.00 1028.75 1028.50 0.5600 18.000 0.0120 0.03 8.48 0.00 2.95 0.06 0.04 0.00 Calculated 2 SITE -LINK -VIRTUAL Pipe SITE-JUNCTION-VIRTUALOUTFALL 2000. 1028.50 1022.00 32.5000 18.000 0.0120 0.49 64.87 0.01 10.79 0.09 0.06 0.00 Calculated 3 PRINCIPAL -SPILLWAY Orifice SAND -FILTER SCM-RISER 1032.00 1028.75 36.000 0.00 4 SAND -MEDIA Outlet SAND -FILTER SCM-RISER 1032.00 1028.75 0.03 5 EM-SPILLWAY Weir SAND -FILTER SITE -JUNCTION -VIRTUAL 1032.00 1028.50 0.00 Subbasin Hydrology Subbasin : {POST-CON}.POST-CON : 1 Input Data Area(ac)----------------------------------------------------- 0.21 Peak Rate Factor ---------------------------------------- 484.00 Weighted Curve Number ---------------------------- 99.57 Rain Gage ID ............................................... NEWTON Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number 0.21 - 99.57 Composite Area & Weighted CN 0.21 99.57 Subbasin Runoff Results Total Rainfall (in) ----------------------------------------- 1.00 Total Runoff (in) ------------------------------------------ 0.95 Peak Runoff (cfs)---------------------------------------- 0.43 Weighted Curve Number ............................ 99.57 Time of Concentration (days hh:mm:ss) ..... 0 00:05:00 Subbasin : {POST-CON}.POST-CON : 1 2.3 2.2 2.1 2 1.9 1.8 1.7 1.6 1.5 1.4 1.3 1.2 1.1 1 0.9 0.8 0.7 06 0.5 0.4 0.3 0.2 0.1 0.46 0.44 0.42 0.4 038 0.36 0.34 0.32 0.3 0.28 0.26 -- 0.24 0.22 0.2 0.18 0.16 0.14 0.12 0.1 0.08 0.06 0.04 0.02 Rainfall Intensity Graph 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hrs) Runoff Hydrograph 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hrs) Subbasin : {POST-CON}.POST-CON : 2 Input Data Area(ac)----------------------------------------------------- 0.28 Peak Rate Factor ---------------------------------------- 484.00 Weighted Curve Number ---------------------------- 96.54 Rain Gage ID ............................................... NEWTON Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number 0.28 - 96.54 Composite Area & Weighted CN 0.28 96.54 Subbasin Runoff Results Total Rainfall (in) ----------------------------------------- 1.00 Total Runoff (in) ------------------------------------------ 0.67 Peak Runoff (cfs)---------------------------------------- 0.47 Weighted Curve Number ............................ 96.54 Time of Concentration (days hh:mm:ss) ..... 0 00:05:00 Subbasin : {POST-CON}.POST-CON : 2 2.4 2.3 2.2 2.1 2 1.9 1.8 1.7 1.6 1.5 1.4 1.3 1.2 'E 1.1 0 1 0.9 0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.1 0.5 0.48 0.46 044 0.42 0.4 0.38 0.36 0.34 0.32 0.3 N 0.28 0.26 0.24 0.22 0.2 0 18 0.16 0.14 0.12 0.1 0.08 0.06 0.04 0.02 Rainfall Intensity Graph 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hrs) Runoff Hydrograph 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hrs) Subbasin : {POST-CON}.POST-CON : 3 Input Data Area(ac)----------------------------------------------------- 0.30 Peak Rate Factor ---------------------------------------- 484.00 Weighted Curve Number ---------------------------- 98.94 Rain Gage ID ............................................... NEWTON Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number 0.30 - 98.94 Composite Area & Weighted CN 0.30 98.94 Subbasin Runoff Results Total Rainfall (in) ----------------------------------------- 1.00 Total Runoff (in) ------------------------------------------ 0.88 Peak Runoff (cfs)---------------------------------------- 0.61 Weighted Curve Number ............................ 98.94 Time of Concentration (days hh:mm:ss) ..... 0 00:05:00 Subbasin : {POST-CON}.POST-CON : 3 2.4 2.3 2.2 2.1 2 1.9 1.8 1.7 1.6 1.5 1.4 1.3 1.2 'E 1.1 0 1 0.9 0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.1 0.7 0.65 0.6 0.55 0.5 0.45 N 0.4 w 0.35 0 0 0 1h 0.3 0.26 0.2 0.15 0.1 0.05 Rainfall Intensity Graph 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hrs) Runoff Hydrograph 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hrs) Subbasin : {POST-CON}.POST-CON : 4 Input Data Area(ac)----------------------------------------------------- 0.20 Peak Rate Factor ---------------------------------------- 484.00 Weighted Curve Number ---------------------------- 77.22 Rain Gage ID ---------------------------------------------- NEWTON Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number 0.20 - 77.22 Composite Area & Weighted CN 0.20 77.22 Subbasin Runoff Results Total Rainfall (in) ----------------------------------------- 1.00 Total Runoff (in) ------------------------------------------ 0.05 Peak Runoff (cfs)---------------------------------------- 0.01 Weighted Curve Number ............................ 77.22 Time of Concentration (days hh:mm:ss) ..... 0 00:05:00 Subbasin : {POST-CON}.POST-CON : 4 2.4 2.3 2.2 2.1 2 1.9 1.8 1.7 1.6 1.5 1.4 1.3 1.2 'E 1.1 0 1 0.9 0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.1 0.01 0.009 0.009 0.008 0.008 0.007 0.007 0.006 ,E0.006 �0.005 0.004 0.004 0.004 0.003 0.003 0.002 0.002 0.001 Rainfall Intensity Graph 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hrs) Runoff Hydrograph 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hrs) Subbasin : {POST-CON}.POST-CON : 5 Input Data Area(ac)----------------------------------------------------- 0.95 Peak Rate Factor ---------------------------------------- 484.00 Weighted Curve Number ---------------------------- 85.08 Rain Gage ID ............................................... NEWTON Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number 0.95 - 85.08 Composite Area & Weighted CN 0.95 85.08 Subbasin Runoff Results Total Rainfall (in) ----------------------------------------- 1.00 Total Runoff (in) ------------------------------------------ 0.17 Peak Runoff (cfs)---------------------------------------- 0.28 Weighted Curve Number ............................ 85.08 Time of Concentration (days hh:mm:ss) ..... 0 00:10:00 Subbasin : {POST-CON}.POST-CON : 5 2.4 2.3 2.2 2.1 2 1.9 1.8 1.7 1.6 1.5 1.4 1.3 1.2 'E 1.1 0 1 0.9 0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.1 0.28 027 0.26 0.25 0.24 0.23 0.22 0.21 0.2 0.19 0.18 _ 0.17 0.16 0 15 0 0.14 0.13 0.12 0.11 0.1 0.09 0.08 0.07 006 0.05 0.04 0.03 0.02 0.01 Rainfall Intensity Graph 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hrs) Runoff Hydrograph 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hrs) Subbasin : {POST-CON}.POST-CON : 6 Input Data Area(ac)----------------------------------------------------- 1.48 Peak Rate Factor ---------------------------------------- 484.00 Weighted Curve Number ---------------------------- 80.47 Rain Gage ID ............................................... NEWTON Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number 1.48 - 80.47 Composite Area & Weighted CN 1.48 80.47 Subbasin Runoff Results Total Rainfall (in) ----------------------------------------- 1.00 Total Runoff (in) ------------------------------------------ 0.09 Peak Runoff (cfs)---------------------------------------- 0.18 Weighted Curve Number ............................ 80.47 Time of Concentration (days hh:mm:ss) ..... 0 00:05:00 Subbasin : {POST-CON}.POST-CON : 6 2.4 2.3 2.2 2.1 2 1.9 1.8 1.7 1.6 1.5 1.4 1.3 1.2 'E 1.1 0 1 0.9 0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.1 0.2 0.19 0.18 0.17 0.16 0.15 0.14 0.13 0.12 0.11 w 0.1 0 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 Rainfall Intensity Graph 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hrs) Runoff Hydrograph 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hrs) Junction Input SN Element Invert Ground/Rim Ground/Rim Initial Initial Surcharge Surcharge Ponded Minimum ID Elevation (Max) (Max) Water Water Elevation Depth Area Pipe Elevation Offset Elevation Depth Cover (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (in) 1 SCM-RISER 1028.75 1036.00 725 1028.75 0.00 0.00 -1036.00 0.00 0.00 2 SITE -JUNCTION -VIRTUAL 1028.50 1036.00 7.50 1028.50 0.00 0.00 -1036.00 0.00 0.00 Junction Results SN Element Peak Peak Max HGL Max HGL Max Min Average HGL Average HGL Time of Time of Total Total Time ID Inflow Lateral Elevation Depth Surcharge Freeboard Elevation Depth Max HGL Peak Flooded Flooded Inflow Attained Attained Depth Attained Attained Attained Occurrence Flooding Volume Attained Occurrence (cfs) (cfs) (ft) (ft) (ft) (ft) (ft) (ft) (days hh:mm) (days hh:mm) (ac-in) (min) 1 SCM-RISER 0.03 0.00 1028.81 0.06 0.00 7.19 1028.78 0.03 0 06:01 0 00:00 0.00 0.00 2 SITE -JUNCTION -VIRTUAL 0.49 0.46 1028.59 0.09 0.00 7.41 1028.53 0.03 0 03:11 0 00:00 0.00 0.00 Pipe Input SN Element Length Inlet Inlet Outlet Outlet Total Average Pipe Pipe Pipe Manning's Entrance Exit/Bend Additional Initial ID Invert Invert Invert Invert Drop Slope Shape Diameteror Width Roughness Losses Losses Losses Flow Elevation Offset Elevation Offset Height (ft) (ft) (ft) (ft) (ft) (ft) ( % ) (in) (in) (cfs) 1 SCM-BARREL 45.00 1028.75 0.00 1028.50 0.00 025 0.5600 CIRCULAR 18.000 18.000 0.0120 0.5000 0.5000 0.0000 0.00 2 SITE -LINK -VIRTUAL 2000. 1028.50 0.00 1022.00 0.00 6.50 32.5000 CIRCULAR 18.000 18.000 0.0120 0.5000 0.5000 0.0000 0.00 Flap No. of Gate Barrels No 1 No 1 Pipe Results SN Element Peak Time of Design Flow Peak Flow/ Peak Flow Travel Peak Flow Peak Flow Total Time Froude Reported ID Flow Peak Flow Capacity Design Flow Velocity Time Depth Depth/ Surcharged Number Condition Occurrence Ratio Total Depth Ratio (cfs) (days hh:mm) (cfs) (ft/sec) (min) (ft) (min) 1 SCM-BARREL 0.03 0 06:02 8.48 0.00 2.95 025 0.06 0.04 0.00 Calculated 2 SITE -LINK -VIRTUAL 0.49 0 03:11 64.87 0.01 10.79 0.03 0.09 0.06 0.00 Calculated Storage Nodes Storage Node : SAND -FILTER Input Data Invert Elevation (ft)---------------------------------------------------------------------------------- 1032-00 Max (Rim) Elevation (ft)-------------------------------------------------------------------------- 1036-00 Max (Rim) Offset (ft)------------------------------------------------------------------------------- 4-00 Initial Water Elevation (ft)------------------------------------------------------------------------ 1032-00 Initial Water Depth (ft)----------------------------------------------------------------------------- 0-00 Ponded Area (ftt)------------------------------------------------------------------------------------- 0-00 Evaporation Loss------------------------------------------------------------------------------------ 0-00 Storage Area Volume Curves Storage Curve: SAND -FILTER Stage Storage Storage Area Volume (ft) (ft2) (ft') 0 1776 0-000 1 2432 2104-00 2 3151 4895-50 3 3960 8451-00 4 4850 12856-00 Storage Area Volume Curves Storage Volume (ft) 0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 81000 9.000 -10,000 11,000 12,000 d------------------------------------------------------------------------------- --- - 3.8 ---- ----- 3.7 ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ----- 3.6 --- ---- ---- ---- ---- ---- ---- ---- ---- ---- ----- ----- 3.4-------- ------------------------ ------ 3.3- - - - - ---- - - - ---- - - - ---- - - - ---- - - - ---- - - - ---- - - - -- -- - - - --- - - - - -- ------ 3.2 --- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ----- 3.1 ---- ---- ---- ---- ---- ---- -- - ---- ---- ----- ?.9---------------------------------------------------------- - - - - -- -- -------------------------------- t.6 -------- ________ _______ _______ _______ _______ _____ ___ _ _______ _______ _______ _______ ______ d.3- - -- - ---- - - - --- -- - -- -- - - ---- ---- -- --- - -- -- - -- - -- -- -------------------------------------- ---------------------- ?.1 - - - - -- - - - - -- - - - - -- - - -- - - - -- - - - - -- - - - - -- - - - - -- - - - - --- - - - - -- - - - - - - 2- ------------------------------ ------ -- ------------------------------------ ------ ------ 1.9----------------L -------L ------- L --- -- L -- --- I ------- I ------- I -------L -------L -------L ------- ------ 1.7----------------------------- ---------------------------------------- ------------------ 1.6 ---------- ------------- 1.4 --- ---- ---- - ---- ---- ---- ---- ---- ---- ---- ---- ----- 1.3 --- ---- -- ---- ---- ---- ---- ---- ---- ---- ---- ----- 1.1- - - - - ---- - - - - -- -- - - - - ---- - - - --- - - - - --- - - - - --- - - - - --- - - - - --- - - - - -- ---------------------- 1 - - - - -- ------ 1.9- -- - - --- -- - --- ------ 1.$ ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ----- 1.7 - - -- - --- - --- -- -- -- -- - - -- - --- - --- -- -- -- -- ----- 1.6 -- -- - -- -- - - --- ----- --- --- -- - - --- -- - --- -- - -- -- -------------------------------------- 1.5 - - - - -- - - - - -- - - - - -- - - - - -- - - - - --- - - - - -- 1.4- - - - - ---- - - - --- - - - - --- - - - - --- - - - - --- - - - - --- - - - - --- - - - - --- - - - - --- - - - - -- ------ 1.3 ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ----- 1.2 - - -- - - -- - --- - --- -- -- -- -- - - -- - --- - --- -- -- -- -- - - --- 0 1,800 2,000 2,200 2,400 2,600 2,800 3,000 3,200 3,400 3,600 3,800 4,000 4,200 4,400 4,600 4,800 Storage Area (fin - Storage Area - Storage Volu m e d M If 3.1 3.5 3.6 3.4 3.3 3.3 3.1 3 2A 2A 2.3 2.s 2.1 2.4 1A 1.8 1.1 1.( 1.6 1.4 1.3 1.2 1.1 1 0.9 0.8 0.3 0.G 0.3 0.4 0.3 0.2 0.1 0 w a� m fJ'1 Storage Node : SAND -FILTER (continued) Outflow Weirs SN Element Weir Flap Crest Crest Length Weir Total Discharge ID Type Gate Elevation Offset Height Coefficient (ft) (ft) (ft) (ft) 1 EM-SPILLWAY Trapezoidal No 1035-00 3-00 10-00 1-00 3-33 Outflow Orifices SN Element Orifice Orifice Flap Circular Rectangular Rectangular Orifice Orifice ID Type Shape Gate Orifice Orifice Orifice Invert Coefficient Diameter Height Width Elevation (in) (in) (in) (ft) 1 PRINCIPAL -SPILLWAY Bottom Rectangular No 36-00 36-00 1033-00 0-63 Output Summary Results Peak Inflow (cfs)-------------------------------------------------------------------------------------- 1-51 Peak Lateral Inflow (cfs)-------------------------------------------------------------------------- 1-51 Peak Outflow (cfs)----------------------------------------------------------------------------------- 0-03 Peak Exfiltration Flow Rate (cfm)------------------------------------------------------------ 0-00 Max HGL Elevation Attained (ft)-------------------------------------------------------------- 1032-93 Max HGL Depth Attained (ft)------------------------------------------------------------------- 0-93 Average HGL Elevation Attained (ft)------------------------------------------------------- 103228 Average HGL Depth Attained (ft)------------------------------------------------------------ 028 Time of Max HGL Occurrence (days hh:mm)----------------------------------------- 0 06-01 Total Exfiltration Volume (1000-ft3)--------------------------------------------------------- 0-000 Total Flooded Volume (ac-in) - 0 Total Time Flooded (min) 0 Total Retention Time (sec)---------------------------------------------------------------------- 0-00 Post -construction 10 Year, 24 Hour BREC, P.A. Dollar General — Store #21867 13 Project Description File Name ---------------------------------------------------- POST-CON-ROUTING.SPF Description -------------------------------------------------- R:\Shared Folders\PROJECTS\BREC\PROJ ECTS\316_TERAMORE_DEVELOPM ENT\3160622019_DOLLAR_GEN ERAL_N E WTO Project Options Flow Units --------------------------------------------------- CFS Elevation Type Elevation Hydrology Method . SCS TR-55 Time of Concentration (TOC) Method -------- User -Defined Link Routing Method Kinematic Wave Enable Overflow Ponding at Nodes ------------ YES Skip Steady State Analysis Time Periods --- NO Analysis Options Start Analysis On . Jan 28, 2020 00-00-00 End Analysis On . Jan 30, 2020 00:00:00 Start Reporting On . Jan 28, 2020 00:00:00 Antecedent Dry Days 0 days Runoff (Dry Weather) Time Step ---------------- 0 01:00:00 days hh:mm:ss Runoff (Wet Weather) Time Step --------------- 0 00:05:00 days hh:mm:ss Reporting Time Step ----------------------------------- 0 00:00:15 days hh:mm:ss Routing Time Step ...................................... 15 seconds Number of Elements Qty Rain Gages 1 Subbasins 6 Nodes 4 Junctions 2 Outfalls 1 Flow Diversions 0 Inlets 0 Storage Nodes 1 Links 5 Channels 0 Pipes 2 Pumps 0 Orifices 1 Weirs 1 Outlets 1 Pollutants 0 Land Uses 0 Rainfall Details SN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 1 NEWTON Time Series 10YR-24HR Cumulative inches North Carolina Catawba 10 521 SCS Type II 24-hr Subbasin Summary SN Subbasin Area Peak Rate Weighted Total Total Total Peak Time of ID Factor Curve Rainfall Runoff Runoff Runoff Concentration Number Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 {POST-CON}.POST-CON : 1 021 484.00 98.00 521 4.97 1.02 1.40 0 00-05-00 2 {POST-CON}.POST-CON : 2 028 484.00 79.60 521 3.04 0.86 1.36 0 00-05-00 3 {POST-CON}.POST-CON : 3 0.30 484.00 93.50 521 4.46 1.33 1.97 0 00-05-00 4 {POST-CON}.POST-CON : 4 020 484.00 39.00 521 024 0.05 0.02 0 00-05-00 5 {POST-CON}.POST-CON : 5 0.95 484.00 4720 521 0.62 0.59 0.58 0 00-10-00 6 {POST-CON}.POST-CON : 6 1.48 484.00 41.60 521 0.35 0.52 0.41 0 00-05-00 Node Summary SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak Max HGL Max Min Time of ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Elevation Elevation Attained Depth Attained Flooding Attained Occurrence (ft) (ft) (ft) (ft) (ft') (cfs) (ft) (ft) (ft) (days hh:mm) 1 SCM-RISER Junction 1028.75 1036.00 1028.75 0.00 0.00 4.55 1029.53 0.00 6.47 0 00:00 2 SITE -JUNCTION -VIRTUAL Junction 1028.50 1036.00 1028.50 0.00 0.00 4.97 102928 0.00 6.72 0 00:00 3 OUTFALL Outfall 1022.00 4.97 102228 4 SAND -FILTER Storage Node 1032.00 1036.00 1032.00 0.00 4.72 103323 Link Summary SN Element Element From To (Outlet) Length Inlet Outlet Average Diameter or Manning's Peak Design Flow Peak Flow/ Peak Flow Peak Flow Peak Flow Total Time Reported ID Type (Inlet) Node Invert Invert Slope Height Roughness Flow Capacity Design Flow Velocity Depth Depth/ Surcharged Condition Node Elevation Elevation Ratio Total Depth Ratio (ft) (ft) (ft) ( % ) (in) (cfs) (cfs) (ft/sec) (ft) (min) 1 SCM-BARREL Pipe SCM-RISER SITE -JUNCTION -VIRTUAL 45.00 1028.75 1028.50 0.5600 18.000 0.0120 4.55 8.48 0.54 4.88 0.78 0.52 0.00 Calculated 2 SITE -LINK -VIRTUAL Pipe SITE-JUNCTION-VIRTUALOUTFALL 2000. 1028.50 1022.00 32.5000 18.000 0.0120 4.97 64.87 0.08 21.74 0.28 0.19 0.00 Calculated 3 PRINCIPAL -SPILLWAY Orifice SAND -FILTER SCM-RISER 1032.00 1028.75 36.000 4.52 4 SAND -MEDIA Outlet SAND -FILTER SCM-RISER 1032.00 1028.75 0.03 5 EM-SPILLWAY Weir SAND -FILTER SITE -JUNCTION -VIRTUAL 1032.00 1028.50 0.00 Subbasin Hydrology Subbasin : {POST-CON}.POST-CON : 1 Input Data Area(ac)----------------------------------------------------- 021 Peak Rate Factor ---------------------------------------- 484-00 Weighted Curve Number---------------------------- 98-00 Rain Gage ID NEWTON Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number 021 - 98-00 Composite Area & Weighted CN 021 98-00 Subbasin Runoff Results Total Rainfall (in) ----------------------------------------- 521 Total Runoff (in) ------------------------------------------ 4-97 Peak Runoff (cfs)---------------------------------------- 1-40 Weighted Curve Number---------------------------- 98-00 Time of Concentration (days hh:mm:ss) ----- 0 00:05:00 Subbasin : {POST-CON}.POST-CON : 1 7.5 7 6.5 6 5.5 5 4.5 4 3.5 3 2.5 2 1.5 05 1.45 1.4 1 35 1.3 1.25 1.2 1.15 1.1 1 05 0.95 09 _ 0.85 0.8 0.75 0 0.7 0.65 0 06 0.55 0.5 0 45 0.4 0.35 0.3 0.25 0.2 0 15 0.1 0.05 Rainfall Intensity Graph 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hrs) Runoff Hydrograph 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hrs) Subbasin : {POST-CON}.POST-CON : 2 Input Data Area(ac)----------------------------------------------------- 0.28 Peak Rate Factor ---------------------------------------- 484.00 Weighted Curve Number ---------------------------- 79.60 Rain Gage ID ............................................... NEWTON Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number 0.28 - 79.60 Composite Area & Weighted CN 0.28 79.60 Subbasin Runoff Results Total Rainfall (in) ----------------------------------------- 5.21 Total Runoff (in) ------------------------------------------ 3.04 Peak Runoff (cfs)---------------------------------------- 1.36 Weighted Curve Number ............................ 79.60 Time of Concentration (days hh:mm:ss) ..... 0 00:05:00 Subbasin : {POST-CON}.POST-CON : 2 8 7.5 7 6.5 6 55 5 4.5 4 3.5 3 2.5 2 1.5 0.6 1.45 1.4 1 35 1.3 1.25 1.2 1.15 1.1 1 05 0.95 09 _ 0.85 0.8 0.75 0 0.7 0.65 0 06 0.55 0.5 0 45 0.4 0.35 0.3 0.25 0.2 0 15 0.1 0.05 Rainfall Intensity Graph 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hrs) Runoff Hydrograph 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hrs) Subbasin : {POST-CON}.POST-CON : 3 Input Data Area(ac)----------------------------------------------------- 0.30 Peak Rate Factor ---------------------------------------- 484.00 Weighted Curve Number ---------------------------- 93.50 Rain Gage ID ............................................... NEWTON Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number 0.30 - 93.50 Composite Area & Weighted CN 0.30 93.50 Subbasin Runoff Results Total Rainfall (in) ----------------------------------------- 5.21 Total Runoff (in) ------------------------------------------ 4.46 Peak Runoff (cfs)---------------------------------------- 1.97 Weighted Curve Number ............................ 93.50 Time of Concentration (days hh:mm:ss) ..... 0 00:05:00 Subbasin : {POST-CON}.POST-CON : 3 8 7.5 7 6.5 6 55 5 4.5 4 3.5 3 2.5 2 1.5 0.6 2.1 2 1.9 1.8 1.7 1.6 1.5 1.4 1.3 N 1.2 1.1 0 1 0.9 0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.1 Rainfall Intensity Graph 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hrs) Runoff Hydrograph 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hrs) Subbasin : {POST-CON}.POST-CON : 4 Input Data Area(ac)----------------------------------------------------- 0.20 Peak Rate Factor ---------------------------------------- 484.00 Weighted Curve Number ---------------------------- 39.00 Rain Gage ID ............................................... NEWTON Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number 0.20 - 39.00 Composite Area & Weighted CN 0.20 39.00 Subbasin Runoff Results Total Rainfall (in) ----------------------------------------- 5.21 Total Runoff (in) ------------------------------------------ 0.24 Peak Runoff (cfs)---------------------------------------- 0.02 Weighted Curve Number ............................ 39.00 Time of Concentration (days hh:mm:ss) ..... 0 00:05:00 Subbasin : {POST-CON}.POST-CON : 4 8 7.5 7 6.5 6 55 5 4.5 4 m 3.5 0'_ 3 2.5 2 1.5 0.6 0.019 0.018 0.017 0.016 0.015 0.014 0.013 0.012 F 0.011 w 0.01 0 0 F=0.009 0.008 0.007 0.006 0.005 0.004 0.003 0.002 0.001 Rainfall Intensity Graph 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hrs) Runoff Hydrograph 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hrs) Subbasin : {POST-CON}.POST-CON : 5 Input Data Area(ac)----------------------------------------------------- 0.95 Peak Rate Factor ---------------------------------------- 484.00 Weighted Curve Number ---------------------------- 47.20 Rain Gage ID ............................................... NEWTON Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number 0.95 - 47.20 Composite Area & Weighted CN 0.95 47.20 Subbasin Runoff Results Total Rainfall (in) ----------------------------------------- 5.21 Total Runoff (in) ------------------------------------------ 0.62 Peak Runoff (cfs)---------------------------------------- 0.58 Weighted Curve Number ............................ 47.20 Time of Concentration (days hh:mm:ss) ..... 0 00:10:00 Subbasin : {POST-CON}.POST-CON : 5 8 7.5 7 6.5 6 55 5 4.5 4 m 3.5 0'_ 3 2.5 2 1.5 0.5 0.62 0.6 0.58 0.56 0.54 0.52 0.5 0.48 0.46 0.44 0.42 0.4 0.30 0.36 0.34 032 0 0.3 0.28 1h 0.26 0.24 0.22 0.2 0.18 0.16 0.14 0.12 0.1 0.08 0.06 0.04 0.02 Rainfall Intensity Graph 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hrs) Runoff Hydrograph 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hrs) Subbasin : {POST-CON}.POST-CON : 6 Input Data Area(ac)----------------------------------------------------- 1.48 Peak Rate Factor ---------------------------------------- 484.00 Weighted Curve Number ---------------------------- 41.60 Rain Gage ID ............................................... NEWTON Composite Curve Number Area Soil Curve Soil/Surface Description (acres) Group Number 1.48 - 41.60 Composite Area & Weighted CN 1.48 41.60 Subbasin Runoff Results Total Rainfall (in) ----------------------------------------- 5.21 Total Runoff (in) ------------------------------------------ 0.35 Peak Runoff (cfs)---------------------------------------- 0.41 Weighted Curve Number ............................ 41.60 Time of Concentration (days hh:mm:ss) ..... 0 00:05:00 Subbasin : {POST-CON}.POST-CON : 6 8 7.5 7 6.5 6 55 5 4.5 4 3.5 3 2.5 2 1.5 0.5 0.44 0.42 0.4 0.38 0.36 0.34 0.32 0.3 0.28 0.26 0.24 w 0.22 0 0.2 0.18 0.16 0.14 0.12 0.1 0.08 0.06 0.04 0.02 Rainfall Intensity Graph 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hrs) Runoff Hydrograph 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hrs) Junction Input SN Element Invert Ground/Rim Ground/Rim Initial Initial Surcharge Surcharge Ponded Minimum ID Elevation (Max) (Max) Water Water Elevation Depth Area Pipe Elevation Offset Elevation Depth Cover (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (in) 1 SCM-RISER 1028.75 1036.00 725 1028.75 0.00 0.00 -1036.00 0.00 0.00 2 SITE -JUNCTION -VIRTUAL 1028.50 1036.00 7.50 1028.50 0.00 0.00 -1036.00 0.00 0.00 Junction Results SN Element Peak Peak Max HGL Max HGL Max Min Average HGL Average HGL Time of Time of Total Total Time ID Inflow Lateral Elevation Depth Surcharge Freeboard Elevation Depth Max HGL Peak Flooded Flooded Inflow Attained Attained Depth Attained Attained Attained Occurrence Flooding Volume Attained Occurrence (cfs) (cfs) (ft) (ft) (ft) (ft) (ft) (ft) (days hh:mm) (days hh:mm) (ac-in) (min) 1 SCM-RISER 4.55 0.00 1029.53 0.78 0.00 6.47 1028.82 0.07 0 11:56 0 00:00 0.00 0.00 2 SITE -JUNCTION -VIRTUAL 4.97 0.97 102928 0.78 0.00 6.72 1028.57 0.07 0 11:57 0 00:00 0.00 0.00 Pipe Input SN Element Length Inlet Inlet Outlet Outlet Total Average Pipe Pipe Pipe Manning's Entrance Exit/Bend Additional Initial ID Invert Invert Invert Invert Drop Slope Shape Diameteror Width Roughness Losses Losses Losses Flow Elevation Offset Elevation Offset Height (ft) (ft) (ft) (ft) (ft) (ft) ( % ) (in) (in) (cfs) 1 SCM-BARREL 45.00 1028.75 0.00 1028.50 0.00 025 0.5600 CIRCULAR 18.000 18.000 0.0120 0.5000 0.5000 0.0000 0.00 2 SITE -LINK -VIRTUAL 2000. 1028.50 0.00 1022.00 0.00 6.50 32.5000 CIRCULAR 18.000 18.000 0.0120 0.5000 0.5000 0.0000 0.00 Flap No. of Gate Barrels No 1 No 1 Pipe Results SN Element Peak Time of Design Flow Peak Flow/ Peak Flow Travel Peak Flow Peak Flow Total Time Froude Reported ID Flow Peak Flow Capacity Design Flow Velocity Time Depth Depth/ Surcharged Number Condition Occurrence Ratio Total Depth Ratio (cfs) (days hh:mm) (cfs) (ft/sec) (min) (ft) (min) 1 SCM-BARREL 4.55 0 11:57 8.48 0.54 4.88 0.15 0.78 0.52 0.00 Calculated 2 SITE -LINK -VIRTUAL 4.97 0 11:57 64.87 0.08 21.74 0.02 028 0.19 0.00 Calculated Storage Nodes Storage Node : SAND -FILTER Input Data Invert Elevation (ft)---------------------------------------------------------------------------------- 1032-00 Max (Rim) Elevation (ft)-------------------------------------------------------------------------- 1036-00 Max (Rim) Offset (ft)------------------------------------------------------------------------------- 4-00 Initial Water Elevation (ft)------------------------------------------------------------------------ 1032-00 Initial Water Depth (ft)----------------------------------------------------------------------------- 0-00 Ponded Area (ftt)------------------------------------------------------------------------------------- 0-00 Evaporation Loss------------------------------------------------------------------------------------ 0-00 Storage Area Volume Curves Storage Curve: SAND -FILTER Stage Storage Storage Area Volume (ft) (ft2) (ft') 0 1776 0-000 1 2432 2104-00 2 3151 4895-50 3 3960 8451-00 4 4850 12856-00 Storage Area Volume Curves Storage Volume (ft) 0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 81000 9.000 -10,000 11,000 12,000 d------------------------------------------------------------------------------- --- - 3.8 ---- ----- 3.7 ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ----- 3.6 --- ---- ---- ---- ---- ---- ---- ---- ---- ---- ----- ----- 3.4-------- ------------------------ ------ 3.3- - - - - ---- - - - ---- - - - ---- - - - ---- - - - ---- - - - ---- - - - -- -- - - - --- - - - - -- ------ 3.2 --- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ----- 3.1 ---- ---- ---- ---- ---- ---- -- - ---- ---- ----- ?.9---------------------------------------------------------- - - - - -- -- -------------------------------- t.6 -------- ________ _______ _______ _______ _______ _____ ___ _ _______ _______ _______ _______ ______ d.3- - -- - ---- - - - --- -- - -- -- - - ---- ---- -- --- - -- -- - -- - -- -- -------------------------------------- ---------------------- ?.1 - - - - -- - - - - -- - - - - -- - - -- - - - -- - - - - -- - - - - -- - - - - -- - - - - --- - - - - -- - - - - - - 2- ------------------------------ ------ -- ------------------------------------ ------ ------ 1.9----------------L -------L ------- L --- -- L -- --- I ------- I ------- I -------L -------L -------L ------- ------ 1.7----------------------------- ---------------------------------------- ------------------ 1.6 ---------- ------------- 1.4 --- ---- ---- - ---- ---- ---- ---- ---- ---- ---- ---- ----- 1.3 --- ---- -- ---- ---- ---- ---- ---- ---- ---- ---- ----- 1.1- - - - - ---- - - - - -- -- - - - - ---- - - - --- - - - - --- - - - - --- - - - - --- - - - - --- - - - - -- ---------------------- 1 - - - - -- ------ 1.9- -- - - --- -- - --- ------ 1.$ ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ----- 1.7 - - -- - --- - --- -- -- -- -- - - -- - --- - --- -- -- -- -- ----- 1.6 -- -- - -- -- - - --- ----- --- --- -- - - --- -- - --- -- - -- -- -------------------------------------- 1.5 - - - - -- - - - - -- - - - - -- - - - - -- - - - - --- - - - - -- 1.4- - - - - ---- - - - --- - - - - --- - - - - --- - - - - --- - - - - --- - - - - --- - - - - --- - - - - --- - - - - -- ------ 1.3 ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ----- 1.2 - - -- - - -- - --- - --- -- -- -- -- - - -- - --- - --- -- -- -- -- - - --- 0 1,800 2,000 2,200 2,400 2,600 2,800 3,000 3,200 3,400 3,600 3,800 4,000 4,200 4,400 4,600 4,800 Storage Area (fin - Storage Area - Storage Volu m e d M If 3.1 3.5 3.6 3.4 3.3 3.3 3.1 3 2A 2A 2.3 2.s 2.1 2.4 1A 1.8 1.1 1.( 1.6 1.4 1.3 1.2 1.1 1 0.9 0.8 0.3 0.G 0.3 0.4 0.3 0.2 0.1 0 w a� m fJ'1 Storage Node : SAND -FILTER (continued) Outflow Weirs SN Element Weir Flap Crest Crest Length Weir Total Discharge ID Type Gate Elevation Offset Height Coefficient (ft) (ft) (ft) (ft) 1 EM-SPILLWAY Trapezoidal No 1035-00 3-00 10-00 1-00 3-33 Outflow Orifices SN Element Orifice Orifice Flap Circular Rectangular Rectangular Orifice Orifice ID Type Shape Gate Orifice Orifice Orifice Invert Coefficient Diameter Height Width Elevation (in) (in) (in) (ft) 1 PRINCIPAL -SPILLWAY Bottom Rectangular No 36-00 36-00 1033-00 0-63 Output Summary Results Peak Inflow (cfs)-------------------------------------------------------------------------------------- 4-72 Peak Lateral Inflow (cfs)-------------------------------------------------------------------------- 4-72 Peak Outflow (cfs)----------------------------------------------------------------------------------- 4-55 Peak Exfiltration Flow Rate (cfm)------------------------------------------------------------ 0-00 Max HGL Elevation Attained (ft)-------------------------------------------------------------- 103323 Max HGL Depth Attained (ft)------------------------------------------------------------------- 123 Average HGL Elevation Attained (ft)------------------------------------------------------- 1032-55 Average HGL Depth Attained (ft)------------------------------------------------------------ 0-55 Time of Max HGL Occurrence (days hh:mm)----------------------------------------- 0 11-56 Total Exfiltration Volume (1000-ft3)--------------------------------------------------------- 0-000 Total Flooded Volume (ac-in) - 0 Total Time Flooded (min) 0 Total Retention Time (sec)---------------------------------------------------------------------- 0-00