Loading...
HomeMy WebLinkAboutSW5200501_2020-05-04 Coolwick Stormwater Report_5/6/2020Stormwater Impact Analysis for Coolwick Warehouse 80 Weathers Street Youngsville, North Carolina May 4, 2020 Prepared for: Coolwick, LLC 186 Wind Chime Court # 200 Raleigh, North Carolina 27615 PRINT NAME: Josh Crumpler, P.E. % ++,++++++r►04/ oy.,'� SIGNATURE: SEAL r on 3y194 REGISTRATION NO. PE-034994 ;'C. 01NE�'Q�r��`�+ G,q •••.......•� tsttl CRUMPLER Consulting Services, PLLC Prepared by Crumpler Consulting Services, PLLC 2308 Ridge Road, Raleigh, North Carolina 27612 p 1 919.413-1704 CRUMPLER Consulting Services, PLLC TABLE OF CONTENTS 1.0 STORMWATER NARRATIVE...............................................................................................2 2.0 DESIGN DATA AND METHODOLOGY................................................................................3 3.0 PRE -DEVELOPMENT STORMWATER RUN-OFF...............................................................4 4.0 POST -DEVELOPMENT STORMWATER RUN-OFF.............................................................5 List of Aapendices Appendix A — IDF Rainfall Data Appendix B — Pre -Development Peak Flow Tables (2-yr, 10-yr, and 100-yr) Appendix C — Post -Development Peak Flow Tables (2-yr, 10-yr, and 100-yr) Appendix D — Snap Tool Calculations Appendix E — Wetlands and Stream Map Appendix F — Drainage Area Maps 2308 Ridge Road I Raleigh, NC 27612 1 p: 919-413-1704 1 e: josh@crumplerconsulting.com 1.0 STORMWATER NARRATIVE Coolwick, LLC is proposing to construct two warehouses and three storage units on a parcel totaling 4.80 acres located at 80 Weathers Street, Youngsville, North Carolina that zoned Industrial (IND). This report represents the stormwater management design and hydrologic model results for the proposed project. As part of the stormwater design, Crumpler Consulting is proposing the installation of a dry detention basin. The dry detention basin has been designed to control and treat the estimated runoff generated from the first inch of rainfall per the requirements of the Neuse Watershed Nutrient Management Strategy and the NCDEQ's stormwater management design manual. The dry detention facility is anticipated to attenuate the peak flow rates for the 2-year, 10-year, and 100-year 24-hour storm events in accordance with NCDEQ's requirements. The nitrogen loading rates have been evaluated as part of this design and are anticipated to be reduced to acceptable rates through treatment by the detention facility and buy down methods. The existing parcel did have minimal existing impervious surfaces that included the an existing driveway which totaled 16,860sf (0.38 acres). The proposed impervious surface consists of the warehouse building, parking lot, driveways, and sidewalks. The proposed impervious area will total 64,588sf (1.48 acres). The proposed grading conveys the majority of the runoff to the southwest corner of the site, where the runoff is collected in a swale which empties into the dry detention basin that discharges to the south west side of the site. The Post -Development Drainage Map shows the stormwater grading and drainage plan and associated details. Page 2 May 4, 2020 2.0 DESIGN DATA AND METHODOLOGY The design of the proposed stormwater facilities was performed in accordance with Chapter 12 of the NCDEQ Stormwater BMP Manual. Hydraflow Hydrographs, a computer modeling software package, was used for the analysis of stormwater routing and hydrology of the existing and proposed watersheds. The hydrology calculations were performed using the Modified Ration Method and TR-55 methods. Franklin County lies within the Type II rainfall distribution. The rainfall amounts for the site were obtained from National Oceanic and Atmospheric Administration (NOAA) and are included in Appendix A. The stormwater analyses performed for this project include the 2-year, 10-year, and 100-year, 24-hour storm events. The Soil Survey of Franklin County, North Carolina, completed by the National Resource Conservation Service (NRCS), was reviewed for general information on the soils within the site area. Page 3 May 4, 2020 3.0 PRE -DEVELOPMENT STORMWATER RUNOFF The pre -development drainage areas were determined using site visits, visual observations, and surveyed topographic data. The peak flow rates for the specified storm events are based on topography, land use cover (such as open space, grass, woods), and soil type. Two drainage points were selected for analysis. The existing 3.42-acre watershed was modeled in HydraFlow as one subcatchment, as described below. Refer to Appendix F of this report for the pre -development watershed map. • Subcatchment 1 Subcatchment 1 is 3.42 acres and drains to the southwest corner of the property. A time of concentration was calculated and was found to be approximately 5 minutes. Therefore, 5 minutes was estimated as the time of concentration for this subcatchment. The HydroFlow analysis can be found in Appendices. The table below summarizes the hydrologic model results for pre -development peak flow rates of the existing 3.42-acre watershed. PRE -DEVELOPMENT STORMWATER RUNOFF STORM EVENT PRE -DEVELOPMENT PEAK FLOW 2-YEAR 6.049 CFS 10-YEAR 7.835 CFS 100-YEAR 10.750 CFS Page 4 May 4, 2020 4.0 POST -DEVELOPMENT STORMWATER RUNOFF An analysis of the post -development runoff was performed using the same methods, parameters, and assumptions as described in the pre -development analysis above. Based upon the calculations, the project reduces the nitrogen loading to acceptable levels for buy -down and does not create an increase in the peak runoff rate for the 2-year, 1 0-year, and 100-year storm events. This will be achieved by constructing appropriate BMPs. The proposed site was divided into two subcatchments for post -development analysis. The subcatchments are described below. Refer to Appendix F of this report for the post -development watershed map. • Drainage Area 1 Drainage Area 1 is 2.13 acres and includes runoff is treated by the dry detention facility. Runoff that is treated by the dry detention facility is collected in swale and discharged overland in the southwestern corner of the site. A time of concentration was calculated and was found to be lower than 5 minutes. Therefore, 5 minutes was estimated as the time of concentration for this subcatchment. • Drainage Area 2 (Bypass) Drainage Area 2 is 1.29 acres and drains offsite to the south bypassing the dry detention facility. A time of concentration was calculated and was found to be lower than 5 minutes. Therefore, 5 minutes was estimated as the time of concentration for this subcatchment. The HydraFlow analysis can be found in Appendices. The follow table summarizes the hydrologic model results for post -development peak flow rates of the 1.91-acre watershed. POST -DEVELOPMENT STORMWATER RUNOFF TOTAL TOTAL STORM EVENT POST -DEVELOPMENT POST -DEVELOPMENT PEAK FLOW PEAK FLOW WITH OUT SCM WITH SCM 2-YEAR 9.71 CFS 2.497 CFS 10-YEAR 12.58 CFS 3.273 CFS 100-YEAR 17.25 CFS 4.529 CFS Page 5 May 4, 2020 APPENDIX A OF Rainfall Data Page 6 May 4, 2020 ,000 D0000000�oo FF- 00000000�00 00000000�00 00000000000 00000000000 00000000�00 00000000000 00000000000 00000000�00 �����000000 0 00000000 00000000�00 00000000�00 00000000�00 00000000�00 00000000�00 00000000000 00000000�00 00000000�00 ,000 D0000000�oo FF- 00000000�00 00000000�00 00000000000 00000000000 00000000�00 00000000000 00000000000 00000000�00 �����000000 0 00000000 00000000�00 00000000�00 00000000�00 00000000�00 00000000�00 00000000000 00000000�00 00000000�00 APPENDIX B Pre -Development Peak Flow Tables (2-yr, 10-yr, and 100-yr) Page 7 May 4, 2020 Watershed Model Schematic Hydraf low Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Project: Coolwick-Existing.gpw Thursday, 04 / 30 / 2020 Hydrograph Summary Report Hydraf low Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 Mod. Rational 6.049 1 5 3,629 ------ ------ ------ EXISTING CONDITIONS Coolwick-Existing.gpw Return Period: 2 Year Thursday, 04 / 30 / 2020 3 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Hyd. No. 1 EXISTING CONDITIONS Hydrograph type = Mod. Rational Storm frequency = 2 yrs Time interval = 1 min Drainage area = 3.420 ac Intensity = 4.655 in/hr IDF Curve = Revised-Raleigh.IDF Target Q =n/a *Composite (Area/C) _ [(0.150 x 0.95) + (3.270 x 0.35)] / 3.420 Thursday, 04 / 30 / 2020 Peak discharge = 6.049 cfs Time to peak = 5 min Hyd. volume = 3,629 cuft Runoff coeff. = 0.38* Tc by User = 5.00 min Storm duration = 2.0 x Tc Est. Req'd Storage =n/a EXISTING CONDITIONS Q (cfs) Hyd. No. 1 -- 2 Year Q (cfs) 7.00 6.00 5.00 4.00 3.00 2.00 1.00 0 00 7.00 6.00 5.00 4.00 3.00 2.00 1.00 0 00 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Hyd No. 1 Time (min) 4 Hydrograph Summary Report Hydraf low Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 Mod. Rational 7.835 1 5 4,701 ------ ------ ------ EXISTING CONDITIONS Coolwick-Existing.gpw Return Period: 10 Year Thursday, 04 / 30 / 2020 Hydrograph Report 5 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Hyd. No. 1 EXISTING CONDITIONS Hydrograph type = Mod. Rational Storm frequency = 10 yrs Time interval = 1 min Drainage area = 3.420 ac Intensity = 6.029 in/hr IDF Curve = Revised-Raleigh.IDF Target Q =n/a Composite (Area/C) _ [(0.150 x 0.95) + (3.270 x 0.35)] / 3.420 Q (cfs) 8.00 4.00 2.00 0.00 v 0 1 2 Hyd No. 1 Thursday, 04 / 30 / 2020 Peak discharge = 7.835 cfs Time to peak = 5 min Hyd. volume = 4,701 cuft Runoff coeff. = 0.38* Tc by User = 5.00 min Storm duration = 2.0 x Tc Est. Req'd Storage =n/a EXISTING CONDITIONS Hyd. No. 1 -- 10 Year 3 4 5 6 7 8 9 Q (cfs) 8.00 4.00 2.00 A 0.00 10 11 12 13 14 15 Time (min) Hydrograph Summary Report Hydraf low Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 Mod. Rational 10.75 1 5 6,449 ------ ------ ------ EXISTING CONDITIONS Coolwick-Existing.gpw Return Period: 100 Year Thursday, 04 / 30 / 2020 Hydrograph Report I N Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Hyd. No. 1 EXISTING CONDITIONS Hydrograph type = Mod. Rational Storm frequency = 100 yrs Time interval = 1 min Drainage area = 3.420 ac Intensity = 8.270 in/hr IDF Curve = Revised-Raleigh.IDF Target Q =n/a *Composite (Area/C) _ [(0.150 x 0.95) + (3.270 x 0.35)] / 3.420 Q (cfs) 12.00 10.00 4.00 2.00 Thursday, 04 / 30 / 2020 Peak discharge = 10.75 cfs Time to peak = 5 min Hyd. volume = 6,449 cuft Runoff coeff. = 0.38* Tc by User = 5.00 min Storm duration = 2.0 x Tc Est. Req'd Storage =n/a EXISTING CONDITIONS Hyd. No. 1 -- 100 Year Q (cfs) 12.00 10.00 4.00 2.00 0.00 y ' ' ' ' ' ' ' ' ' ' ' ' ' ' X 0.00 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Hyd No. 1 Time (min) Hydraflow Rainfall Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Return Period Intensity -Duration -Frequency Equation Coefficients (FHA) (Yrs) B D E (N/A) 1 0.0000 0.0000 0.0000 -------- 2 74.0559 13.3000 0.8788 -------- 3 0.0000 0.0000 0.0000 -------- 5 83.5115 14.8000 0.8514 -------- 10 105.7041 16.8000 0.8710 -------- 25 118.9249 17.6000 0.8582 -------- 50 137.0265 18.6000 0.8630 -------- 100 157.1766 19.6000 0.8692 -------- File name: Revised-Raleigh.IDF Intensity = B / (Tc + D)^E Thursday, 04 / 30 / 2020 Return Intensity Values (in/hr) Period (Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 5.76 4.65 3.92 3.40 3.01 2.70 2.45 2.25 2.08 1.93 1.81 1.70 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 6.57 5.43 4.64 4.07 3.63 3.28 3.00 2.76 2.57 2.40 2.25 2.12 10 7.22 6.03 5.19 4.57 4.09 3.71 3.40 3.13 2.91 2.72 2.56 2.41 25 8.19 6.90 5.98 5.29 4.75 4.32 3.97 3.67 3.41 3.20 3.01 2.84 50 8.95 7.59 6.60 5.86 5.27 4.80 4.41 4.08 3.81 3.57 3.36 3.17 100 9.71 8.27 7.22 6.42 5.79 5.28 4.86 4.50 4.20 3.93 3.70 3.50 Tc = time in minutes. Values may exceed 60. Storm rreci . The name: aam ie. c Rainfall Precipitation Table (in) Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 0.00 2.20 0.00 3.30 4.25 5.77 6.80 7.95 SCS 6-Hr 0.00 1.80 0.00 0.00 2.60 0.00 0.00 4.00 Huff -1st 0.00 1.55 0.00 2.75 4.00 5.38 6.50 8.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 1.75 0.00 2.80 3.90 5.25 6.00 7.10 APPENDIX C Post -Development Peak Flow Tables (2-yr, 10-yr, and 100-yr) Page 8 May 4, 2020 Watershed Model Schematic Hydraf low Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Project: Coolwick-Proposed Without BMPs.gpw Thursday, 04 / 30 / 2020 Hydrograph Summary Report Hydraf low Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 Mod. Rational 9.710 1 5 5,826 ------ ------ ------ PROPOSED WITHOUT BMP Coolwick-Proposed Without BMPs.gpw Return Period: 2 Year Thursday, 04 / 30 / 2020 Hydrograph Report 3 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Hyd. No. 1 PROPOSED WITHOUT BMP Hydrograph type = Mod. Rational Storm frequency = 2 yrs Time interval = 1 min Drainage area = 3.420 ac Intensity = 4.655 in/hr IDF Curve = Revised-Raleigh.IDF Target Q =n/a * Composite (Area/C) _ [(1.480 x 0.95) + (1.940 x 0.35)] / 3.420 Q (cfs) 10.00 . 11 4.00 2.00 Thursday, 04 / 30 / 2020 Peak discharge = 9.710 cfs Time to peak = 5 min Hyd. volume = 5,826 cuft Runoff coeff. = 0.61 * Tc by User = 5.00 min Storm duration = 2.0 x Tc Est. Req'd Storage =n/a PROPOSED WITHOUT BMP Hyd. No. 1 -- 2 Year Q (cfs) 10.00 . 11 4.00 2.00 0.00 r 1 1 1 1 1 1 1 1 1 1 1 1 1 1 A 0.00 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Hyd No. 1 Time (min) 4 Hydrograph Summary Report Hydraf low Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 Mod. Rational 12.58 1 5 7,547 ------ ------ ------ PROPOSED WITHOUT BMP Coolwick-Proposed Without BMPs.gpw Return Period: 10 Year Thursday, 04 / 30 / 2020 Hydrograph Report 5 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Hyd. No. 1 PROPOSED WITHOUT BMP Hydrograph type = Mod. Rational Storm frequency = 10 yrs Time interval = 1 min Drainage area = 3.420 ac Intensity = 6.029 in/hr IDF Curve = Revised-Raleigh.IDF Target Q =n/a * Composite (Area/C) _ [(1.480 x 0.95) + (1.940 x 0.35)] / 3.420 Q (cfs) 14.00 12.00 10.00 NIM 4.00 2.00 Thursday, 04 / 30 / 2020 Peak discharge = 12.58 cfs Time to peak = 5 min Hyd. volume = 7,547 cuft Runoff coeff. = 0.61 * Tc by User = 5.00 min Storm duration = 2.0 x Tc Est. Req'd Storage =n/a PROPOSED WITHOUT BMP Hyd. No. 1 -- 10 Year Q (cfs) 14.00 12.00 10.00 • 11 4.00 2.00 0.00 y ' ' ' ' ' ' ' ' ' ' ' ' ' ' A 0.00 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Hyd No. 1 Time (min) Hydrograph Summary Report Hydraf low Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 Mod. Rational 17.25 1 5 10,352 ------ ------ ------ PROPOSED WITHOUT BMP Coolwick-Proposed Without BMPs.gpw Return Period: 100 Year Thursday, 04 / 30 / 2020 Hydrograph Report I N Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Hyd. No. 1 PROPOSED WITHOUT BMP Hydrograph type = Mod. Rational Storm frequency = 100 yrs Time interval = 1 min Drainage area = 3.420 ac Intensity = 8.270 in/hr IDF Curve = Revised-Raleigh.IDF Target Q =n/a * Composite (Area/C) _ [(1.480 x 0.95) + (1.940 x 0.35)] / 3.420 Q (cfs) 18.00 15.00 12.00 •m 3.00 Thursday, 04 / 30 / 2020 Peak discharge = 17.25 cfs Time to peak = 5 min Hyd. volume = 10,352 cuft Runoff coeff. = 0.61 * Tc by User = 5.00 min Storm duration = 2.0 x Tc Est. Req'd Storage =n/a PROPOSED WITHOUT BMP Hyd. No. 1 -- 100 Year Q (cfs) 18.00 15.00 12.00 M 3.00 0.00 v 1 1 1 1 1 1 1 1 1 1 1 1 1 1 A 0.00 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Hyd No. 1 Time (min) Watershed Model Schematic Hydraf low Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 1 3 4 Project: Coolwick-Proposed.gpw Thursday, 04 / 30 / 2020 Hydrograph Summary Report Hydraf low Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 Mod. Rational 7.069 1 5 4,241 ------ ------ ------ PROPOSED POND 2 Reservoir 0.000 1 n/a 0 1 395.59 4,241 Proposed Pond 3 Mod. Rational 2.497 1 5 1,498 ------ ------ ------ PROPOSED POND 4 Combine 2.497 1 5 1,498 2, 3 ------ ------ COMBINED SITE Coolwick-Proposed.gpw Return Period: 2 Year Thursday, 04 / 30 / 2020 Hydrograph Report 3 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Hyd. No. 1 PROPOSED POND Hydrograph type = Mod. Rational Storm frequency = 2 yrs Time interval = 1 min Drainage area = 2.130 ac Intensity = 4.609 in/hr IDF Curve = Raleigh.IDF Target Q =n/a Composite (Area/C) _ [(1.330 x 0.95) + (0.800 x 0.35)] / 2.130 Q (cfs) 8.00 4.00 2.00 0.00 y 0 1 2 Hyd No. 1 Thursday, 04 / 30 / 2020 Peak discharge = 7.069 cfs Time to peak = 5 min Hyd. volume = 4,241 cuft Runoff coeff. = 0.72* Tc by User = 5.00 min Storm duration = 2.0 x Tc Est. Req'd Storage =n/a PROPOSED POND Hyd. No. 1 -- 2 Year 3 4 5 6 7 8 9 Q (cfs) 8.00 4.00 2.00 A 0.00 10 11 12 13 14 15 Time (min) Hydrograph Report 4 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Hyd. No. 2 Proposed Pond Hydrograph type = Reservoir Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 1 - PROPOSED POND Max. Elevation Reservoir name = Pond Max. Storage Storage Indication method used. Q (cfs) 8.00 4.00 2.00 0.00 61 0 1 2 Hyd No. 2 3 4 5 6 Hyd No. 1 Proposed Pond Hyd. No. 2 -- 2 Year Thursday, 04 / 30 / 2020 = 0.000 cfs = n/a = 0 cuft = 395.59 ft = 4,241 cuft 7 8 9 10 11 12 13 14 I_I_I_I_I_I_I Total storage used = 4,241 cuft Q (cfs) 8.00 4.00 2.00 V 0.00 15 Time (min) Hydrograph Report 5 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Hyd. No. 3 PROPOSED POND Hydrograph type = Mod. Rational Storm frequency = 2 yrs Time interval = 1 min Drainage area = 1.290 ac Intensity = 4.609 in/hr IDF Curve = Raleigh.IDF Target Q =n/a Composite (Area/C) _ [(0.150 x 0.95) + (1.140 x 0.35)] / 1.290 Q (cfs) 3.00 2.00 1.00 0.00 y 0 1 2 Hyd No. 3 Thursday, 04 / 30 / 2020 Peak discharge = 2.497 cfs Time to peak = 5 min Hyd. volume = 1,498 cuft Runoff coeff. = 0.42* Tc by User = 5.00 min Storm duration = 2.0 x Tc Est. Req'd Storage =n/a PROPOSED POND Hyd. No. 3 -- 2 Year 3 4 5 6 7 8 9 Q (cfs) 3.00 2.00 1.00 N 0.00 10 11 12 13 14 15 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2018 by Autodesk, Inc. 02 Thursday, 04 / 30 / 2020 Hyd. No. 4 COMBINED SITE Hydrograph type = Combine Peak discharge = 2.497 cfs Storm frequency = 2 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 1,498 cuft Inflow hyds. = 2, 3 Contrib. drain. area = 1.290 ac Q (cfs) 3.00 2.00 1.00 0.00 -A 0 COMBINED SITE Hyd. No. 4 -- 2 Year Q (cfs) 3.00 2.00 1.00 I I I 1 V 0.00 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Time (min) Hyd No. 4 Hyd No. 2 Hyd No. 3 Hydrograph Summary Report Hydraf low Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 Mod. Rational 9.265 1 5 5,559 ------ ------ ------ PROPOSED POND 2 Reservoir 0.000 1 n/a 0 1 395.83 5,559 Proposed Pond 3 Mod. Rational 3.273 1 5 1,964 ------ ------ ------ PROPOSED POND 4 Combine 3.273 1 5 1,964 2, 3 ------ ------ COMBINED SITE Coolwick-Proposed.gpw Return Period: 10 Year Thursday, 04 / 30 / 2020 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Hyd. No. 1 PROPOSED POND Hydrograph type = Mod. Rational Storm frequency = 10 yrs Time interval = 1 min Drainage area = 2.130 ac Intensity = 6.042 in/hr IDF Curve = Raleigh.IDF Target Q =n/a * Composite (Area/C) _ [(1.330 x 0.95) + (0.800 x 0.35)] / 2.130 Q (cfs) 10.00 . 11 4.00 2.00 Thursday, 04 / 30 / 2020 Peak discharge = 9.265 cfs Time to peak = 5 min Hyd. volume = 5,559 cuft Runoff coeff. = 0.72* Tc by User = 5.00 min Storm duration = 2.0 x Tc Est. Req'd Storage =n/a PROPOSED POND Hyd. No. 1 -- 10 Year Q (cfs) 10.00 . 11 4.00 2.00 0.00 y ' ' ' ' ' ' ' ' ' ' ' ' ' ' N 0.00 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Hyd No. 1 Time (min) Hydrograph Report I Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Hyd. No. 2 Proposed Pond Hydrograph type = Reservoir Storm frequency = 10 yrs Time interval = 1 min Inflow hyd. No. = 1 - PROPOSED POND Reservoir name = Pond Storage Indication method used Q (cfs) 10.00 . 11 4.00 2.00 0.00 11 0 1 2 Hyd No. 2 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage Proposed Pond Hyd. No. 2 -- 10 Year 3 4 5 6 Hyd No. 1 Thursday, 04 / 30 / 2020 = 0.000 cfs = n/a = 0 cuft = 395.83 ft = 5,559 cuft 7 8 9 10 11 12 13 14 I_I_I_I_I_I_I Total storage used = 5,559 cuft Q (cfs) 10.00 . 11 4.00 2.00 V 0.00 15 Time (min) Hydrograph Report 10 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Hyd. No. 3 PROPOSED POND Hydrograph type = Mod. Rational Storm frequency = 10 yrs Time interval = 1 min Drainage area = 1.290 ac Intensity = 6.042 in/hr IDF Curve = Raleigh.IDF Target Q =n/a *Composite (Area/C) _ [(0.150 x 0.95) + (1.140 x 0.35)] / 1.290 Q (cfs) 4.00 3.00 2.00 1.00 0.00 y 0 1 2 — Hyd No. 3 Thursday, 04 / 30 / 2020 Peak discharge = 3.273 cfs Time to peak = 5 min Hyd. volume = 1,964 cuft Runoff coeff. = 0.42* Tc by User = 5.00 min Storm duration = 2.0 x Tc Est. Req'd Storage =n/a PROPOSED POND Hyd. No. 3 -- 10 Year 3 4 5 6 7 8 9 Q (cfs) 4.00 3.00 2.00 1.00 A 0.00 10 11 12 13 14 15 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Thursday, 04 / 30 / 2020 Hyd. No. 4 COMBINED SITE Hydrograph type = Combine Peak discharge = 3.273 cfs Storm frequency = 10 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 1,964 cuft Inflow hyds. = 2, 3 Contrib. drain. area = 1.290 ac Q (cfs) 4.00 3.00 2.00 1.00 0.00 " 1' 0 1 2 — Hyd No. 4 COMBINED SITE Hyd. No. 4 -- 10 Year 3 4 5 6 Hyd No. 2 7 8 9 10 11 Hyd No. 3 12 13 14 Q (cfs) 4.00 3.00 2.00 1.00 V 0.00 15 Time (min) 12 Hydrograph Summary Report Hydraf low Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 Mod. Rational 12.82 1 5 7,692 ------ ------ ------ PROPOSED POND 2 Reservoir 2.151 1 14 469 1 396.07 7,487 Proposed Pond 3 Mod. Rational 4.529 1 5 2,718 ------ ------ ------ PROPOSED POND 4 Combine 4.529 1 5 3,187 2, 3 ------ ------ COMBINED SITE Coolwick-Proposed.gpw Return Period: 100 Year Thursday, 04 / 30 / 2020 Hydrograph Report 13 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Hyd. No. 1 PROPOSED POND Hydrograph type = Mod. Rational Storm frequency = 100 yrs Time interval = 1 min Drainage area = 2.130 ac Intensity = 8.360 in/hr IDF Curve = Raleigh.IDF Target Q =n/a * Composite (Area/C) _ [(1.330 x 0.95) + (0.800 x 0.35)] / 2.130 Q (cfs) 14.00 12.00 10.00 • 11 4.00 2.00 Thursday, 04 / 30 / 2020 Peak discharge = 12.82 cfs Time to peak = 5 min Hyd. volume = 7,692 cuft Runoff coeff. = 0.72* Tc by User = 5.00 min Storm duration = 2.0 x Tc Est. Req'd Storage =n/a PROPOSED POND Hyd. No. 1 -- 100 Year Q (cfs) 14.00 12.00 10.00 • 11 4.00 2.00 0.00 y ' ' ' ' ' ' ' ' ' ' ' ' ' ' N 0.00 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Hyd No. 1 Time (min) Hydrograph Report 14 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Hyd. No. 2 Proposed Pond Hydrograph type = Reservoir Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 1 - PROPOSED POND Max. Elevation Reservoir name = Pond Max. Storage Storage Indication method used Q (cfs) 14.00 12.00 10.00 • 11 4.00 2.00 0.00 ' ' 0 2 4 Hyd No. 2 Proposed Pond Hyd. No. 2 -- 100 Year Thursday, 04 / 30 / 2020 = 2.151 cfs = 14 min = 469 cuft = 396.07 ft = 7,487 cuft Q (cfs) 14.00 12.00 10.00 lllll• 11 4.00 2.00 I I I I 1 I1 0.00 6 8 10 12 14 16 18 20 22 24 Time (min) Hyd No. 1 I_I_I_I_I_I_1 Total storage used = 7,487 cuft Hydrograph Report 15 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Hyd. No. 3 PROPOSED POND Hydrograph type = Mod. Rational Storm frequency = 100 yrs Time interval = 1 min Drainage area = 1.290 ac Intensity = 8.360 in/hr IDF Curve = Raleigh.IDF Target Q =n/a *Composite (Area/C) _ [(0.150 x 0.95) + (1.140 x 0.35)] / 1.290 Q (cfs) 5.00 4.00 3.00 2.00 1.00 Thursday, 04 / 30 / 2020 Peak discharge = 4.529 cfs Time to peak = 5 min Hyd. volume = 2,718 cuft Runoff coeff. = 0.42* Tc by User = 5.00 min Storm duration = 2.0 x Tc Est. Req'd Storage =n/a PROPOSED POND Hyd. No. 3 -- 100 Year Q (cfs) 5.00 4.00 3.00 2.00 1.00 0.00 y ' ' ' ' ' ' ' ' ' ' ' ' ' ' A 0.00 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Hyd No. 3 Time (min) 16 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Thursday, 04 / 30 / 2020 Hyd. No. 4 COMBINED SITE Hydrograph type = Combine Peak discharge = 4.529 cfs Storm frequency = 100 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 3,187 cuft Inflow hyds. = 2, 3 Contrib. drain. area = 1.290 ac Q (cfs) 5.00 4.00 3.00 2.00 1.00 0.00 ' 0 2 4 Hyd No. 4 COMBINED SITE Hyd. No. 4 -- 100 Year 6 8 10 Hyd No. 2 12 14 16 Hyd No. 3 18 20 22 Q (cfs) 5.00 4.00 NW1111 2.00 1.00 M-►- 0.00 24 Time (min) APPENDIX D SNAP Tool Calculations Page 9 May 4, 2020 Project Summary Project Name: Coolwick Warehouse 209,089 ft 1451490 ft 4.8000 acres Submission Date: 3.3400 acres April 30, 2020 Project Area (ft): Disturbed Area (ft): County: Franklin Local Jurisdiction: Youngsville Development Land Use Type: Commercial Owner Type: Private Development Activity Type: Development - New Designated Downtown Area? no Nutrient Management Watershed: Neuse Subwatershed: Neuse - 03020201 Phosphorus Delivery Zone:1 Neuse - Upper Nitrogen Delivery Zone: Neuse - Upper Phosphorus Delivery Factor (%): 100% Nitrogen Delivery Factor (%): 100% Phosphorus Loading Rate Target (Ib/ac/yr): 0.74 Nitrogen Loading Rate Target (Ib/ac/yr): 5.29 Phosphorus Load Target at Site (lb/yr): 3.57 Nitrogen Load Target at Site (lb/yr): 25.40 Phosphorus Load Leaving Site w/SCMs (lb/yr): 9.64 Nitrogen Load Leaving Site w/SCMs (lb/yr): 28.48 P Offsite Buy -Down Threshold Loading Rate (lb/ac/yr): N/A N Offsite Buy -Down Threshold Loading Rate N/A Total P Load Reduction Needed (lb/yr): 0.00 Total N Load Reduction Needed (lb/yr): 0.00 P Load Treatment Balance at Site (lb/yr): 6.07 N Load Treatment Balance at Site (lb/yr): 3.08 P Load Treatment Balance at Lake (lb/yr):l 6.07 1 N Load Treatment Balance at Lake (lb/yr):l 3.08 Pre -Project Post -Project Post -Project Post -Project Post -Project N utrent Export Summary Whole Site Whole Site Whole Site with SCM-Treated Conditions without SCMs SCMs Area Percent Impervious (for runoff calculation) (%) 0.0% 33.5% 33.5% 68.5% Untreated Area 5.7% Percent Built -Upon Area (BUA) (%) 0.0% 30.9% 30.9% 62.6% 5.7% Annual Runoff Volume (ft3/yr) 42,458 299,370 288,759 240,761 47,999 Annual Runoff % Change (relative to pre-D) 0% 605% 580% Total Nitrogen EMC (mg/L) 0.97 1.36 1.58 1.60 1.51 Total Nitrogen Load Leaving Site (lb/yr) 2.57 25.40 28.48 23.97 4.51 Total Nitrogen Loading Rate (Ib/ac/yr) 0.54 5.29 5.93 11.29 1.69 Total Nitrogen % Change (relative to pre-D) 0% 888% 1008% Total Phosphorus EMC (mg/L) 0.03 0.19 0.54 0.58 0.31 Total Phosphorus Load Leaving Site (lb/yr) 0.08 3.57 9.64 8.70 0.94 Total Phosphorus Loading Rate (Ib/ac/yr) 0.02 0.74 2.01 4.10 0.35 Total Phosphorus % Change (relative to pre-D) 0% 4391% 12019% SCM/Catchment Summary[ SCM ID and Type Volume Reduction (%) Catchment 1 4.22% TN Out (mg/L) TP Out (mg/L) 1.60 0.58 TN Out (Ibs/ac/yr) 11.29 TP Out TN Reduction TP Reduction (%) (Ibs/ac/yr) (%) 4.10-14.80%-230.77% 101: Dry Pond per MDC 4.22% 1.60 0.58 11.29 4.10 -14.80% -230.77% 102: NA 0.00% 0.00 0.00 0.00 0.00 0.00% 0.00% 103: NA 0.00% 0.00 0.00 0.00 0.00 0.00% 0.00% Catchment 2 0.00% 0.00 0.00 0.00 0.00 0.00% 0.00% 201: NA 0.00% 0.00 0.00 0.00 0.00 0.00% 0.00% 202: NA 0.00%- 0.00 0.00 0.00 0.00 0.00% 0.00% 203: NA 0.00% 0.00 0.00 0.00 0.00 0.00% 0.00% Catchment 3 0.00% 0.00 0.00 0.00 0.00 0.00% 0.00% 301: NA 0.00% 0.00 0.00 0.00 0.00 0.00% 0.00% 302: NA 0.00% 0.00 0.00 0.00 0.00 0.00% 0.00% 303: NA 0.00% 0.00 0.00 0.00 0.00 0.00% 0.00% Catchment 4 0.00% 0.00 0.00 0.00 0.00 0.00% 0.00% 401: NA 0.00% 0.00 0.00 0.00 0.00 0.00% 0.00% 402: NA 0.00% 0.00 0.00 0.00 0.00 0.00% 0.00% 403: NA 0.00% 0.00 0.00 0.00 0.00 0.00% 0.00% Catchment 5 0.00% 0.00 0.00 0.00 0.00 0.00% 0.00% 501: NA 0.00% 0.00 0.00 0.00 0.00 0.00% 0.00% 502: NA 0.00% 0.00 0.00 0.00 0.00 0.00% 0.00% 503: NA 0.00% 0.00 0.00 0.00 0.00 0.00% 0.00% Catchment 6 0.00% 0.00 0.00 0.00 0.00 0.00% 0.00% 601: NA 0.00% 0.00 0.00 0.00 0.00 0.00% 0.00% 602: NA 0.00% 603: NA 0.00% 0.00 0.00 0.00 0.00 0.00% 0.00% 0.00 0.00 0.00 0.00 0.00% 1 0.00% SCM rows in red have a data entry error for the SCM that makes an error in the calculation. Nutrient Management Strategy Watershed - Nutrient Offset Credit Reporting Form Please complete and submit the following information to the local government permitting your development project to characterize it and assess the need to purchase nutrient offset credits. Contact and rule implementation information can be found online at: http://deg.nc.gov/about/divisions/water-resources/planning/nonpoint-source-management/nutrient-offset- information PROJECT INFORMATION Applicant Name: Coolwick, LLC Project Name: Coolwick Warehouse Project Address: 80 Weathers Street Date: (mm/dd/yyyy) 4/30/2020 Development Land Use Type: Commercial County: Franklin Development Activity Type: Development - New Pre -Project Built -Upon Area %: 0.00% Project Latitude: 36D 01M 45.04S Post -Project Built -Upon Area %: 30.89% Project Longitude: 78D 29M 55.23S WATERSHED INFORMATION Nutrient Management Watershed: Neuse N Offsite Threshold Rate (lb/ac/yr): N/A Subwatershed: Neuse - 03020201 P Offsite Threshold Rate (lb/ac/yr): N/A Nitrogen Delivery Zone: Neuse - Upper Nitrogen Delivery Factor: 100% Phosphorus Delivery Zone: Neuse - Upper Phosphorus Delivery Factor: 100% NUTRIENT OFFSET REQUEST Nitrogen Load Offset Needs (A) (B) (C) (D) (E) (F) (G) (H) (L) (Where Applicable) Untreated Treated Loading Rate Reduction Project Size Offset Delivery State Buy Local Gov't Loading Rate Loading Rate Target Need (ac) Duration (yrs) Factor (/°) Down Amount Buy Down (Ibs/ac/yr) (Ibs/ac/yr) (Ibs/ac/yr) (Ibs/ac/yr) (Ibs) Amount (Ibs) B-C D"E"F'G 5.29 1 5.93 1 5.29 1 0.64 4.8000 30 100% 92.52 Phosphorus Load Offset Needs (A) (B) (C) (D) (E) (F) (G) (H) (L) (Where Applicable) Untreated Treated Load Loading Rate Reduction Project Size Offset Delivery State Buy Local Gov't Load Rate Rate Target Need (ac) Duration (yrs) Factor (%) Down Amount Buy Down (Ibs/ac/yr) (Ibs/ac/yr) (Ibs/ac/yr) (Ibs/ac/yr) (Ibs) Amount (Ibs) B-C D"E"F"G 0.74 2.01 0.74 1.26 4.8000 30 100% 182.02 LOCAL GOVERNMENT AUTHORIZATION APPENDIX E Wetland and Stream Map Page 10 May 4, 2020 N Q Study Area Weathers Street Site O CAROLINA Franklin County, NC ECOSYSTEMS Feet �� USGS Mapped Stream 0 80 160 Wetlands 36.028594,-78.500018 September 2019 Field Map 2017 NC Statewide Aerial Photography APPENDIX F Drainage Area Maps Page 1 1 May 4, 2020 -1 LI G� I AMERICAN BUILDERS _ _ =_ — -'- -- 5 _ _RTA I� \ 1 I AND CONTRACTORS _ - - /— I�/i/ \ �\ \ �Z�� 1 I DB 2064, PG. 176 MB 2000, PG. 180 I ZONING: INDUSTRIAL (IND) \ \ 1 I \ \ \ KIRK B. NEWTON HEIRS =--- - DB 1695, PG. 50 MB 2008, PG. 150 ZONING: INDUSTRIAL IND I 18 10 Eff/ O I , IPS I 1 EIP I I I \ FOR CS SONS LLC II 11 \ \\ DB 2153, PG. 1710 I 1 I I \\ \\ -, 0 �-'oo ul CD MB 2008, PG. 150 1 I I I\ \\ \ I // // / // //' // //EXIs�I I CENT-E�RkI/ ZONING: COMMERICAL-1 ( C1 —1I1I ) I 7/oF5�RO ` � �Isf�o �u9�CT�y TE /SETBACK 20.00' >> DRAINAGE EASEMENT 17 EXISTING FENCE TO BE REMOVED I \ \ \ �\-------- \\\\��j/ ��� / / / / // // // I I I I I/ ,A�/ U' A,) KONKLE INVESTMENT PROPERTY LLC �\ \\ I�\ \\ \�� �� / / //// / ,/ I I I I/ DB 1746, PG. 312 ZONING: INDUSTRIAL (IND) 405 \ \ L DRAINAGE \ \ \\ \ \ \\ \\ \ \\ EASEMENT SIDE SETBACK 0. \ \ TyPt'A' \ \ \ s \ \ \ O mil/ / EXISTING \ j1 � DPCARPE \ \\ — _ \ JURISDITIONAL \ \ \ \ \ \ \ / / / WETLAND (OUTSIDE \� I \ 1 1 1 \ \ \ \ \ \ \ / / PROJECT LEGEND OH W OH W EXISTING PROPERTY LINE EXISTING ABUTTING PROPERTY LINE EXISTING RIGHT-OF-WAY EXISTING OVERHEAD POWER LINE EXISTING ABUTTING PROPERTY LINE EXISTING BUILDING SETBACK LINE EXISTING PARKING SETBACK LINE EXISTING EDGE OF PAVEMENT EXISTING CONTOUR MAJOR EXISTING CONTOUR MINOR EXISTING WETLANDS PROPOSED CONTOUR MAJOR PROPOSED CONTOUR MINOR PROPOSED SIDEWALK PROPOSED ROADWAY W Q KInTr-:C 1. BOUNDARY AND EXISTING CONDITIONS SURVEY PROVIDED BY B.L. SCOTT LAND SURVEYING DATED 08-08-19. 2. A PORTION OF THE PROPERTY IS LOCATED IN ZONE X THAT IS LOCATED WITHIN THE 0.2% ANNUAL CHANCE ZONE. THE REMAINING PORTIONS OF THE PROPERTY IS LOCATED IN ZONES X (AREA DETERMINED TO BE LLJ OUTSIDE THE 0.2% ANNUAL CHANCE AND FUTURE 1 % ANNUAL CHANCE FLOODPLAIN) BASED ON THE FEMA MAP NUMBER 3720184200L DATED APRIL , 2013. 3. ONSITE WETLANDS HAVE BEEN IDENTIFIED WITHIN THE PROJECT OR PARCEL AS SHOWN. WETLANDS INVESTIGATION PERFORMED BY CAROLINA ECOSYSTEMS IN SEPTEMBER 2019. 4. THIS DRAWING IS NOT FOR RECORDATION. \ \y �9�77 -/ ----- BOUNDARY) -� \\ I PUBLIC // I / /. . . . . . \ \ I UTILITY - . 40\0' \ \ \ \ II 1 EASEMENT YPE"SA' \\ \L— —I—--- —-- LA \ \ �BU �� \`\ \\\ \\\ \ \\\ �'' _ EIP- -. .... .5>3 1 EIS P .�88.0 S 88 \\\\ 12'09" W �1 �J \ 1 \ J. C. WILSON WWW PROPERTIES AND \ DB 737, PG. 261 EXISTING RENTALS LLC JURISDITIONAL ZONING: MIXED USE-1 (MU-1) DB 1898, PG. 178 WETLAND (OUTSIDE N PROJECT ZONING: MIXED USE-2 (MU-2) BOUNDARY) 30 15 0 30 SCALE: 1 INCH = 30 FEET N N -0 00 0 I Q)0�M C)'U�Lo 00 0 0 r7 N a- 6 N �U ;t�rrNu a 111j��I • SEAL FN v �.% ttttt/11111� ISSUED FOR CONSTRUCTION Lu r V Q Z Q U 0 Z J Z Q � a U a- Q 0 W J J�0 wQ0 > U w 0 U) 0 a_ PROJECT NO.: 19024 DRAWN BY: JAC H or- LLJ LLJ 0 U_ � o w z QLU J W J CDU) CD (D Z O CHECKED BY: JAC DATE: 04/07/20 1"=30' SCALE: C-4 Lu J_ LL 0 Q 0 4 of 8 I I � G R7p \ \ \\ \ ;�) to I \ ;�� 12 — _ _ _ 584 _ ' 11P s . \ 0 I AMERICAN BUILDERS _ _ _ _ - _ _ ----7 _ — I %/ = , l• \ \\ �_ I AND CONTRACTORS _ — —� — — / _ — Ili/ / "1'�•\ �Z�� 1 ' DB 2064 PG. 176� MB 2000, PG. 180 _ _ —�— /\ °s }� �s• I ZONING: INDUSTRIAL (IND)_ _ _ �� — _ — ___--- — . \ \ ,1 s s 1• •I Y. • • �f %s \ F� _ %�\ KIRK B. NEWTON HEIRS I I — __-- _— — 4 . , . s • • - \.� .` \ \ DB 1695, PG. 50 1 / _ _ — — _�� —_ _ _ = ass �— - AA , i . �1\ •1 i• ,, \ \ MB 2008, PG. 150 I l j I = >> — / _ — 1 s i • 1 • • .. . • ZONING: INDUSTRIAL (IND) j\I 18 10 // — _—_ r .1 Md ll-%1 1-____.—, 1 — A A d 4 \_ • s . POST -DEVELOPMENT BYPASS I \ 1 /I/ .Gj / I 4EIP I / 's • 1 l I / D� 2 \ \ I `\ I I / , Is. DRAINAGE AREA: I �� , / , I ul I I //�� / \ I \ \ \ I I !_ •• s . I• 56 143 S F/1.29 AC / / I �f/ y / FOR CS SONS LLC 1 \ \ — ---- / / o / DB 2153, PG. 1710 I 1 `I I \\ \\ I i :1 : C=0.42 / / � M B 2008, P G. 150 11 I I I\ \ \ \ I •s A. " • • ' • / / / j ZONING: COMMERICAL-1 C-11 I I I �\ \ \ s; ,1 1•. / / / / / ///// ,OFF RLINEt / \ \ / //// ( ) I Lit \ I \ \ \ J / / /F STREAM' I I �, III \ \ \ .• ;s�� \ I \ \ • s.• I I / / / / / i �/ / i l / / / /// /�// 16. 0 I s• / I I \ \ \ s I I / / / / / // / / �0� / / / / /// / / E - - I / / // / / / / / / / / / / / / �7 / /SETBACK = I I \ I \ \ _ \S� Z / / / 20.00' I \ �, s. s / / / / / / / / / / //� i / DRAINAGE A. ///// /� // // � // / /iii// / EASEMENT \ I I POST -DEVELOPMENT DRAINAGE AREA: 92,487 SF/2.13 AC s / / s s° Ad EXISTING FENCE\ \ \\ I \ \ \ \ \ \ \ \ s_ / TO BE REMOVE \ \ \ \ — — — — >\��/ A� \ KONKLE INVESTMENT Ad A PROPERTY LLC `\ \1 \\ \\\ \\� '..-1•—` �.-, / / / /// / ,/ I I I II// IN, s ////// �/ // // I II I / / / DB 1746, PG. 312 \ I \I S\ •s.,1• •1•,• .Al. -A / / // / i I I I / / ZONING: INDUSTRIAL (IND) , \ \s } sa \ \ I \ s • \ \ Tom'• i•-�"s \ \I \ \ • ••\ • s —�•_ \ \ I \ \\ .\ • , ;1 •4 s�`.,—•- ,jam i• •1. • \ \ / \\ \I \ \ \ .. s• \ \ I / / / 20.00' DRAINAGE EASEMENT 16.0' SIDE SETBACK 4b. 0' \ \ TYP 'A' \ \ \ \ \LLjI �D CAPE \ \\ \ �j // / / / EXISTING JURISDITIONAL \ \ Uf�FER\ \ \ \ \ \ \\ I \ 1 1 1\ \ \ \ \ \ \ \ \ \\\ WETLAND (OUTSIDE PROJECT BOUNDARY) \ I I \ \ \ \ \ \ \ PUBLIC / I / /. . . . . . \ \ I UTILITY I 0\0' \ \ I EASEMENT LA nD / \ \ -. �... 513 1 EIS T�� \\\\ 2'09" W IP . .g . V 1 6J \ 1 \ S 88 1 \ \ J. C. WILSON WWW PROPERTIES AND \ DB 737, PG. 261 EXISTING RENTALS LLC JURISDITIONAL ZONING: MIXED USE-1 (MU-1) DB 1898, PG. 178 WETLAND (OUTSIDE PROJECT ZONING: MIXED USE-2 (MU-2) BOUNDARY) LEGEND OH W OH W EXISTING PROPERTY LINE EXISTING ABUTTING PROPERTY LINE EXISTING RIGHT-OF-WAY EXISTING OVERHEAD POWER LINE EXISTING ABUTTING PROPERTY LINE EXISTING BUILDING SETBACK LINE EXISTING PARKING SETBACK LINE EXISTING EDGE OF PAVEMENT EXISTING CONTOUR MAJOR EXISTING CONTOUR MINOR : *06*191►[eHTJIA0Ie\01�7: PROPOSED CONTOUR MAJOR PROPOSED CONTOUR MINOR PROPOSED SIDEWALK PROPOSED ROADWAY 1. BOUNDARY AND EXISTING CONDITIONS SURVEY PROVIDED BY B.L. SCOTT LAND SURVEYING DATED 08-08-19. 2. A PORTION OF THE PROPERTY IS LOCATED IN ZONE X THAT IS LOCATED WITHIN THE 0.2% ANNUAL CHANCE ZONE. THE REMAINING PORTIONS OF THE PROPERTY IS LOCATED IN ZONES X (AREA DETERMINED TO BE OUTSIDE THE 0.2% ANNUAL CHANCE AND FUTURE 1 % ANNUAL CHANCE FLOODPLAIN) BASED ON THE FEMA MAP NUMBER 3720184200L DATED APRIL , 2013. 3. ONSITE WETLANDS HAVE BEEN IDENTIFIED WITHIN THE PROJECT OR PARCEL AS SHOWN. WETLANDS INVESTIGATION PERFORMED BY CAROLINA ECOSYSTEMS IN SEPTEMBER 2019. 4. THIS DRAWING IS NOT FOR RECORDATION. N 30 15 0 30 SCALE: 1 INCH = 30 FEET LQ J J N co N ­4- -0 00 0 I .j � C, Lo o' cy) T 0 "' N _ 6 ct rO V ISSUED FOR CONSTRUCTION cn I— Z w O U Z � O J Q W :D O U Li Q Z J _J w 0 U Z Lu r V Q z Q Z 0 C1 � ° �zJwQ 0� U z LLJ j U U) � � o Q — = z _�Ow> LL] Q Ld J wa0C)(D U z w O Q PROJECT NO.: 19024 DRAWN BY: JAC CHECKED BY: JAC DATE: 04/07/20 SCALE: 1"=30' C-4 Lu J_ LL 0 Q 0 4 of 8