HomeMy WebLinkAboutNC0005088_SOC WQ S17-009_20200423 fetN DUKE RECEIVED James Wells
Vice President
ENERGY. Environmental,Health and Safety
MAY 012020 Programs&Environmental Sciences
526 South Church Street
Charlotte,NC 28202
NCDEQIDWRINPDES (980)373 9646
April 23, 2020
Via Overnight Mail
Landon Davidson
Asheville Regional Office Regional Supervisor
North Carolina Department of Environmental Quality
Division of Water Resources
Water Resources - Water Quality Regional Operations
2090 U.S. 70 Highway
Swannanoa, NC 28778-8211
Bob Sledge
North Carolina Department of Environmental Quality
Water Quality Permitting Program
Division of Water Resources
1617 Mail Service Center
Raleigh, NC 27699-1617
Subject: Report Under Special Order by Consent—EMC SOC WQ S 17-009
Duke Energy Carolinas, LLC— Rogers Energy Complex
NPDES Permit NC0005088
2019 Annual Seep Survey Report
Dear Messrs. Davidson and Sledge:
On behalf of Duke Energy Carolinas, LLC (DEC), I am submitting to you the Rogers Energy
Complex Annual Seep Survey Report summarizing the findings of the comprehensive survey as
required by the Rogers Energy Complex NPDES Permit NC0005088 Special Order by Consent
(SOC), SOC No. S 17-009 Section 2.c.3).
As required by the SOC,I certify under penalty of law that this document and all attachments were
prepared under my direction or supervision in accordance with a system designed to assure that
qualified personnel properly gather and evaluate the information submitted. Based on my inquiry
of the person or persons who manage the system, or those persons directly responsible for
gathering the information, the information submitted is, to the best of my knowledge and belief,
true, accurate, and complete. I am aware that there are significant penalties for submitting false
information, including the possibility of fine and imprisonment for knowing violations.
Messrs. Davidson and Sledge
April 23, 2020
Page 2
Please direct any questions concerning the Rogers Energy Complex NPDES Permit NC0005088
SOC No. S 17-009 to Robert Wylie at (704) 382-4669 and to Chris Hallman at (980) 373-7892
relative to the annual seep inspection report.
Sincerely,
James is
Vice President, Environment, Health & Safety-
Programs and Environmental Sciences
Duke Energy
Attachment:
Rogers Energy Complex 2019 Annual Seep Survey
cc: Richard Baker, Duke Energy
Robert Wylie, Duke Energy
Chris Hallman, Duke Energy
Steve Hodges, Duke Energy
Paul Draovitch, Duke Energy
Matt Hanchey, Duke Energy
46_
synTerra
2019 ANNUAL SEEP REPORT
ROGERS ENERGY COMPLEX
CLIFFSIDE STEAM STATION
EMC SOC WQ S17-009
573 DUKE POWER ROAD
MOORESBORO, NC 28114
APRIL 2020
PREPARED FOR
toi DUKE
ENERGY.
CAROLINAS
DUKE ENERGY CAROLINAS, LLC
Tim Grant
Project Scientist
Scott Spinner, NC LG #2243
Project Manager
2019 Annual Seep Report April 2020
Rogers Energy Complex-Cliffside Steam Station-Duke Energy Carolinas, LLC SynTerra
TABLE OF CONTENTS
SECTION PAGE
1.0 INTRODUCTION 1-1
1.1 Inspection Details 1-1
2.0 FINDINGS 2-1
2.1 General Observations 2-1
2.2 Effects of Decanting 2-1
2.3 Changes to Seep Status 2-1
3.0 REFERENCES 3-1
LIST OF FIGURES
Figure 1 SOC Locations and Inspection Areas
LIST OF TABLES
Table 1 SOC Locations and Descriptions-2019 Inspection
LIST OF APPENDICES
Appendix A Photographs
Page i
2019 Annual Seep Report April 2020
Rogers Energy Complex-Cliffside Steam Station-Duke Energy Carolinas,LLC SynTerra
LIST OF ACRONYMS
EMC Environmental Management Commission
SOC Special Order by Consent
Page ii
2019 Annual Seep Report April 2020
Rogers Energy Complex-Cliffside Steam Station-Duke Energy Carolinas,LLC SynTerra
1.0 INTRODUCTION
On March 6-7, 2019, Scott Spinner (NC L.G. #2243) of SynTerra inspected the Cliffside
Steam Station (Cliffside or Site) property for existing and potential new seeps. No
changes to seep status were observed during this inspection. Two previously
unidentified seeps were observed. Inspection activities were performed in accordance
with North Carolina Environmental Management Commission (EMC) Special Order by
Consent (SOC) EMC WQ #S17-009. That Special Order by Consent describes inspection
requirements as follows:
Duke Energy shall conduct annual comprehensive surveys of areas down gradient of ash
basins identifying new seeps, and documenting the physical characteristics of previously
documented seeps. All examinations ofseeps must include identification se s
eP ePof seeps by
approximate latitude and longitude and date-stamped digital photographs of their
appearance. A report summarizing the findings of the surveys, including a section
analyzing the effect decanting of the basin(s) has on seep flows, accompanied by copies of
the photographs noted above ("Annual Seep Report"), shall be submitted to DWR in
conjunction with submittal of the April 30 quarterly report noted in 2(c)(2) above. This
Annual Seep Report must list any seep that has been dispositioned (as described below)
during the previous year, including an analysis of the manner of disposition.
All locations listed in Table 1 of the SOC were observed and documented with
photographs during the inspection.
General inspection observations include:
• One previously unidentified seep (S-37) was observed during the inspection.
• One previously unidentified seep (S-38) was observed on a follow-up visit after
the annual inspection.
• No notable changes to existing seep status were observed during this inspection.
• Decanting of the active ash basin had not begun at the time of this inspection.
1.1 Inspection Details
During the inspection, the weather was clear and no precipitation occurred. The most
recent rain event was 0.7 inches on March 3, 2019, according to the on-Site rain gage.
Temperatures ranged from approximately 40 to 55 degrees Fahrenheit(F).
Page 1-1
• 2019 Annual Seep Report April 2020
Rogers Energy Complex-Cliffside Steam Station-Duke Energy Carolinas,LLC SynTerra
The inspector reviewed previous seep inspection reports and the weekly dam safety
inspection reports pertaining to each ash basin. Patrick Dunn (Duke Energy system
owner) conducted the ash basin dam safety inspections and prepared the reports. Mr.
Dunn was interviewed about recent rainfall, recent construction/stabilization projects
associated with the ash basins, and general Site conditions in and surrounding the ash
basins. Observations from the dam safety inspection reports were consistent with
observations made during the annual inspection.
The inspection included observations in the following areas (Figure 1):
• Along the Broad River, north of the Unit 5 inactive ash basin
• Between Unit 5 inactive ash basin and Unit 5 power plant
• Along the Broad River, northeast of the former Units 1-4 ash basin
• Along the Broad River, north of the ash storage area
• Along the Broad River, north of the active ash basin
• Along the eastern bank of Suck Creek, adjacent to the active ash basin
• Areas along and downgradient of the ash basins
Seep locations and inspection areas are shown on Figure 1. Observations noted during
the inspection are summarized on Table 1. Photographs taken of each seep location
during the inspection are included in Appendix A.
Page 1-2
• 2019 Annual Seep Report April 2020
Rogers Energy Complex-Cliffside Steam Station-Duke Energy Carolinas,LLC SynTerra
2.0 FINDINGS
2.1 General Observations
Inspection observations of each seep are described in Table 1. Details include:
• Seep conditions were found to be generally similar to conditions in previous
inspections.
• Seeps S-37 and S-38 were identified as a part of the 2019 inspection and will be
incorporated into the monitoring program. Both newly identified seeps exhibited
insufficient flow to collect a sample.
• No previously unidentified or unreported pipes were observed during
inspection.
2.2 Effects of Decanting
Decanting of the active ash basin at Cliffside had not yet begun at the time of this
inspection.
2.3 Changes to Seep Status
Mr. Spinner inspected each seep to evaluate whether it met requirements to be
dispositioned in accordance with the SOC. The requirements for dispositioning a seep
are as follows:
For purposes of this Special Order, "dispositioned" includes the following: (1) the seep is
dry for at least three consecutive quarters; (2) the seep does not constitute, and does not
flow to, waters of the State or Waters of the United States for three consecutive quarters;
(3) the seep is no longer impacted by flow from any coal ash basin as determined by the
Director of DWR in accord with applicable law and best professional judgment; or (4) the
seep has been otherwise eliminated (e.g., through an engineering solution). If a seep that
has been dispositioned through drying up reappears in any subsequent survey, such a
seep will no longer be deemed dispositioned and can be subsequently re-dispositioned as
specified above. Non-constructed seeps described in paragraph 1(h) of this SOC cannot be
dispositioned through option (2) above.
No changes to seep status were observed during this inspection.
Seeps S-37 and S-38 were identified as a part of the 2019 inspection and will be included
in future inspections.
Page 2-1
• 2019 Annual Seep Report April 2020
Rogers Energy Complex-Cliffside Steam Station-Duke Energy Carolinas,LLC SynTerra
3.0 REFERENCES
NCDEQ. (2018). Special Order by Consent EMC SOC WQ S17-009.
Page 3-1
• 2019 Annual Seep Report April 2020
Rogers Energy Complex-Cliffside Steam Station-Duke Energy Carolinas,LLC SynTerra
FIGURES
• 2019 Annual Seep Report April 2020
Rogers Energy Complex-Cliffside Steam Station-Duke Energy Carolinas,LLC SynTerra
TABLES
TABLE 1
SOC LOCATIONS AND DESCRIPTIONS - 2019 INSPECTION
2019 ANNUAL SEEP REPORT
ROGERS ENERGY COMPLEX - CLIFFSIDE STEAM STATION
DUKE ENERGY CAROLINAS, LLC, MOORESBORO, NC
Location Coordinates_ Receiving Receiving
Facility Sample ID Waterbody Waterbody Description SOC Monitoring Interim Action Levels Notes from Inspection
Latitude Longitude Classification
Minor flow was located at bank of Broad River, Flow observed on bank entering Broad River. Flow
Cliffside S-13** 35.218353 -81.754942 Broad River WS-IV adjacent to Unit 1-4 Inactive Ash Basin. NA - Seep Dispositioned NA - Seep Dispositioned rate at a trickle. Orange aerobic bacteria/floc/iron-
Following ash basin excavation, seep has
disappeared. oxidation apparent on substrate.
Seepage located along toe of dike (west side)
Cliffside S-14 35.214511 81.755844 Suck Creek WS-IV of the active ash basin. Area of wetness - no Suck Creek Instream NA 2B Standards Apply Pooled water by sign, but no flow toward Suck
flowing water observed. Any flow would move Monitoring Creek.
toward Suck Creek.
Second seepage area located along toe of dike
(west side) of the active ash basin. Area of Suck Creek Instream Wetter than previous inspections, flow in channel
Cliffside S-15 35.214297 -81.756117 Suck Creek WS-IV wetness - no flowing water observed. Any flow Monitoring NA - 2B Standards Apply reaches Suck Creek.
could move via poorly incised channel toward
Suck Creek.
Third seepage area located along toe of dike Steady flow within channel. Notable floc/iron-
Cliffside S-16 35.2141 -81.756208 Suck Creek WS-IV (west side) of the active ash basin. Any minor Suck Creek Instream NA - 2B Standards Apply oxidizing bacteria on substrate. Flow continues
flow could move via channelized area toward Monitoring
toward Suck Creek.
Suck Creek.
Minor seep at river edge and below the
Cliffside S-17** 35.217192 -81.769272 Broad River WS-IV ordinary high water level of Broad River, west NA - Seep Dispositioned NA - Seep Dispositioned Similar to previous inspections. Flow in three
(upstream of S 2). separate channels enters the Broad River.
Seepage from riprap at toe of inactive Unit 5 Orange aerobic bacteria/floc/iron-oxidation
Cliffside S-18 35.216439 -81.768564 UT to Broad River WS-IV Ash Basin. Flows north into wetland area Monitoring at S-02 See S-02 apparent on substrate. Aquatic life
monitoring site. PP q apparent in
draining to sampling site S-2. stream. Slightly wetter than previous inspections.
Seepage from wooded area at toe of inactive Orange aerobic bacteria/floc/iron-oxidation
Cliffside S-19 35.216361 -81.768681 UT to Broad River WS-IV Unit 5 Ash Basin. Flows north into wetland area Monitoring at S-02 See S-02 apparent on substrate. More flow than previous
draining to sampling site S-2. monitoring site. inspections.
Seepage from wooded area at toe of inactive Orange aerobic bacteria/floc/iron-oxidation
Cliffside S-19A 35.216581 -81.769217 Broad River WS-IV Unit 5 Ash Basin. Flows north into wetland area Monitoring at S-02 See S-02 apparent on substrate. Slightly more flow than
monitoring site.
draining to sampling site S-2. previous inspections.
Stagnant AOW at toe of northeast side of Seep not visible in area of rip-rap repair. Water
Cliffside S-20** 35.215856 -81.765217 Broad River WS-IV Inactive Unit 5 Ash Basin. AOW dispositioned NA - Seep Dispositioned NA - Seep Dispositioned exists in ditch farther downgradient near the
via repair. cooling tower.
Seep located along dike of the active ash basin Stagnant water that follows groin of upstream dam
Cliffside S-21 35.214625 81.755953 Suck Creek WS-IV (west side). Area of wetness - no flowing Suck Creek Instream NA 2B Standards Apply and infiltrates prior to discharge into Suck Creek.
water observed. Any flow would move toward Monitoring Traces of orange aerobic bacteria/floc/iron-
Suck Creek. oxidation apparent on substrate.
Cliffside S-22** 35.218278 -81.748258 WS-IV Pipe has been plugged; discharge eliminated. NA - Seep Dispositioned NA - Seep Dispositioned Pipe is plugged, no discharge.
Page 2 of 4
TABLE 1
SOC LOCATIONS AND DESCRIPTIONS - 2019 INSPECTION
2019 ANNUAL SEEP REPORT
ROGERS ENERGY COMPLEX - CLIFFSIDE STEAM STATION
DUKE ENERGY CAROLINAS, LLC, MOORESBORO, NC
Location Coordinates Receiving
Facility Sample ID Receiving Waterbody Description SOC Monitoring Interim Action Levels Notes from Inspection
Latitude Longitude Waterbody Classification
Seep to pooled area adjacent to the Broad
River, located north of the active ash basin. Broad River Instream Ponded water present at seep emergence. Visible
Cliffside S-23 35.217994 -81.750208 Broad River WS-IV Minor seepage from pool emerges with any Monitoring NA - 2B Standards Apply flows reaching Broad River.
minor flow draining north to the Broad River.
Cliffside S-24* 35.218139 -81.749428 Broad River WS-IV Minor seepage to AOW near bank of Broad NA - Seep Dispositioned NA - Seep Dispositioned Sandy and silty substrate. Stable with low flow to
River and north of active basin. the river.
Minor seepage to AOW below ash storage area.
Cliffside S-25** 35.217689 -81.751894 Broad River WS-IV No measurable flow has been observed NA - Seep Dispositioned NA - Seep Dispositioned Similar to previous inspections. Trickle of flow to
Broad River.
throughout site history.
Cliffside S-26* 35.217425 -81.753931 Suck Creek WS-IV Natural conveyance near bank of Suck Creek NA - Seep Dispositioned NA - Seep Dispositioned Sandy and silty substrate with rock outcrops. Flow
near confluence with the Broad River. in channel entering Suck Creek.
Seep located along dike of the active ash basin
Cliffside S-27 35.21383 -81.756478 Suck Creek WS-IV (west side). Area of wetness no flowing Suck Creek Instream NA - 2B Standards Apply No flow or wetness observed.
water observed. Any flow would move toward Monitoring
Suck Creek. I
Minor diffuse groundwater seepage along steep Suck Creek Instream Wetter than previous inspections. Orange aerobic
Cliffside S-28 35.211677 -81.753876 Suck Creek WS-IV bank of Suck Creek, west of the active ash Monitoring NA - 2B Standards Apply bacteria/floc/iron-oxidation apparent on substrate.
basin dike.
Minor diffuse groundwater seepage along steep Suck Creek Instream Flow is low and clear. Orange aerobic
Cliffside S-29 35.211542 -81.753993 Suck Creek WS-IV bank of Suck Creek, west of the active ash NA - 2B Standards Apply bacteria/floc/iron-oxidation apparent on substrate.
Monitoring
basin dike. Similar to previous inspections.
Minor diffuse groundwater seepage along steep Suck Creek Instream Flow discharges across several areas toward Suck
Cliffside S-30 35.211496 -81.75391 Suck Creek WS-IV bank of Suck Creek, west of the active ash NA - 2B Standards Apply
Monitoring Creek over rocks and as drip faces along the bank.
basin dike.
Flow is trickling/dripping and clear. Orange aerobic
Minor diffuse groundwater seepage along steep Suck Creek Instream bacteria/floc/iron-oxidation apparent on substrate.
Cliffside S-31 35.211482 -81.753887 Suck Creek WS-IV bank of Suck Creek, west of the active ash NA - 2B Standards Apply Area is approximately 20 feet wide along bank and
basin dike. Monitoring water trickles toward Suck Creek at several
locations.
Minor diffuse groundwater seepage along steep Flow is a trickle and clear. Orange aerobic
Cliffside S-32 35.211258 -81.753646 Suck Creek WS-IV bank of Suck Creek, west of the active ash Suck Creek Instream NA - 2B Standards Apply bacteria/floc/iron-oxidation apparent on substrate.
basin dike. Monitoring Area of diffuse flow approximately 30 feet wide
flowing toward Suck Creek.
Seep was located at bank of Broad River, Soft sediment at bank. Abandoned outfall gone. No
Cliffside S-33** 35.218272 -81.754754 Broad River WS-IV adjacent to Unit 1-4 Inactive Ash Basin. NA - Seep Dispositioned NA - Seep Dispositioned flow. New outfall constructed for wastewater
Following ash basin excavation, seep has treatment plant.
disappeared.
Sandy and silty substrate with rock outcrops. Flow
Cliffside S-34* 35.217556 -81.753725 Suck Creek WS-IV Natural conveyance near bank of Suck Creek NA - Seep Dispositioned NA - Seep Dispositioned infiltrates prior to entering Suck Creek. No
apparent iron-oxidizing bacteria observed.
Page 3 of 4
TABLE 1
SOC LOCATIONS AND DESCRIPTIONS - 2019 INSPECTION
2019 ANNUAL SEEP REPORT
ROGERS ENERGY COMPLEX - CLIFFSIDE STEAM STATION
DUKE ENERGY CAROLINAS, LLC, MOORESBORO, NC
Location Coordinates Receiving Receiving
Facility Sample ID Waterbody Waterbody Description SOC Monitoring Interim Action Levels Notes from Inspection
Latitude Longitude Classification
Flow less than previously observed and infiltrates
Cliffside S-35* 35.208203 -81.755703 Suck Creek WS-IV Natural conveyance near bank of Suck Creek NA - Seep Dispositioned NA - Seep Dispositioned prior to entering tributary. Sandy and silty with
minor amounts of iron-oxidizing bacteria observed
at the confluence of the tributary.
Minor diffuse groundwater seepage along bank
Cliffside S-36 35.210258 -81.753983 Suck Creek WS-IV of Suck Creek, west of the active ash basin Suck Creek Instream NA - 2B Standards Apply Steady trickle flow from three drip faces.
dike. New area identified with no current data. Monitoring
Area to be monitored to determined status.
Seeps Discovered During 2019 Inspection
Seep located approximately 20 feet
downstream of S-36. Flow emerges 25 feet Suck Creek Instream Flow minor and diffuse. Notable iron staining and
Cliffside S-37 35.210266 -81.753827 Suck Creek WS-IV from Suck Creek as standing water which Monitoring NA - 2B Standards Apply floc present. Insufficient volume to sample.
becomes shallow, flowing, and somewhat
diffuse as it flows toward Suck Creek.
Seep emerges near the ordinary high water
mark of the Broad River north of the active ash Broad River Instream Flow is low and not apparent when river levels are
Cliffside S-38 35.217759 -81.752742 Broad River WS-IV basin. Flow is low and travels through multiple Monitoring NA - 2B Standards Apply high. Iron staining present on sandy substrate.
channels in sandy shoreline substrate toward Insufficient volume to sample.
the Broad River.
NPDES locations
Seepage from bank downgradient of active ash Steady flow consistently within a well-defined rip
Outfall 104 NA - Monitored per terms rap channel. Silty and clayey sand beneath rip-rap.
Cliffside (S 04) 35.217641 -81.752596 Broad River WS-IV basin to a channel flowing toward the Broad of the NPDES permit NA - 2B Standards Apply Orange aerobic bactera/floc/iron oxidizing bacteria
River. apparent on rip-rap substrate along channel.
Steady stream with moderate flow volume Steady moderate flow. Water is clear. Seepage
within well-defined channel at toe drain for observed at toe of the dam at/near the rip-rap pile.
Outfall 106 NA - Monitored per terms
Cliffside (S-06) 35.21844 -81.748266 Broad River WS-IV active ash basin dam, downstream of former of the NPDES permit NA - 2B Standards Apply Vegetation conceals some flow. Orange aerobic
AOW S-22 and bacterial/floc/iron-oxidation apparent on substrate
near the confluence with the Broad River. along channel, especially apparent in eddies.
Prepared by: KDF Checked by: GTC
Notes: Revised by:TJG Checked by: SAS
* -Location previously investigated as a seep. Monitoring has not indicated the presence of coal combustion residuals.
**-Seep dispositioned via repair and/or non-flowing condition to potentially reach Waters of the U.S.,or other,as noted. Monitoring shall be conducted at the approximate locations indicated on the attached site map.
All monitoring shall be conducted per the requirements found in Attachment B of this Order.
pg/L-micrograms per liter
2B- 15A NCAC 02L.0202 Standard
mg/L-milligrams per liter
NA-Not Applicable
NPDES-National Pollutant Discharge Elimination System
S.U. -Standard Units
SOC-Special Order by Consent
TDS-Total Dissolved Solids
UT-Unnamed Tributary
Page 4 of 4
• 2019 Annual Seep Report April 2020
Rogers Energy Complex-Cliffside Steam Station-Duke Energy Carolinas,LLC SynTerra
APPENDIX A
PHOTOGRAPHS
• 2019 Annual Seep Report April 2020
Rogers Energy Complex-Cliffside Steam Station-Duke Energy Carolinas,LLC SynTerra
NW d NE
3 a'N'?1 e 35 216P"4°N 81 771704'W t1C Oft ♦6r8ft
o
icy ..0♦ `- '"
f
3� A
•l ' ,,�'" ` .
\ �tto 4� y�r ' '' � .
0
1 S-01 View of dispositioned seep location facing north.
NW NE
v.)
I • 1?. • 1 • i.• 1 • 1 • 1 • 1 •j • I • 1 • I • I • 1 •
v • 'N,81.768738°W±16 4ft A 694ft
'f
`,"q p X •l e Via.
* Y$'
y '. 4
n ti
A.
fy, r
A4
s a a .Ma:i#t .46:s
S-02 View of SOC sample location facing north-northeast.
Page 1 of 20
• 2019 Annual Seep Report April 2020
Rogers Energy Complex-Cliffside Steam Station-Duke Energy Carolinas,LLC SynTerra
4
.r,
Decimal DMS
Latitude 35.216137 35'12'58" N
Longitude -81.758364 81°45'30"w
U19 U&0'7(TIT u) 1.'_52{PM;
S-03 View of seep location facing southeast.
E S
ISO,. 21
• 35.217594°N,81.752647°W*16.4ft ♦651f*
111
•
•
aFi
n 1111111MINsw
View of NPDES Outfall 104(S-04) facing
Duncan 104 (S-04) southeast.
Page 2 of 20
• 2019 Annual Seep Report April 2020
Rogers Energy Complex-Cliffside Steam Station-Duke Energy Carolinas,LLC SynTerra
a..
W NW N N
093&14W(T) 36.218006°N,81.751076°W x32.8ft ♦679ft
! - r
•
4
s"A
,r..
So! \ /14
11111
IS-05 View of dispositioned seep location facing north-northwest.
NE E SE
30 90
®74°E(T) 35.218292°N,81.748306°W 1.-16.4ft ♦678ft
/yX
f"
b AS4? 1
•
•
� d r
. y.
1114 S ,µ �„ 4a ,'T' '.
Sf` '15F31t Yr
0 17:Q9-32
Outfall 106 (S-06) View of NPDES Outfall 106(S-06) facing east.
Page 3 of 20
• 2019 Annual Seep Report April 2020
Rogers Energy Complex-Cliffside Steam Station-Duke Energy Carolinas,LLC SynTerra
S I .. W
o 223°SW(T) *35.218784°N,81.745682°W 1656.2ft A 686tt
-
• ti M -d `..�
Ye,,-, 4� .q
;:..y .-. +x .- r
ur •,
.
•
:,
, AOYY r ' �
,.
--.,,,,,,
'-�a
s-7 „;- `' Y .
.....•• ,:,, , . ....,•, .,
.. -.., — :.,
,....:,
.„., ,
.y 3 ""_--'c',.- _ r 4fj',;,-, -' ' �°
-:, ., -
,,
0
• `' '
,
S-07 View of SOC sample location facing southwest.
10.01 - N
_ ,. NE
0 31.)0 33G�-" 0 30
®341°N(T) • 35.208508°N,81.756218°W±16.4ft A 754ft
it
P.*'"\*
•'IV:**
r, :
Y
•
j M
AI }.. :itita Sit I. *,
•
a
titf �`A" 0.4$ ` .
R
. *Qt b
91rwN.+l� t �28"
S-08 View of dispositioned seep location facing north-northwest.
Page 4 of 20
2019 Annual Seep Report April 2020
Rogers Energy Complex-Cliffside Steam Station-Duke Energy Carolinas,LLC SynTerra
4 34' :: :1"kl!,-, ' ' . ° '
4
Decimal D
Latitude 35.217376 35°13'2' N
Longitude -81.754172 81'45'15" W
S-09 View of dispositioned seep location facing southeast.
1.
-11 r
} " Decimal DMS
L. ,rude 35.210991 35"12'39" N f°E
Longitu-le -8'1 767075 31°46'4" W
S-10 View of dispositioned seep location facing north.
Page 5 of 20
1
• 2019 Annual Seep Report April 2020
Rogers Energy Complex-Cliffside Steam Station-Duke Energy Carolinas,LLC SynTerra
t
...1 lib
t!
l
voma. - a.• ..
Deci .
Latitude 35.219549 S. N
Longitude -81.756671 P1 , Of
5-1 1 View of dispositioned seep location facing northeast.
90
1 • 1 • 1 • 1 • 1 • 1 • 1 • I • I • I • I • k
0 32°NE(1-1 •35 217472°N,81 751839°W-.32 8ft ♦700ft
i ' 4.4t 44' 14 i
1 i
ilk VC -et.4"(,,411''',. '4,5;: 'NW -4':0.' '... ',
et .c..4,...,.,,, , ,,,,-,,,,,,k,:, .
,..., P'''''
"I'f r r 4 1 "ci*
i
` Ir 2019,16.19:47
S-12 View of dispositioned seep location facing northeast.
Page 6 of 20
2019 Annual Seep Report April 2020
Rogers Energy Complex-Cliffside Steam Station-Duke Energy Carolinas,LLC SynTerra
, ,t \ + ,, ,,.
mot"':7 4f,.,
-� D-;, , ��al
Latitude 35.218257 35°13'5" N
Longitude -81.754643 81°4516' W
S-13 View of dispositioned seep location facing north.
W NW N
2F0 3co to 0 30
1 • 1 • 1 • 1 • 1 • 1 • 1 • 1 • 1 • 1 • 1 • 1 • 1 • I •
0 3291NW(T) •35 214615°N,81 755798°W±16 Oft A 688tt
•
e"" 4, ,:.: ...' -.4 „
, AO.W.
if S
j\ 1
I e ak
S v 'Mar 2Q19, :38:42
S-14 View of seep location facing northwest.
Page 7 of 20
• 2019 Annual Seep Report April 2020
Rogers Energy Complex-Cliffside Steam Station-Duke Energy Carolinas,LLC SynTerra
W NW
a;.! 270 3C 1,1
(T; • 15 11177'1'N 91?55 39''W1`:•16.1f• ♦6f317
°r off.« Tu t.
X
•
4 t
Ztot1 ya7„1�1�
i�. Y
Z
aw
yq ; r
View of location facingnorthwest.
S15 seep
W j NW _ N
.40 170 IiQ 330
4 , I • I • l • I • I • I • I • I • I • I • l • • ) •
297°NW(T) *35.214207°N,81.756111°W±16.4ft ♦697ft
r •
Rn
d �
„ robir
�t �f
�g ft,
^mod
-, / a — . .
S 16 View of seep location facing west-northwest.
Page 8 of 20
P
• 2019 Annual Seep Report April 2020
Rogers Energy Complex-Cliffside Steam Station-Duke Energy Carolinas,LLC SynTerra
NE E ,E
0 75°E(7) 0 35.217281°N,81.769218°W±16.4ft ♦683ft
t
w.
alkt
t
•
a <Y ,
IL
a t2
u A.
L17 View of dispositioned seep location facing east.
N
' ' „ .+"cr '' 4. f 7�(%1316 4ft A 66Th
CAM.q . ::,, Fn4r....,F. -J.:N,14..• -
•
y y
f
S-18 View of seep location facing north.
Page 9 of 20
r
• 2019 Annual Seep Report April 2020
Rogers Energy Complex-Cliffside Steam Station-Duke Energy Carolinas,LLC SynTerra
W N
t,
it
'
V
Ic....
,19 a
1.., .4
�.�'
IS-19 View of seep location facing northwest.
11111111111.1.111.
O 328'NW{T) 0 35.216499'N,81.769005 v". -_i c . a
it
.,
Olt
1.**04:4 ,4 t 4 / "'.''-;41:-4114:14 *i*:'..t,•*l',
•
I. ii X .
a e
r _ I . .- i 11:
k.
Y. a
„` .
4.4.,,-- .,. .. -r_ r-,,..i. ..e,-, .4tr• +.(''
t ,A ,{ a iiff r r .°,,;
/j _. k
T / 1_
S-19A View of seep location facing northwest.
Page 10 of 20
• 2019 Annual Seep Report April 2020
Rogers Energy Complex-Cliffside Steam Station-Duke Energy Carolinas,LLC SynTerra
S SSW W
,c
14u
'3218°S"''T'' • fir,°1.1 r ir,N Pi,a,qn?'tf/','P" ♦683ft
a.: V. y•‘,.: _-
p 4,r {,-x,idrs.... 4;It
a a,..�t V}Yw
. ,.
« .+A:tom «^ , ~k' `'.,.<
lb
. } 1v . 011.E
5-20 View of dispositioned seep location facing southwest.Photograph
taken after annual seep inspect wii
W NV N
770 300 9:3.1
I • I • I • I • I • I • I • t • I • 1 • I • i • ; • 1 •
*<?316°NW(T) *' % 35.214676°N,81.755936°W±16.4ft A 687ft
e s?}
4
�,., 4. •
_ .Ak
{ y.�.
w
1 ., A E
„1
w�A
k P
. ,
S-21 I View of seep location facing northwest.
Page 11 of 20
• 2019 Annual Seep Report April 2020
Rogers Energy Complex-Cliffside Steam Station-Duke Energy Carolinas,LLC SynTerra
E S
. , . r . , . , . . . . • • • , • , .
O 166°S(T) 0 35 13.102'N,81°44.896'W*16ft ♦651ft
4
'K
Vipt k- ''' fir• .
:... ��� ,' _ ,�n-•
View of dispositioned seeplocation facingsouth.Photograph taken
P
S-22 after annual seep inspection.Approximate abandoned pipe
location indicated by red arrow.
`rr•E SE S
• t . 1 . 1 . 1 • 1 . i . ; • 1 • 1 • • 1 • I • 1 • 1
O 151°SE(1) #35.218113°N,81.750504°W±16.4ft ♦647ft
4-- 1 r
x
1 r
.
S-23
View of seep location facing southeast. lar 2019 16°29.50
Page 12 of 20
• 2019 Annual Seep Report April 2020
Rogers Energy Complex-Cliffside Steam Station-Duke Energy Carolinas,LLC SynTerra
SE S SW
Q1•" (1) 0:4•.4. * ', 81.749466°W.164?t ♦6F°`,
ti "f
- i 1
11
S-24 View of dispositioned seep location facing south.
O 82°E in •35 217522°N,81752243°W±16.4ft •706ft
� T
r
‘ . :5,, 4 r, ...:,,Ailk, , 11
1311
f , e►r ,
ti SO s�. T1 + }
iif it _
,dam•a - .,,7: ;',
S-25 View of dispositioned seep location facing east.
Page 13 of 20
• 2019 Annual Seep Report April 2020
Rogers Energy Complex-Cliffside Steam Station-Duke Energy Carolinas,LLC SynTerra
likip
Er
It ..or ? t :—• . •'
<r I:
a
o
Decimal Di4'g
Latitude 35.217384 35°13 N
Longitude -81.754196 81°4515 tAi
2019-03-07(Thu) 02:01(PM)
S-26 View of dispositioned seep location facing southeast.
W NW N N:
i • I • 1 • 1 • I • 1 • 1 • 1 • 1 • 1 • 1 • 1 • 1 • 1 •
0 337°NW(T) ;•35.213703°N,81.756317°W±32.8tt ♦707ft
e Y
0"
jS_27 Vic., of seep location facing north-northwest.
Page 14 of 20
I
• 2019 Annual Seep Report April 2020
Rogers Energy Complex-Cliffside Steam Station-Duke Energy Carolinas,LLC SynTerra
paimik
S W
O 227"SW 9 . 20141 *16.4ft ♦737ft
& '4w
' -28 , ,
iii
+'11
•
t;M
i. Oro i
;.41
µiP
it
S-28 View of seep location facing southwest.
1 W NW , N
'•270 ,mx, . 0 30
0 329°NW(T) • 35 211582°N 81 754021'W s184ft ♦712ft
f.
1 . N *''t
41,
,;tee 7
� '
. ,
5-29 View of seep location facing northwest.
Page 15 of 20
• 2019 Annual Seep Report April 2020
Rogers Energy Complex-Cliffside Steam Station-Duke Energy Carolinas,LLC SynTerra
S W
.
0 228°SW(T) •35.21 ' . .81.754074°W±16.4tt A 746ft
i
S-30404
` -.
..e :yio y y{..+� w,
r ,
3 rw ,
S-30 View of seep location facing southwest.
NE E SE 1
1 i is
O 111°E(T) $35.211536°N,81.753792°W±16.4ft ♦729ft
,. « 1 rr
.+ S 31 .. 44+ e
slit.
P r P 14 � Aitit pt` � � F��y:Y.L � i
7. . Y .0
5. .` 1 `
4 i „AD OA , I,.. 4,4, , ..,,, ,, ,i ,. „...
S-31 View of seep location facing east.
Page 16 of 20
•
• 2019 Annual Seep Report April 2020
Rogers Energy Complex-Cliffside Steam Station-Duke Energy Carolinas,LLC SynTerra
E E SE S '
i • . • I • . .. • , • I • . , • , • i • t • , • i •
0116°SE(T) t•35.211273°N,81.753609°W±16.4ft ♦769ft
S »v.� +"i 9•.. h am•.
1 �•
i• '" a. \`,cif y 4 ..
`6�R i ate « ^` � .
ri
r p�
1,4
rokt
4 r, . ;to,*
0
:,.. .,, y .
,, 06 NO2019,1 ''
S-32 View of seep location facing east-southeast.
A.O.W.. .,„ ., , , „,,,,,,,f, l,s, ,?,• ' ,
-k., .,,4 i 1
: .
,, z , +t z , ' `. 5-33
C Y A..(eA J fi a >
,r, any. `y o
n :,,,"s• "*err" ^«... .. • ...! ,.
Decimal DMS
Latitude 35.21 323 35°13 5' N
Longitude -81.754812 E1°45'17' ' y,
1 20i9O I.tt . 0141(PM
S-33 I View of dispositioned seep location facing east.
Page 17 of 20
• 2019 Annual Seep Report April 2020
Rogers Energy Complex-Cliffside Steam Station-Duke Energy Carolinas,LLC SynTerra
; . J
'` dfr
C.bliiit.,
1n
Decimal ' DMS
Latitude 35.217666 35°13`3" N
Longitude -81.753762 81'45'13'w
S-34 View of dispositioned seep location facing southeast.
N NE
u
0 347.14(T) 0 35. .:. N,81.756195°W±16.4ft ♦781 ft
yame.
`
i
x '
r f•
41 ac
♦ y 1 `„s c ? V
f"_ 4
N
Sr
t
S-35 View of dispositioned seep location facing north.
Page 18 of 20
• 2019 Annual Seep Report April 2020
Rogers Energy Complex-Cliffside Steam Station-Duke Energy Carolinas,LLC SynTerra
E
. . . . . . . . . . . . . .
`O oc°f! ^,"11(17^2°y Cr O .'lip1,, A -1•
' \ AriTtit.
;.0 1' , g. ,
a gar•• • ITT '
q yrr �
itiy01,a .
ry ' i:
•• 1
J., ' ' ..f' t,, .!
'3 ]y
• 1 `
+ , , 06 Mar 2019.10:42:08
S-36 View of seep location facing east.
W NW i N N
270 310 s1
• 1 • 1 • 1 • 1 • 1 • 1 • 1 . 1 • 1 • 1 • 1 • 1 • 1 • 1 •
O 335°NW(T) :•35.210270°N,81.753822°W±16.4ft ♦770ft
7 - * s,+ ..v .
4411*
M 1,
Mso
i
➢:
A�
, 1
S-37 Viet, 11i seep location facing northwest.
Page 19 of 20
f
2019 Annual Seep Report April 2020
Rogers Energy Complex-Cliffside Steam Station-Duke Energy Carolinas,LLC SynTerra
rvn.c w c.w J
ivi.
,.„. ..., .
_.,
. .;
,. , . Decimal DMS
Latitude 35.217739 35°13`3' N
Longitude -81.752471 81°45'8" W
5-38 View of seep location facing east.Photograph taken after annual
see. inspection.
Page 20 of 20