Loading...
HomeMy WebLinkAboutCreek ProjectState of North Carolina Water Resources Environmental Quality Department of Environmental Quality Division of Water Resources 15A NCAC 02H .0506(b)(4) Water Quality Certification, Notification of Work in Trout Watersheds FORM: TroutWS 11-2017 Notification of Work in Trout Watersheds Form. A. Applicant Information 1. Processing la. Specify Nationwide Permit (NWP) number: ,� or General Permit (GP) number: 1 b. Has the NWP or GP number been verified by the Corps? ❑ Yes ❑ No 1 c. Does the project meet all the Conditions of the applicable Water Quality Certification ❑ Yes ❑ No Please note that your project may be subject to the Sediment and Erosion Control Program and/or Trout Buffers implemented by the Division of Energy, Mineral, and Land Resources. Find more info at: https:/Ideq.nc.gov/abouVd ivis ions/energy-mineral-land-resources/erosion-sed iment-control 2. Project Information 2a. Name of project: 2b. County: 2c. Nearest municipality / town: C'S vr1 3. Owner Information 3a. Name(s) on Recorded Deed: 9�. z fr©ff 3b. Responsible Party (for LLC if applicable): > c� 7 r� ZZ-C 3c. Street address: 31ah --4)'n,, } c'l 3d. City, state, zip: to yr�'ll c 1,2 610 3e. Telephone no.: 3f. Email address: L�U,C�ir'✓1 375' ei/Sc)vT-h 4. Agent/Consultant Information (if applicable) 4a. Name: 4b. Business name (if applicable): 4c. Telephone no.: 4d. Email address: B. Project Information 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): �j %�. DO —03 l �� Latitude: Longitude: - (DD.DDDDDD) (-DD.DDDDDD) 1 b. Site coordinates (in decimal degrees): 2. Project Description 2a. Explain the purpose of the proposed project (continue on back): 2b. Describe the overall project detail, including the type of equipment to be used: pin / 1 ReesiD Ils k C�ifi �'�f tint#' Bider m trr�c ban t ev A) F ! / ✓�Uc,� (f.�� � c�u,f�-,eh f C. Stream Impacts: Please list all proposed impacts to the stream la. Stream Name: /e- r,,4 1b. Type of impact Average stream width (linear feet) Impact length (linear feet) [Bank Stabilization - Sloping and Revegetating0 It { t ❑ Bank Stabilization - Sloping and Riprap/Armoring ❑ Bank Stabilization - Gabion Baskets / Retaining Wall ❑ Culvert Installation Culvert Diameter: ❑ Temporary Impacts for required dewatering activities ❑ Other (describe): _ 1 c. Comments: Owner/Agent's Printed Name Date Owner/Agent's Signature (Agent's signature is valid only if an authorization letter from the owner is provided.)