Loading...
HomeMy WebLinkAbout20200495 Ver 1_More Info Received_20200513Strickland, Bev From: MARINE CONSTRUCTION OF HI <marinecon1 @embargmail.com> Sent: Wednesday, May 13, 2020 2:00 PM To: Perez, Douglas J Subject: [External] Re: 379 Yacht Rd. Attachments: Paul Schwartzott Buffer Formjpg External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Hello Doug here is the filled out form attached. Thank you From: "Perez, Douglas J" <doug.perez@ncdenr.gov> To: "marineconl" <marineconl@embargmail.com> Sent: Monday, May 11, 2020 11:11:00 AM Subject: 379 Yacht Rd. Hello Mr. Schwartzott, I am emailing you today about your shoreline stabilization project application. It all looks in order, however there is one form that I will need you to fill out, sign, and email back to me. It is the Catawba Notification Form which lets us know you acknowledge the Catawba Riparian Buffer Rules. If you could get that back to me, I can continue on with your application. I've attached the form here. Thanks in advance. Sincerely, 1 Doug Perez DWR DiviAlon of Water Resources Doug Perez — Environmental Specialist NC Dept. of Environment & Natural Resources (NCDENR) Division of Water Resources - Water Quality Regional Operations 610 East Center Ave., Suite 301, Mooresville, NC 28115 Phone: (704) 235-2162 Fax: (704) 663-6040 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. Tony Gaines Marine Construction Company 1173 Shiloh Church Rd. Hickory, N.C. 28601 (828) 495-3040 (828) 312-8202 marineconl@embarqmail.com z CATAWBA RIPARIAN BUFFER NOTIFICATION FORM Project Name/address Owner: rau I _)(,L ,�4 -4 Print Contractor/agent: C1wye, Print �A(-kt R19 MLWe,Svr'fl Sign �V Aounty: Signature The approval is for the purpose and design described in your application. Impacts not indicated in the application is a violation of the Buffer Rule. Site specific work should be provided in the application. [15A NCAC 02H .0506 and 15A NCAC 02B .0243(8)] Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation), unless approved. Exception, those trees that are severely undermined along the immediate shoreline can be removed. Minimal shaping and sloping along the immediate shoreline is allowed. [15A NCAC 02B .0243(6)] Benching and grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 02B .0243 (6)] Beaches, impervious patios, impervious walkways, etc. are not allowed in the buffer unless specifically approved by the Division. There are limitation on size for decks. [15A NCAC 02B .0243(4) and (6)] Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction material must be outside the buffer. [15A NCAC 02H .0502 and 15A NCAC 026 .0243 (4), (6), (8)] Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or sheet flow at non -erosive velocities to the lake. [15A NCAC 02B .0243(5), (6)] -% Acknowledgement of Notification I, PC.4 , hereby state that I have been informed of the Catawba Riparian Buffer Rule. Any work conducted in the buffer, not specifically stated in the application and approved by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be taken such that the construction will be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plan(s) and specification(s), and other supporting materials. / Signature (owner): te: �!