Loading...
HomeMy WebLinkAboutNC0024945_Pretreatment_Annual_Report_2019updates_20200513 (2)Chapter 9, PAR Guidance Pretreatment Performance Summary (PPS) 1. 2. Pretreatment Town Name: Charlotte Water "Primary" N PD ES Number N C00 24945 or N on_D i scharge Permi t# if appl i cabl a => 3. PAR begin Date, please enter 01 /01 /yy 3. => 4. PAR end D ate, pl ease enter 12/31 /yy 4. => 5. Total number of SI Us, i ncl udes Cl Us 5. => 6. Number of Cl Us 6. => 7. Number of SlUswith no lUP, or with an expired lUP 7.=> 8. Number of SI Us not i nspected by POTW 8. => 9. Number of SI Us not sampled by POTW 9. => 10. Number of SI Us in SNC dueto I UP Limit violations 10. => 11. N umber of SI U s i n SN C due to Reporti ng A of ati ons 11. => 12. Number of SIUs in SNC dueto violation of a compliance schedule, CO, AO or similar 12. => 13. Number ofClUsinSNC 13.=> 14. Number of SI Us included in public notice 14. => 15 Total number of SI Us on a compliance schedule, CO, AO or si mi I ar 15. => 16. N umber of N OV s, N N Cs or si mi I ar assesed to SI U s 16. => 17. Number of Civil Penalties assessed to SI Us 17. => 18. Number of Criminal Penalties assessed to SI Us 18. => 19. Total Amount of Civil Penalties Collected 19. => $ 20. Number of SlUsfrom which penal ti es col I ected 20. => AO Administrative Order I U P Industrial User Pretreatment Permit CIU Categorical Industrial User NNC Noticeof Non -Compliance CO Consent Order NOV Noticeof Violation IU Industrial User PAR Pretreatment Annual Report mimiia 12/31/19 tiQ t!i1].'Y�LT�I M POTW Publidy Owned Treatment Works SIU Significant Industrial User SNC Significant Non -Compliance revised 1/2018: PAR PPS 2018 Pretreatment Annual Report (PAR) Significant Non -Compliance Report (SNCR) WWTP = Wastewater Treatment Plant, use separate form for each WWTP. SIU = Significant Industrial User SNC = Significant Non -Compliance Control Authority, Town Name => Charlotte Water WWTP Name => Sugar Creek NPDES # => NCO024937 Par begin date >= 1/1/2019 Par end date => 12/31/2019 A SNCR Form must be submitted with every PAR, please write "None" if you had No SIUs in SNC during calendar year UP # Pipe # Industry Name Parameter or "Reporting" SNC ? (Yes/No) for each 6-month period. Jan. -June July - Dec. 5012 001 Haz—Mat Environmental Services, LLC Compliance Order No Yes 5012 001 Haz—Mat Environmental Services, LLC Manipulation Yes No Pretreatment Annual Report (PAR) Significant Non -Compliance Report (SNCR) WWTP = Wastewater Treatment Plant, use separate form for each WWTP. SIU = Significant Industrial User SNC = Significant Non -Compliance Control Authority, Town Name => Charlotte Water WWTP Name => Irwin Creek NPDES # _> NC0024945 Par begin date >= 1/1/2019 Par end date => 12/31/2019 A SNCR Form must be submitted with every PAR, please write "None" if you had No SIUs in SNC during calendar year IUP # Pipe # Industry Name Parameter or "Reporting" SNC ? (Yes/No) for each 6-month period. Jan. -June July - Dec. 0060 001 Aramark Uniform and Career Apparel >33% TRC for Lead No Yes 0060 001 Aramark Uniform and Career Apparel >33% TRC for Zinc No Yes 1003 001 Carolina Foods, Inc. Slug Loading for Oil & Grease Yes No 1020 001/002 AERC Acquisition Corp. d/b/a DART, a Clean Earth Co. Cease and Desist Yes No 1020 001/002 AERC Acquisition Corp. d/b/a DART, a Clean Earth Co. Compliance Order Yes Yes 1020 002 AERC Acquisition Corp. d/b/a DART, a Clean Earth Co. Slug Loading for TTO Yes No 1020 002 AERC Acquisition Corp. d/b/a DART, a Clean Earth Co. Slug Loading for p-cresol Yes No 1020 002 AERC Acquisition Corp. d/b/a DART, a Clean Earth Co. >33% TRC for p-cresol Yes No Pretreatment Annual Report (PAR) Significant Non -Compliance Report (SNCR) WWTP = Wastewater Treatment Plant, use separate form for each WWTP. SIU = Significant Industrial User SNC = Significant Non -Compliance Control Authority, Town Name => Charlotte Water WWTP Name => McAlpine Creek NPDES # => NCO024970 Par begin date >= 1/1/2019 Par end date => 12/31/2019 A SNCR Form must be submitted with every PAR, please write "None" if you had No SIUs in SNC during calendar year UP # Pipe # Industry Name Parameter or "Reporting" SNC ? (Yes/No) for each 6-month period. Jan. -June July - Dec. 3028 001 Bakkavor Foods USA, Inc. Compliance Agreement Yes Yes Pretreatment Annual Report (PAR) Significant Non -Compliance Report (SNCR) WWTP = Wastewater Treatment Plant, use separate form for each WWTP. SIU = Significant Industrial User SNC = Significant Non -Compliance Control Authority, Town Name => Charlotte Water WWTP Name => Mallard Creek NPDES # => NCO030210 Par begin date >= 1/1/2019 Par end date => 12/31/2019 A SNCR Form must be submitted with every PAR, please write "None" if you had No SIUs in SNC during calendar year UP # Pipe # Industry Name Parameter or "Reporting" SNC ? (Yes/No) for each 6-month period. Jan. -June July - Dec. 2000 001 Mallard Creek Polymers Incorporated >33%TRC for Ammonia Yes No Pretreatment Annual Report (PAR) Significant Non -Compliance Report (SNCR) WWTP = Wastewater Treatment Plant, use separate form for each WWTP. SIU = Significant Industrial User SNC = Significant Non -Compliance Control Authority, Town Name => Charlotte Water WWTP Name => McDowell Creek NPDES # => NCO036277 Par begin date >= 1/1/2019 Par end date => 12/31/2019 A SNCR Form must be submitted with every PAR, please write "None" if you had No SIUs in SNC during calendar year UP # Pipe # Industry Name Parameter or "Reporting" SNC ? (Yes/No) for each 6-month period. Jan. -June July - Dec. None 2019 1020 AERC Acquisition Corporation d/b/a DART, A Clean Earth Company Pipe 001 The SIU was in SNC for the January to June 2019 reporting period. The Control Authority did not monitor during the first 6-month compliance period due to the SIU being placed under a Cease and Desist Order on 02/25/2019 which lasted until 04/24/2019. As of 02/25/2019, the permittee has hauled off all metals bearing waste and has not discharged wastewater through Pipe 001. The Permittee completed one self -monitoring event from 02/19/2019 to 02/22/2019; there was no flow during the month of January 2019 at Pipe 001. The SIU was in SNC for the July to December 2019 reporting period. Pipe 002 The SIU was in SNC for the January to June 2019 reporting period. AERC Acquisition Corporation d/b/a DART was issued an NOV with the designation of SNC on 02/05/2019. The SIU exceeded the 33% TRC threshold for the parameter of TTO during the July to December 2018 Compliance Judgement Period. Out of 12 Compliance Judgement Points (CJPs) for TTO, 6 were TRC violations, which is 50%. A civil penalty of $500.00 was assessed and payment was received on 02/15/2019. Due to ongoing enforcement and appeals, the SIU was not published for 2018 violations. Following the Settlement Agreement signed 03/28/2020, the SIU was published in 2020 in an addendum to the 2018 Public Notice and updated in the corresponding 2018 SNC Report addendum. Three days of cBOD data were rejected during the Control Authority's first quarter monitoring event due to values being reported as greater than results. The permittee did not discharge or perform self -monitoring from March through May. The permittee began single -day batch discharges as of 06/26/2019 with a 24-hour notification prior to discharge to the Control Authority. One day of composites and two days of grabs were collected by the Control Authority during the second quarter. Self -monitoring was conducted on all discharges through the end of 2019 per terms of a Compliance Order. The SIU was issued a Cease and Desist Order on 02/25/2019 due to elevated pollutant discharges that included p-cresol, TTO, cBOD and COD. These elevated discharges adversely impacted the Irwin Creek WWTP from April of 2018 until January of 2019, including contributing to a violation of the Irwin Creek WWTP NPDES permit for weekly average cBOD in April 2018. On 02/26/2019 the SIU filed a written appeal of the Cease and Desist Order. As part of the appeal process, an Informal Review was held with the SIU on 03/21/2019. A Corrective Action Plan was submitted by the Permittee on 03/29/2019 as a result of the Informal Review. An additional meeting was held on 04/24/2019 to address the status of the Cease and Desist Order. At this time the Cease and Desist Order was rescinded, and the Permittee was issued a Compliance Order (CO). The SIU commenced discharging wastewater on 06/26/2019 in batch discharges. The Permittee has opted to only discharge categorical wastewater from Pipe 002 at this time which is regulated under 40 CFR 437, subcategory D (oily and organic). As required by the CO, all batch discharges require a minimum of a 24-hour notification to the assigned Compliance Specialist before discharge can commence and monitoring of all effluent by a third -party laboratory is required. The CO was issued and became effective on 04/24/2019 and was set to expire 12/31/2019. The Activity deadlines (Activities 4-8) within the CO were extended at the request of the Permittee on 06/21/2019; the expiration date is now set as 06/30/2020. The deadline extensions were granted based on a timeline provided by the SIU's 3rd party consultants to properly complete the tasks within the CO. Notification that CEHI Acquisition Corp (Indirect stock owner of Clean Earth Inc. and its operating subsidiaries, including AERC Acquisition Corporation, d/b/a DART, a Clean Earth Company) was being sold to Calrissian Holdings, LLC on 06/28/2019 was received by CLTWater on 07/09/2019. Calrissian Holdings, LLC is a wholly owned subsidiary of Harsco Corporation (HSC). The SIU was in SNC for the July to December 2019 reporting period. AERC Acquisition Corporation d/b/a DART was issued an NOV with the designation of SNC on 08/27/2019, which was amended as part of a Settlement Agreement on 04/03/2020. The SIU was found to be in violation for failing to ensure that self -monitoring and sampling was representative of prevailing conditions during the period of April 2018 to November 2018. A civil penalty of $25,000.00 was assessed. Due to ongoing enforcement and appeals, the SIU was not published in 2019 for 2018 violations. Following the Settlement Agreement signed 03/28/2020, the SIU paid the total sum of $25,000.00 and was published in 2020 in an addendum to the 2018 Public Notice and updated in the corresponding 2018 SNC Report addendum. The SIU was also issued an NOV with the designation of SNC on 08/27/2019 for multiple slug discharges which occurred during the second week of December 2018. The SIU discharged slugs of p-cresol at 1.9 mg/I (9.3 times the permitted limit of 0.205 mg/1) and TTO at 29.8602 mg/I (7.47 times the permitted limit of 4.0 mg/1) on 12/12/2018. The SIU also discharged slugs of p-cresol at 2.9 mg/I (14.1 times the permitted limit of 0.205 mg/1), TTO at 29.8542 mg/I (7.46 times the permitted limit of 4.0 mg/1) and cBOD at 24,000 mg/I (4,453.62 Ibs/day, which was 31.9% of the remaining available MAIL at Irwin Creek) on 12/14/2018. A civil penalty of $25,000.00 was assessed. Due to ongoing enforcement and appeals, the SIU was not published in 2019 for 2018 violations. Following the Settlement Agreement signed 03/28/2020, the SIU paid the total sum of $25,000.00 and was published in 2020 in an addendum to the 2018 Public Notice and updated in the corresponding 2018 SNC Report addendum. The SIU was also issued an NOV with the designation of SNC on 08/27/2019 for multiple slug discharges which occurred during the third week of December 2018. The SIU discharged slugs of p-cresol at 2.4 mg/I (11.7 times the permitted limit of 0.205 mg/1) and TTO at 32.3397 mg/I (8.08 times the permitted limit of 4.0 mg/1) on 12/18/2018. The SIU discharged slugs of p-cresol at 1.4 mg/I (6.8 times the permitted limit of 0.205 mg/1) and TTO at 29.7915 mg/I (7.45 times the permitted limit of 4.0 mg/1) on 12/19/2018. The SIU discharged slugs of p-cresol at 1.85 mg/I (9.02 times the permitted limit of 0.205 mg/1) and TTO at 43.531 mg/I (10.88 times the permitted limit of 4.0 mg/1) and cBOD at 47,000 mg/I (6,271.68 Ibs/day, which was 44.0% of the remaining MAIL at Irwin Creek) on 12/20/2018. The SIU discharged slugs of p-cresol at 0.48 mg/I (2.3 times the permitted limit of 0.205 mg/1) and TTO at 21.0248 mg/I (5.25 times the permitted limit of 4.0 mg/1) and cBOD at 12,000 mg/I (1,841.72 Ibs/day, which was 12.9% of the remaining MAIL at Irwin Creek) on 12/21/2018. A civil penalty of $25,000.00 was assessed to the SIU. Due to ongoing enforcement and appeals, the SIU was not published for 2018 violations. Following the Settlement Agreement signed 03/28/2020, the SIU paid the total sum of $25,000.00 and was published in 2020 in an addendum to the 2018 Public Notice and updated in the corresponding 2018 SNC Report addendum. AERC Acquisition Corporation d/b/a DART was issued an NOV with the designation of SNC on 08/27/2019 for multiple slug discharges which occurred in January 2019. The SIU discharged slugs of p-cresol at 0.97 mg/I (4.73 times the permitted limit of 0.205 mg/1) and TTO at 77.507 mg/I (19.38 times the permitted limit of 4.0 mg/1) on 01/15/2019. The SIU discharged a slug of p-cresol at 1.1 mg/I (5.36 times the permitted limit of 0.205 mg/1) on 01/16/2019. The SIU discharged a slug of p-cresol at 2.0 mg/I (9.76 times the permitted limit of 0.205 mg/1) on 01/17/2019. The SIU discharged a slug of p-cresol at 1.9 mg/I (9.27 times the permitted limit of 0.205 mg/1) on 01/18/2019. A civil penalty of $25,000.00 was assessed. Following the Settlement Agreement signed 03/28/2020, the SIU paid the total sum of $25,000.00 and was published in 2020 AERC Acquisition Corporation d/b/a DART was issued an NOV with the designation of SNC on 08/27/2019. The SIU exceeded the 33% TRC threshold for the parameter of p-cresol during the January to June 2019 Compliance Judgement Period (out of 10 CJPs for p-cresol, 4 were TRC violations, which is 40%). A civil penalty of $500.00 was assessed. Following the Settlement Agreement signed 03/28/2020, the SIU paid the total sum of $500.00 and was published in 2020. AERC Acquisition Corporation d/b/a DART was issued a Cost Recovery Letter on 08/27/2019 for the time frame of April 2018 to January 2019. The Cost Recovery included unpaid COD surcharges, System Protection staff time, investigation laboratory analysis for both in-house and subcontracted analysis, and extra sampling and analysis performed by the Control Authority at the SIUs monitoring point. A Cost Recovery total of $181,299.53 was assessed. Following the Settlement Agreement signed 03/28/2020, the SIU paid the total sum of $181,299.53 in connection with the Assessment of Cost Recovery and was published in 2020. On 09/23/2019 the Control Authority granted a 1-month extension to the Compliance Order due to the unexpected death of the lead investigator and Principal of the consulting firm hired by the SIU to help them return to compliance. At the request of the 3rd party consultants, a 1-month extension of the CO was requested to complete the Principal review and certification of the project. The SIU filed a written appeal to each of the NOVs and civil penalties, including the cost recovery assessment issued by CLTWater on 08/27/2019. The appeal was dated 09/27/2019 and was received by CLTWater on 09/30/2019. The SIU requested an Informal Review to discuss the findings and circumstances connected to the NOVs and cost recovery On 10/31/2019 the SIU delivered a request for an ATC and a modification to the deadlines for Activities 7-8 of the CO as part of the proposal developed by their 3rd party consultants. The ATC request included removal of Pipe 001 and discharge of only organic/oily waste, the addition of new carbon filters for polishing treated wastewater, and the addition of new effluent holding tanks to allow for analytical testing of treated wastewater to confirm permit compliance prior to discharge. On 12/16/2019 the Control Authority granted the modification to the deadlines for Activities 7-8 of the CO and delivered it on 12/18/2019. On 11/12/2019 the Control Authority held an Informal Review at the request of the SIU in response to the NOVs issued on 08/27/2019. On 12/05/2019 the SIU delivered a follow-up response to the Informal Review, outlining the SIU's arguments against the NOVs issued and the Control Authority's enforcement actions. The SIU's response disputed the use of the term "Manipulation," the portions of the cost recovery assessment related to Control Authority staff time and laboratory analysis expenses, the civil penalties assessed, and objected to the use of the name "AERC Acquisition Corporation d/b/a DART, A Clean Earth Company" on the NOVs. On 03/28/2020 the Control Authority and the SIU entered into a Settlement Agreement. The SIU paid the total sum of $100,500.00 in connection with the NOVs and the sum of $181,299.53 in connection with the Assessment of Cost Recovery and was published in 2020. The Control Authority withdrew the allegation of manipulation of sampling, monitoring and reporting requirements and replaced it with the allegation that "AERC failed to ensure that self - monitoring and sampling was representative of prevailing conditions". The Control Authority agreed to classify the alleged inaccuracies in sampling monitoring and reporting requirements as "Failed to perform the required self - monitoring or a significant portion thereof" in all public notices. The annual inspection was conducted on 07/08/2019. The SIU will be published. SIU PENALTIES Industry NOV/Penalty Fine Date Issued Date Received Date Paid Notes Express Container#3022 Exceeded 33% TRC threshold for Zinc $100.00 1/30/2019 2/4/2019 2/14/2019 Dart Exceeded 33% TRC threshold for TTO $500.00 2/5/2019 2/8/2019 2/19/2019 Arjobex Slug of TSS $150.00 2/19/2019 2/26/2019 3/11/2019 Charlotte Plating Slug of Zinc $100.00 4/16/2019 4/22/2019 5/13/2019 Carolina Foods Slug of Oil and Grease $500.00 6/3/2019 6/7/2019 6/21/2019 Prinston Pharmaceuticals #2111 Failure to submit Best Management Plan certification $100.00 6/10/2019 6/13/2019 7/1/2019 General permittee; fine not included in SIU total Arjobex Failure to monitor per requirements in permit $100.00 7/29/2019 8/5/2019 8/12/2019 Mallard Creek Polymers Slug of Ammonia $200.00 7/29/2019 8/5/2019 8/15/2019 Mallard Creek Polymers Exceeded 33% TRC threshold for Ammonia $200.00 8/13/2019 8/15/2019 8/29/2019 Aplix Slug of Ammonia $100.00 8/14/2019 8/16/2019 8/16/2019 Aramark Slug of Lead $300.00 8/14/2019 8/16/2019 8/27/2019 Dart Non -representative self monitoring $25,000.00 8/27/2019 8/30/2019 4/10/2020 Dart Slug of p-cresol, TTO and cBOD (Dec 1) $25,000.00 8/27/2019 8/30/2019 4/10/2020 Dart Slug of p-cresol, TTO and cBOD (Dec 2) $25,000.00 8/27/2019 8/30/2019 4/10/2020 Dart Slug of p-cresol and TTO (Jan 1) $25,000.00 8/27/2019 8/30/2019 4/10/2020 Dart Exceeded 33% TRC threshold for p-cresol $500.00 8/27/2019 8/30/2019 4/10/2020 Alsco#3024 Slug of CBOD $100.00 9/11/2019 9/17/2019 9/24/2019 Aramark Slug of Lead and Zinc $800.00 12/2/2019 12/2/2019 12/13/2019 SIU PENALTIES THAT WERE ADDED TO THE BILL AND PAID DOWNTOWN Industry NOV/Penalty Fine Date Issued Date Received Date added to Bill Siemens Exceeded 33% TRC threshold for Copper $100.00 1/3/2019 1/4/2019 1/7/2019 NCG-ERC Slug of Arsenic $600.00 1/23/2019 1/25/2019 2/19/2019 Southeastern Metals Slug of Oil and Grease $100.00 1/24/2019 1/25/2019 2/14/2019 Bakkavor Exceeded 33% TRC threshold for Oil and Grease $100.00 1/29/2019 1/31/2019 1/31/2019 Southeastern Metals Slug of Oil and Grease $500.00 2/12/2019 2/14/2019 2/14/2019 Bakkavor Slug of Oil and Grease $100.00 3/12/2019 3/15/2019 3/19/2019 Haz-Mat Slug of CBOD $500.00 5/23/2019 5/23/2019 7/3/2019 Southeastern Metals Slug of Oil and Grease and Zinc $850.00 5/6/2019 5/7/2019 6/11/2019 Southeastern Metals Slug of Oil and Grease $700.00 6/7/2019 6/10/2019 6/11/2019 Brenntag Slug of Phosphorus $500.00 7/15/2019 7/17/2019 7/18/2019 INOLEX Failure to monitor per requirements in permit $100.00 8/2/2019 8/2/2019 8/6/2019 Bakkavor Failure to monitor per requirements in permit $100.00 8/14/2019 8/16/2019 8/19/2019 Southeastern Metals Slug of Oil and Grease $800.00 9/18/2019 9/19/2019 10/17/2019 Brenntag Slug of TSS $100.00 9/27/2019 9/30/2019 10/7/2019 Trimac Slug of Zinc $150.00 10/8/2019 10/17/2019 10/22/2019 Bakkavor Slug of Oil and Grease $100.00 10/24/2019 10/24/2019 11/6/2019 Brenntag Slug of Nickel $500.00 11/5/2019 11/5/2019 11/6/2019 Barnhardt Failure to monitor per requirements in permit $200.00 12/11/2019 12/17/2019 12/20/2019 Haz-Mat Manipulation of sampling, monitoring & reporting requirements $25,000.00 8/27/2019 8/30/2019 2/10/2020 SIU COST RECOVERY Industry Work Description Fine Date Issued Date Received Date added to Bill Notes Bakkavor CCTV Inspection/Sewer Line Cleaning $2,682.51 4/18/2019 4/24/2019 4/24/2019 Dart Assessment of Cost Recovery $181,299.53 8/27/2019 8/30/2019 Paid by check 4-10-2020 Settled Haz-Mat Assessment of Cost Recovery#1 $27,946.16 8/27/2019 8/30/2019 Due 02/29/2020 Haz-Mat Assessment of Cost Recovery#2 $25,000.00 8/27/2019 8/30/2019 Due 03/31/2020 Bakkavor CCTV Inspection $283.49 11/1/2019 11/5/2019 11/6/2019 WAITING ON SETTLEMENT Fine Date Issued Date Received Date added to Bill Notes Tarheel Paving Company Illegal Dumping Civil Penalty $30,499.98 6/22/2015 6/22/2015 8/29/2016 Full balance has not been paid on bill, $0.00 paid 2019 FOG PENALTIES Company NOV/Penalty Fine Date Issued Date Received Date Paid Notes S&D Environmental Resources Failure to follow grease handling procedures and falsification of records $24,985.00 2/2/2018 2/9/2018 Appeal complete. Fine upheld. The Locker Room (4809 South Tryon St) Failure to maintain grease trap / interceptor at frequency that ensures efficient operation $1,000.00 6/12/2018 Closed after owner passed away. Machu Picchu (315 S Polk St) Failure to maintain grease trap / interceptor at frequency that ensures efficient operation $800.00 1/25/2019 1/28/2019 3/6/2019 Harris Teeter #340 (9759 Sam Furr Rd) Failure to follow grease handling procedures/ FOG policies. Maintenance records not available. $650.00 4/16/2019 4/17/2019 6/21/2019 FOG PENALTIES THAT WERE ADDED TO THE BILL AND PAID DOWNTOWN Company NOV/Penalty Fine Date Issued Date Received Date added to Bill Novant Health (325 Hawthorne Ln) Contributing to the interference of the POTW with damage or adverse impact $2,000.00 4/4/2019 4/8/2019 4/11/2019 Tutor Time If 3526 Ervin Rd) Failure to install an approved grease trap or interceptor $700.00 6/7/2019 6/11/2019 7/18/2019 Ms. Chops Academy#2 (5950 The Plaza) Failure to install an approved grease trap or interceptor $500.00 7/2/2019 7/3/2019 8/6/2019 SEPTAGE PENALTIES Company NOV/Penalty Fine Date Issued Date Received Date Paid Notes Eagle Septic Jammed object in tank resulting in spilled waste $500.00 1/4/2019 1/9/2019 1/25/2019 Carolina Container Services Improper handline and / or spillage of pump and haul waste $850.00 10/1/2019 10/3/2019 10/14/2019 Total Civil Penaties collected from SIUs in 2019 $9,250.00 Total Civil Penaties collected from non-SIUs in 2019 $6,100.00 Total Civil Penalties paid in 2019 $15,350.00 Total of Cost Recovery payments received in 2019 $2,966.00 APRIL 24, 2020 Il#ectc(enburg County Anthony � Sylvan Pools Corp., commercial construction at 11829 Bridgeview Ln., (pool), $700300. Balfour Beatty Construction LLC, commercial alteration at 10650 Park Rd. #310, Pineville Medical Plaza (3D), $243,308. Ba@four Beatty Construction LLC, commercial alteration at 10650 Park Rd. #330, Pineville Medical Plaza (3B), $103,501. Balfour Beatty Construction LLC, commercial alteration at 10650 Park Rd. #220, Pineville Medical Plaza (ZC clinical), $213,384. Balfour Beatty Construction LLC, commercial alteration at 10650 Part( Rd. #220, Pineville Medical Plaza (2C), $320,076. Balfour Beatty Construction LLC, commercial alteration at 10650 Park Rd. #330, Pineville Medicat Plaza (3C), $517,510. Balfour Beatty Construction LLC, commercial alteration at 10650 Park Rd. #480, Pineville Medical Plaza (4C), $1,275,946. Balfour Beatty Construction LLC, commercial alteration at 10650 Park Rd. #420, Pineville Medical Plaza (4B), $53,844. Balfour Beatty Construction LLC, commercial alteration at 10650 Part< Rd. #330, Pineville Medical Plaza (3A), $621,011. Balfour Beatty Construction LLC, commercial alteration at 10650 Part< Rd., Pineville Medical Plaza, $1,137,532. Balfour Beatty Construction LLC, commercial alteration at 10650 Part( Rd. #330, Pineville Medical Plaza (derm/endo),$828,015. Balfour Beatty Construction LLC, commercial alteration at 10650 Park Rd. #310, Pineville Medical Plaza (3F), $91,240. Balfour Beatty Construction LLC, commercial alteration at 10650 Park Rd. #310, Pineville Medical Plaza (3E), $273,722. Barnhill Contracting Co., commercial alteration at 4701 Hedgemore Dr., Hedgemore Plaza, $285,474. Barringer Construction Co., commercial addition/ alteration at 1217 The Plaza, Giddy Goat Coffee Roasters, $901,000, 242 sf. Barringer Construction Co., commercial alteration at 150 N. College St., (urinal replacements), $85,000. BH Charlotte LLC, commercial construction at 7217 Country View Ct., (pool), $60,000, 50 sf. Bimini Builders LLC, commercial addition/ alteration at 5960 Sardis Rd., PDS Batting Cage, $160,651. Blue Waters Construction Inc., commercial construction at 970 Ben Black Rd., (poop, $74,200. Carolina Premier Homes Inc., commercial alteration at 18825 W. Catawba Ave. #200, SMCOMM EPS- Northstate Development (office), $94,641. Casey Boucher, commercial alteration at 115 E. Park Ave. #307, (reroof), $150,000. Casey Boucher, commercial alteration at 6530 Point Comfort Ln., (roofs/sidings/ gutters), $110,000. CDR Grading Inc./ Bella Pools, commercial construction at 11679 James Richard Dr., (pool), $69,000, 400 sf. CDR Grading Inc./ Bella Pools, commercial construction at 3935 Barclay Downs Dr., (pool), $122,000, 691 sf. Chad Goodin Signaure Homes, commercial construction at 2603 Fort St., (pool), $61,000. Colony Builders inc., commercial alteration at 1300 South Blvd. #101A, Allure Dentistry, $360,000. Dimensions General Contractors, commercial alteration at 309 S. Sharon Amity Rd. #310, SMCOMM EPS-Wellness Counseling Center,$100,100. Dimensions General Contractors, commercial alteration at 2815 Coliseum Centre Dr. #530, DSV, $116, 000. OLT Contracting, commercial alteration at 123 E. 5th St. #4000 5th Street C (bar), $485,000. Edifice Inc., commercial building at 11836 Patterson Rd., KTP Huntersville, $60,000. Edison Foard Inc., commercial construction at 5501 Josh Birmingham PI<wy., (entry monument/ secondary signs), $266,000. Fairwood Construction LLC, commercial alteration at 2023 John Crosland Jr. Dr., (repairs), $127,388. Frontier BuRding Corp., commercial building at 6233 Albemarle Rd., 7-Eleven #35543, $1,075,000, 3,043 sf. GE Construction, commercial alteration at 5125 South Blvd. #A, Ombre Nail Bar, $160,000. Gilbane Bldg Co., commercial addition/ alteration at 650 S. Tryon St., $252,000. GHbane Building Co., commercial addition/ alteration at 620 S. Tryon St., Legacy Union Connector, $308,200. Handling Services Inc., commercial alteration at 14201 Meacham Farm Dr., Crane Runway,$78,200. Harker LLC, commercial aIteration at 1300 S. Mint St. #410,$107,500. Harker LLC, commercial alteration at 227 W. Trade St. #330, Hines Property Management, $80,000. Harker LLC, commercial alteration at 440 S. Church St. #500, Driven Brands Renovation, $100,900, Harker LLC, commercial aIteration at 525 N. Tryon St. #7000 JMD, $142,800. Hondros & Assoc. - SC, commercial addition at 1100 Continental Blvd., Tropical Foods, $3,000,000. Horne Brothers Construction Inc., commercial construction at 130 N. Tryon St., RNC Blumenthal (antennas), $132,199. Hubert Whitlock Builders Inc., commercial alteration at 2633 Richardson Dr. #8C, $84,300. Hudson Co. of Tennessee, commercial alteration at 7735 N. Tryon St., McDonald's, $100,000. James R. Vannoy & Sons, commercial alteration at 201 S. College St. #2200, Randstad,$921,400. James R. Vannoy & Sons, commercial alteration at 10330 David Taylor Dr., United Rentals - Charlotte, $273,295. James R. Vannoy & Sons, commercial alteration at 125 Queens Rd., (levels 4/5), $287,400. JD Goodrum Inc., commercial alteration at 1213 W. Morehead St., (refinery/4th fI. corridor), $71,000. JD Goodrum Inc., commerciat alteration at 1213 W. Morehead St. #400, Pinnacle Bank, $592,000. Jeffrey B. Davies 11, commercial alteration at 605 Jetton St. #B, Davidson Coffee Shop, $66,700, JF Construction, commercial building at 1260 Center Park Dr., Hernandez Steel (office bldg.), $169,800, 2,496 sf. JL Thompson Construction, commercial construction at 11936 N. Community House Rd., Endhaven (pool/spa), $108,000, Landmark Builders Inc., commercial alteration at 4348 Statesville Rd., Landmark Builders, $530,000. LC Tyson Construction Co. Inc., commercial alteration at 4710 Bette -Oaks Dr. #104, $511,646. Lombardo Swimming Pool Co., commercial construction at 6619 Gardner Ln., (pool), $72,500, Marts A. Coyle, commercial aIteration at 3540 N. Sharon Amity Rd. #2, $112,520, Mark A. Coyle, commercial alteration at 3540 N. Sharon Amity Rd. #3, $112,520. Maxco Construction LLC, commercial alteration at 8000 Tower Point Dr., Quality Automotive (office), $90,100. Mcgee Corp., commercial building at 6233 Albemarle Rd., 7-Eleven #35543 (canopy), $249,283, 30043 sf. fulyers & Chapman Inc., commercial addition/ aIteration at 16639 Birkdale Commons Plavy., $365,614. New Dimensions Outdoor Service, commercial construction at 2710 Chick Godley Rd., Kaleido Noda (retaining wall), $236,000. Osterhus Outdoors LLC, commercial construction at 12900 Westmoreland Rd., (pool), $84,796. Packard Atlantic inc., commercial alteration at I1020 David Taylor Dr. #100, Unique Logistics, $59,000. Party Reflections Inc., commercial construction at 1001 Blythe Blvd., Atrium Health, $75,000, 2,460 sf. Petroleum Equipment & Service, commercial construction at 420 Inwood Dr., Fire Station 12 (abovegroundfuel system), $103,800, 200 sf. Ratzlaff Construction Co. LLC, commercial alteration at 12435 Old Statesville Rd., LNCS (administration office), $160,000. Cl Demolition Inc., commercial demolition at 3144 Freedom Dr., Freedom - Shopping Center (total demo), $69,800. Rodgers Builders Inc., commercial alteration at 800 W. Trade St., (innovation tab), $661916. Rodgers Builders Inc., commercial addition/ alteration at 13146 Ballantyne Corporate Place, Northwood (office tower), $250,000. San Juan Fiberglass Pools, commercial construction at 11905 Abernathy Rd., (pool), $53,000. San Juan Fiberglass Pools, commercial construction at 2818 Walker Rd., (pool), $52,300. San Juan Fiberglass Pools, commercial construction at 11510 Darlington Ridge Ln., (pool), $54,700. Shelco LLC, commercial building at 100 W. Worthington Ave., (core/ shell), $66,009,300, 423,388 sf. Shelco LLC, commercial alteration at 214 N. Tryon St. #2320, Truist HQ (23rd ft.), 50,000. Shelco LLC, commercial alteration at 214 N. Tryon St. #Z100, Truist HQ(21stfL), $Z50D00. Spectrum Building Co. inc., commercial alteration at 2810 South Blvd. #A, Five Guys, $400,000. Spectrum Building Co. Inc., commerciat alteration at 5818 Highland Shoppes Dr. #C4, Pure Barre Highland Creek, $174,060. SS12 LLC, commercial alteration at 1525 W. WT liarris Blvd. #1B, Welts Fargo, $6, 214,100. Stocker Associates Inc., commercial alteration at 15720 Brixham Hitt Ave. #550, Forest2Market, $153, 000. Stocker Associates Inc,, commercial alteration at 1111 Metropolitan Ave. #Z50, BGE - Charlotte Metropolitan at Midtown, $4391000. Stocker Associates Inc,, commercial alteration at 11215 Rushmore Dr., Bae Rushmore, $152,000. The Greentech Group LLC, commercial addition/ alteration at 760 Village Main VSM Greenway, $61,000. The Whiting -Turner Contracting, commercial alteration at 3628 Yorkmont Rd. #B, Cargo 7 (field maintenance), $3,846,500. Titian Contractors Inc., commercialaddition/ alteration at 7930 Idlewild Dollar Tree, $238,563. Trustees of Davidson College, commercial alteration at 200 Baker Dr., Davidson College Balser Sports (ahu replacements), $1,010,250. Vertex Construction Co. LLC, commercial alteration at 13108 Eastfield Rd. #C, Food Lion 2243/Eastfield at Prosperity Village, $55,000. Victor! Construction LLC, commercial alteration at 1721 Kenilworth Ave., $521300. Winning Pools, commercial construction at 1810 Ferncliff Rd., (pool), $65,000. Zenith Building Group LLC, ommercial alteration at 2800 Zebuton Ave. #205, $601000. Zenith Building Group LLC, commercial alteration at 230 E. WT Harris Blvd. #A3, Fourth Ward Dentistry - University, $183,000. Zenith Building Group LLC, commercial alteration at 2800 Zebuton Ave. #207, $701000, Lehner Construction Co. of York Co., commercial building at 1075 RCCC Rd., (5-story training center), $1,163,212, 3,081 sf. Steve Christy, commercial building at 1940 Phaniel Church Rd., (truck repair IS $55,000, 3,000 sf. Vorlr County Evans General Contracting, commercial building at 2225 Williams Industrial Blvd., Legacy Park East (bldg. 1), $3,791,314, 128,699 sf. Theodore Allen, commercial alteration at 2542 India Hook Rd., $184,741, 1,965 sf. $Pk6L1 iff`n�rta(L,Y' lret'ell County Eastwood Construction Co. Inc., townhome at 114 Syndandra Dr. #A, $226,421, 2,587 sf. Eastwood Construction Co. Inc., townhome at 114 Syndandra Dr. #B, $160,915, 1,851 sf. Mecklenburg County DPS Construction Corp., townhomes addition/ alteration at 933/937/925 Plaza Walk Dr., Plaza Watl< Townhomes (each), $115,339, 1,131 sf. DPS Construction Corp., townhome at 929 Plaza Wall( Dc, Plaza Walk Townhomes, $116,939, 1,147 sf. Eastwood Construction, townhome at 5543 Harris Cove Dr., $196,833, 1,678 sf. Eastwood Construction, townhomes at 5535/5531/5539 Harris Cove Dr., (each), $195,882, 1,817 sf. Eastwood Construction, to at 5527 Harris Cove Dr., $213,880, 11957 sf. Fairview Builders LLC, to at 1700 Dunkirk Dr., $251,727, 2,269 sf. Fairview Builders I.I.C. townhome at 805 Spruce St., $290,773, 2,686 sf. HC Construction Services LLC, townhomes at 1751/1735 Cannon View Ln., (each), $162,9371 1,338 sf. HC Construction Services LLC, townhomes at 1743/1747/1739 Cannon View Ln., (each), $160,437, 1,311 sf. tfearhe & Co. Inc., duplex at 6416 Park S. Dr., $74,893, 749 sf. i<earas & Co. Inc., duplex at 6414 Park S. Dr., $214,331, 1,916 sf. NVR Inc. (East), townhomes at 8728/8724 Granby HiR Rd., (each), $224,678, 2,223 sf- NVR Inc, (North), town homes at10624/10632 Overtook Mountain Dc, (each), $165,135, 1,549 sf. NV Inc. (North), townhomesat10636/10628 Overlook Mountain Dr., (each), $196,832, 1,765 sf. NVR Inc. (North), townhome at 10620 Overlook Mountain Dr., $196,832, 1,765 sf. NVR inc. (North), townhomes at 119/123/127/ 131/135/139/ 115 Music Hall Way, Tremont Square (each), $223,082, 1,845 sf. R-Cubed CLT Builders LLC, duplexes at 1115 Greenleaf Ave. #A/B, City View Terraces (each), $205,000, 1,607 sf. R-Cubed IBuilders LLC, dupleresat1621/1619 N.Davidson St., City View Terraces (each), $280,000, 2,386 sf. R-Cubed CLT Builders LLC, duplexes at 1113 Greenleaf ve. 2,095 A#A/B, Greenleaf (each), $211,500, 1,885 sf. WeeP<ley Homes Inc., townhome at 2542 Barry St., Villa Heights, $231,929, sf. Week Homes Inc., townhome at 2540 Barry St., Villa Heights, $231,129, 2,095 sf. Weekley Homes inc., townhome at 307 Johnston Dr., $234,229, 21079 sf. Week Homes Inc., townhome at 311 Johnston Dr., $167,685, 1,502 sf. Weeldey Homes Inc., townhome at 315 Johnston Dr., $167,235, 1,498 sf. Week Homes Inc., townhome at 319 Johnston Dr., $232,329, 2,058 sf. Rowan Counffy PAID ADVERTISING Prespro LLC, duplexes at 213 N. Oak St. #A/B/211 N. Oak St. #215 N. Oak St. #A, $159,330, 1,410 sf. Prespro LLC, duplex at 2156 N. Oat( St., $159,330, 1,410 sf. DR I-8orton Inc., townhomes at 551/549/553 Altamonte Ct., (each), $233,000. Field Homes LLC, townhomes at 314/313/310/316/321/317 Embers Ln., (each), $233,000. Cabarrus County True Elomes LLC, singte- family residence at 8759 Robinson Church Rd., As required by 40 CFI3 403.8(f)(2)(viii) the City of Charlotte's Charlotte Vliater publishes annually the names of industrial users who are in Significant Rion -Compliance (SNC) of pretreatment standards and/or requirernents. The following is a list of users identified as in SNC for the reporting period of January 1, 2019 through December 31, 2019, B Aramark Lfnitorm and Career Apparel P.0). Box 668563 Charlotte, NC 28266-8563 D, N Fiaz-Mat Envirol�rnental Services, LLC P.O. Box 37392 Charlotte, NC 28237 B, AERC Acquisition A Mallard Creek Polymers, D, Corporation d/b/a DART, a Incorporated K, Clean Earth Company 2800 Morehead Road P 4132 Pompano Road Charlotte, NC 28262 Charlotte, NO 28216 K Carolina Foods, Inc. 1807 South Tryon Street Charlotte, NO 28203 LEGEND: A= iiIOLATED ONE OR MORE OF IMPOSED CONVENTIONAL POLLUTANT LIMITS 13= VIOLATED ONE OR MORE OF IMPOSED TOXIC POLLUTANT LIMITS WITHIN SPECIFIED DEADLINE I r'I DAYS AFTER THE D SEWER PRIVILEGES REVOKED J= VIOLATED GIVE OR MORE PERMIT CONDITIONS K= SLUG LOAD L= FAILED TO ACCURATELY REPORT NON-COMPLIANCE BY ALTERING INFORMATION CONTAINED ON THE PAPERWORK 12 C Search,.. - a x Development&Connec[io.. %[1I 2 DIMS: Adminirtration- Branding ,.. FSData E City of Charlotte Employe,.. City of Charlotte Employe... ki OnB— 18,0.0.37[Tert Sys,. ® 0 @In - Page, Safety, Tools �� w4;TER CHARLOTTE WATER ABOUT US - DEVELOPMENT & CONNECTIONS - RATES & BILLING - CUSTOMER CENTER - PROJECT5 - City of Charlotte > Charlotte Water n Development & Connections > industrial Waste Industrial Waste $Print ,Share Certain customers, often known as significant industrial users, must be permitted because of the large amounts of 2018 Pretreatment Annual Report Public Nofice wastewater they discharge each day or because of the potential their wastewater has for adversely affecting the Addendum treatment plant operation. 2019 Pretreatment Annual Report Public Notice Important Fors: Our wastewater treatment plants are designed to handle wastes from a typical household. Wastewater discharged from a factory, for example, may contain pollutants that could interfere with the operation of the treatment plant. Current Wastewater Discharge Permit Application Industrial and commercial users are required — in accordance with the permit — to control the quality of their Current Industrial Waste Charges discharge by installing appropriate treatment systemsthat will "pretreat" their wastewater prior to dischargingto Guidance for Completing Wastewater Discharge the sewer system. Permit Application Sample Permit Charlotte Water regulates with wastewater sampling and on site inspections of commercial and industrial facilities 05 Industrial Wastewater Discharge Survey — both permitted and non permitted. Farm 12 Periodic Self -Monitoring Report Industrial pretreatment also has a septage receivable program in place for septic tank waste, portable toilet waste, 12 Periodic Self -Monitoring Report Certification and special industrial discharges. Farm Industrial Waste Charges IN Field Measurement Record Form Chain of Custody Record Form Since wastewater from an industry or business costs more to treat — even after it has been pretreated at the plant — the business Dr industry must also incur the increased costs to the treatment plant This ensures that proper measures are in place at the treatment plant to adequatelytreat the higher strength wastewater and that the If vo u have questions a bout whether your As required by 40 CFR 403.8(f)(2)(viii) the City of Charlotte's Charlotte Water publishes annually the names of industrial users who are in Significant Non -Compliance (SNC) of pretreatment standards and/or requirements. The following is a list of users identified as in SNC for the reporting period of January 1, 2019 through December 31, 2019. B Aramark Uniform and Career Apparel P.O. Box 668563 Charlotte, NC 28266-8563 D, N Haz-Mat Environmental Services, LLC P.O. Box 37392 Charlotte, NC 28237 B, D, AERC Acquisition Corporation d/b/a A Mallard Creek Polymers, Incorporated K, P DART, a Clean Earth Company 2800 Morehead Road 4132 Pompano Road Charlotte, NC 28262 Charlotte, NC 28216 K Carolina Foods, Inc. 1807 South Tryon Street Charlotte, NC 28203 LEGEND: A= VIOLATED ONE OR MORE OF IMPOSED CONVENTIONAL POLLUTANT LIMITS B= VIOLATED ONE OR MORE OF IMPOSED TOXIC POLLUTANT LIMITS C= UNDER A COMPLIANCE AGREEMENT D= UNDER A COMPLIANCE ORDER E= FAILED TO PERFORM THE REQUIRED SELF -MONITORING OR A SIGNIFICANT PORTION THEREOF F= SIGNIFICANTLY FAILED TO MEET REPORTING REQUIREMENTS G= FAILED TO DELIVER REQUIRED INFORMATION WITHIN 45 DAYS AFTER THE DUE DATE H= FAILED TO COMPLETE AN ACTIVITY IN AN S.O.C. WITHIN 90 DAYS AFTER THE SPECIFIED DEADLINE 1= CONVICTED OF CRIMINAL VIOLATIONS OF THE CWA AND SEWER PRIVILEGES REVOKED J= VIOLATED ONE OR MORE PERMIT CONDITIONS K= SLUG LOAD L= FAILED TO ACCURATELY REPORT NON-COMPLIANCE BY ALTERING INFORMATION CONTAINED ON THE PAPERWORK M= PERMIT TERMINATED N= FALSIFYING INFORMATION; TAMPERING, DAMAGES AND/OR OTHERWISE RENDERING SAMPLE EQUIPMENT INACCURATE OR INOPERABLE O= VIOLATED ONE OR MORE PROHIBITED DISCHARGE STANDARDS P= UNDER A CEASE AND DESIST ORDER Q= ILLEGAL DISCHARGE