HomeMy WebLinkAboutWQ0041533_Application (FTSE)_20200306i A6 I State of North Carolina
Department of Environmental Quality
DWR Division of Water Resources
15A NCAC 02T.0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION
Division of Water Resources FTA 04-16 & SUPPORTING DOCUMENTATION
Application Number: 41q U D 9 15,3 3 (to be completed by DW R)
All items must be completed or the application will be returned
1. APPLICANT INFORMATION:
I. Applicant's name: Town of Saratoga (company, municipality, HOA, utility, etc.)
2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership
❑ Federal ❑ State/County ® Municipal
3. Signature authority's name: Charles Thomas Hawkins per 15A NCAC 02T .0106(b)
Title: Mayor
4. Applicant's mailing address: PO Box 206
City: Saratoga State: NC Zip: 27873-
5. Applicant's contact information:
Phone number: L) 238-3487 Email Address: saratoga(a saratoganc.org
II. PROJECT INFORMATION:
❑ Privately -Owned Public Utility
❑ Other
Project name: Saratoga -Wilson Sewer Connection Project - Varnell Street Lift Station and Force Main
2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project
If a modification, provide the existing permit number: WQ00 and issued date:
If new construction but part of a master plan, provide the existing permit number: WQ00_
3. County where project is located: Wilson
4. Approximate Coordinates (Decimal Degrees): Latitude: 35.654440:, Longitude:-77.795522
5. Parcel ID (if applicable):
(or Parcel ID to closest downstream sewer)
III. CONSULTANT INFORMATION:
i. Professional Engineer: Mike Tolson, PE License Number: 028911
Firm: Mack Gay Associates, PA
Mailing address: 1667 Thomas A Betts Pkw
City. Rocky Mount State: NC Zip: 27804-
Phone number: ) 446-3017 Email Address: mike@mackeayua.com
IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION:
1. Facility Name: Hominy Swamp Water Reclamation Facility Permit Number: NCO023906
Owner Name: Ci of Wilson
V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF):
I. Permit Number(s): WQ Downstream (Receiving) Sewer Size: inch
System Wide Collection System Permit Number(s) (if applicable): WQCS
Owner Name(s):
A
z
�flc In�l�l� l
Awch 6
FORM: FTA 04-16 Page I of
.41
VI. GENERAL REQUIREMENTS
1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached?
❑ Yes ❑No (ON/A
2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached?
❑ Yes ❑No ®NIA
3. If the Applicant is a Home/Property OwnersAssociation, has an Operational Agreement (FORM: HOA) been attached?
❑ Yes [:]No ®NIA
4. Origin of wastewater: (check all that apply):
® Residential Owned ❑ Retail (stores, centers, malls) ❑ Car Wash
® Residential Leased ❑ Retail with food preparation/service ❑ Hotel and/or Motels
❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool !Clubhouse
❑ Food and drink facilities ® Church ® Swimming Pool,'Filter Backwash
❑ Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment)
5. Nature of wastewater: 100 % Domestic/Commercial % Commercial
_ % Industrial (See 15A NCAC 02T .0103(20))
1 Is there a Pretreatment Program in effect? ❑ Yes ❑ No
6. Has a flow reduction been approved under 15A NCAC 02T .0114 ? ❑ Yes ® No
If yes, provide a copy or flow reduction approval letter
7. Summarize wastewater generated by project:
Establishment Type (see 02T.0I 14(f))
Daily Design Flow
No. of Units
Flow
gall
GPD
gall
GPD
gall
GPD
gall
GPD
gall
GPD
gall
GPD
Total
GPD
a See 15A NCAC 02T .01 14 b . d), (e l and e 2 for caveats to wastewater design flow rates (i.e., minimum flow per
dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas;
and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined
in G.S. 42A4).
b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01141 shall be
determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data.
S. Wastewater generated by project: 0 GPD (per 15A NCAC 02T .0I i 4)
D Do not include future flows or previously permitted allocations
If permitted flow is zero, indicate why:
❑ Pump Station or Gravity Sewer where now will be permitted in subsequent permits that connect to this line
❑ Flow has already been allocated in Permit Number:
® Rehabilitation or replacement of existing sewer with no new now expected
❑ Other (Explain):
FORM: FTA 04- l6 Page 2 of 5
VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers);
I. Summarize gravity sewer to be permitted:
Size (inches) Length (feet) Material
➢ Section 11 & (II of the MDC for Permitting of Gravity Sewers contains information related to design criteria
➢ Section III contains information related to minimum slopes for gravity sewer(s)
➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC
VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC(Pump Stations/Force Mains):
COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT
1. Pump station number or name: Varnell Street Lift Station
2. Approximate Coordinates (Decimal Degrees): Latitude: 35.654496= Longitude:-77.796165'
3. Design flow of the pump station:.057 millions gallons per day (firm capacity)
4. Operational point(s) of the pump(s): 180 gallons per minute at 44 feet total dynamic head (TDH)
5. Summarize the force main to be permitted (for this Pump Station).
Size (inches)
Length (feet)
Material
6
6,740
PVC
6
250
HDPE
°) O
6. Power reliability in accordance with 15A NCAC 02T .0305(h)(I ):
® Standby power source or pump with automatic activation and telemetry - I5A NCAC 02T .0305(h)(1)(B)_
➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day
➢ Must be permanent to facility
Or if the pump station has an average daily flow less than 15,000 gallons per day:
❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T
.0305(h)(1)(C)
or
❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C):
It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement)
and is compatible with the station.
➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage
capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided
in the case of a multiple station power outage.
FORM: FTA 04-16 Page 3 of 5
IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)):
1. Does the project comply with all separations found in 15A NCAC 02T .0305 &
Z 15A NCAC 02T.0305 contains minimum se arations that shall be orovided for sewers stems'
® Yes [—]No
Setback Parameter*
Separation Required
Stone sewers and other utilities not listed below vertical
24 inches
Water mains vertical -water over sewer including in benched trenches
18 inches
Water mains horizontal
10 feet
Reclaimed water lines vertical - reclaimed over sewer
18 inches
Reclaimed water lines horizontal - reclaimed over sewer
2 feet
"Any private or public water supply source, including any wells, WS-1 waters of CIass I or
Class lI impounded reservoirs used as a source of drinking water
100 feet
"Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal
high water or tide elevation and wetlands see item IX.2
50 feet
*'"Any other stream, lake, impoundment, or ground water lowering and surface drainage
ditches
10 feet
Any building foundation
5 feet
AnX basement
10 feet
Top slope of embankment or cuts of 2 feet or more vertical height
10 feet
Drainage systems and interceptor drains
5 feet
Any swimming pools
I0 feet
Final earth grade vertical
36 inches
15A NCAC_02T.0305(e) contains alternatives where separations in 02T.0305(o cannot be achieved.
z "Stream classifications can be identified using the Division's NC Surface Water Classifications web a e
D If noncompliance with 02T.0305(f) or (g), see Section X of this application
2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ® Yes ❑ No
See the Division's draft separation requirements For situations where separation cannot be meet
No variance is required if the alternative design criteria specified is utilized in design and construction
D As built documents should reference the location of areas effected
3. Does the project comply with all setbacks found in the river basin rules per 15A NCAC 02B .0200? ® Yes ❑ No
This would include Trout Buffered Streams per 15A NCAC 2B.0202
4. Does the project comply with an individual 404 Permit or any 401 Certifications? ® Yes ❑ No
D Wetland -related permits shall be requested, obtained, and adhered to for projects that impact wetlands or surface waters
Information can be obtained from the 401. &_ Buffer Permitting Branch
5. Does project comply with 15A NCAC 02T.0105(c)(6) (additional perrnits/certifications)?
® Yes [:]No
Per 15A NCAC 02T_.0I05(c)(6), directly related environmental permits or certification applications are being prepared, have
been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and
sedimentation control plans, stormwater management plans, etc.).
6. Does this project include any sewer collection lines that are deemed "high -priority?"
Per 15A NCAC 02T,0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer
positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer.
❑ Yes ® No
If yes, include an attachment with details for each line, including type (aerial line, size, material, and location)
High priority lines shall be inspected by the perm ittee or its representative at least once every six -months and inspections
documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit.
FORM: FTA 04-16 Page 4 of 5
X. CERTIFICATIONS:
I. Does the submitted system comply with 15A NCAC 02T, the Minimum_ _Design Criteria for the Permitting of Pump Stations
and Force Mains latest version and the Gravity Sewer Minimum Desi n Criteria latest version as applicable?
® Yes ❑ No
If No, complete and submit the Variance/Alternative Design Request application (VADC 10-I4) and supporting documents for
review. Approval of the request is required prior to submittal of the Fast Track Avolication and sumportine documents.
2. Professional Engineer's Certification:
(Professional Engineer's name from Application Item 111.1.)
attest that this application for
has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications,
engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best
of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer
Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting
of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this
submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and
have judged it to be consistent with the proposed design.
NOTE — In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed S10,000, as well as civil penalties up to $25,000 per violation.
North Carolina Professional Engineer's seal, signature, and date:
W/Y l Z0
3. Applicant's Certification per 15A NCAC 02T .0106(b):
l4 "5 r 0 aAWtir
(Signature Authority's name & title from A
on Item 1.3.)
that this application for
has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of
this application are not completed and that if all required supporting documentation and attachments are not included, this
application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non -
discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties,
injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition
of this permit be violated. I also understand that if all required parts of this application package are not completed and that if
all required supporting information and attachments are not included, this application package will be returned to me as
incomplete.
NOTE — in accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation.
�r?�1���
FORM: FTA 04-16 Page 5 of 5
a
s3
Narrative for the Varnell Street Pump Station and New 6" Force Main to Speight School Road
Town of Saratoga — Sartoga-Wilson Sanitary Sewer Connection Project
Project No. E-SRP-W-17-0118
The project changes the recipient of the Town of Saratoga's waste water from the Town of
Stantonsburg to the City of Wilson. A new 6,740LF force main with 250 LF of directional bore
will be installed from the existing main pump station, Varnell Pump Station, to a gravity MH just
upstream of the existing, recently constructed Speight School Road Pump Station. The existing
6" force main that conveys the Town's effluent to the Town of Stantonsburg collection system
will be abandoned as part of these improvements. The new 6" force main will be installed along
an existing utility easement and within the right of way Speight School Road.
Scope:
• 6,740 Linear Feet of 6-inch Sanitary Sewer Force Main including:
• 250-foot Directional Bore
• Replacement of pumps at the Varnell Street Pump Station
• Air Release manholes and valves
Upon previous submittal of an application package to cover all aspects of the Wilson SS
Connection project, DEQ requested that one permit to cover Varnell Street and its new force
main be requested and modification of the recently issued Speight School Road Pump Station
permit (WQ 0039049) be processed. The check for this "new permit" for the existing Varnell
Street Pump Station has already been submitted.
MAR - 9 2020
State of North Carolina
Raleigh Regional Office Department of Environmental Quality
' L Division of Water Resources
Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Applications
(FTSE 04-16)
Entity Requesting Allocation: Town of Saratoga _
Project Name for which flow is being requested: Saratoga -Wilson Sewer Connection
More than one FTSE may be required for a single project if the owner of the IVfVTP is not responsible for all pump
stations along the route of the proposed wasteuraterJloit'.
I. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name: Hominy Swamp Water Relcamation Facility
b. WWTP Facility Permit # NCO023906
All flows are in MGD
c. WWTP facility's permitted flow 14 MGD
d. Estimated obligated flow not yet tributary to the WWTP 1.01325 MGD
e. WWTP facility's actual avg. flow 8.86 MGD
f. Total flow for this specific request 0.067 MGD
g. Total actual and obligated flows to the facility 9.94058 MGD
h. Percent of permitted flow used 71.00
I1. Complete this section for each pump station you are responsible for along the route of this
proposed wastewater flow.
List pump stations located between the project connection point and the WWTP:
(A)
(B)
(C)
(D)-(B+C)
(E)=(A-D)
Design
Obligated,
Pump
Average Daily
Approx.
Not Yet
Total Current
Station
Firm
Flow**
Current Avg.
Tributary
Flow Plus
(Name or
Capacity, *
(Firm ;` po,
Daily Flow,
Daily Flow,
Obligated
Available
Number)
MGD
MGD
MGD
MGD
Flow
Capacity***
9
1.526
0.611
0
0.067
0.067
0.5436
2
25.92
10.368
3.01
0.30298
3.3130
7.0550
* The Firm Capacity of any pump station is defined as the maximum pumped flow that
can be achieved with the largest pump taken out of service.
** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking
factor (pi) not less than 2.5.
*** A Planning Assessment Addendum shall be attached for each pump station located
between the project connection point and the WWTP where the Available Capacity is < 0.
Downstream Facility Name (Sewer): Hominy Swamp Water Reclamation
Downstream Permit Number: NC 0023906
Page 1 of
FTSE 04-16
III. Certification Statement:
I W.T. Bass IV, PE certify to the best of my knowledge that the addition of
the volume of wastewater to be permitted in this project has been evaluated along the route to the
receiving wastewater treatment facility and that the flow from this project is not anticipated to
cause any capacity related sanitary sewer overflows or overburden any downstream pump station
en route to the receiving treatment plant under normal circumstances, given the implementation of
the planned improvements identified in the planning assessment where applicable. This analysis
has been performed in accordance with local established policies and procedures using the best
available data. This certification applies to those items listed above in Sections I and II plus all
attached planning assessment addendums for which I am the responsible party. Signature of this
form indicates acceptance of this wastewater flow.
r�
Signing Cfficral Signatin•e Date
Page 2 of d
FTSE 04-1h
PACL4
Mack Gay Associates, P.A.
Engineering - Surveying • Planning
Date: 03/04/2020
1667 Thomas A. Betts Pkwy., Rocky Mount, NC 27804
Phone: 252-446-3017 - Fax: 252-446-7715
Firm License: C-0569 - www.mackgaypa.com
LETTER OF TRANSMITTAL.
Project Name: E-SRP-W-17-0118 -Town of Saratoga
Saratoga to Wilson Sanitary Sewer Connection
Project No.: P 170104
To: 3800 Barrett Drive
Raleigh, NC 27609
1628 Mail Service Center
Raleigh, NC 27699-1628
NC Dept of Environmental Quality
MAR - 6 2020
Raleigh Regional Office
ITEM NO.
QTY.
ITEM
DESCRIPTION
1
1
Cover Letter
2
1
Check
Required Review Fee ($480)
3
1
FTA 04-16 Application
4
1
Flow Tracking /
Acceptance Forms
FTA for City of Wilson
5
1
Site Maps
USGS Quad Map / Exhibit Map
6
1
Interlocal Agreement
Purchase Agreement b/w Town
and City of Wilson
THESE ARE TRANSMITTED as checked below:
® For approval ❑ Approved as submitted ❑ Resubmit copies for approval
❑ For your use ❑ Approved as noted ❑ Submit copies for distribution
❑ As requested ❑ Returned for corrections ❑ Return corrected prints
® For review and comment
REMARKS:
Mr. Cashion,
Please find the above -mentioned materials in support of the sewer extension permit application
for the above project. This project will redirect flow from the Town of Saratoga that is currently
pumped to and treated by the Town of Stantonsburg to the City of Wilson Campus at 587 to be
ultimately treated by the City of Wilson WWTP. The FTA form for the City of Wilson is being
processed and will be forwarded to your attention once completed.
Michael D. Tolson, PE
mike@mackgaypa.com
NORTH CAROLINA
WIRER RESOURCES
July 31, 2017
Mayor Tommy Hawkins
Town of Saratoga
6904 Main Street
Saratoga, N.C. 27873
Subject: Potential Sewer Service for Town of Saratoga
Dear Mr. Hawkins,
Thank you for your interest in possibly becoming a City of Wilson wholesale sewer customer. As you are aware,
the City already serves Black Creek, Lucama, and Sims with this service. Your town engineer, Mark Russell with
Mack Gay and Associates and I have spoken about possible sewer connection locations for service. We have
also spoken with your Town Attorney, Mr. Brian Pridgen, and understand that your board has voted to explore
the project as an option for the town. According to Mr. Russell, you are requesting a flow of 100,000 gallons
per day (gpd). The City has sewer capacity of 14 million gallons per day at our facility, and we have more than
enough excess capacity available at our facility to handle the requested 100,000 god of additional flow. With
the requested capacity and a pump station design factor X2.5, our pump station or gravity sewer downstream
would need to be capable of handling 250,000 gpd. The Woodard Industrial Park Pump Station (now called
"The Campus at 587") which is currently under construction (with a completion date of early 2018) has a
capac'ty of 1.55 MGD which is more than adequate as is downstream gravity sewer capacity.
With treatment capacity available and with infrastructure capacity available, the City is willing to accept
100,000 gpd of wastewater from the Town of Saratoga, subject to Wilson City Council approval, and other
minor ordinance modifications. The capacity charge for wastewater capacity at our facility is currently $4.08
per gallon, or $408,000 for the requested flow. Contact me if you have any questions or if you need anything
else from the City.
Sincerely,
Barry G. Parks
Director of Water Resources
City of Wilson
Cc: Dathan Shows C.O.C. Wilson Utilities
Harry Tyson, Deputy City Manager
Brian Pridgen, Saratoga Town Attorney
Stantonsburg WWTP Flow
Total Annual
Volume
Pumped
Annual
Percent
Fiscal Year
(ending June 30)
Source of
financia data
Total Yearly
WWTP
Volume treated
from Saratoga
of Stantonsburp's
Annual
Percent
regarding
Yearly Count of
at
to
Total Volume
Sewer Charge
Stantonsburg
of Stantonsburg
Satatoga's annual
Average Days
Stantonsburg
Stantonsburg
that is pumped
Saratoga paid to
Sewer
Revenue from
payment to
Flow In
WWTP
from Saratoga
Stantonsburg
Revenue
Saratoga
Stantonsburg
Year MGD Year
MG
(MG)
(percent)
(Dollars)
(Dollars)
2011 0.16272 365
59 3925
14 740892
24.8%
S52,542
Estimate by Mark Russel:
2012 015269 366
558862
15.760741
28.2%
S62,121
Estimate by Mark Russel'
2013 0 20600 365
75.1909
22.4764$
29.9%
S86.691
1
Estimate by Mark Russel;
2014 026529 365
968313
16 711131
17.3%
$58.785
Estimate by Mark Russel:
2015 025853 365
943648
No Data
No Data
$65 035
Estimate by Mark Russel:
2016 022798 366
83.441
No Data
No Data
No Data
2017 017751 365
64 7906
No Data
No Data
I S77,106
S310 000
24.90/6
Saratoga Fiscal Report
Stantonsburg, NC0057606, 0.375 MGD Monthly Flow limit
0.8
0.7
0.6
u 0.3
t
0.2 a
0.2
0
Jan-11 Jan-12
Jan-13
-- Oally now at wwn,
— Monthly Aweraae Flow
-- -- MonthlyFbw Lima
Jan-14 Jan-15 Jan-16 Jan-17
Jan-18
— StantonsburgwWrP.Monthly Awerape Flow
0.5
— — StantonliburitNPpESPermit Monthly Flow Limit
---�-- Saratoga- Monthly AwerapeFlow pumped to Stamomburp
0.45
0.4
-
-------------------------------__-
---T-- - - - - --
�--
0.35
0.3
t°
0
0.25
Q
0.2
—
L
— —
0.05
0
Jan-11
Jan-12 Jan-13 Jan-14 Jan-15 Jan-16 Jari-17 Jan•18
m
O
N
LD
m
m
ri
r-I
00
O
r,M
n
LO
LPL
ri
0c0
M
c3i
N
N
OIZ
n
00
N
1�
Ln
ri
tO
to
�
LO
�
m
O
O�
N
ra
r-IO
?�
N
r%
ri
r-I
ri
ri
ri
ri
�
N
D
r-I
ri
Ln
at
N
m
O
n
r-I
00
m
N
0)
I�
r-I
n
M
N
Ln
00
ri
Ln
N
tD
in
Ln
en
en
0
N
Ln
Ln
00
v
M1
Ln
o
r i
0;
ri
�
N
tr1
L6
O
Lr
LP)
O
G
01
00
ri
r%
Iz
ri
Ln
O
n
00
to
00
to
01
Ln
o
O
ri
ri
o
V
O
00
qi
00
tD
tD
Ln
ri
r�
0
3
C4
ri
4
.-;
ri
ri
ri
ri
rZ
ri
ri
L6
ri
in
N
O
ri
r•4
LL
Ml
I�
O
ri
0)
q*
C
o
0
o
rV
0
C
O
er
r-IO
N
o
tD
tD
tD
00
00
00
N
00
00
04
ri
Cr
O
00
O
00
ri
ri
00
00
00
Ln
oo
�
C
o
[�
M9
LV
q'
I`
�
Lf1
Lr
Lf1
LD
Lr1
tD
o
'Y
Ln
Ln
r%
t0
ri
00
00
LD
tO
LO
I`
LO
r�
M
rna%
N
r�Ln
W
r-
r-
0)
a)
01
00
01
lqr
a
r-I
O
4
N
ri
ri
ri
ri
ri
ri
ri
ri
rY
ri
N
co
LL
Ql
O1
0)
0)
r-I
N
O1
ri
'Gh
N
0)
Ln
ri
r-I
Ln
N
m
'q
O
LO
O
00
00
Cr)N
LD
i-
N
r-I
0)
rt
m
r4
iD
ri
0)
rn
Ln
0)
Ln
o
[r
CA
E
Op
00
N
N
0�
Il
00
O
01
00
Ln
I-
ri
O
rr1
iy
O
N
Gr
rn
m
to
s-i
LD
4
Ln
G
tD
LD
r-i
O
N
tD
mr
m
mr
O
ri
ri
Ln
r�
m
y_
ri
ri
ri
ri
r 1
ri
rV
r4
ri
ri
ri
Lr)
4
O
O
N
3
Lu
o
�
a
LO
01
m
ri
n
O
00
ri
m
N
00
cr
N
00
w
n
N
0)
00
qr
00
Ln
oo
C
n
oo
iT
O
y
01
tD
01
00
01
Lr)
LO
tD
O
Ln
Ln
m
00
Irr
1,
O)
ri
ri
o
m
o
LO
00
0)
Lry
�i
O
00
cu
KL
r-I
m
n
00
I;r
00
Mi
00
r-
LO
C
lqr
fV
E
N
M
M
m
0)
ri
eW
N
ri
O
O
N
a+
�
ri
ri
r-4
ri
ri
ri
r-I
r-I
ri
ri
•-4
�
ri
�
C
N
0
0
3
N
LL
N
Lp
N
rr
00
Ol
Ln
ri
m
m%T
00
m
01
m
R*
m
ri
m
01
zr
00
1�
Ln
lqr
N
m
m
N
ri
N
0)
00
ri
R
M
N
Ln
M
M1
00
-zr
tD
N
o
ip
qr
m
LD
Ln
tD
a
o
rl
Lo
to
!:
rr
4
ri
ce
4
O
O
O1
o
ri
a)
w
Ln
W
N
00
N
O1
LD
00
00
Ln
o
�
tD
00
LD
o
M
N
d
er
r-I
N
n
O
q:t
O
Nr
vi
tO
C)
01
ri
L
0
ri
O
ri
LV
ri
1
ri
r'i
ri
T 4
ri
ri
t-4
r�
ri
t-4
O
CO
O
ei
m
N
U-
�
O
L
N
L11
7
o
_
=
7-
0
2
❑
1
O
N
7
m
L
w
L
w
L
w
fLL
0)
C
L
ro
Q.
J*
LO
LU
C
a
m
Ld
1Z
_
u
p
LU
a.+
>
>>
N
N
Li
2
¢
2
�
?
Q
Ln
0
Z
0
Fp
Q
a
Robinson, Jason
From: Mike Tolson < mike@mackgaypa.com >
Sent: Monday, May 11, 2020 11:50 AM
To: Robinson, Jason
Cc: Cashion, Ted
Subject: (External] Re: Re: Varnell PS & FM Application
Attachments: letter signed allowing Saratoga to send wastewater to COW.pdf; Stantonsburg
NCO057606 Flow DMR 2010 - 2017.xis; Old Saratoga sewer flow data.xlsx
+ likwm-al ernall: Do not. dia links or open atta6m—ants unless you ve", Send ak susplall*ys,ertall as an attachmeneto
(r2nort. Spa m.� riczov
Jason and Ted,
To clarify, your assumption from Friday is correct. The .067MGD is the current flow the Town intends to send
to the City of Wilson. Wilson has indicated that they have capacity and are willing to potentially accept up to
0.1 MGD from the Town however the current monthly pumping rates (attached) do not support that high of a
demand.
On Fri, May 8, 2020 at 7:00 PM Robinson, Jason <iason.t.robinson c-bncdenr.gov> wrote:
Mike,
Sorry, I didn't get back with you, I will try to call Monday
But we'll need a written explanation (via email) that we will attach to the application.
Jason T. Robinson, P.E.
Raleigh Regional Office
Water Quality Regional Operations
NC Division of Water Resources, DEQ
919-791-4200
`*Subscribe to Collection System & Sewer Permitting U dates`"
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to
third parties.
Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has
adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or
are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to
appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle
your requests by phone or email. We appreciate your patience as we continue to serve the public during this
challenging time.
From: Mike Tolson [mailto:mike(@mack a a.com]
Sent: Friday, May 8, 2020 2:14 PM
To: Robinson, Jason <'ason.t.robinson ncdenr. ov>
Subject: [External] Re: Varnell PS & FM Application
�. -r _
Dar t'caT kl n topers attachments unless yot, verify: Send'all suspicious -email as an atta6mentta
Jason,
Please call me to discuss this.
On Fri, May 8, 2020 at 2:01 PM Robinson, Jason <'ason.t.robinson c ncdenr. ov> wrote:
I received a voicemail from Joe Dooley yesterday (Thursday) concerning this.
He asked about the other emails that my co-worker Ted had sent about the Speight School Rd project
application. Ted has since forwarded those to the Town.
To proceed with the review of this application, we'll need a written explanation of the 0.067 MGD Requested
Flow that was included on the FTSE form. Is this the total tributary flow that will be sent from Saratoga to
Wilson?
Jason T. Robinson, P.E.
Ralei-h Regional Office
Water Quality Regional Operations
NC Division of Water Resources. DEQ
919-791-4200
"Subscribe to Collection System & Sewer Permittin Updates"
E-mail correspondence to and from this athh-ess maY he strlliec t to the .North Carolina Pahlic Records Lair and trot• be disclosed to
third parties.
Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental
Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are
working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations
are limiting public access to appointments only. Please check with the appropriate staff before visiting our
offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we
continue to serve the public during this challenging time.
From: Robinson, Jason
Sent: Wednesday, May 6, 2020 6:09 PM
To: bbassOmwilsonnc.orb; Mike Tolson <mike c mack 7a a.com>; saratogatmsarato ane.org
Cc: Cashion, Ted <ted.cashion @ncdenr.gov>
Subject: Vamell PS & FM Application
Mike & Bill,
We're reviewing the application for the Varnell PS & FM (different than the Speight School PS application
that Ted was emailing you about Mike).
The Varnell application shows a flow of "0". However, on the Flow Tracking Sheet (FTSE) that is signed by
Bill, it shows a flow of 0.067 MGD being requested. I assume this is the total flow that will be sent from
Saratoga to Wilson, but we want to confirm that, and confirm that Wilson is willing to accept all of the flow
from Saratoga. Mike and Bill, please confirm.
Thanks!
Jason T. Robinson, P.E.
Raleigh Regional Office
Water Quality Regional Operations
NC Division of Water Resources, DEQ
919-791-4200
"Subscribe to Collection System & Sewer Permitting Updates"
E-mail correspondence to and! front tliiti• Mill bL' Nrrlyrct to thl .10; th Cur olow YrrhliL Rec of clti Lau and mar be thsch)scd to
third parries.
Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental
Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are
working remotely or are on staggered shifts. To accommodate these staffing changes. all DI_Q office locations
are limiting public access to appointments only. Please check with the appropriate staff before visiting our
offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we
continue to serve the public during this challenging time.
Respectfully,
Michael D. Tolson, PE, PLS
Mack Gay Associates, P.A.
1667 Thomas A. Betts Pkwy
Rocky Mount, NC 27804
252.446.3017 (o)
252.343.6467 (m)
mike@mackgaYpa.com
www.mackgaypa.com_f mackgay_pa.coml
Respectfully,
Michael D. Tolson, PE, PLS
Mack Gay Associates, P.A.
1667 Thomas A. Betts Pkwy
Rocky Mount, NC 27804
252.446.3017 (o)
252.343.6467 (m)
mikeCa@mackgaypa.com
www.mackqaypa.com rmackgayl2a.coml
s
Robinson, Jason
From: Mike Tolson <mike@mackgaypa.com>
Sent: Monday, April 13, 2020 2:27 PM
To: Robinson, Jason
Cc: Cashion, Ted; Vinson, Scott
Subject: Re: [External] Re: Re: Sewer Application - Saratoga -Wilson Connection
• Hiternalemail. Do not click -links or open attachments unless you ve€ffy. send 9I1.suspiaious email as an attaahmentto T i
10-4 will have this submitted as soon as possible.
On Mon, Apr 13, 2020 at 2:25 PM Robinson, Jason <iason.t.robinson c .nedenr. ov> wrote:
Thanks Mike.
We will use the fee that you already submitted towards one of the new apps you submit. It's probably be easier for us
if that is for the new permit (The Varnell PS & FM). Please make sure to explain in the narrative that a check has
already been submitted for that one.
A new fee will need to accompany the application for the modification (Speight School Rd. Sewer Project).
Thanks,
Jason
Jason T. Robinson, P.E.
Raleigh Regional Office
Water Quality Regional Operations
NC Division of Water Resources, DEQ
919-791-4200
"Subscribe to Collection System & Sewer Permitting Updates"
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Latin and may be disclosed to
third parties.
From: Mike Tolson [mailto:mike mack a a,com
Sent: Monday, April 13, 2020 2:22 PM ,
To: Robinson, Jason <jason.t.robinson@ncdenr.sov>
Cc: Cashion, Ted <ted.cash ion A ncdenr, ov>; Vinson, Scott <scott.vinson(@ncdenr.gov>
Subject: Re: [External] Re: Re: Sewer Application - Saratoga -Wilson Connection
Ut&hai.etiia I. po na dkoinWor open attachments unless you verify. Send all suspicious ernail as an attachment to
.1
Just to make sure I'm clear, it sounds like both the existing 3" FM that leaves the Speight School Rd PS (to Saratoga's
line) and the existing 6" FM that leaves the Varnell PS (to Stantonsburg line) will both be abandoned. Is that correct?
Yes, that's correct. The existing 3" and the existing 6" will be abandoned.
The permit scenario you suggested sounds good to me. l will work on getting these forms to you as soon as
possible. Thanks for working with me on this.
And finally, Stantonsburg is fully aware of this project. I have numerous correspondence between the Towns
indicating the need and desires of Saratoga to put this arrangement in place.
As far as fees go, should I submit two new fees or will the first fee we submitted stand for one of these new
applications?
On Mon, Apr 13, 2020 at 2:17 PM Robinson, Jason <iason.t.robinson c ncdenr. >o,,r> wrote:
Thanks for the response Mike.
Just to make sure I'm clear, it sounds like both the existing 3" FM that leaves the Speight School Rd PS (to Saratoga's
line) and the existing 6" FM that leaves the Varnell PS (to Stantonsburg line) will both be abandoned. Is that correct?
If that's the case, here's what I think might be the best way to proceed, although this is open for discussion:
Tw permits would cover this scenario:
1. Create a new permit for Varnell PS. This permit will include the PS (with its upgraded capacity), as well as the
proposed 6" FM that will exit it (to Saratoga's system).
Z. Modify the existing permit for the Speight School Rd. PS (WQ0039049) to include the new capacity of the PS and
the new 8" FM that will go to Wilson.
Does this sound reasonable? If so, we'd need two applications, both with fees and supporting documentation.
1. One could be called "Varnell Pump Station and Forcemain" (or something like that), and Item I1.2 would be
checked "Proposed". This would include the Varnell Pump Station with its final capacity, and the new 6" FM that will
leave it.
Z. The second would be a modification to the "Speight School Road Sewer Project "WQ0039049". It would include
the new capacity of the Speight School Rd. PS and the new 8"FM that will go to Wilson. It will not include the existing
FM that will be abandoned.
AnotherQuestion: Is Stantonsburg aware of this roiect? Do Stantonsburg know that Saratqjga will be eliminating
the flow that goes to Stantonsbur 's CS and WWTP?
Jason T. Robinson, P.E.
Raleigh Regional Office
Water Quality Regional Operations
NC Division of Water Resources, DEQ
3
919-791-4200
"Subscribe to Collection System & Sewer Permitting Updates—
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be d;scloSed to
third parties.
From: Mike Tolson [mailto:mike@mackgavoa.com]
Sent: Thursday, April 9, 20204:37 PM
To: Robinson, Jason <'ason.t.robinson ncdenr. ov>
Subject: [External] Re: Re: Sewer Application - Saratoga -Wilson Connection
i Cternal:eii�ail. Uc_raaftI[c links or open attachments unless you verify: Send all suspicious tin4ll as an aitachme�"
+ � , au
Jason,
Sorry, I missed the actual questions in that email.
1. To create a new permit for the existing Varnell PS and new forcemain from Varnell To Speight, since there
isn't an existing permit for, or at least it was so long ago that it can't be found.Question: is the proposed
fi 740 LF of 6" FM going from Varnell to Speight School replacing an existing FM? Or is it all new, and the
existing FM from Varnell will be abandoned?
Yes. There is an existing 3" force main that runs from Speight School Road PS to a MH that eventually gets to
Varnell PS. The 6" will be reversing flow from Varnell to a MH that will gravity down to Speight School Road.
Existing 6" FM that runs from Varnell PS to Stantonsburg system will be abandoned in place.
2. Modify the Speight School PS permit for the pump upgrade.Question: Basically the same as above will
the existing FM that currently leaves Speight School be abandoned and will the proposed 16,580 LF of 8" FM
all be new?
Yes. 8" FM will leave Speight School PS and head to Wilson Industrial Park connection as City of Wilson will
now be treating Town of Saratoga's WW instead of Stantonsburg.
3. Create a new permit just for the proposed FM from Speight School PS to Wilson's System.
I hope this makes sense and if it does, just advise me as to what documents you need from me and I will get
them prepared and sent over.
On Thu, Mar 26, 2020 at 2:05 PM Robinson, Jason <iason.t.robinson awncdenr.gov> wrote:
Yeah, this one is a little tricky.
One way to do this:
I. To create anew permit for the existing Varnell PS and new forcemain from Varnell To Speight, since there isn't
an existing permit for, or at least it was so long ago that it can't be found.Question: is the proposed fi 740 LF of 6"
FM going from Varnell to Speight School replacing an existing FM? Or is it all new, and the existing FM from Varnell
will be abandoned?
2. Modify the Speight School PS permit for the pump upgrade. Question: Basically the same as above, will the
existing FM that currently leaves Speight School be abandoned and will the proposed 16580 LF of 8" FM all be new?
3. Create anew permit just for the proposed FM from Speight School PS to Wilson's System.
Depending on your answers, or further though/discussion, there may be an easier way.
Jason T. Robinson, P.E.
Raleigh Regional Office
Water Quality Regional Operations
NC Division of Water Resources, QEQ
919-791-4200
"Subscribe to Collection System & Sewer Permitting Updates—
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to
third parties.
From: Mike Tolson [mailto:mike@mackeavna.com]
Sent: Thursday, March 26, 2020 1:12 PM
To: Robinson, Jason <iason.t.robinson@ncdenr.gov>
Subject: [External] Re: Sewer Application - Saratoga -Wilson Connection
J[ .� a ,e bi. Via. dot e.11ck:llnks o:r�open aftachmer� s unle�sy�au verify. Send all suspicious ejnal as ao att6chment o
[goo rtApam a2kffLgy. i
Not sure about the Varnell Street PS. I know that we worked on an upgrade / rehab to the station a few years
ago. All I can find from that is a certification letter deeming that the project didn't increase capacity and
simply supplied emergency backup power as well as rehabbed the station. The permits weren't referenced in
the documents 1 could find. (copy of letter attached) I have also attached the images we have of the original
plans from the 81-85 era for when the original station was constructed. These plans are from another firm
and I would expect that any permit issued would have accompanied that set of drawings.
A question to consider: Since we are extending such a significant length of force main for this and the pump
stations are technically permitted already and just have modifications, should this simply be a force main
extension application and then modifications to the other two existing permits? With that said, I'm willing to
work this out however you guys think would be the most appropriate way.
On Thu, Mar 26, 2020 at 12:26 PM Robinson, Jason <iason.t.robinson(t-encdenr.g_ov> wrote:
Hi Mike,
We're reviewing the referenced application, and have the following questions and comments:
1. The application includes the upgrade of the Varnell PS. Is there an existing sewer extension permit that
covers the existing Varnell pump station (and associated FM)
2. The application also includes the upgrade of the Speight School PS. I think this is the pump station
(and force main) covered under permit WQ0039049, issued in 2017, modified in 2017, and modified again
in 2019. If this is the case, we typically require the existing permit to be modified, instead of having two
active permits that cover the same pump station.
So if I'm understanding the scenario correctly, we'd have to figure out the best way to handle this. Initially,
I would think that a new permit would need to be issued for the Varnell PS and forcemain (if an existing
permit cannot be found), and the existing Speight School PS Permit would have to be modified to describe
the upgrades to it, and potentially add the connecting forcemain to that permit. I plan to discuss with
coworkers. Let me know about the Varnell PS (if there's a permit), and you have any input.
-Jason
Jason T. Robinson, P.E.
Raleigh Regional Office
Water Quality Regional Operations
NC Division of Water Resources, DEQ
919-791-4200
"Subscribe to Collection System & Sewer Permitting Updates—
E-mail rorrespoudh' we to and h•om this mhh s ti unn hL' StI/!j ( 10 dw Aorth Carolina Public Rceordl Lim (IMI utut• hc' 411 0o Lid
to third parties,
Respectfully,
Michael D. Tolson, PE, PLS
Mack Gay Associates, P.A.
1667 Thomas A. Betts Pkwy
Rocky Mount, NC 27804
252.446.3017 (o)
252.343.6467 (m)
mike mackgay_pa.com
www.mackgaypa.com mack a a.com
Respectfully,
Michael D. Tolson, PE, PLS
Mack Gay Associates, P.A.
1667 Thomas A. Betts Pkwy
Rocky Mount, NC 27804
252.446.3017 (o)
252.343.6467 (m)
r
mike(d)mackgaypa.com
www.mackciaypa.com rmackgayi2a.coml
Respectfully,
Michael D. Tolson, PE, PLS
Mack Gay Associates, P.A.
1667 Thomas A. Betts Pkwy
Rocky Mount, NC 27804
252.446.3017 (o)
252.343.6467 (m)
mike0mackgaypa.com
www.mackgaYpa.com [mackgavpa.coml
Respectfully,
Michael D. Tolson, PE, PLS
Mack Gay Associates, P.A.
1667 Thomas A. Betts Pkwy
Rocky Mount, NC 27804
252.446.3017 (o)
252.343.6467 (m)
mike@)mackgayr)a.com
www.mackgayDa.com [mackgavQa.coml