Loading...
HomeMy WebLinkAbout880198 Ver al_Complete File_19880225DIVISION OF ENVIRONMENTAL MANAGEMENT WATER QUALITY SECTION Comments concerning an application for State Federal CAMA Permit(s) from r A. PERMIT: This office cannot comment on this project until after-the close of the Section 401 Certification Public Comments Period. This office has no objection to the issuance of the permit(s) for the proposed project with the following conditions: That the activity be conducted in such a manner as to prevent significant increases in turbidity outside the area of construction or construction related discharge (increases of 25 NTU.!s or less are not considered significant). That the instream turbidity not be increased by more than 50 NTU's as a result of the proposed activity after a reasonable opportunity for dilu- tion and mixture. That turbidity levels in shall not be increased - by more than 10 NTU's as a result of the proposed activity after a reason- able opportunity for dilution and mixture. B. CERTIFICATION STATUS: Certification is not required for this project. Certification is required for this project.-,Such action to process-the.certification has - been initiated. Proposed Certification will be acted on or after The proposed project is certified under General..Certification A) No. 1179 issue: on January 25, No'. 1431 issued on October 16, -- - - -.. , :1977, for sewer line construction _ :1980, for boat ramp construction. B) No. 1272 issued on November 10, -E) No. 1664 issued on September 8, 1978, for bulkhead construction. 1983, for Rip-Rap Placement. -- -C} - - No. 127 issued= on November 10, F)- No. 1665--Issued on September. 15, - -- t97$ -,_J i-scfiarse- s id.. liquid : 1-983, for ine-idental bridge effluent-`-from -diked- 41znd--disposal = - eons truction -- _. areas.---.-. . '•?, ___ -_._.-. .:-_ .. :..3..x[3":- - -_ °__ WATER. QUALITY SECTION' - DIVISION-OF ENVIRONMENTAL MANAGEMENT DIVISION OF ENVIRONMENTAL MANAGEMENT MEMORANDUM f"t DATE: a/aY/YV _ TO: Bill Mills Operations Branch FROM: James H. Gregson Wilmington Regional Office THROUGH: A. Preston Howard, Jr. Wilmington Regional Offic SUBJECT: Regional Office Review & Recommendations Application for Permit for Excavation and/or Fill Project Description: a? ° a n7+ . Adjacent Water Body:J4&&aZ* 6&-k Classification: S* Status : o/ eAl The project has been reviewed to determine impacts to water quality. The appropriate comments below have been checked: (X) The project will will not require a 401 Water Quality Certification. ( ) The project complies with the General 401 Water Quality Certification # for (fit) The proposed project should be done in such a way as to not cause the turbidity outside the immediate construction area to exceed JS- NTU. This office has no objection to the project as proposed. JHG:kc cc : DCM doB s-nfmO CF, WiRO OFFICE OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. Applicant's name NC DOT - DOH - Tributary to Shallotte Creek (Bridge # 55) 2. Location of project site Bridge # 55 on SR # 1140 over a tributary to Shallotte Creek - Brunswick County 3. Investigation type: Dredge & Fill CAMA X 4. Investigative procedure: (A) Dates of site visit 2-17-88 (B) Was applicant present no 5. Processing procedure: Application received 1-29-88 Office Wilmington 6. Site description: (A) Local Land Use Plan Brunswick County Land Classification from LUP Development constraints identified in LUP (B) ABC(s) involved: Ocean Hazard Estuarine Shoreline X Coastal Wetlands x Public Trust Waters X Estuarine Waters x Other (C) Water dependent: Yes x No Other (D) Intended use: Public X Private Commercial (E) Type of waste crater treatment: Existing N/A Planned N/A (F) Type of structures: Existing Bridge Planned Replacement Bridge (G) Estimated annual rate of erosion N/A Source --- 7. Habitat description: (A) Vegetated wetlands: Spartina alterniflora Spartina cvnocoroides. Juncus romerianis Cladiun spp. AREA Dredged Filled Other Appx. 1190 s.f. (B) Non-vegetated wetlands: Tributary Am. 322 s.f. (C) Other: High Ground Appx. 729 s.f. (D) Total Area Disturbed: Appx. 2241 s.f. 8. Project Summary The applicants propose to replace an existing bridge at this location with a new structure. 9. PROJECT DESCRIPTION The project is located on unimproved SR 1140 in Brunswick County. The road crosses an unnamed tributary of Shallotte Creek by means of an existing bridge. The creek is approximately 14' wide at this point. There are coastal wetlands associated with the creek. These include Spartina alterniflora, Spartina cynocoroides, and Cladium Jamaicense. The waters are classified as SA open and are designated primary nursery area. The applicants propose to replace the existing bridge with a new structure. The dimensions of the new bridge will be approximately 83' long x 27' wide. 10. ANTICIPATED IMPACTS Although not clearly shown in the plats, the replacement bridge should have at least the same span and height clearance for the stream as now exists. If this is provided, no other significant impacts will result if the structure is constructed as proposed. Submitted by: C. Robert Stroud, Jr. Date: February 23, 1988 Office: Wilmington s; Please type or print. Carefully describe all an- ticipated development activities, including construc- tion, excavation, filling," paving, land clearing, and stormwater control. If the requested information is not relevant to your project, write N/A (not ap- plicable). Items 1-4 and 8-9 must be completed for all projects. 1 APPLICANT a. Name Wi11iam (; Ma 1PY Jr PE Address P_ 0- RnX ?S201 City Ra 1 P i gh State NC Zip 27 61 1 Day phone 731-634A Landowner or -_ Authorized agent b. Project name (if any N / A c. If-the applicant is not the landowner, also give the owner's name and address. 2 LOCATION OF PROPOSED PROJECT a. Street address or secondary road number b. City, town, community, or landmark Shallotte c. County Brunswick d. Is proposed work within city limits or planning jurisdiction? No e. Name of body of water nearest project Tri h To Sha 11 r*t-o crf- ak 3 DESCRIPTION AND. PLANNED USE OF PROPOSED PROJECT a. Describe all development activities you propose (for example, building a home, motel, marina, bulkhead, or pier). Replace Deteriorati_ Bridge With Bridge if you plan to build a marina, also complete and attach Form DCM-MP-2. b. Is the proposed activity maintenance * of an ex- isting project, new work, or both? Maintenance Of Existing Proiect C. Will the project be for community, private, or commercial use? P1]blic TranspQrrta i tin d. Describe the planned use of the project. Public Transportation 4 LAND AND WATER CHARACTERISTICS a. Size of entire tract N/A b. Size of individual lot(s) N/A c. Elevation of tract above mean sea level or Na- tional Geodetic Vertical Datum N/A d. Soil type(s) and texture(s) of tract _ N/A e. Vegetation on tract N/A f. Man-made features now on tract N/A g. What is the CAMA Land Use Plan Classifica- tion of the site? (Consult the local land use plan.) Conservation Transitional Developed Community X Rural Other h. How is the tract zoned by local government? N/A i. How are adjacent waters classified? j. Has a professional archaeological survey been carried out for the tract? No If so, by whom? 5 UPLAND DEVELOPMENT Compiete this section if the project includes any upland development. a. Type and number of buildings, facilities, or structures proposed N/A b. Number of lots or parcels N/A C. Density (Give the number of residential units and the units per acre.) N/A d. Size of area to be graded or disturbed N/A e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimen- tation control plan at least 30 days before land disturbing activity begins. If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? N/A f. Give the percentage of the tract within 75 feet of mean high water to be covered by im- permeable surfaces, such as pavement, buildings. or rmfranc_ N/A g. List the materials, such. as marl, paver stone, asphalt, or concrete, to be used for paved surfaces. N/A h. If applicable, has a stormwater management plan been submitted to the Division of En- vironmental Management? N/A i. Describe proposed sewage disposal and/or waste water treatment facilities. N/A j. Have these facilities received state or local approval? _ N/A k. Describe existing treatment facilities. N/A 1. Describe location and type of discharges to waters of the state (for example,-surface runoff, sanitary wastewater, industrial/commercial effluent, or "wash down"). qurfacp_ Runoff A l ono; Project m. Water supply source N/A n. If the project is oceanfront development, describe the steps that will be taken to main- tain established public beach accessways or pro- vide new access. N/A o. If the project is on the oceanfront, what will be the elevation above mean sea level of the first habitable floor?_ N/A 6 EXCAVATION AND FILL INFORMATION a. Describe below the purpose of proposed excava- tion or fill activities (excluding bulkheads, which are covered in Section 7). ' Access channel (MLW) or (NWL) Boat basin Other (break. water, pier, boat ramp, rock jetty) Fill placed in wetland or below MHW Upland fill b. Amount of material to be excavated from below water level in cubic yards None c. Type of material N/A d. Does the area to be excavated include marsh- land, swamps, or other wetlands? N/A e. High ground excavation, in cubic yards N/A f. Dimensions of spoil disposal area N/A g. Location of spoil disposal area N/A h. Do you claim title to the disposal area? N A If not, attach a letter granting permission from the owner. i. Will a disposal area be available for future maintenance? 1, N/A If so, where? N/A j. Does the disposal area include any marshland, swamOland,'or water areas? N/A k. Will the fill material be placed below mean high water? N/A 1. Amount of fill in cubic yards N/A m. Type of fill material N/A n. Source of fill material _ N/A o. Will fill material be placed on marsh or other wetlands? No p. Dimensions of the wetland to be Mled None q. How will excavated or fill material be kept on site and erosion controlled? By S ri nit _ Erosion Control Me h g r. What'.type of construction equipment will be used (for example, dragline, backhoe, or hydraulic dredge)? _Cxane With Drop Hamner s. Will wetlands be crossed in transporting equip- ment to the project site?.Np_ If yes, explain the steps that will be taken to lessen en- vironmental impacts. 7 SHORELINE STABILIZATION a. Length of bulkhead or riprap Ai1R b. Average distance waterward of mean high water or normal water level N/A c. Shoreline erosion during preceding 12 months, in feet None Evident d. Type of bulkhead material N/A e. Amount of fill, in cubic yards, to be placed below mean high water None f. Type of fill material __N/A Length Width Depth 8 ADDITIONAL INFORMATION In addition to the completed application form, the following items must be submitted: A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected property. If the applicant is not claiming to be the owner of said property, then for- ward a copy of the deed or other instrument under which the owner claims title, plus written permis- sion from the owner to carry out the project. An accurate work plat (including plan view and cross sectional drawings) drawn to scale in black ink on 8 Sh x 11 white paper. (Refer to Coastal Resources Commission Rule 7j.0203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue-line prints or other larger plats are acceptable only if 16 high quality copies are provided by the applicant. (Contact the U.S. Army Corps of Engineers regard- ing that agency's use of larger drawings.) A site or location map is a pan of plat requirements and it must be sufficiently detailed to guide agency per- sonnel unfamiliar with the area to the site. Include county road (SR) numbers, landmarks, and the like. A stormwater management plan, if applicable; that may have been developed in consultation with the Division of Environmental Management. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners. These individuals have 30 days in which to submit com- ments on the proposed project to the Division of Coastal Management. The applicant must advise the adjacent landowners of this opportunity by sen- ding a copy of the permit application to them by registered or certified mail. This notification is re- quired by G.S. 113-229(d). Name Luke Fulford Address Route 2. Box 1786 SuM y. Ir 28462 Name-James Hewett Address Route 3 Supply. NC 28462 Name _Larry Hewett Address Route 1, Box 290-D T.ihart?? NC` ?779R A list of previous state or "federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. A check for $100 made payable to the Depart- ment of Natural Resources and Community Development to cover the costs of processing the application. A signed AEC hazard notice for projects in ocean- front and inlet areas. A statement on the use of public funds. If the project involves the expenditure of public funds, at- tach a statement documenting compliance with the North Carolina Environmental Policy Act (N.C.G.S. 113A-1 to 10). 9 CERTIFICATION AND PERMIS- SION TO ENTER ON LAND Any permit issued in response to this application will allow only the development described in the application. The project will be subject to condi- tions and restrictions contained in the permit. I certify that to the best of my knowledge, the pro- posed activity complies with the State of North Carolina's approved Coastal Management Program and will be conducted in a manner consistent with such program. I further certify that I am authorized to grant, and do' in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit ap- plication and follow-up monitoring of project. This is the 15 day of 19_$x. X C4?AA-:_ 6. Landowner or Authorized agent Send the completed application materials to the Division of Coastal Management Office nearest you and the U.S. Army Corps of Engineers. See the map on the inside front cover for the appropriate DCM office and addresses and phone number. 4 UL UB V? ?C RF,VISED SE PT. 1987: / OF 2 SH=S lw 1a?? NC DEPAFM4DYT OF TRANSPORTATION D=ION OF HIGHWAYS BRUNSIJICK COUNrY REPLACEMENT OF BR. NO. 55 ON SR 1140 OVER TRIB. m . SHALLk7PI'E CREEK 4 ? . 1L i ? Mw ' 14 42 of -- ? C?I?Nw. /rcA A.Y . f ? ?w? aw ? h. 11r? • , N .rr. `w Carr CM?fi1. /.Jd /YIfM l CAI4 HA. C?fMpYil 71.Aii 9 1 7 . j -an VICIIdi:'Y MAP FROM N.C.D.O.T. BRUNSWICK COUNTY MAP LUKE FULFORD I i- l v ; PARK -'LUKE FULFORD ` / yT RT. 2BOX 1286 SUPPLY N.C. 28462 o ? • ? PiQbdosto ,BRiO?E Z N 'c ISO SRI14o LARVY McKNIGHT RT. I BOX 290-D LIBERTY, o14 -01 wooers o, '5'p JAMES HEWETT! scACE -5 _:- I r/, •? I/5 ?y 'RT. 3 SUPPLY, N.C. S rq /fss 110 _ 2 B 440 `coREO Stge . qp°SkEw 1 1 f O e CoFic?' Z /00- _/00 PROPOSED QRfDGE prop.9R. /y (,4O p GR _ Qo it Es 1 I /SNAZZXAL i I I ; SICAcE P' = 50'flonZ, I ' /'' _ Zo It V eR; i NC DEPARTMNT OF TRANSPORTATION DIVISION OF HIGHWAYS BRUNSWICK COUNTY REPLACEPaJT OF BR. NO. 55 ON- • SR 1140 OVER TRIB. TO SHALL TTE CREEK SHEET 1 of 1 REVISED SL•'PT..' 1987 State of North Carolina Department of Natural Resources and Community Development Division of Coastal Management 512 North Salisbury Street • Raleigh, North Carolina 27611 James G. Martin, Governor S. Thomas Rhodes, Secretary March 4, 1988 Ms. Renee Gledhill-Earley Environmental Review Coordinator Division of Archives and History Raleigh, North Carolina 27611 Dear Ms. Gledhill-Earley: The attached copy of an application submitted by: David W. Owens Director NC DOT -- Bridge #55 Applicant's Name Shallotte Creek on SR 1140 Brunswick Location of Project County for a State permit to perform excavation and/or fill work in coastal North Carolina and for a CAMA major development permit... X for a CAMA major development permit (only) ... ... is being circulated to State and Federal agencies having jurisdiction over the subject matter which might be affected by the project. Please indicate on the reverse side of this form your viewpoint on the proposed work and return it to me not later than Sincerely, o R. Parker, Jr , hief Major Permits Processing Section JRP:ap:2480 P.O. Box 27687, Raleigh, North Carolina 27611-7687 Telephone 919-733-2293 An Equal Opportunity Affirmative Action Employer Permit Class New STATE OF NORTH CAROLINA Department of.Natural Community Development t Mew A. . 01 a Majo )??e loci nt';id onmental Con '1PRlt 12 t77b ?? XD Excavatio i? )45 ' . g,> ir?sp i to NCGS 113-229 4 Permit Number y 59-88 Issued to NC Dept. of Transportation, Div. of Highways, P.O. Box 25201, Raleigh, NC 27611 authorizing development in Brunswick Countyat Shal 1 otte Creek, (unnamed tributary to), on SR 1140, Bridge #55 as requested in the permittee's application dated 1/15/88 including attached plats, sheets 1-2 of 2 dated revised 9/87. This permit, issued on `7/!/ is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may subject permittee to a fine, imprisonment or civil action; or maycause the permit to be null and void. (1) The bridge must be constructed in such a 'way as to provide an ample span across the creek and provide the same height clearance above MHW as now exists so as not to impede boat navigation. (2) Standard erosion and sedimentation control techniques must be employed before, during and after construction. (3) All disturbed sites must be permanently revegetated as soon as possible following construction to prevent excessive soil erosion. (4) The activity will be conducted in such a manner as to prevent significant increases in turbidity outside the area of construction or construction-related discharge. NOTE: Traffic should be re-routed around the project area utilizing existing roads. This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or cogtinuance, as the case may be. This permit must be accessible on-site to Department 11.1.11 personnel when the project is inspected for compliance:-.-- Any maintenance work or project modification not covered hereunder requires further Departmental approval. All work must cease when the permit expires on December 31. 1991 In issuing this permit, the State 'of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DNRCD and the Chairman of the Coastal Resources Commission. David W. Owens, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee A It STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION P.O. BOX 25201 RALEIGH 27611-5201 JAMES G. MARTIN GOVERNOR January 13, 1988 JAMES E. HARRINGTON SECRETARY Division of Coastal Management Department of Natural Resources & Community Development P. 0. Box 27687 Raleigh, North Carolina 27611 ATTENTION: Mr. John Parker Dear Sir: 198$ Ada nmbffve Services , . DIVISION OF HIGHWAYS GEORGE E. WELLS, P.E. STATE HIGHWAY ADMINISTRATOR ` , - IV ! 2P i SUBJECT: Brunswick County, Bridge No. 55 on SR 1140 over Tributary of Shallotte Creek The North Carolina Department of Transportation proposes to replace the existing bridge with a new structure along the same alignment. During construction traffic will be detoured over the existing road system. Application is hereby made for a CAMA permit as required by the proposed project: The project will not require a permit from the Corps of Engineers. If you have any questions, please call Barney O'Quinn at 733-7842. Sincerely, ?'/1 day William G. Marley, Jr. P. E. Assistant State Highway Administrator BJO/sdt Attachment cc: Mr. Paul Wilms, NRCD Regulatory Branch Corps of Engineers Mr. Jimmy Lee, P. E. Mr. A. L. Hankins, Jr. P. E. Mr. D. J. Bowers, P. E. An Equal Opportunity /Affirmative Action Employer 7 ? Go ??S ?Gti1 4 ?O le??slato ?cn of teAJ,te? ,ale cove 1 ?s aQ4ltoa?, o? p,GC, lGP S as?al Pt 113 P,11 1sGGS ti9 _ ?tea?G5,113 Ge?`t4,Gat` . G t al`3,ti15 Jla?eal a'?e 5.1 tee of ?r ? k to ??ll ? - tac?'t°es et . efiet`t 1 6,1 ce fi??t` Q of OT-V 1g9q ? G G 5' ? a?ets l Q??' k`llo4?' s Poc o? is ? G C'?Ve? a`e?e?`vets atetxal to av??o 10 °? a ot??ll et ?oc oa?eol.- Sect tie ?tea?e Glea°? at oastal o ?atuta` Viso eclat' o? ??e o??teets t' OR Cet?t ?. ?cy of s Otv?s? ?e4a a G°?? Sept y G° ttcc ttn - ?e °utce Stt,:c?'t°'c'? ?evelpG?00 tl Fob 4?1??1 Please type or print. Carefully describe all an- ticipated development activities, including construc- tion, excavation, filling, paving, land clearing, and stormwater control. If the requested information is not relevant to your project, write N/A (not ap- plicable). Items 1-4 and 8-9 must be completed for all projects. 1 APPLICANT a. Name William G. Marley. Jr.. PE Address P- n- R o x 2 5 2 01 City R;; 1 e i gh State NC Zip 27611 JDayphone 733-6348 Landowner or _X Authorized agent b. Project name (if any) N/A c. If -the applicant is not the landowner, also give the owner's name and address. 2 LOCATION OF PROPOSED PROJECT a. Street address or secondary road number Sg 1140 b. City, town, community, or landmark Shallotte c. County Brunswick d. Is proposed work within city limits or planning jurisdiction? No e. Name of body of water nearest project Trih To Shallotte Creek 3 DESCRIPTION AND PLANNED USE, OF PROPOSED PROJECT a. Describe all development activities -you propose (for example, building a home, motel, marina, bulkhead, or pier). Replace Deteriorating Bridge With Bridge If you plan to build a marina, also complete and attach Form DCM-MP-2. b. Is the proposed activity maintenance of an ex- isting project, new work, or both? Maintenance Of Existing Project c. Will the project be for community, private, or commercial use? Ruhlir Transportation d. Describe the planned use of the project. Public Transportation 4 LAND AND WATER CHARACTERISTICS a. Size of entire tract N/A b. Size of individual lot(s) N/A c. Elevation of tract above mean sea level or Na- tional Geodetic Vertical Datum N/A d. Soil type(s) and texture(s) of tract N/A e. Vegetation on tract N/A f. Man-made features now on tract N/A g. What is the CAMA Land Use Plan Classifica- tion of the site? (Consult the local land use plan.) Conservation Transitional Developed Community X Rural Other h. How is the tract zoned by local government? N/A i. How are adjacent waters classified? j. Has a professional archaeological survey been carried out for the tract? No If so, by whom? 5 UPLAND DEVELOPMENT Complete this section if the project includes any upland development. a. Type and number of buildings, facilities, or structures proposed N/A b. Number of lots or parcels N/A c. Density (Give the number of residential units and the units per acre.) N/A d. Size of area to be graded or disturbed N/A e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimen- tation control plan at least 30 days before land disturbing activity begins. If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? N/A f. Give the percentage of the tract within 75 feet of mean high water to be covered by im- permeable surfaces, such as pavement, buildings, or rooftops. N/A g. List the materials, such as marl, paver stone, b. Amount of material to be excavated from asphalt, or concrete, to be used for paved below water level in cubic yards None surfaces. N/A c. Type of material N/A d. Does the area to be excavated include marsh- h. If applicable, has a stormwater management land, swamps, or other wetlands? N/A plan been submitted to the Division of En- e. High ground excavation, in cubic yards N/A vironmental Management? N/A f. Dimensions of spoil disposal area N/A i. Describe proposed sewage disposal and/or waste g. Location of spoil disposal area N/A water treatment facilities. N/A h. Do you claim title to the disposal area? N/A j. Have these facilities received state or local If not, attach a letter granting permission from approval? N/A the owner. k. Describe existing treatment facilities. i. Will a disposal area be available for future N/A maintenance?? N/A If so, where? N/A j. Does the disposal area include any marshland, 1. Describe location and type of discharges to swamplland,'or water areas? N/A waters of the state (for example surface runoff, k. Will the fill material be placed below mean sanitary wastewater, industrial/commercial high water? N/A effluent, or "wash down"). 1. Amount of fill in cubic yards N/A Surface Runoff Along Project m. Type of fill material N/A n. Source of fill material N/A m. Water supply source N/A o. Will fill material be placed on marsh or other n. If the project is oceanfront development, wetlands? No describe the steps that will be taken to main- p. Dimensions of the wetland to be filled None tain established public beach accessways or pro- q. How will excavated or fill material be kept on vide new access. N/A site and erosion controlled? B?z S r; n=nt _ Erosion Control Methods o. If the project is on the oceanfront, what will be the elevation above mean sea level of the first habitable floor? N/A 6 EXCAVATION AND FILL INFORMATION a. Describe below the purpose of proposed excava- tion or fill activities (excluding bulkheads, which are covered in Section 7). Length Width Depth Access channel (MLW) or (NWL) N/A Boat basin N/A Other (break- water, pier, N/A boat ramp, rock jetty) Fill placed in wetland or below MHW Upland fill areas N/A r. What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic dredge)? Crane With Drop Hammer Will wetlands be crossed in transporting equip- ment to the project site? No If yes, explain the steps that will be taken to lessen en- vironmental impacts. 7 SHORELINE STABILIZATION. a. Length of bulkhead or rip rap ETA b. Average distance waterward of mean high water or normal water level N/A c. Shoreline erosion during preceding 12 months, in feet None Evident d. Type of bulkhead material N/A e. Amount of fill, in cubic yards, to be placed below mean high water None f. Type of fill material N/A 7 r 8 ADDITIONAL INFORMATION ti In addition to the completed application form, the following items must be submitted: A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected property. If the applicant is not claiming to be the owner of said property, then for- ward a copy of the deed or other instrument under which the owner claims title, plus written permis- sion from the owner to carry out the project. An accurate work plat (including plan view and cross sectional drawings) drawn to scale in black ink on 8 V2 x 11 white paper. (Refer to Coastal Resources Commission Rule 7J.0203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue-line prints or other larger plats are acceptable only if 16 high quality copies are provided by the applicant. (Contact the U.S. Army Corps of Engineers regard- ing that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency per- sonnel unfamiliar with the area to the site. Include county road (SR) numbers, landmarks, and the like. A stormwater management plan, if applicable, that may have been developed in consultation with the Division of Environmental Management. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners. These individuals have 30 days in which to submit com- ments on the proposed project to the Division of Coastal Management. The applicant must advise the adjacent landowners of this opportunity by sen- ding a copy of the permit application to them by registered or certified mail. This notification is re- quired by G.S. 113-229(d). Name Luke Fulford Address Route 2. Box 1286 Supply, NC 28462 Name James Hewett Address Route 3 Supply, NC 28462 Name Larry Hewett Address Route 1, Box 290-D TJhert1z; W 27298 A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. A check for $100 made payable to the Depart- ment of Natural Resources and Community Development to cover the costs of processing the application. A signed AEC hazard notice for projects in ocean- front and inlet areas. A statement on the use of public funds. If the project involves the expenditure of public funds, at- tach a statement documenting compliance with the North Carolina Environmental Policy Act (N.C.G.S. 113A-1 to 10). 9 CERTIFICATION AND PERMIS- SION TO ENTER ON LAND Any permit issued in response to this application will allow only the development described in the application. The project will be subject to condi- tions and restrictions contained in the permit. I certify that to the best of my knowledge, the pro- posed activity complies with the State of North Carolina's approved Coastal Management Program and will be conducted in a manner consistent with such program. I further certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit ap- plication and follow-up monitoring of project. This is the . day of 19 U . Landowner or Authorized agent Send the completed application materials to the Division of Coastal Management Office nearest you and the U.S. Army Corps of Engineers. See the map on the inside front cover for the appropriate DCM office and addresses and phone number. 1 U r m!a h+.ar ON Oac 1 aMY1a avow UA tartar - --leap f 2 YYaIM >u , ?r U41 REVISED SEPT. 1987: / OF 2 SHEETS mom" Mal ? 1 )1 ,lyre. coir i r . 16 = ha vwo sea* 121 f?ir M"M"fe half t )? f aMaar • - CGreNaa AIMCA half • 1 . C-A- a..r k fa. 1 arolala /aad r t willal 011 I Kura Iaad N. md6w r al AIW60 a- CMI.r cam"&* loll SAWN L CAM lfAa IWIfNOYSa Of ?Q NC DEPARTM IT OF TRANSPORTATION DIVISION OF HIGHWAYS BRUNSWICk COUNTY REPLACEMENT OF BR. NO. 55 ON SR 1140 OVER TRIG. TO SHAI.IA'ITE CREEK SLAM 1 a 1 f • aa" VICINl Y MAP MOM N.C.D.O.T. BRUNSWICK COUNTY MAP T I LUKE FULFORD. I ; /WP i ? /6YT O ? Pi2ooesE? eR?oc? r 1 Ta A/ G SRIt4o 4 'LAR9Y McKNIGHT if RT. I BOX 290-D LIBERTY, o'??` .? LL wooos /SNA JAMES HEWETT? (5i ( -- - RT. 3 SUPPLY, N.C.' •' LUKE FULFORD RT. 2 BOX 1286 SUPPLY N.C. 28_462 t r-- I "r ? I t s TA /f3s" Flo 2 B 4o ?Coa?e sz qs -- ?/O C?p°SKEty + ? I p?Co F?c /00 2 _ _ boo PRoposeo QI?IDGE ?- -- - -_ PROP. 3R. ?/?AH T/DE 1 ...? H PtC ES ? ? I ? ( I I ? /0 VeR;r NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS BRUNSWICK COUNTY REPLACEMENT OF BR. NO. 55 ON SR 1140 OVER TRIB. TO SHALLOZTE CREEK '? SHEET 1 of 1 REVISED SEPT. 1987. i DIVISION OF COASTAL FIELD OFFICES Elizabeth City 108 South Water Street Elizabeth City, N.C. 27909 (919) 338-1558 Washington Box 1507 1424 Carolina Avenue Washington, N.C. 27889 (919) 946-6481 Wilmington 7225 Wrightsville Avenue Wilmington, N.C. 28403 (919) 256-4161 Raleigh Central Office N.C. Department of Natural Resources and Community Development 512 N. Salisbury Street Box 27687 Raleigh, N.C. 27611.7687 (919) 733-2293 Morehead City Box 769 3411 Arendell Street Morehead City, N.C. (919) 726-7021 1-800-682-2632 28557' U.S. Army Corps of Engineers Wilmington District Box 1890 Wilmington, N.C. 28402 (919) 3434639 MANAGEMENT