Loading...
HomeMy WebLinkAbout880194 Ver al_Complete File_19881024l c... SL1rj `? James G. Martin, Governor S. Thomas Rhodes, Secretary State of North Carolina Department of Natural Resources and Community Development Division of Environmental Management 512 North Salisbury Street 0 Raleigh, North Carolina 27611 R. Paul Wilms Director October 24, 1988 Mr. William G. Marley, Jr., P.E. Asst. Highway Administrator N. C. Department of Transportation P. 0. Box 25021 Raleigh, NC 27611 Subject: Certification Pursuant to Section 401 of the Federal Clean Water Act, Proposed Bridge Replacement - Sunset Beach N. C. Dept. of Transportation Atlantic Intracoastal Waterway Brunswick County Dear Mr. Marley: Attached hereto are two (2) copies of Certification No. 2282 issued to N. C. Department of Transportation dated October 24, 1988. If we can be of further assistance, do not hesitate to contact us. Sincerely yours, R. Paul Wilms cc: Wilmington District Corps o Engineers Wilmington Regional Office Mr. William' Mills Mr. David Owens Pollution Prevention Pars P.O. Box 27687, Raleigh, North Carolina 27611-7687 Telephone 919-733-7015 An Fnnal Onnortunitv Affirmative Action Employer A, NORTH CAROLINA Brunswick Coun CERTIFICATION THIS CERTIFICATION is issued in conformity with the requirements of Section 401 Public Laws 92-500 and 95-217 of the United States and subject to the North Carolina Division of Environmental Management- Regulations in 15 NCAC 2H, Section .0500 to N. C. Dept. of Transportation pursuant to an application filed on the 21st day of August, 1988 to replace the Sunset Beach Bridge. The Application provides adequate assurance that the discharge of fill material into a wetlands area adjacent to the waters of Atlantic Intracoastal Water Way in conjunction with the proposed bridge replacement in Brunswick County will not result in a violation of applicable Water Quality Standards and discharge guidelines. Therefore, the State of North Carolina certifies that this activity will not violate Sections 301, 302, 303, 306, 307 of PL 92-500 and PL 95-217 if conducted in accordance with the application and conditions hereinafter set forth. Condition(s) of Certification: 1. That the activity be conducted in such a manner as to prevent significant increase in turbidity outside the area of construction or construction- related discharge (increases such that the turbidity in the Stream is 25 NTU's or less are not considered significant). 2. That silt fences and other erosion controls be in place prior to any earthen movement in the area of the wetlands. 3. That all fill material be clean material from an upland source and free of any toxic materials. 4. That the side slopes of the filled areas be stabilized with vegetation as soon as possible to prevent erosion. Violations of any condition herein set forth shall result in revocation of this Certification. This Certification shall become null and void unless the above conditions are made conditions of the Federal Permit. This the 24 day of October, 1988. DIVISION OF ENVIRONMENTAL MANAGEMENT WQC# 2282 . Paul Wilms, Director STA7Z State of North Carolina Department of Natural Resources and Community Development Division of Environmental Management 512 North Salisbury Street • Raleigh, North Carolina 27611 James G. Martin, Governor S. Thomas Rhodes, Secretary October 24, 1988 Mr. William G. Marley, Jr., P.E. Asst. Highway Administrator N. C. Department of Transportation P. 0. Box 25021 Raleigh, NC 27611 R. Paul Wilms Director Subject: Certification Pursuant to Section 401 of the Federal Clean Water Act, Proposed Bridge Replacement - Sunset Beach N. C. Dept. of Transportation Atlantic Intracoastal Waterway Brunswick County Dear Mr. Marley: Attached hereto are two (2) copies of Certification No. 2282 issued to N. C. Department of Transportation dated October 24, 1988. If we can be of further assistance, do not hesitate to contact us. Sincerely yours, R. Paul Wilms cc: Wilmington District Corps o Engineers Wilmington Regional Office Mr. William Mills Mr. David Owens Pollution Prewntion Pa}•s P.O. Box 27687, Raleigh, North Carolina 27611.7687 Telephone 919-733-7015 An Eoual Opportunity Affirmative Action Employer J NORTH CAROLINA brunswicx county CERTIFICATION THIS CERTIFICATION is issued in conformity with the requirements of Section 401 Public Laws 92-500 and 95-217 of the United States and subject to the North Carolina Division of Environmental Management- Regulations in 15 NCAC 2H, Section .0500 to N. C. Dept. of Transportation pursuant to an application filed on the 21st day of August, 1988 to replace the Sunset Beach Bridge. The Application provides adequate assurance that the discharge of fill material into a wetlands area adjacent to the waters of Atlantic Intracoastal Water Way in conjunction with the proposed bridge replacement in Brunswick County will not result in a violation of applicable Water Quality Standards and discharge guidelines. Therefore, the State of North Carolina certifies that this activity will not violate Sections 301, 302, 303, 306, 307 of PL 92-500 and PL 95-217 if conducted in accordance with the application and conditions hereinafter set forth. Condition(s) of Certification: 1. That the activity be conducted in such a manner as to prevent significant increase in turbidity outside the area of construction or construction- related discharge (increases such that the turbidity in the Stream is 25 NTU's or less are not considered significant). 2. That silt fences and other erosion controls be in place prior to any earthen movement in the area of the wetlands. 3. That all fill material be clean material from an upland source and free of any toxic materials. 4. That the side slopes of the filled areas be stabilized with vegetation as soon as possible to prevent erosion. Violations of any condition herein set forth shall result in revocation of this Certification. This Certification shall become null and void unless the above conditions are made conditions of the Federal Permit. This the 24 day of October, 1988. DIVISION OF ENVIRONMENTAL MANAGEMENT WQC# 2282 j Paul Wilms, Director DIVISION OF ENVIRONMENTAL MANAGEMENT DATE: August 31, 1988 ki EE D TO: Bill Mills Operations Branch FROM: James H. Gregson Wilmington Regional Office THROUGH: Donald SafriQaW - Wilmington Regional Office SUBJECT: Regional Office Review & Recommendations Application for Permit for Excavation and/or Fill U.S.C.G. Public Notice 5-676 AIWW Bridge Construction/Sunset Beach Brunswick Co. Project Description: The N.C. D.O.T. plans to replace the steel barge swing span drawbridge with a new fixed highway bridge. Adjacent Water Body: AIWW Classification: SA Status: Closed The project has been reviewed to determine impacts to water quality. The following comments are provided: The project will require a 401 certification and that certification should include the following conditions for the filling of wetlands: a. That silt fences and other erosion controls be in place prior to any earthen movement in the area of the wetlands. b. That all fill material be from a clean upland source, free from any toxic material. c. That the turbidity in the water not exceed 25 NTU due to the project. d. That the side slope of the filled area be stabilized with vegetation as soon as possible to prevent erosion. This office has no objection to the project as proposed. cc: WiRO, CF U.S. Department of Transportatio/Aff United States Coast Guard -J i ?n ? rc ? S?'1 Commander ederai Lm nc 3LU1h,-& Fittn Coa ',Guard Des?nCt 43-1 Crawforo S?ree- Portsmouth. VA 23705-5004 Staff Symboi ( oan ) Phone. (604) 398-6227 August 22, 19$g Public Notice 5-676 To Whom It May Concern All interested parties are notified that an application has been received from the North Carolina Department of Transportation by the Commander, Fifth Coast Guard District, for approval of location and plans for construction of a fixed highway bridge over a navigable waterway of the United States. WATERWAY AND LOCATION: Atlantic Intracoastal Waterway, mile 337.9, Sunset Beach, North Carolina. CHARACTER OF WORK: To replace a steel barge, swing span drawbridge with a new fixed highway bridge. MINIMUM NAVIGATIONAL CLEARANCES: Existing Horizontal: 82' between fender systems normal to the axis of the channel. Proposed Horizontal: 90' between fender systems normal to the axis of the channel. Vertical: 0' (pontoon bridge) in the closed position (unlimited clearance in the open position) Vertical: 65' at mean high water; 69.2' at mean low water ENVIRONMENTAL CONSIDERATIONS: The Federal Highway Administration, the lead Federal Agency, has approved this project as a Finding of No Significant Impact. The bridge will be located in the floodplain. The existing bridge and surrounding area are within the 100 year floodplain. No significant encroachments on the floodplain are expected to occur due to the proposed project. The proposed bridge is along an alignment west of the existing bridge. Approximately 6 acres of right-of-way will be taken for highway purposes. The loss of approximately 11 acres of wetland due to dredging and filling will occur. The amount of acreage and wetland loss differs from the amount published in the Environmental Assessment. This . change was verified via a telephone conversation on August 10, 1988, between NC DOT and the Coast Guard. The type of wetland to be impacted will be low tidal marshland consisting of smooth cordgrass, glasswort, sea lavender, salt meadow grass, black needlerush and sea ox-eye. AUG 2 ? E8 ^lilr.:i? io„ c;ional O 'C3 'U Mitigation measures will consist of the roadbed being elevated by piers and/or pilings over much of the marsh:?and; the earthen causeway will be removed to compensate for the loss of marsh vegetation which will be returned to biological production; all fill material will be removed down to the existing marsh elevation to allow for revegetation of marsh grasses; and saltmarsh cordgrass will be planted to enhance restoration of the impacted wetlands. To maintain water quality during and after the construction of the proposed bridge, erosion control will be in accordance with Section 107-13 of NC DOT Standard Specifications for Roads and Structures. In the Environmental Assessment, it was recommended that some additional testing be conducted to determine if archaeological features were preserved under the shell midden layer. Additional tests were conducted in May 1982 and the findings were negative. The report was submitted to the State Historic Preservation Officer. SHPO then requested further testing be conducted to determine if the site was eligible for the National Register of Historic Places. This test was completed in September 1985 and the test revealed the midden deposits very thin and insignificant in the proposed right-of-way. The conclusion that the proposed project will have no effect on significant archaeological resources or properties eligible for inclusion in the National Register of Historic Places is accepted by -SHPO in their letter dated October 31, 1985. There are no wildlife and waterfowl refuges, recreational areas,. public parks or historic sites in the vicinity of the bridge. The North Carolina Division of Coastal Management has advised the applicant that a formal CZM consistency statement will not be required. The State's position of consistency will be included as part of the CAMA permit. SOLICITATION OF COMMENTS: Interested parties are invited to express their views in writing on the proposed. bridge giving sufficient detail to establish a clear understanding of their reasons for support of or opposition to the proposed work. Comments will be received for the record at the office of the Commander (ob), Fifth Coast Guard District, 431 Crawford Street, Portsmouth, Virginia 23704-5004 through September 26, 1988. Map of location and plans attached. C ./%.5 . Xd r Cap i S. Toast Guard C of ATON W terways ana ement Branch By direction of the Commander Fifth Coast Guard District EXISTING BRIDGE TO BE REMOVED PROPOSED OSED BRIDGE WATEw -? Q O O q a q J 44 w1 q 0 VICINITY MAP N 1 Miles Sheet l of 3 LOCATION MAP PPOJECT: 8.22330101 t7q[ M um" take" DEPARTMENT OF TRANSPORTATION PROPOSED HIGHWAY BRIDGE OVER I NTRACOASTAL WATERWAY ON SR 1172 TO SUNSET BEACH 9RUNSWI KTr SLSWITTED BY v6-b-,- CHEF ENGINEER DRAWN BYe B.C. H. UALL 20 SPANS K 54'-6" 4 SPANS @ 90' 4 SPANS @ 90' I c======== ?- 65' VERTICAL -' CLEARANCE .=77-=7771,71= i IR in_ FILL MEAN HIGH TIDE EL.+ .7 40 0 40 80 120 EET 90'HORIZ. SCALE CLEARANCE 20 SPANS @ 54'-6" ?: SURVEI' & BRIDGE 30'-10" 8 SPANS @='55'-6 7F rXAN LOW TIDE FILL EL. -1.5 -20't WATER DEPTH ELEVATE o N 4 SPANS ,116' CHANNEL @ 90' SPAN 116' CHANNEL SPAN 4 SPANS @ 90' LCHANNEL 8 SPANS @ 55'-6'; TO NCI 1 179 95° ' PROPOSED FENDER SYSTEM, 41990V HORIZ. CLEARANCE MAINTAIN EXISTING CHANNEL DURING* CONSTRUCTION N Ul N Z_411 i I SHEET Z of 3 .1. TO SUNSET BEACH DOLPHIN 15 i \ TYP.) r SHORE LINE I I I i EXISTING BRIDGE ,---?{I I 40 0 4b 80 120 EXISTING FENDER SYSTEM FEET SCALE PROJECT: E.22330101 FEDERAL FUNDS WILL BE USED TO FINANCE THIS PROJECT PLAN DRAWN BYt O.C. H_ CHECKED BYtSKC DATEt 11=23-E7 Tw v '"n. tow. DEPARTMENT OF TRMSP0R7A7VN note" PROPOSED HIGHWAY BRIDGE OVER I NTRACOASTAL WATERWAY ON SR 1172 TO SUNSET BEACH BRUK514'I C CCX/M? St*MtTTED DY. CHIEF ENMEER NOTICE OF FILING OF _iPPLICATION FOR CAMA MAJOR DEVELOPMENT PERMIT AND WATER QUALITY CERTIFICATION The Department of Natural Resources and Community Development hereby gives public notice as required by NCGS 113A-119(b) and 143-215 3(a)(1)(c) that N. C. Department of Transz nrtatinn Of .qunset RParh, RrunguTirk rr%1ip filed an application on June 23, 1988 for- 9L permit from the Division of Coastal Management to develop in an Area of Environmental Concern and for certification from the Division of Environmental Management that a discharge of fill material in project wetlands will not violate applicable water quality standards. According to said application The applicants propose to repl nrP the Pxi ding swim bridge connecting the mainland to Sunset Beach with a fixed-span high riGP structure. A copy of the entire application and additional information may be examined (or copies furnished upon request and payment of reproduction costs) during normal business hours of the Division of Coastal Management and/or the Division of Environmental Management, Regional Office 7225 Wrightsville Avenue, Wilmington, North Carolina 28403. The Division of Environmental Management proposes to take final action on this water quality certification on or before October 13, 1988 The issuance of the CAMA Major Development Permit and the Section 401 Certification may deviate from this projected date depending upon the nature of the comments submitted and subsequent hearings that may arise. All persons desiring to make comments should do so in writing to Mr. David Owens, Director, Division of Coastal Management, P.O. Box 27687, Raleigh, North Carolina 27611 prior to October 8 1988 for consideration in the CAMA permit decision, and to Mr. Bill Mills, Division of Environmental Management, P.O. Box 27687, Raleigh, North Carolina 27611 prior to October 8, 1988 for consideration in the water quality certification decision. Later comments on the CAMA application will be accepted and considered up to the time of permit decision. Project modifications may occur based on review and comment by the public and state and federal agencies. Notice of the permit decision in this matter will be provided upon written request. Publish on September ?2, 1988