Loading...
HomeMy WebLinkAboutWQ0041601_Application (FTSE)_20200401State of North Carolina Department of Environmental Quality DWR Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division aF Water Resources FTA 04-16 & SUPPORTING DOCUMENTATION Application Numbcr: Uy/M (to be completed by DWR) All items must be completed or the application will be returned I. APPLICANT INFORMATION: 1. Applicant's name: The Wake County Board of Education (company, municipality, HOA, utility, ctc.) 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Privately -Owned Public Utility ❑ Federal ❑ State/County ❑ Municipal ® Other 3. Signature authority's name: Clint Council per I SA NCAC 02T .0106(b) n Title: Director 4. Applicant's mailing address: I I 1 Corning Road, Suite 190 City: Cat., State: NC Zip: 27518- cD 5. Applicant's contact information: o. t. _.. Phone number: (9� 694-0218 Email Address: acouncilnu,wcnss.net A II. PROJECT INFORMATION: a 1. Project name: Northwoods ElemenWa School Mobile Unit Addition rt. m r. 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project if a modification, provide the existing permit number: WQ00 and issued date: If new construction but part of a master plan, provide the existing permit number: WQ00 3. County where project is located: Wake 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.795 Longitude:-78.7897" 5. Parcel ID (if applicable): 0764242639 (or Parcel ID to closest downstream sewer) Ill. CONSULTANT INFORMATION: 1. Professional Engineer: Danielle Kirk. PE License Number: 043929 Firm: Timmons Group Mailing address: 5410 Trinity Road, Suite 102 City: Raleigh State: NC Zip: 27607- Phone number: (984) 255-2364 Email Address: daniclle kirk(wtimmons.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: North Cary WWTP Permit Number: 48879 Owner Name: Town V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Permit Number(s): WQn_a. Downstream (Receiving) Sewer Size: 8 inch System Wide Collection System_Permit Nuinber(s) (if applicable): WQCS Owner Name(s): Town of Cary FORM: FTA 04-16 Page 1 of VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑No ON. A 2. If the Applicant is a Developer of lots to be sold, has a Develo er's 012crational Agreement FORM: DEV been attached? [:]Yes ❑No ®NIA 3. If the Applicant is a Home/Pra ert Owners' Association has an Operational A =reemeni FORM: HOA been attached? ❑ Yes []No ®NIA 4. Origin of wastewater: (check all that apply): ❑ Residential Owned ❑ Retail (stores, centers, malls) ❑ Car Wash ❑ Residential Leased ❑ Retail with food preparation. --'service ❑ Hotel and/or Motels ® School / preschool 1 day care ❑ Medical 1 dental I veterinary facilities ❑ Swimming Pool /Clubhouse ❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash ❑ Businesses I offices I factories ❑ Nursing Home ❑ Other (Explain in Attachment) 5. Nature of wastewater: 100 % Domestic/Commercial % Commercial _ % Industrial (See 15A NCAC 02T .0103(,20)) 4,Is there a Pretreatment Program in effect? ❑ Yes ❑ No 6. Has a flow reduction been approved under 15A NCAC 02T .0114(n? ❑ Yes ® No ➢ If yes, orevide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114tf1) Daily Design Flow `,b No, of Units Flow School without Cafeteria, gym or shower 10 alx30studentsx 1 OCR 10 gallstudent (30 students per CR) 10 CR 3,000 GPD gall GPD gall GPD gall GPD gall GPD gall GAD Total 3,000 GPD a See 15A NCAC 02T .01 14(b). (d). (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01 14] shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 3,000 GPD (per 15A NCAC 02T .01 14) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: FTA 04-16 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers): I. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 6 270 PVC ➢ Section II & [H of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pumn_Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: - 3. Design flow of the pump station: - millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): gallons per minute at feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1): ❑ Standby power source or pump with automatic activation and telemetry -I SA NCAC 02T .0305(h)(1)(B)_ ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(l)(C): ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timcframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)): I. Does the project comply with all separations found in 15.A NCAC 02T _0305(f) & te) ➢ 15A NCAC 02T.0305 contains minimum separations that shall be Drovidcd for sewers stems: ® Yes ❑ No Setback Parameter* Separation Required Storm sewers and other utilities not listed below vertical 24 inches Water mains vertical -water over sewer including in benched trenches) IS inches Water mains horizontal 10 feet Reclaimed water lines vertical - reclaimed over sewer 18 inches Reclaimed water lines horizontal - reclaimed over sewer 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class I or Class R impounded reservoirs used as a source of drinking water 100 feet **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water or tide elevation and wetlands see item IX.2 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet Any basement 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage s stems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade vertical 36 inches ➢ 15A NCAC 0)T_0305 contains alternatives where separations in 02T.0305(f) cannot be achieved. ➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications web a ge ➢ If noncompliance with 02T.0305 or see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ® Yes ❑ No ❑ NIA ➢ See the Division's draft separation requirements for situations where separation cannot be meet ➢ No variance is required if the alternative design criteria specified is utilized in design and construction ➢ As built documents should reference the location of areas effccted 3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 0213 .0200? ® Yes [:]No ❑ NIA ➢ This would include Trout Buffered Streams per 15A NCAC 213.0202 4. Does the project require coverage/authorization under a 404 Nationwide or ® Yes [:]No individual permits or 401 Water Quality Certifications? ➢ information can be obtained from the 401_& Buffer Permitting Branch 5. Does project comply with 15A NCAC 02T.0 I 05(c)(6) (additional permits/certifications)? ® Yes ❑ No Per 15A NCAC 02T.0 i 05(c)(6), directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to strcambanks that is subject to erosion that undermines or deteriorates the sewer. ❑ Yes ® No ❑ NIA ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be Inspected by the permittee or Its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's Individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with t 5A NCAC 02T. the ,Minimum Design Criteria for the Permitting of pump Stations and Force Mains (latest version/, and the Gravity Sewer Minimum Design Criteria (latest version as applicable? ® Yes ❑ No If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review. Approval ofthe renuest is required prior to submittal of the Fast Track Application and supporting document9. 2. Professional Engineer's Certification: Ki 1, Danielle Kira( _ attest that this application for (Professional Engineer's name from Application Item [H.1.) has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design_ NOTE — In accordance with General Statutes 143-215,6A and 143-215.6R, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. North Carolina Professional Engineer's seal, signature, and date: Applicant's Certification per 15A NCAC 02T .0106(b): (Signature Authority's name & title from Application item I.3.) attest that this application for has been reviewed by me and is accurate and complete to the best of my knowledge. l understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. 1 understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. l also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-2I5,6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to S25,000 per violation. Signature: �yr'Z.liYt.C(�i Date. ,3 - FORM: FTA 04-16 Page 5 of 5 State of North Carolina Department of Environmental Quality Division of Water Resources Dlvlslon of Water Resources Flow Tracking/Acceptance for Sewer Extension Applications (FTSE 04-16) Entity Requesting Allocation: Town of Cary Project Name for which flow is being requested: Northwoods ES Mobile Unit Project More than one FTSE may be required jar a single project if the owner of the WWTP is not responsible jar all pump stations along the route of the proposed waslewaterflom I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: North Cary WWTP Facility b. WWTP Facility Permit M 48879 uQ All flows are in MGD c. WWTP facility's permitted flow 12.0 d. Estimated obligated flow not yet tributary to the WWTP 0.69 e. WWTP facility's actual avg. flow 7.35 f. Total flow for this specific request 0.003 g. Total actual and obligated flows to the facility 7.35 h. Percent of permitted flow used 61.25 II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) Design Pump Average Daily Station Firm Flow** (Name or Capacity, * (Firm / po, Number) MGD MGD -a (B) (C) (D)=(B+C) (E)=(A-D) Obligated, Approx. Not Yet Total Current Current Avg. Tributary Flow Plus Daily Flow, Daily Flow, Obligated Available MGD MGD Flow Capacity*** * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Town of Cary Downstream Permit Number: n.a. 2t 0 e a Page I of 6 FTSE 04-16 III. Certification Statement: I Shu an Tian certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and 11 plus all attached planning assessment addendums for which I am the responsible party. Signature of this form indicates acceptance of this wastewater flow. /- -;27',?oz0 Signing Offcial'Signature Date Page 2 of b USE Q4-1 b 000�• • TIMMONS GROUP YOUR VISION ACHIEVED THROUGH OURS. TRANSMITTAL TO: NCDENR-Raleigh Regional Office Date: 03/31/20 Job #:44056 Division of Water Resources Project: Northwoods 3800 Barrett Drive —1628 Mail Service Center Reference. Raleigh, NC 27609 Copies Sent To: ❑ ENCLOSED PLEASE FIND: ❑ WE ARE SENDING UNDER SEPARATE COVER: COPIES DATE NUMBER DESCRIPTION 1 1 Fast Track Sewer Application 1 2 Project Narrative 1 1 3 USGS ma 1 4 Vicinity Ma 1 5 Flow Acceptance Form/ Certification Statement 1 6 Check for $480 THESE ITEMS ARE TRANSMITTED: If enclosures are not as noted, please notify us at once. COMMENTS: Feel free to contact me with any questions at 984-255-2364 or danielle.kirk@timmons.com. Thank you, Danielle Kirk Project Engineer Nc�ptof ENV f ro�m�n#al APR _ Qualty Ra1�r �?0 Regionot Om lee 0 �o N U Z s Cn Ce N tn 0 CC Z7 C r_ c M tp Li Ci U, llq cn a, 4 v L6 LO aq o, r E u vi c 0 E E PROJECT NARRATIVE Project Name: Northwoods ES Mobile Unit Addition Location: Cary, Wake County, NC Owner: The Wake County Board of Education 1 l 1 Corning Road, Suite 190 Cary, NC 27518 Consultant: Timmons Group Danielle Kirk, PE 5410 Trinity Road, Suite 102 Raleigh, NC 27607 Phone: 984-255-2364 PROJECT DESCRIPTION AND NARRATIVE: NC Dept QFEaviraamental QUaIi APR -12020 Raleigh Regional o"e The proposed project is inside the Town of Cary jurisdictional limits and is located along Chapel Hill Road. The scope of this project will include the construction of a seven (7) Classroom Mobile Unit. The proposed public sewer extension will provide domestic service to the new seven (7) Classroom Mobile Unit and three (3) existing classrooms on site. Development Flow Rate: 3,000 gpd 10 Classrooms @ 10 gpd/Student @ 30 Students/Classroom CHAPEL H"D { 9 VICINITY MAP (NOT TO SCALE) APPROX. LOCATION OF WORK ON SITE. ACCESS 9Y CHAPEL HILL ROAD THROUGH PARKING �LdF W- -1 W JQF,N30N CHAPL-L Hu, e..