STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
JAMES B. HUNT JR. P.O. BOX 25201, RALEIGH, N.C. 27611-5201
GOVERNOR
January 24, 2000
Mr. Mike Bell
US Army Corps of Engineers
Washington Regulatory Field Office
Post Office Box 1000
Washington, North Carolina 27889-1000
Dear Mr. Bell:
DAVID MCCOY
SECRETARY
Subject: 1999 Annual Monitoring Report for Ballance Farm Mitigation Site,
Currituck County.
Please find enclosed one copy of the 1999 Annual Monitoring Report for the Ballance
Farm Mitigation Site. This report details the hydrologic and vegetation monitoring
activities from the past year at the site, which was constructed in 1998.
A meeting to discuss this and other sites evaluated by the Washington and Wilmington
Regulatory Field Offices has been scheduled for Friday, February 18, 2000 at 9:00am in
Room 470 of the Transportation Building. Representatives from NCDOT and various
other agencies will be in attendance.
If you should have any questions prior to this meeting, please contact Beth Smyre,
Natural Systems Engineer, at (919) 733-1175. Thank you for your continued support and
cooperation.
Sincerely,
Y- C A;tz
V. Charles Bruton, Ph.D.,
Assistant Manager
Project Development and
Environmental Analysis Branch
Cc: w/ attachment
David Franklin, USACE (1)
Kelly Williams, NCDCM (2)
John Hennessy, NCDWQ (1)
David Cox, NCWRC (1)
W/o attachment
Bruce Ellis, NCDOT
STATE OF NORTH CAROLINA
DEPARTWNT OF TRANSPORTATION
JAMES B. HUNT JR.
GOVERNOR
February 2, 2001
Mr. Mike Bell
US Army Corps of Engineers
Washington Regulatory Field Office
P.O. Box 1000
Washington, NC 27889-1000
Dear Mr. Bell:
DAVID MCCOY
SECRETARY
FEB 6 2MI
Subject: 2000 Annual Monitoring Reports for the Ballance Farm Wetland
Mitigation Site, Currituck County, and the Cox Farm Mitigation Site,
Beaufort County
Please find enclosed the 2000 Annual Monitoring Reports for the Ballance Farm Wetland
Mitigation Site, Currituck County, and the Cox Farm Mitigation Site, Beaufort County.
Thess reports detail the hydrologic and vegetation monitoring activities over the past year
at the sites. Per the attached e-mail from Mr. Scott McLendon, USAGE Wilmington, the
Department is in agreement to wait to receive written comments from the regulatory and
resource agencies 30 days after receipt of the reports. A meeting to discuss any
outstanding issues on a site by site basis will be scheduled for March 8, 2001 at the
Transportation Building in Raleigh.
If you should have any questions, please contact Mr. Randy Griffin, Natural Systems
Engineer, or Mr. Phil Harris, PE, Natural Systems Engineer, at (919) 733-3141. Thank
you for your continued support and cooperation.
Sincerely,
V. Charl Bruton, Ph.D.,
U Assistant Branch Manager
Project Development and Environmental
Analysis Branch
MAILING ADDRESS: TELEPHONE: 919-733-3141 LOCATION:
PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS FAX: 919-733-9794 TRANSPORTATION BUILDING
1548 MAIL SERVICE CENTER - 1 SOUTH WILMINGTON STREET
RALEIGH NC 27699-1548 WEBSITE. WWW.DOH.DOTSTATE. NC.US RALEIGH, NC
Cc: w/ attachment
file
Scott McLendon, USACE (1)
Kelly Williams, NCDCM (2)
John Hennessy, NCDWQ (1)
David Cox, NCWRC (1)
Tom McCartney, USFWS (1)
Ron Sechler, NMFS (1)
w/o attachments
Randy Turner, NCDOT
Subject: Mitigation Monitoring Reports
Date: Fri, 5 Jan 2001 17:10:14 -0500
From: Scott.C.McLendon@saw02.usace.army.mil
To: coxdr@mail. wildlife. state.nc. us, John. Hennessy@ncmail. net, Ron.Sechler@noaa.gov,
matthews.kathy@epamail.epa.gov, Tom_McCartney@fws.gov
CC: David.Franklin@saw02.usace.army.mil, RGRIFFIN@DOT.STATE.NC.US
Greetings,
As you are aware, NCDOT is in the process of sending the annual mitigation
monitoring reports out to the regulatory and resource agencies. Instead of
bringing our comments to a meeting with NCDOT as we have done in the past, we
have elected to provide our written comments to NCDOT for their review prior to
having any sort of meeting.. If any outstanding issues remain after NCDOT has
had an opportunity to review our comments, we would plan to meet at the
Transportation Building in Raleigh on March 8, 2001.
As there is a time factor involved, we would like to provide our comments back
to NCDOT within 30 days of the receipt of the reports. To that end, a response
via e-mail is perfectly acceptable.. Please provide your comments on these
reports to the appropriate NCDOT Project Manager with a copy to me in
Wilmington.
If you have any questions regarding this message, I may be reached at
910-251-4725. Point of Contact at NCDOT is Randy Griffin.
Thanks,
Scott McLendon