Loading...
HomeMy WebLinkAbout20090385 Ver 1_Application_20091210V II r C1 V STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION BEvERLY EAvEsPERDuE GOVERNOR U. S. Army Corps of Engineers Regulatory Field Office 151 Patton Avenue Room 208 Asheville, NC 28801-5006 nnr? v?? (?? December 16, 2009 QG@ (?0 ML? ?? ?? u 2 DEC 1 E 2009 DENR - WATER QUALI5Y WETLANDS AND STORW ATER BRANCH EUGENE A. CONU, JR. SECRETARY ATTN: Mr. David Baker NCDOT Coordinator Subject: Application for Section 404 Nationwide Permit 12 for the proposed replacement of Bridge No. 82 over Jacktown Creek on NC 226 in McDowell County, Federal Aid Project No. BRSTP-226(10); Division 13; TIP No. B-4191; WBS 33539. 1.1 Reference: 404 Nationwide Permit 23 and 33; SAW-2009-0707 issued June 18, 2009 401 Water Quality Certification; Project no: 20090385 issued June 24, 2009 Dear Sir: The North Carolina Department of Transportation (NCDOT) proposes to replace Bridge No. 82 over Jacktown Creek on NC 226, with a 90-foot reinforced concrete box culvert (RCBC). There will be <0.01 acres (9 feet) of temporary impacts due to the installation of a 12-inch waterline prior to the start of the box culvert and temporary detour construction. Installation of the water line involves a 3-foot wide excavation at three crossings of the jurisdictional stream. The water line will be buried a minimum of 3 feet below existing and proposed stream grade. Please see prior received permits, referenced above. Please see enclosed copies of the Pre-Construction Notification (PCN) Form, Permit Drawings and Design Plans. Environmental documents were previously distributed and additional copies are available upon request. This project let on September 15, 2009. MAILING ADDRESS: NC DEPARTMENT OF TRANSPORTATION PROJECT DEVELOPMENT AND ENNRONMENTAL ANALYSIS 1598 MAIL SERVICE CE W ER TELEPHONE: 919A31-2000 . FAX: 919-031-2002 wzacnr- wuAni Nr. nT nar. LOCATION: 4701 ATLANTIC AVENUE SUITE 116 RALEIGH NC 27604 A copy of this permit application will be posted on the NCDOT Website at: l;trp://www.ncdot.orJdo Jprealnsu acUpe/. If you have any questions or need additional information, please cal'.- Jennifer Harrod at (919) 431-6672. Sinc`erel? ?rm( Gregory .Thorpe, Ph.D. Environmental Management Director, PDEA w/attachment Mr. Brian Wrenn, NCDWQ (2 copies) Ms. Marla Chambers. NCWRC Ms. Marella Buncick, USFWS w/r-, attachment (see permit website for attachments) :. David (hail g, P.-- 1-Ivdraulics Mr. Mark State;: Roadside Environmental Mr. Victor Barbour, P.E., Project Services Unit Nir. Greg Per ctti, .`.E.; Structure Design Mr. J.J. Swain, P. E., Division 13 Engineer Mr. Roger Bryan; Division 13 Environmental Officer Mr. Jay Bennett, P.E., Roadway Design Mr. Majed Alghandour, P. E., Programming and TIP Mr. Art McMillan, P.E.. Highway Design Mr. Scott McLendon. USACE, Wilmington Ms. Vincent Rhea. Project Planning Engineer ysen ,5ro.c»?•e?!g 4JATc„ i SV''f?i' ,? Oil cx?a=m?n,nm?nn?1'?I -`w? Office Use Only: ; Corps action ID no _ DWQ project no. _ Form Version 1.3 Dc.. 10 2003 Pre-Construction Notification (PCN) Form A. Apolicant Information 1. Processing 2... Tvpe( % of approval sought from the ® Section 404 Permit ? Section 10 Permit Coro', 1b. Specify Nationwide Permit (NWP) number: 12 or General Permit (GP) number: lc. i Has the NWP or GP number been verified by the Corps? ® Yes ? No 1 d. T vpe(s) of approval sought from the DWQ (check all that apply): 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit ? 401 Water Quality Certification - Express ? Riparian Buffer Authorization F 1 e. - Is this notification, solely for the record For the record only for DWQ 401 For the record only for Corps Permit; because written approval is not required? Certification: I 0 Yes ? No ? Yes ® No { 'if Is payment icto a mitigation bank or in-lieu tee program proposed for mitigation ? Yes I F71 of impacts? if so, attach the acceptance letter from mitigation bank or in-lieu fee program. L 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1h ? Yes ® No below. 1). Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ®No ?.. Proiect Information Name o Repiacment of Bridge 82 over Jacktown Creek on NC 226 „??, pro: Lo, County: McDowell 2c. Nearest municipality % town: Marion 2d. Subdivision name: not applicabie 2e NCDOT only, T.I.P. or state B-41 91 project no: Owner information 3a. Name(s) on Recorded Deed: North Carolina Department of Transportation 3b Deed Bcuk and Page No. not applicable :rc e f :r y Ift?r LLC rf not app.;cable a al l app u.abl ?, - - u. ' ' ^, addiess: 1598 Mail Service Center Cit .,tale, z.r,: Raisigh, NC 27699-1598 3 f. Telephone no.: ('919) 431-6672 13q. Fax no.: (919) 431-2002 ! 3h. Email address: iwh2rrod@ncdot.gov Page 1 01 11 j 4. Aooi{can; informadun (if different from owner) 4= Appiicant is _-', Agent ? Other; specify: - - - I ? 4a Business name (if apl iicab(e): _ 4d. Street address 4e. City, state, zip: 4f. Telephone no.: j 4q. Fax no. 4h. Email address: --- (5_ Agent/Consultant leant information (if applicable) I Zia. i\ienle:-? - riot aopucabip 1 511. Business name Qf appiicabe): 5c. Street address: f oa. City, state, zip: 5e. Telephony no.: 5.'. Fax no. 'ic . Email addr-s.. "'a Le 2 of 12 R. Prniect Irformafion and Prior Project. History ? Property irientification 1 a. Property identification no. (tax PIN or parcel ID): not applicable Latitude: 35.65 Longitude: - 81.95 tb. Site coordinates (in decimal degrees): (DD.DDDDDD) (-DD.DDDDDD) 950 ft L x 225 ft W = 213,750 sq. ft 1c. Property size: (213,750) sq. ft. / (43,650) sq. ft = 4.9 acres - ----- ^. SurFa::e Wate.s 12a. Narne of nearest body of water (stream. river, etc.) to Jacktown Creek procosed project: 21). Water Quality Classification of nearest receiving water C 2c. River basin: Catawba r ! 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: I Area is heavily developed/disturbed with a community college and major intersection wl 1-40 nearby. A waterline is to be placed causing some temporarv impa,,ts to Jacktown Creek. A NW 23 and 33 have already been obtained for the raplacenteni of Bridoe No. 82 with a 90-foot long reinforced concrete box culvert. I- 3b. List the total estimated acreage cf all existing wetlands on the property: 0 3r,. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 250 feet 3d. Explain the purpose of the proposed project: T'c replace a structurally deficient and/ or functionally obsolete bridge. i 3e. Describe the overall project in detail, including the type of equipment to be used: installation of a ,?-inch waterline involving a 3-foot excavation through existing stream prior to start of box culvert and temporary detour construction. The project involves replacing a 21-foot bridge with a 90-foot, RCBC at new location just no theast cf the existing location. Standard road building equipment, such as trucks, dozers, and cranes will be used. 4.. Ju isdictlnna! Detarminatiors 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property ® Yes El No ? Unknown i project (including all prior phases) in the past? Comments: rob. If the Corps made the jurisdictional determination, what type ? Preliminary ®Final of determination was made? 1 11c. !f yes, who delineated the jurisdictional areas? Agency/Consultant Company: USACE Name (if knor,n: David Barer Other: 41 . If yes, lis: the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 1 401 NW 2; and 33 SAVV-2009-0707 issued June 18, 2009, 401 Water Quality Cert. Prot. No. 20090385 issued June 24, 2003. 5. Prriect History 5a. Have permits or certifications been requested or obtained T® Yes ? No ? Unknown for this project (including all prior ph_ses) in the past? 5b. If yes, explain in detail according to "help file" instructions. See 4d above for permit information. This PCN pertains to a request for an additional permit, a NW 12, for utility mpacts. Page 3 of 12 s this z ha5eJ Project? El Yes Z No bh. it ve,., explai, n=v of 12 C. proposed Irnpacts inventory i. Fi771+d::iS JW UIi IiY?v I a. Which sections were completed below for your project (,check all that apply): ? Wetlands Streams - tributaries ? Buffers ? Open Waters ? Pond Construction 2. Wattand Impacts I If friere are wetland impacts proposed on the site, then complete this question for each wetland area impacted. .2a 2b. 2c. 2d. 2e. 2f. - Weiland impact Type of jurisdiction I dumber -- l yne of Impact Type of wetland Forested (Corps - 404, 10 Area of impact i r°er•tranEta {°) cr (!t ic.,.. -,) DWQ -- non-404, cth-r) (aoras) _i emDLirar?;T)_ I ?- -- Site1 ?P?T ElNos ?E] Corps DWQ Site 2 Cj G' ? T ---- ? Yes ? Corps ? No ? DWQ Site 3 -7, P ? Yes ? Corps -- --- _; No - - ? DWO -- - -- -- ---- - -- i=' J i ? Yes ? Corps W - - I ----- ? No ? Yes ? DWQ D Corps site -n f._:J P D 1 - -- -- j ? No Yes F__1 ? ?DWQ _ El Corps Site f [ j P F1 T - ---- L No N o ? DWQ 2g. Total wetland impacts X Permanent X Temporary 2h. Comments: 3. Stream Impacts I !f there ai .- pereennia: nr intermitieni stream impacts (including temporary impacts) proposed on me site, then complete this gl!ESfIOn fer as 5(:'r3a Ol sites impacted. 3a. i 3b. ? 3c. 3d. 3e. 3f. 3g. Stmam !.=r:pact Type of impact Stream name Perennial Type of .Average !mpact nut per - (PER) or jurisdiction stream length (linear Permanent (P) or irdermittent (Corps - 404, 10 width feet) Temporary (T (INT ? ) DWQ - non-404, (feet) _ I j Site 1? P 0 T ^ 12' waterline installation through 3-foot ackto,n'n Creek ? PER ? INT other) ® Corps ? DWQ ' 9 excavation I l PER D Corps __ _ : ?: - ? ? INT Corns ? DWQ ? --- o r; -- T . - ----- ?PER ? Corps -- ? INT ? DWQ - iia 5 ? P ? T? - -- -- J PER _ ? Corps ? I ? INT ? DWQ ? --- ---` ---- - L-. 1 -,In n Cj i ---- ---- I --- ? PER I ! INT j ? Corps ? DWQ L-- 3h. Total stream and tribtstarfr impacts ; S Temp !<M )l act, 1'asse 5 of 12 4. t).Dsn Water Impacts 4 there are proposed impacts to fakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individual) list all open water imoacts below. 14a. 4b. 4c. 4d. 4e. Open water Name of impact number- waterbody Type of impact Waterbody type Area of impact (acres) Permanent (Fl (if applicable) I or Temporary T) l D I E, PDT - f-1 P F-'! T L 02 -O= 1 PLAT - L° ?PI 4f Total o en water im acts Permanent J p p . X Temporary e. Comments: c:. Punri or E.aks Construction Fpond o_ lake construction pro posed, then oompete the chart below. _ -- `.'_ . 5b. 1 5c 5d. 5e I W^tland Impacts (acres) Stream Impacts (feet) Upland Fond ID Proposed use or (acres) number purpose of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P11 - ? Sf. Total - P`' ---- S;. Ca:ns:a=:ra: h. s a dam high hazard permit required? I] Yes ? No If yes, permit to no: I 5i. Expected pond surface area (acres): 51. Size of pond watershed (acres): 5k. Method of construction: a,-? e 5 of 1 e. Buffer impacts (tor DWG) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation. then ou MUST fill out Section D of this form. h. ? Neuse ? Tar-Parnlice ? Other: Project is in which protected basin? ? Catawba ? Randleman • d 6c. Ad. 6e. 6f. g. uffer impact nurrber - Reason for impact Buffer Zone 1 impact Zone 2 impact Permanent (P) or Stream name mitigation (square feet) (square feet) Temporary (T) re wired? Bt ?PI]T ?Yes ? No B2 1 l T J P - - ? Yes V ? ? No . .. E] Yes FM FL ' i ? N ? ---- --- o - 6h. Total buffer impacts 6i. Comim:,nts: Page 7 of 12 D. Impact Justification and Mitigation I ??- :avvlV.l!q.u au'v [Yf 111111I1L6lFU l1 __ I ?a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The placement of the waterline utilizes the path with the least amount of stream crossings.. 1b. ti^edfically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Excavation will be done by open cut and Jacktown Creek will only be impacted at the designated areas for the pipe j installation. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 22. !:-oec the project require Compensatory Mitigation for ? Yes ®No impacts to Waters of the U.S. or Waters of the State? i 2b. ii yes. mitigation is required by ;cr eck aii that appiy): ? DWQ ? Corps i i i i ? Mitigation bank 2c. If yes, which mitigation option will be used for this El Payment to in-lieu fee program projects ? Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Brame of Mifigation Bank not applicable 3b. Credits Purchased (attach receipt and let±er) Type Quantity 13c. I Comments: j d. Complete if Making a Payment to In-lieu Fee Program L 4i- Approval letter from in-lieu fee program is attached. ? Yes I 'tb. Stream mitigation requested: linear feet =. 11 using strea-: mitigation, stream temperature: ? warm ? cool ?coid 4d. Gur ar rnitigaiion requested (DWQ only): square feet {s. F?iparan we and mitigation requested acres 4f - No rlnarian wetland mitigation requested: acres 4g. ~ Coastal (tidal) wetland mitigation requested: acres 4h. Comments: - 5. _ Complete if Using a Permittee Responsible Mitigation Plan 1 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation Plan. 1 Pae; 8 of 12 - - ----------- e R"Wa:ec Ripanar: "user rtt-tes) - required by DWQ i C.a. vVill he proiecf result in an impact within a protected riparian buffer that requires ? Yes u i?o rilf , m:t,Paflan.' uo'. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of rnitigation required. r --? 6c. l 6d. - 6e. Reason for impact Total impact Zone Multiplier Required mitigation L (square feet) (square feet) ?o-• ? _ - _ 3 (2 for Catawba) Zo - - ne 2 1.5 - --? - _ ? i 6f. Total puffer mitigation required: I l- I fin. ? if buffer mitigation is require+.1, discuss what type of mitigation is proposed (e. g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Pn?;9of12 ,_, r4an-ciement and `J!ffos$ FInky ,"Plat! (required by DWQ) i ?. Diffuse Plow Plan la . Does the project include or is it adjacent to protected riparian buffers identified ? Yes ® No within one of the Riparian Buffer Protection Rules? 1 b . If yes, then is a diffuse flow plan included? If no, explain why. ? Yes [] No Cnmrllents: ?. r3[J.'!lllMate-r Management Plan '.a . Vlha-. is the overall percent imperviousness of this oroject? N/A % 2b . Does this project require a Stormwater Management Plan? ® Yes ? No 2c - . If this project DOES NOT require a Stormwater Management Plan, explain why: r 2d . If this project DOES require a Stormwater Management Plan, then provide a brief, na rrative description of the plan: See attached ? Certified Local Government 2e Who will be responsible for the review of the Stormwater Management Plan? El DWO Stormwater Program ? DWO401 Unit 3- Certified Local Government Stormwater Review i ?3a. In which local government's jurisdiction is this project? not applicable ? Phase II 3b . Which of the following locally-implemented Stormwater management programs ? NSW ? USMP apply icheck all that apply): ? Water Supply Watershed ? Other: 3c. His the approved Stormwater Management Plan with proof of approval been ? Yes ? No i i 4. DWQ Siormwater Program Review_ ? Coastal counties ? HOW 4a. Vftch of the fol!o?Adng state-implerented stormwater management programs apply ? ORW (check all that apply,/ ? Session Law 200E-246 ? Other: 4b. Has the appiov-:d Stormwater Management Plan with proof of approval been atiar:hed - -- ? Yes ? No i. "'A 'Q 1 Un!t 5?ormwater Review t 5a. Does the Stormwater Management Plan meet the appropriate requirements? ® Yes ? No 55. Have all of the 401 Unit submittal requirements been met? ®Yes ? No Paa- 10 of 12 P. Sup,siar entary Into rmadon j i i, Erviranmen:al Dct:ilmepeapon (DWQ Requirement' 1 a. Does the proiect involve an expenditure of public. (federalistatellocal) funds or the ? Yes [j No use or public (federal;state) land? 11.). If you answered "yes" to the above, does the project require preparation of an j environmental document pursuant to the requirements of the National or State ® Yes ? No (Nlrith Ca iffi i nn,, Environment_! Policy A.rf /NFPAI? PPA)? 1 c If you n U eo "yes" to the above has the document review been finalized by the State C!ea riq House? (If so, attach a xpy of the NEPA or SEPA final approval i Yes h. t Cemrnents 2. Violations (DWQ Requirement) 2a. is the site in violation of DWO Wetland Rules (15A NCAC 2H .0500), Isolated Welland Rules (15A NCAC 2H .1360), DWQ Surface Water or Wetland Standards, ? Yes ®No or Riparian Buffer Rules (15A NCAC 2E.02001)? I au ;nis?xn afterEnefact permit application? ?J i'es (?? i`do c. --- !* ; -jj-, " red ', i''.o ona er ?jc c of tiw cbo.e ques6cns, provide an explacation of the .ic!atcn(s): --------------- i -------- -- Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in Yes ®No additional development, which could impact nearby downstream water quality? 3b. If you answered ",yes" to the above... submit a qualitative or quantitative cumulative impact analysis in accordance with the st r^--!,t DV':'Q policy. If your a' swer_d "oo," provide a short narrative description. ! Due to the: minimal transportation impact resulting from this bridge replacement, this project will neither Influence nearby and uses r or stimulate growth. Therefore, a detailed indirect or cumulative effects study will not be necessary. S. SLwaye Disposal (DWQ Requirement) As. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or availabie capacity of the subject facility. not applicable. -a>rc' i I or i2 . Endangered Species and Designates: Critical Habitat (Corps Requirement) ? 15a . Will this project occur in or near an are_; with federally protected species or habitat? ? Yes ® No j 5h, . Have you checked with the USFWS con; erning Endangered Species Act El Yes No t U irnpa ;ts? --- 5- ------------ !f ves, indi,:att4 the USr•NS Field Office you have contacted. ? ? Raleigh ? Asheville 5d . What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat.; http://www.fws.govinc-es/es/countyfr.htm! ; Field investigations within the project study area we re conducted by NCDOT I staff resulting in biological conclusions of No Effect (No Habitat present) for all T&E species listed for McDowell County. 6- E:.ssentl l Fish Habitat (Corps Require er,+' 6a . Will this project occur in or near an area designated as essential fish habitat? I ? Yes No 6b , lNhat data sources did you use to determine whether vour site would impact Essential Fish Hab itat? I NMFS Counby Index 7. - Historic or Prehistoric Cultural Resources (Corps Requirement) 7a . Will this project occur in or near an area that the state, federal or tribal I governments have designated as having historic or cultural preservation status (e q., Nalional Historic Trust designation or properties significant in ? yes No North Carofr a history and archaeology? -- _ ----- - - 7b , VIhat date sources did you use to determine whether your site would impact historic or archeolo gical resources? I NEPA Documentation 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ? Yes ® No 5b. If yes, explain how project meets FEM.A requirements: Hydraulics coordination with FEMA Sc. Wha* source(s) did you use to make the fioodpiain determination? FEMA Maps I I ? l Dr. Gregory i. Thorpe. Ph D I - ? "i -? Applicant/Agent's Printed Name plican Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 12 of 12 I 0.25 0 0.25 0.5 MILES N ?Kti 1737 1737 1738 1751 - ?? V!N 1871 ?`. ` ,y 1741 17401 118 ` ?? x+^40 $ i PROJECT LOCATION 221 F X1819 -Pill '1828 r I:.... 'CF a^ 26 1 0 1 2 NORTH CAROLINA ? DEPARTMENT OF TRANSPORTATION :.J?1fl PROJECT DEVELOPMENT G ENVIRONMENTAL ANALYSIS BRANCH McDOWELL COUNTY TIP NO. B-4191 BRIDGE NO. 82 ON NC 226 OVER JACKTOWN CREEK VICINITY MAP FIGURE 1 Permit Drawing 1 Sheet .-L- Of v T L E u G i. P C _ L N ? C. ? a U L ^ R C a ? yD U J L R » _ C a9i ..Y. G .O .'. 0 o U ° -°ti . U C U ,? R R C y O L R CZ L L L C Y r. ? ? U O C R U L ? C R G U V Y V o00 F ? O ? O C R C U n R R L G Y .? 55 u E LZ£ _ C C E U U? O R C U W R y U R R U c V - V Y G L L :z z L R a=. Y > E L F U _ R 1 C Y _r ? O X ? U [GO ? O. 'Cf ? Q U 1"? Y L (Q C R = t1 L _ Y ro X E. ?.. zv, Y y l} L R N `? a z 4 O.O.. C N? O r =1 O'Ot O 0--, C Y o R .5.. U Y w L o Y C? ? M V ?" ? Y tt) O Y J ? ? V O = ? z O Y ?` Y Y ?_ J A Y G ? R 3 N ro d on o 3 o m p ? N R y Y a ? ? y, O V Y O ro ? _T O ^ X C Y '? G Y t y V > Y a+ U ? O '' O a. O Y LO ^ V ? L_ 3 C D - 'O O Y O - R v a ?_ ? r O 1 - O N 'J ? O Y (? =?? z `r ?s I U?ji?v Permit Drawing shoot 2 of o _, o es $ F - O §:R 1 " z s a 0 U 2 j T 5? L r ?I J 0 4 J 4 W Ib r O8 3 4 = M N t O 2 2 mx w 6W fL MM oLL ?a LLO J J 8 8 W¢ g a E 1g E o0 M¢ LLa Cd ? O?JeR t9 o?m"' y / ??W W I au'iWi o? i ll y? S 3 s =:s3 'a!5 ld -?- ? :' OO+SL r Z=°g9 r ? 1N r r r ? -.? ff5 r I ??6 f ,BSI a i ?aW A --Rig I z?? n ? h. m3 ?SY s sc•eaooa ? ? a d chi h. ? d ?ar? ? FI IB N? CIO . 2 W r W I 0 ? 0 Z ? W ? W m ? m N, ??V W 00*91 ???88 0 \ 4 c4' r o ? \a.er P3U S.i ! ? Ico 0 \ o T1 Fd?? .ys x al , HI 9NI ls1%3 o!s].ZI %.81 a 1 a I 9NI151X3 m \ / / l e/ l J? C o _ ? $a r e ?v o 6?? ???Isanaa: \\ e \\ 7t ?? u Y ??"Jlu vaa ? E W ?Fl..?aaa?a J z :,5 I l mWs H F- u U F- 0 ? a z Va a U $ j H >^ i, H f- \+?x? I J ?n/ .? C OJx g S .;?. 05. W / g?\Y m m-z / C W I ?i 9.o i kit ?Po sT. O Zxp? // 4?ztl ?; 35 C55 W z J w Q 3 O z M J r I i W4 ?o W w¢y o ?a low Q f Igo 3 L! Q i !? N [TN, O 7 z z Q 0 1-} 2 x W W 6 W s OLL W NQ LLO JJ l 00 mm 00 6 Q ? [ aLL Z '0l5 Sd L -7- ? QPh SI / gz'OSi? / d55xSm? / / dNN I? J c)gi; 5 56']0'W'M i?w ON N f ?L' 1 mz ?W(x ??3Q'?/?/ d? f4 / ? I r - --- DD \ 1t W O N W WN i I?J Jnm J] I m$ 0 0? aQ ??w 3 ?mm+a I ? m Nmo mm I r 1 I?Z AtOal?m J ?b a~i z .- z w w I W m o m z N m O V d' W F ? I 7 ? U 00191 z ?8?g8 C? I 1 p 1 1 i T O T1 ?dl'?9NLL 51 %3?a ISO, Ni151%3 + + ? ml ? 1 C J o^ a„ \ • 8 0 x n'?/ / \ Sb e? \? ? y/ / A' / 8 mdt ?/ - Z W : n $ n ne .a w.? ?gbk?g ? ?n / 1 3 °T4 F ? N 9 u ? N a b ,. 9 ,1In I 1 1' 1 I L o r I - ? I I I Q I I I z O I I I I L ? I I o. N 00 # ?W I LL T ?I V I\ O c , so (Jo I 5 , I I ? I IL ILu NI Z Co Lo II I I II II I I I N I II III I, ? I U ? r? ?