December 08, 2009
DWQ# 09-1225
Mecklenburg County
Mr. Jarrod Karl
City of Charlotte, Stormwater Services
600 East Fourth St.
Charlotte, NC 28202
Subject: Upper Stoney Creek Stream Restoration
APPROVAL of 401 Water Quality Certification with Additional Conditions
Dear Mr. Karl:
You have our approval, in accordance with the general certification and those conditions listed
below, to impact 0.10 acre of wetland and 3,962 linear feet (If) of stream in order to conduct the
proposed stream restoration project in Mecklenburg County, as described in your application received
by the Division of Water Quality (DWQ) on November 13, 2009. After reviewing your application, we
have determined that this project is covered by Water Quality General Certification Numbers 3705
and 3689, which can be viewed on our web site at http://h2o.enr.state.nc.us/ncwetlands. The
General Certifications allow you to use Nationwide Permit Numbers 18 and 27 once they are issued
to you by the U.S. Army Corps of Engineers. Please note that you should get any other federal, state
or local permits before proceeding with your project, including those required by (but not limited to)
Sediment and Erosion Control, Non-Discharge, and Water Supply Watershed regulations.
The above noted Certifications will expire when the associated 404 permits expire unless
otherwise specified in the General Certification. This approval is only valid for the purpose and
design that you described in your application. If you change your project, you must notify us in
writing, and you may be required to send us a new application for a new certification. If the property
is sold, the new owner must be given a copy of the Certification and approval letter; and is thereby
responsible for complying with all conditions.
In addition to the requirements of the certification, you must also comply with the following
conditions:
1. The Mooresville Regional Office shall be notified in writing once construction at the approved
impact areas has commenced.
Mooresville Regional Office One
Location: 610 East Center Avenue, Suite 301, Mooresville, NC 28115 NorthCarolina
Phone: (704) 663-1699\Fax: (704) 663-6040\ Customer Service: 1-877-623-6748 ?aturall?
Internet. www.ncwaterauality.org
An Fminl Onnnrtnnihi/APrirmativa Artinn Fmnlnvar _ 9;00 Ronvrlori1100/ Pnct r.nnciimar Pin nor
2. Deed notifications or similar mechanisms shall be placed on all retained jurisdictional wetlands,
waters and protective buffers in order to assure compliance for future wetland, water and buffer
impact. These mechanisms shall be put in place at the time of recording of the property, or of
individual lots, whichever is appropriate. A sample deed notification can be downloaded from the
401/Wetlands Unit web site at http-.Hh2o.enr.state.nc.us/ncwetiands. The text of the sample deed
notification may be modified as appropriate to suit to this project.
3. The project if submitted to and included in the Charlotte Umbrella Mitigation Bank shall
meet/adhere to all requirements and specifications of the banking agreement.
4. Use of native vegetation and other soft stream bank stabilization techniques must be used where
practicable instead of riprap or other bank hardening methods. If riprap is necessary, it shall not
be placed in the streambed, unless approved by the DWQ.
5. Storm water discharge structures at this site shall be constructed in a manner such that the
potential receiving streams (of the discharge) will not be impacted due to sediment accumulations,
scouring or erosion of the stream banks.
6. No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond
the footprint of the impacts depicted in the Preconstruction Notification application. All
construction activities associated with this project shall meet, and/or exceed, those requirements
specified in the most recent version of the North Carolina Sediment and Erosion Control Manual
and shall be conducted so that no violations of state water quality standards, statutes, or rules
occur.
7. Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum
extent practicable. If placement of sediment and erosion control devices in wetlands and waters is
unavoidable, they shall be removed and the natural grade restored within two months of the date
the Division of Land Resources has released the project.
8. Upon completion of the project, the applicant shall complete and return the enclosed "Certificate of
Completion" form to the 401/Wetlands Unit of the NC Division of Water Quality.
9. Continuing Compliance. The applicant (City of Charlotte Jarrod Karl) shall conduct all activities in
a manner so as not to contravene any state water quality standard (including any requirements for
compliance with section 303(d) of the Clean Water Act) and any other appropriate requirements of
state and federal law. If DWQ determines that such standards or laws are not being met
(including the failure to sustain a designated or achieved use) or that state or federal law is being
violated, or that further conditions are necessary to assure compliance, DWQ may reevaluate and
modify this certification to include conditions appropriate to assure compliance with such
standards and requirements in accordance with 15 A NCAC 2H.0507(d). Before codifying the
certification, DWQ shall notify the applicant and the US Army Corps of Engineers, provide public
notice in accordance with 15A NCAC 21-1.0503, and provide opportunity for public hearing in
accordance with 15A NCAC 2H.0504. Any new or revised conditions shall be provided to the
applicant in writing, shall be provided to the United States Army Corps of Engineers for reference
in any permit issued pursuant to Section 404 of the Clean Water Act, and shall also become
conditions of the 404 Permit for the project.
If you do not accept any of the conditions of this certification, you may ask for an adjudicatory
hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing,
send a written petition that conforms to Chapter 1506 of the North Carolina General Statutes to the
Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This
certification and its conditions are final and binding unless you ask for a hearing.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean
Water Act. If you have any questions, please telephone Mr. Alan Johnson in the Mooresville
Regional Office at 704-663-1699 or Ms. Cyndi Karoly in the Central Office in Raleigh 919-733-9721.
Sincerely,
KIZ 3 k-1
for Coleen H. Sullins
Attachments