Loading...
HomeMy WebLinkAbout20200608 Ver 1_Riparian Buffer Authorization Request_20200506Buffer Authorization Application Form 15ANCAC 02B .0233 (8)(b), .0243 (8)(b), .0250 (11)(b), .0259 (8)(b), .0267 (11)(c), .0607 (e)(2) Buffer Authorization Online Fo Update 10/23/2018 Original Submittal 5/6/2020 A. Owner/Applicant Information General Information Primary Contact Email:* info@graindabuilders.com Rease list the contact person's en -ail for questions or payrrent on this project if needed. Who is submitting the application?* W Owner r Applicant other than Owner r Agent Is there an agent working on this application r Yes but not submitting it? r No 1. Property Owner Information: la. Name on Recorded Deed:* 1b. Responsible Party: 1c. Mailing Address:* 1d. Telephone:* 704-892-7640 Grainda Builders Inc Joe Grainda (for Corporations) Street Address PO Box 1221 Address Line 2 aty State / Province / Pbegion Cornelius NC Fbstal / Zip Code Country 28031 United States le. Email Address:* info@graindabuilders.com B. Project Information and Prior Project History ...................................................................... ...................................................... .................. .............. 1. Project Information la. Name of Project:' Mt Isle Lot 1 Boardwalk (Subdivision, facility, or establishrrent narre) 1b. Is this a publicly -funded transportation project?* Yes r No 1d. Subdivision Name: Mt Isle Estates 1e. Nearest Charlotte Municipality: 1f. Property Size: 1.65 acres A 1g. County (or Counties) where the project is located:* Mecklenburg 1h. Property ID# Date of Purchase 3123140 1 /8/2020 Tax RN or Rarcel id 1 i. Deed Information .... ...... ...... ...... ...... Type of Book Book# Page# Deed F I Map 49 757 1j. Attach a copy of the recorded map that indicates when the lot was last platted. nick the upload button or drag and drop files here to attach docurrent X19MIE1-Model.pdf 251.13KB RDF only 1k. How would you like to provide the Latitude and Longitude information?* r Address Lookup r Manually Address Lookup Street Address 2455 Mountain Park Drive Address Line 2 aty State / Frovince / Ibgion Charlotte NC Fbstal / Zip Code Country 28214 us Latitude * 35.346159 Longitude *-80.969858 11. Is the project located in any of North Carolina's twenty coastal counties? r Yes r No 2. Surface Waters 2a. Name of the nearest body of water to proposed project:* Mountain Island Lake 2b. Water Quality Classification of nearest receiving water:* 0 2c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:* 0 (linear feet only) 3. Project Description: 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: This is a residential home site with direct access to Mountain Island Lake. Topography map link: https://viewer.nationalmap.gov/basic/? basemap=b1 &category=nbd,bathydem,bathylidar,ned,nedsrc,histtopo,nhd,naip,nbd mi,gnis, smaIIscale,nsd,vectorcmb,ntd,ustopo,wood Ian d&q=&zoom=16&bbox=- 80.97758532,35.33970429,-80.96316576,35.35234105&preview=-&avail=&refpoly= 3b. Attach an 8'/. x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site. nick the upload button or drag and drop files here to attach document 2455 Mountain Park Drive Charlotte Topography.pdf 175.72KB FDF only 3c. Attach an 81/2 x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map depicting the project site. aick the upload button or drag and drop files here to attach docurrent NC -Paw Creek_164315_1948_24000_geo.pdf 9.08MB FDF only 4. Proposed Activity Provide a detailed description of the proposed activity including its purpose and include the type of equipment to be used: There is a ravine between the house and the lake. We propose building a boardwalk over the ravine to allow easy access to the lake for the homeowners. This would be a 8' wide wood slatted deck structure spanning over the ravine. This raised structure would be supported by timber pilings similar to a pier. Attach a site plan as applicable to the project: Click the upload button or drag and drop files here to attach docurrent 2455 Mountain Park Drive Charlotte.pdf 106.82KB FDF only 5. Jurisdictional Determinations ................................................................................................................................................ 5a. Have jurisdictional wetlands or stream determinations by the Corps or State been requested or obtained for this property/project (including all prior phases) in the past?* f Yes r No 6. Project History .................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?* r Yes r No 7. Future Project Plans 7a. Is this project a phased project?* O Yes O No C. Proposed Impacts Inventory Buffer Impacts Project is in which protected Basin?* r Neuse River Basin (15A NCAC 02B.0233) r Catawba River Basin (15A NCAC 02B.0243) f Randleman Lake Watershed (15A NCAC 0213.0250) r Tar -Pamlico River Basin (15A NCAC 0213.0259) r Jordan Lake Watershed (15A NCAC 02B.0267) r Goose Creek Watershed (15A NCAC 02B.0606 & 15A NCAC 02B.0607) Individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. Site# - Reason Stream Name Buffer Impact* LlmpactType:—]L Zone 1 Zone 2 r Boardwalk - lake Mountain Permanent Exempt 0.00 0.00 access Island Lake (P) Square Square K/lap label (e.g. Road F@rnnor Terrp Feet Feet Crossing 1) Total Zone 1 Impacts: 0.00 Total Zone 2 Impacts: 0.00 Total Buffer Impacts: 0.00 Comments: The boardwalk would have little to no impact on the ravine. Water only flows through the bottom of the ravine during a rain. Shortly after the rain stops, the water flow recedes and then no water is in the bottom of the ravine. The raised boardwalk will be constructed similar to a pier to allow easy access to the lake for the homeowners. D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project.* The boardwalk will be built by manual labor requiring no machines at the build site. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.* Boardwalk materials will be hand delivered to the site. Tools will be small power tools to cut and join materials. E. Diffuse Flow Plan 1a. What type of SCM are you providing?* E Level Spreader r Vegetated Conveyance (lower SHWT) r Wetland Swale (higher SHWT) V Proposed project will not create concentrated stormwater flow through the buffer F— Other SCM that removed minimum of 30% nitrogen 1c. Diffuse Flow Documentation* aick the upload button or drag and drop files here to attach docurrent Supplemental EZform- MI1 Boardwalk.pdf 171.5KB FDF only F. Supplementary Information Environmental Documentation ............ 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? C Yes (-- No Violations 2a. Is the site in violation of DWR Wetland Rules (15A NCAC 02H .0500), Isolated Wetland Rules (15A NCAC 02H .1300), DWR Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 02B .0200)? r Yes t: No 2b. Is this an after -the -fact buffer authorization application? f Yes F No ............ G. Additional Information Please upload any additional information you would like the Division to consider during application review. Additional Attachments: Click the upload button or drag and drop files here to attach docunent FDF only Additional Comments: This is a small project but because it sits in the buffer, Charlotte Zoning is requiring a buffer authorization before issuing a permit to construct the boardwalk. H. Sign and Submit By digitally signing below, I certify that: o I have given true, accurate, and complete information on this form; • I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act') o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the application form." Print Name:* Joe Grainda Signature Submission Date: (Auto populated field) Initial Review Is this accepted into the review process?* Is this project a public transportation project?* ID#* Version:* Select Reviewer: Select Reviewing Office* Has payment been received?* O Yes O No O Yes O No 20200608 Alan Johnson:eads\adjohnson1 Mooresville Regional Office - (704) 663-1699 C No Payment Needed r Fee Received r Need Fee - send electronic notification 2455 Mountain Park Drive Charlotte, NC UNITED STATES `s DEPARTMENT OF THE INTERIOR �'- GEOLOGICAL SURVEY FILE COPY 1,-,^A-B ion and lSekl*V- STATE OF NORTH CAROLINA HIGHWAY AND PUBLIC WORKS COMMISSION 35°22'31 161 I 17'3 5600 FE 35°1! n1 ­1 8.7 Mi. TO N.C. 73 Mapped, edited, and published by the Geological Survey Control by USGS, USC&GS, and 'North Carolina Geodetic Survey Compiled from aerial photographs by multiplex methods low Aerial photographs taken 1948. Field check 1948 Polyconic projection. 1927 North American datum 10,000-foot grid based on North Carolina coordinate system Red tint indicates area in which only landmark buildings are shown - ,_ SCALE 1:24000 1 0 1 MILE 1 1000 0 1000 2000 3000 4000 5000 6000 7000 FEET -------------- 1 .5 0 1 KILOMETER z � m A zz z DATUM IS MEAN SEA LEVEL X. APPROXIMATE MEAN DECLINATION, 1948 THIS MAP COMPLIES WITH NATIONAL MAP ACCURACY STANDARDS FOR SALE BY U. S. GEOLOGICAL SURVEY, WASHINGTON 25, D. C. A FOLDER DESCRIBING TOPOGRAPHIC MAPS AND SYMBOLS IS AVAILABLE ON REQUEST USCs Historical File TOROVJaphic DiYisiop PAW CREEK QUADRANGLE NORTH CAROLINA op�� 7.5 MINUTE SERIES (PLANIMETRIC) 10 OnOC7/7n" °22'30" 000 r F, 30" 15, 80'52'30" .c, ROAD CLASSIFICATION ��, 4 LANE 16 LANE LI ht-dU 0 i8 ty...................... T F 4 LANE 16 LANE F Medium -duty � Unimproved dirt =---_-= 9� U. S. Route O State Route FILE C$op PAW CREEK, N. C. N3515—W8052.5/7.5 1948 �g52 NOTES: * PROPERTY MAY BE SUBJECT TO RECORDED OR UNRECORDED RIGHTS OF WAYS OR EASEMENTS NOT OBSERVED * OWNER TO VERIFY ALL SETBACKS AND ZONING REGULATIONS PRIOR TO ANY PLANNING OR CONSTRUCTION. * DIMENSIONS OF ALL IMPROVEMENTS SHOWN ON THIS PLAT SHOULD NOT BE SCALED OR RELIED UPON FOR DESIGN OR CONSTRUCTION WITHOUT A FIELD VERIFICATION OF ALL DIMENSIONS. * DIGITAL COPIES OF THIS FILE ARE FOR REFERENCE ONLY AND MAY NOT BE USED FOR DESIGN WORK. * A PORTION OF THIS PROPERTY IS LOCATED IN A 100 YEAR FLOOD PLAIN. * NO PORTION OF THE PROPOSED STRUCTURE IS LOCATED IN THE 100 YEAR FLOOD PLAIN. 60 0 60 120 180 GRAPHIC SCALE - FEET MOUNTAIN ISLAND LAKE LOT #2 MB 49-757 Course Bearing Distance L1 S 17°12'08" E 22.85' L2 S 27°52'37" E 52.10' Curve Radius Length Chord Chord Bear. Cl 1 170.00' 32.64' 32.59' S 22°22'37" E LEGEND R\W RIGHT—OF—WAY E\P EDGE OF PAVEMENT C\L CENTERLINE PDE PERMANENT DRAINAGE EASEMENT X UTILITY POLE LIGHT POLE OVERHEAD UTILITY LINE FENCE MOUNTAIN PARK RD 40' PUBLIC R\W COMMON AREA MB 28-987 SITE PLAN SURVEY FOR GRAINDA BUILDERS 2455 MOUNTAIN PARK DR, CHARLOTTE, NC LOT #1, MT. ISLE ESTATES CITY OF CHARLOTTE, MECKLENBURG COUNTY, NC I SCALE: 1" = 60' DEDMON SURVEYS CHUCK POOVEY, PLS #3762 ROBERT DEDMON, PLS #3899 3704 NC HIGHWAY #16 NORTH P.O. BOX 494 - DENVER, NC 28037 PHONE: 704/483/49o8 FAX: 704/483/2170 .. N CA Q�pFESSI SEAL L-3899 = — %�FRT SURD /��llll 111111\\\ 3899 PROFESSIONAL LAND SURVEYOR LICENSE N0. SURV. BY: N\A I DRAWN: RD J JOB# RD VICINITY MAP SITE a 0 0 MT ISLE 7z HARBOR DR i rn m 2455 Mountain Park Drive Charlotte, NC SUPPLEMENT-EZ COVER PAGE FORMS LOADED 1 Project Name Mt Isle Lot 1 Boardwalk 2 Project Area (ac)1.65 3 Coastal Wetland Area (ac)0 4 Surface Water Area (ac)0 5 Is this project High or Low Density?Low 6 Does this project use an off-site SCM?No 7 Width of vegetated setbacks provided (feet)0 8 Will the vegetated setback remain vegetated?Yes 9 Is BUA other that as listed in .1003(4)(c-d) out of the setback?No 10 Is streambank stabilization proposed on this project?No 11 Infiltration System 0 12 Bioretention Cell 0 13 Wet Pond 0 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting (RWH)0 18 Green Roof 0 19 Level Spreader-Filter Strip (LS-FS)0 20 Disconnected Impervious Surface (DIS)0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Bayfilter 0 26 Filterra 0 FORMS LOADED 27 Name and Title:Joseph Grainda, President 28 Organization:Grainda Builders, Inc. 29 Street address:17824 Statesville Rd. Suite 121 30 City, State, Zip:Cornelius, NC 28031 31 Phone number(s):704-892-7640 32 Email:info@graindabuilders.com Certification Statement: Designer ______________________________________________ Signature of Designer ______________________________________________ Date I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. PROJECT INFORMATION NUMBER AND TYPE OF SCMs: DESIGNER CERTIFICATION COMPLIANCE WITH 02H .1003(4) Seal