Loading...
HomeMy WebLinkAboutSW1200501_Plan (Set)_20200506BUNCOMBE COUNTY, NORTH CAROLINA BUNCOMBE COUNTY SCHOOLS CAR RIDER IMPROVEMENTS FAIRVIEW ELEMENTARY SCHOOL SCHEDULE OF DRAWINGS APRIL 2020 VICINITY MAP G-001 . . . . . COVER SHEET G-002 . . . . . GENERAL NOTES AND LEGENDS G-003 . . . . . GENERAL NOTES AND LEGENDS CE-101 . . . .EXISTING CONDITIONS C-101 . . . . .SITE PLAN C-102 . . . . .CAR RIDER ROAD PLAN AND PROFILE C-103 . . . . .GRADING PLAN C-104 . . . . .EROSION CONTROL PLAN C-105 . . . . .STORMWATER PLAN C-106 . . . . .STORMWATER PROFILES C-501 . . . . .MISCELLANEOUS DETAILS C-502 . . . . MISCELLANEOUS DETAILS C-503 . . . . MISCELLANEOUS DETAILS C-504 . . . . MISCELLANEOUS DETAILS C-505 . . . . MISCELLANEOUS DETAILS C-506 . . . . MISCELLANEOUS DETAILS 2 0 1 2 4 2DIVISION VALUE = FEETGRAPHIC SCALE P:\2019\19.00154-BUNCOMBEBOE-FAIRVIEW ELEM CAR RIDER LANE\DRAWINGS\CIVIL\19.00154 SHEETS.DWG PLOT DATE 4/16/2020 9:09 AM NATHAN SAWYERmcgillassociates.com 55 Broad Street Asheville, NC 28801 828.252.0575 NC Firm License # C-0459 19.00154 BUNCOMBE COUNTY SCHOOLS - FAIRVIEW ELEMENTARY SCHOOL - CAR RIDER IMPROVEMENTSPROJECT ENGINEER MR. SCOTT BURWELL, PE 55 BROAD STREET ASHEVILLE, NC 28801 828.252.0575 DEVELOPER MR. CLARK WYATT, DIRECTOR OF MAINTENANCE BUNCOMBE COUNTY SCHOOLS 175 BINGHAM ROAD ASHEVILLE, NC 28806 GENERAL NOTES AND LEGENDS 19.00154 BUNCOMBE COUNTY SCHOOLS - FAIRVIEW ELEMENTARY SCHOOL - CAR RIDER IMPROVEMENTS55 Broad Street Asheville, NC 28801 828.252.0575 NC Firm License # C-0459 mcgillassociates.com NOT TO SCALE N/A G-002 P:\2019\19.00154-BUNCOMBEBOE-FAIRVIEW ELEM CAR RIDER LANE\DRAWINGS\CIVIL\19.00154 SHEETS.DWG PLOT DATE 4/14/2020 4:25 PM NATALIE CROOMNO.DATE BY DESCRIPTION SHEET OFFICE MANAGER PROJECT MANAGER DESIGNER REVIEWER DATE PROJECT #FUNDING # CTV 000000000000000000000000000000000nnnEXISTING CONDITIONS LEGEND BUNCOMBE COUNTY, NORTH CAROLINA BUNCOMBE COUNTY SCHOOLS CAR RIDER IMPROVEMENTS FAIRVIEW ELEMENTARY SCHOOL M. CATHEY S. BURWELL N. CROOM N. SAWYER APRIL 2020 19.00154 GENERAL EROSION CONTROL NOTESEC 43 UPDATED FEBRUARY, 2020 NCG01 SELF-INSPECTION, RECORDKEEPING AND REPORTING EFFECTIVE: 04/01/19 PART III SELF-INSPECTION, RECORDKEEPING AND REPORTING SECTION A: SELF-INSPECTION Self-inspections are required during normal business hours in accordance with the table below. When adverse weather or site conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of equal to or greater than 1.0 inch occurs outside of normal business hours, the self-inspection shall be performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. PART III SELF-INSPECTION, RECORDKEEPING AND REPORTING SECTION B: RECORDKEEPING 1.E&SC Plan Documentation The approved E&SC plan as well as any approved deviation shall be kept on the site. The approved E&SC plan must be kept up-to-date throughout the coverage under this permit. The following items pertaining to the E&SC plan shall be documented in the manner described: 2. Additional Documentation In addition to the E&SC Plan documents above, the following items shall be kept on the site and available for agency inspectors at all times during normal business hours, unless the Division provides a site-specific exemption based on unique site conditions that make this requirement not practical: (a)This general permit as well as the certificate of coverage, after it is received. (b)Records of inspections made during the previous 30 days. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically-available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard-copy records. (c)All data used to complete the Notice of Intent and older inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] PART III SELF-INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1.Occurrences that must be reported Permittees shall report the following occurrences: (a)Visible sediment deposition in a stream or wetland. (b)Oil spills if: ·They are 25 gallons or more, ·They are less than 25 gallons but cannot be cleaned up within 24 hours, ·They cause sheen on surface waters (regardless of volume), or ·They are within 100 feet of surface waters (regardless of volume). (a)Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (b)Anticipated bypasses and unanticipated bypasses. (c)Noncompliance with the conditions of this permit that may endanger health or the environment. 2.Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Division's Emergency Response personnel at (800) 662-7956, (800) 858-0368 or (919) 733-3300. NCG01 GROUND STABILIZATION AND MATERIALS HANDLING EFFECTIVE: 04/01/19 GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCG01 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCG01 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below: POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1.Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 2.Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3.Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4.Provide ponding area for containment of treated Stormwater before discharging offsite. 5.Store flocculants in leak-proof containers that are kept under storm-resistant cover or surrounded by secondary containment structures. HAZARDOUS AND TOXIC WASTE 1.Create designated hazardous waste collection areas on-site. 2.Place hazardous waste containers under cover or in secondary containment. 3.Do not store hazardous chemicals, drums or bagged materials directly on the ground. EQUIPMENT AND VEHICLE MAINTENANCE 1.Maintain vehicles and equipment to prevent discharge of fluids. 2.Provide drip pans under any stored equipment. 3.Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4.Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5.Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6.Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1.Never bury or burn waste. Place litter and debris in approved waste containers. 2.Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3.Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4.Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5.Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6.Anchor all lightweight items in waste containers during times of high winds. 7.Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8.Dispose waste off-site at an approved disposal facility. 9.On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1.Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2.Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3.Contain liquid wastes in a controlled area. 4.Containment must be labeled, sized and placed appropriately for the needs of site. 5.Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1.Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2.Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3.Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. HERBICIDES, PESTICIDES AND RODENTICIDES 1.Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2.Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3.Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4.Do not stockpile these materials onsite. CONCRETE WASHOUTS 1.Do not discharge concrete or cement slurry from the site. 2.Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3.Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4.Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5.Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6.Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7.Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8.Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9.Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10.At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. EARTHEN STOCKPILE MANAGEMENT 1.Show stockpile locations on plans. Locate earthen-material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2.Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3.Provide stable stone access point when feasible. 4.Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. A A BELOW GRADE WASHOUT STRUCTURE 1:1 SIDE SLOPE (TYP.) 10 MIL PLASTIC LINING 3'-0"MIN.& X'MAX.SECTION A-A NOT TO SCALE ABOVE GRADE WASHOUT STRUCTURE NOT TO SCALE PLAN SECTION B-B HIGH COHESIVE & LOW FILTRATION SOIL BERM 8"6" 2' HIGH COHESIVE & LOW FILTRATION SOIL BERM1:1 SIDE SLOPE (TYP.) 10 MIL PLASTIC LINING B B 3'-0"MIN.& X'MAX.A SANDBAGS (TYP.) OR STAPLES SANDBAGS (TYP.) OR STAPLES SANDBAGS (TYP.) OR STAPLES SANDBAGS (TYP.) OR STAPLES NOTES: 1. ACTUAL LOCATION DETERMINED IN FIELD 2. THE CONCRETE WASHOUT STRUCTURES SHALL BE MAINTAINED WHEN THE LIQUID AND/OR SOLID REACHES 75% OF THE STRUCTURES CAPACITY. 3.CONCRETE WASHOUT STRUCTURE NEEDS TO BE CLEARY MARKED WITH SIGNAGE NOTING DEVICE. NOTES: 1. ACTUAL LOCATION DETERMINED IN FIELD 2. THE CONCRETE WASHOUT STRUCTURES SHALL BE MAINTAINED WHEN THE LIQUID AND/OR SOLID REACHES 75% OF THE STRUCTURES CAPACITY TO PROVIDE ADEQUATE HOLDING CAPACITY WITH A MINIMUM 12 INCHES OF FREEBOARD. 3.CONCRETE WASHOUT STRUCTURE NEEDS TO BE CLEARY MARKED WITH SIGNAGE NOTING DEVICE. ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER CONCRETE WASHOUT CONCRETE WASHOUT PLAN CLEARLY MARKED SIGNAGE NOTING DEVICE (18"X24" MIN.) CLEARLY MARKED SIGNAGE NOTING DEVICE (18"X24" MIN.) SILT FENCE 10'MIN10' MIN SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. Site Area Description Timeframe variations -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed unless there is zero slope Stabilize within this many calendar days after ceasing land disturbance 7 7 7 14 None None (a)Perimeter dikes, swales, ditches, and perimeter slopes (b)High Quality Water (HQW) Zones (c)Slopes steeper than 3:1 If slopes are 10' or less in length and are not steeper than 2:1, 14 days are allowed (d)Slopes 3:1 to 4:1 (e)Areas with slopes flatter than 4:1 14 -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed GENERAL NOTES AND LEGENDS 19.00154 BUNCOMBE COUNTY SCHOOLS - FAIRVIEW ELEMENTARY SCHOOL - CAR RIDER IMPROVEMENTS55 Broad Street Asheville, NC 28801 828.252.0575 NC Firm License # C-0459 mcgillassociates.com NOT TO SCALE N/A G-003 P:\2019\19.00154-BUNCOMBEBOE-FAIRVIEW ELEM CAR RIDER LANE\DRAWINGS\CIVIL\19.00154 SHEETS.DWG PLOT DATE 4/14/2020 4:25 PM NATALIE CROOMNO.DATE BY DESCRIPTION SHEET OFFICE MANAGER PROJECT MANAGER DESIGNER REVIEWER DATE PROJECT #FUNDING #BUNCOMBE COUNTY, NORTH CAROLINA BUNCOMBE COUNTY SCHOOLS CAR RIDER IMPROVEMENTS FAIRVIEW ELEMENTARY SCHOOL M. CATHEY S. BURWELL N. CROOM N. SAWYER APRIL 2020 19.00154 EXISTING CONDITIONS55 Broad Street Asheville, NC 28801 828.252.0575 NC Firm License # C-0459 mcgillassociates.com BUNCOMBE COUNTY, NORTH CAROLINA BUNCOMBE COUNTY SCHOOLS CAR RIDER IMPROVEMENTS FAIRVIEW ELEMENTARY SCHOOL DIVISION VALUE = FEETGRAPHIC SCALE 40 0 20 40 80 40 0 M. CATHEY S. BURWELL N. CROOM N. SAWYER APRIL 2020 19.00154 N/A CE-101 PLAN P:\2019\19.00154-BUNCOMBEBOE-FAIRVIEW ELEM CAR RIDER LANE\DRAWINGS\CIVIL\19.00154 SHEETS.DWG PLOT DATE 4/14/2020 4:25 PM NATALIE CROOMNO.DATE BY DESCRIPTION SHEET OFFICE MANAGER PROJECT MANAGER DESIGNER REVIEWER DATE PROJECT #FUNDING #19.00154 BUNCOMBE COUNTY SCHOOLS - FAIRVIEW ELEMENTARY SCHOOL - CAR RIDER IMPROVEMENTS SITE PLAN55 Broad Street Asheville, NC 28801 828.252.0575 NC Firm License # C-0459 mcgillassociates.com BUNCOMBE COUNTY, NORTH CAROLINA BUNCOMBE COUNTY SCHOOLS CAR RIDER IMPROVEMENTS FAIRVIEW ELEMENTARY SCHOOL DIVISION VALUE = FEETGRAPHIC SCALE 30 15 30 60 30 0 M. CATHEY S. BURWELL N. CROOM N. SAWYER APRIL 2020 19.00154 N/A C-101 PLAN P:\2019\19.00154-BUNCOMBEBOE-FAIRVIEW ELEM CAR RIDER LANE\DRAWINGS\CIVIL\19.00154 SHEETS.DWG PLOT DATE 4/14/2020 5:06 PM NATALIE CROOMNO.DATE BY DESCRIPTION SHEET OFFICE MANAGER PROJECT MANAGER DESIGNER REVIEWER DATE PROJECT #FUNDING #19.00154 BUNCOMBE COUNTY SCHOOLS - FAIRVIEW ELEMENTARY SCHOOL - CAR RIDER IMPROVEMENTS CAR RIDER ROAD PLAN AND PROFILE55 Broad Street Asheville, NC 28801 828.252.0575 NC Firm License # C-0459 mcgillassociates.com DIVISION VALUE = FEETGRAPHIC SCALE 50 0 25 50 100 50 0 N/A C-102 PLAN P:\2019\19.00154-BUNCOMBEBOE-FAIRVIEW ELEM CAR RIDER LANE\DRAWINGS\CIVIL\19.00154 SHEETS.DWG PLOT DATE 4/14/2020 4:26 PM NATALIE CROOMNO.DATE BY DESCRIPTION SHEET OFFICE MANAGER PROJECT MANAGER DESIGNER REVIEWER DATE PROJECT #FUNDING # PROFILE SCALE: HORIZ. 1"= 50' VERT. 1"= 5' BUNCOMBE COUNTY, NORTH CAROLINA BUNCOMBE COUNTY SCHOOLS CAR RIDER IMPROVEMENTS FAIRVIEW ELEMENTARY SCHOOL M. CATHEY S. BURWELL N. CROOM N. SAWYER APRIL 2020 19.00154 19.00154 BUNCOMBE COUNTY SCHOOLS - FAIRVIEW ELEMENTARY SCHOOL - CAR RIDER IMPROVEMENTS ########### # # #######PROPOSED CAR RIDER ROAD GRADING PLAN55 Broad Street Asheville, NC 28801 828.252.0575 NC Firm License # C-0459 mcgillassociates.com BUNCOMBE COUNTY, NORTH CAROLINA BUNCOMBE COUNTY SCHOOLS CAR RIDER IMPROVEMENTS FAIRVIEW ELEMENTARY SCHOOL DIVISION VALUE = FEETGRAPHIC SCALE 40 0 20 40 80 40 0 M. CATHEY S. BURWELL N. CROOM N. SAWYER APRIL 2020 19.00154 N/A C-103 PLAN P:\2019\19.00154-BUNCOMBEBOE-FAIRVIEW ELEM CAR RIDER LANE\DRAWINGS\CIVIL\19.00154 SHEETS.DWG PLOT DATE 4/14/2020 4:26 PM NATALIE CROOMNO.DATE BY DESCRIPTION SHEET OFFICE MANAGER PROJECT MANAGER DESIGNER REVIEWER DATE PROJECT #FUNDING #19.00154 BUNCOMBE COUNTY SCHOOLS - FAIRVIEW ELEMENTARY SCHOOL - CAR RIDER IMPROVEMENTS nnnnnnnnnnn n n n n n n n n n n n n n n n n n n ######nnnnnnnnn########### # # #nn ######nnnnnnnnnn n n #####n n nn n nnnnnEROSION CONTROL PLAN55 Broad Street Asheville, NC 28801 828.252.0575 NC Firm License # C-0459 mcgillassociates.com BUNCOMBE COUNTY, NORTH CAROLINA BUNCOMBE COUNTY SCHOOLS CAR RIDER IMPROVEMENTS FAIRVIEW ELEMENTARY SCHOOL DIVISION VALUE = FEETGRAPHIC SCALE 40 0 20 40 80 40 0 M. CATHEY S. BURWELL N. CROOM N. SAWYER APRIL 2020 19.00154 N/A C-104 PLAN P:\2019\19.00154-BUNCOMBEBOE-FAIRVIEW ELEM CAR RIDER LANE\DRAWINGS\CIVIL\19.00154 SHEETS.DWG PLOT DATE 4/16/2020 9:22 AM NATHAN SAWYERNO.DATE BY DESCRIPTION SHEET OFFICE MANAGER PROJECT MANAGER DESIGNER REVIEWER DATE PROJECT #FUNDING #19.00154 BUNCOMBE COUNTY SCHOOLS - FAIRVIEW ELEMENTARY SCHOOL - CAR RIDER IMPROVEMENTSLEGEND nn#### ########### # # #######STORMWATER PLAN55 Broad Street Asheville, NC 28801 828.252.0575 NC Firm License # C-0459 mcgillassociates.com BUNCOMBE COUNTY, NORTH CAROLINA BUNCOMBE COUNTY SCHOOLS CAR RIDER IMPROVEMENTS FAIRVIEW ELEMENTARY SCHOOL DIVISION VALUE = FEETGRAPHIC SCALE 40 0 20 40 80 40 0 M. CATHEY S. BURWELL N. CROOM N. SAWYER APRIL 2020 19.00154 N/A C-105 PLAN P:\2019\19.00154-BUNCOMBEBOE-FAIRVIEW ELEM CAR RIDER LANE\DRAWINGS\CIVIL\19.00154 SHEETS.DWG PLOT DATE 4/16/2020 9:22 AM NATHAN SAWYERNO.DATE BY DESCRIPTION SHEET OFFICE MANAGER PROJECT MANAGER DESIGNER REVIEWER DATE PROJECT #FUNDING #19.00154 BUNCOMBE COUNTY SCHOOLS - FAIRVIEW ELEMENTARY SCHOOL - CAR RIDER IMPROVEMENTS STORMWATER PROFILES55 Broad Street Asheville, NC 28801 828.252.0575 NC Firm License # C-0459 mcgillassociates.com DIVISION VALUE = FEETGRAPHIC SCALE 50 0 25 50 100 50 0 N/A C-106 P:\2019\19.00154-BUNCOMBEBOE-FAIRVIEW ELEM CAR RIDER LANE\DRAWINGS\CIVIL\19.00154 SHEETS.DWG PLOT DATE 4/14/2020 4:27 PM NATALIE CROOMNO.DATE BY DESCRIPTION SHEET OFFICE MANAGER PROJECT MANAGER DESIGNER REVIEWER DATE PROJECT #FUNDING # PROFILE SCALE: HORIZ. 1"= 50' VERT. 1"= 5' BUNCOMBE COUNTY, NORTH CAROLINA BUNCOMBE COUNTY SCHOOLS CAR RIDER IMPROVEMENTS FAIRVIEW ELEMENTARY SCHOOL M. CATHEY S. BURWELL N. CROOM N. SAWYER APRIL 2020 19.00154 19.00154 BUNCOMBE COUNTY SCHOOLS - FAIRVIEW ELEMENTARY SCHOOL - CAR RIDER IMPROVEMENTS MISCELLANEOUS DETAILS55 Broad Street Asheville, NC 28801 828.252.0575 NC Firm License # C-0459 mcgillassociates.com BUNCOMBE COUNTY, NORTH CAROLINA BUNCOMBE COUNTY SCHOOLS CAR RIDER IMPROVEMENTS FAIRVIEW ELEMENTARY SCHOOL NOT TO SCALE M. CATHEY S. BURWELL N. CROOM N. SAWYER APRIL 2020 19.00154 N/A C-501 P:\2019\19.00154-BUNCOMBEBOE-FAIRVIEW ELEM CAR RIDER LANE\DRAWINGS\CIVIL\19.00154 SHEETS.DWG PLOT DATE 4/14/2020 4:27 PM NATALIE CROOMNO.DATE BY DESCRIPTION SHEET OFFICE MANAGER PROJECT MANAGER DESIGNER REVIEWER DATE PROJECT #FUNDING # INLET PROTECTIONEC 14 NOT TO SCALE SILT FENCEEC 1 UPDATED MARCH, 2017 NOT TO SCALE SLOPE MATTING INSTALLATION UPDATED MARCH, 2017 EC 11 NOT TO SCALE PIPE OUTLET PROTECTIONEC 17 C C D D OR UPDATED MARCH, 2017 NOT TO SCALE 19.00154 BUNCOMBE COUNTY SCHOOLS - FAIRVIEW ELEMENTARY SCHOOL - CAR RIDER IMPROVEMENTSTEMPORARY DIVERSION DITCHEC 4 UPDATED MARCH, 2017 NOT TO SCALE PERMANENT SWALE w/ EROSION CONTROL MATTINGEC 8 UPDATED MARCH, 2017 NOT TO SCALE PERMANENT DRAINAGE SWALEEC 7 UPDATED MARCH, 2017 NOT TO SCALE MISCELLANEOUS DETAILS55 Broad Street Asheville, NC 28801 828.252.0575 NC Firm License # C-0459 mcgillassociates.com BUNCOMBE COUNTY, NORTH CAROLINA BUNCOMBE COUNTY SCHOOLS CAR RIDER IMPROVEMENTS FAIRVIEW ELEMENTARY SCHOOL NOT TO SCALE M. CATHEY S. BURWELL N. CROOM N. SAWYER APRIL 2020 19.00154 N/A C-502 P:\2019\19.00154-BUNCOMBEBOE-FAIRVIEW ELEM CAR RIDER LANE\DRAWINGS\CIVIL\19.00154 SHEETS.DWG PLOT DATE 4/16/2020 9:29 AM NATHAN SAWYERNO.DATE BY DESCRIPTION SHEET OFFICE MANAGER PROJECT MANAGER DESIGNER REVIEWER DATE PROJECT #FUNDING # WATTLE SECTION STAKE DETAILS WATTLE DITCH PROTECTIONEC 23 NOT TO SCALE TEMPORARY CONSTRUCTION ENTRANCEEC 24 UPDATED MARCH, 2017 NOT TO SCALE TEMPORARY SKIMMER BASIN with RISEREC 28 UPDATED MARCH, 2017 NOT TO SCALE SKIMMER SEDIMENT BASIN SCHEDULE BASIN# TOP BERM ELEV. (ft) RISER TOP ELEV. (ft) EMERGENCY SPILLWAY (D x WIDTH) SKIMMER INVERT ELEV. (ft) BASIN SIDE SLOPE RATIO BASIN SPILLWAY LENGTH (FT) BASIN SPILLWAY WIDTH (FT) SKIMMER SIZE (IN) SKIMMER ORIFICE SIZE (IN) BASIN DEPTH (FT) BASIN BOTTOM LENGTH (FT) BASIN BOTTOM WIDTH (FT)19.00154 BUNCOMBE COUNTY SCHOOLS - FAIRVIEW ELEMENTARY SCHOOL - CAR RIDER IMPROVEMENTSINLET PROTECTION - WATTLEEC 15 UPDATED MARCH, 2017 NOT TO SCALE PIPE INLET PROTECTIONEC 18 UPDATED MARCH, 2017 NOT TO SCALE MISCELLANEOUS DETAILS55 Broad Street Asheville, NC 28801 828.252.0575 NC Firm License # C-0459 mcgillassociates.com BUNCOMBE COUNTY, NORTH CAROLINA BUNCOMBE COUNTY SCHOOLS CAR RIDER IMPROVEMENTS FAIRVIEW ELEMENTARY SCHOOL NOT TO SCALE M. CATHEY S. BURWELL N. CROOM N. SAWYER APRIL 2020 19.00154 N/A C-503 P:\2019\19.00154-BUNCOMBEBOE-FAIRVIEW ELEM CAR RIDER LANE\DRAWINGS\CIVIL\19.00154 SHEETS.DWG PLOT DATE 4/14/2020 5:06 PM NATALIE CROOMNO.DATE BY DESCRIPTION SHEET OFFICE MANAGER PROJECT MANAGER DESIGNER REVIEWER DATE PROJECT #FUNDING # POROUS BAFFLE DETAIL UPDATED MARCH, 2017 EC 41 NOT TO SCALE REINFORCED CONCRETE ENDWALLSD 9 UPDATED MARCH, 2017 NOT TO SCALE 19.00154 BUNCOMBE COUNTY SCHOOLS - FAIRVIEW ELEMENTARY SCHOOL - CAR RIDER IMPROVEMENTSSTRUCTURE AND PIPE SCHEDULESSD 3 UPDATED MARCH, 2017 NOT TO SCALE PLAN A A PRECAST CONCRETE MANHOLE MANHOLE STEPS MANHOLE INVERTS SECTION A-A PLAN ELEVATION SIDE ELEVATION SECTION A-A ELEVATION VIEW PRECAST CONCRETE MANHOLESD 5 UPDATED MARCH, 2017 NOT TO SCALE MISCELLANEOUS DETAILS55 Broad Street Asheville, NC 28801 828.252.0575 NC Firm License # C-0459 mcgillassociates.com BUNCOMBE COUNTY, NORTH CAROLINA BUNCOMBE COUNTY SCHOOLS CAR RIDER IMPROVEMENTS FAIRVIEW ELEMENTARY SCHOOL NOT TO SCALE M. CATHEY S. BURWELL N. CROOM N. SAWYER APRIL 2020 19.00154 N/A C-504 P:\2019\19.00154-BUNCOMBEBOE-FAIRVIEW ELEM CAR RIDER LANE\DRAWINGS\CIVIL\19.00154 SHEETS.DWG PLOT DATE 4/14/2020 5:06 PM NATALIE CROOMNO.DATE BY DESCRIPTION SHEET OFFICE MANAGER PROJECT MANAGER DESIGNER REVIEWER DATE PROJECT #FUNDING #19.00154 BUNCOMBE COUNTY SCHOOLS - FAIRVIEW ELEMENTARY SCHOOL - CAR RIDER IMPROVEMENTSUPDATED MARCH, 2017 PRE-CAST CATCH BASINSD 1 NOT TO SCALE CATCH BASIN TOP DETAILSSD 2 UPDATED MARCH, 2017 NOT TO SCALE CONCRETE FLARED END SECTIONSD 11 UPDATED MARCH, 2017 NOT TO SCALE MISCELLANEOUS DETAILS55 Broad Street Asheville, NC 28801 828.252.0575 NC Firm License # C-0459 mcgillassociates.com BUNCOMBE COUNTY, NORTH CAROLINA BUNCOMBE COUNTY SCHOOLS CAR RIDER IMPROVEMENTS FAIRVIEW ELEMENTARY SCHOOL NOT TO SCALE M. CATHEY S. BURWELL N. CROOM N. SAWYER APRIL 2020 19.00154 N/A C-505 P:\2019\19.00154-BUNCOMBEBOE-FAIRVIEW ELEM CAR RIDER LANE\DRAWINGS\CIVIL\19.00154 SHEETS.DWG PLOT DATE 4/14/2020 5:39 PM NATHAN SAWYERNO.DATE BY DESCRIPTION SHEET OFFICE MANAGER PROJECT MANAGER DESIGNER REVIEWER DATE PROJECT #FUNDING #19.00154 BUNCOMBE COUNTY SCHOOLS - FAIRVIEW ELEMENTARY SCHOOL - CAR RIDER IMPROVEMENTS SECTION CONCRETE BASE AT RISER DETAIL BIORETENTION CELL #1 DETAILSD 16 UPDATED AUGUST, 2018 NOT TO SCALE RISER DETAIL FRONT VIEW of TRASH RACK NOTES: 4. 6. 7. SECTION CONCRETE BASE AT RISER DETAIL BIORETENTION CELL #2 DETAILSD 16 UPDATED AUGUST, 2018 NOT TO SCALE RISER DETAIL FRONT VIEW of TRASH RACK NOTES: 4. 6. 7. MISCELLANEOUS DETAILS55 Broad Street Asheville, NC 28801 828.252.0575 NC Firm License # C-0459 mcgillassociates.com BUNCOMBE COUNTY, NORTH CAROLINA BUNCOMBE COUNTY SCHOOLS CAR RIDER IMPROVEMENTS FAIRVIEW ELEMENTARY SCHOOL NOT TO SCALE M. CATHEY S. BURWELL N. CROOM N. SAWYER APRIL 2020 19.00154 N/A C-506 P:\2019\19.00154-BUNCOMBEBOE-FAIRVIEW ELEM CAR RIDER LANE\DRAWINGS\CIVIL\19.00154 SHEETS.DWG PLOT DATE 4/14/2020 4:28 PM NATALIE CROOMNO.DATE BY DESCRIPTION SHEET OFFICE MANAGER PROJECT MANAGER DESIGNER REVIEWER DATE PROJECT #FUNDING #19.00154 BUNCOMBE COUNTY SCHOOLS - FAIRVIEW ELEMENTARY SCHOOL - CAR RIDER IMPROVEMENTSA A SECTION A-A A A SECTION A-A ELEVATION ELEVATION DETAIL WITH EXISTING PAVEMENT DETAIL WITH PROPOSED PAVEMENT ST 15 CONCRETE CURB & GUTTER (2'-0") NOT TO SCALE UPDATED MARCH, 2017 DRIVEWAY TURNOUT WITH GUTTERSST 26 UPDATED MARCH, 2017 NOT TO SCALE CURB TERMINUSST 40 UPDATED MARCH, 2017 NOT TO SCALE TYPICAL PAVEMENT REPAIRSST 4 UPDATED JAN., 2020 NOT TO SCALE CHAIN LINK FENCEM 11 UPDATED MARCH, 2017 NOT TO SCALE ST 12 STANDARD DUTY PAVEMENT CROSS SECTION UPDATED MARCH, 2017 NOT TO SCALE TYPICAL ROAD CROSS-SECTION WITH CURB & GUTTER ST 8 UPDATED MAY, 2018 NOT TO SCALE TYPICAL TRENCHING DETAIL HDPE PIPE WITH WASHED STONE EMBEDMENT NOT TO SCALE REVISION DATE - NOVEMBER 3, 2008