Loading...
HomeMy WebLinkAbout20200606 Ver 1_401 Application_20200506DWR mrlslon of Water Resources Pre -Construction Notification (PCN) Form April 11, 2020 Ver 3.1 Initial Review Has this project met the requirements for acceptance in to the review process?* r Yes r No Is this project a public transportation project?* G Yes r No Change only if needed. BIMS # Assigned 20200606 Is a payment required for this project?* r No payment required r Fee received r Fee needed - send electronic notification Reviewing Office * Raleigh Regional Office - (919) 791-4200 Information for Initial Review 1a. Name of project: Apex West Greenway 1a. Who is the Primary Contact?* Drew Havens 1b. Primary Contact Email:* drew.havens@apexnc.org Date Submitted 5/6/2020 Nearest Body of Water UT to Reedy Branch Basin Cape Fear Water Classification WS-N;NSW Site Coordinates Latitude: 35.7284 A. Processing Information County (or Counties) where the project is located: Wake Is this a NCDMS Project r Yes r No Longitude: -78.9308 Is this project a public transportation project?* r Yes r No 1a. Type(s) of approval sought from the Corps: W Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Version#* 1 What amout is owed?* r $240.00 r $570.00 Select Project Reviewer* Stephanie Goss:eads\szgoss 1c. Primary Contact Phone:* (919)249-3301 1b. What type(s) of permit(s) do you wish to seek authorization? W Nationwide Permit (NWP) r Regional General Permit (RGP) r Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? r Yes r No Nationwide Permit (NWP) Number: Nationwide Permit (NWP) Number: NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: W 401 Water Quality Certification - Regular r Non-404 Jurisdictional General Permit r Individual Permit 14 - Linear transportation 13 - Bank Stabilization le. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: F- 401 Water Quality Certification - Express P Riparian Buffer Authorization 1f. Is this an after -the -fact permit application?* r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No Acceptance Letter Attachment 1h. Is the project located in any of NC's twenty coastal counties? r Yes r No 1j. Is the project located in a designated trout watershed? r Yes r No B. Applicant Information 1d. Who is applying for the permit? W Owner r Applicant (other than owner) le. Is there an Agent/Consultant for this project?* r Yes r No 2. Owner Information 2a. Name(s) on recorded deed: Town of Apex 2b. Deed book and page no.: 2c. Responsible party: 2d.Address Street Address 73 Hunter Street Address Line 2 City Apex Fbstal / Zip Code 27502 2e. Telephone Number: (919)249-3301 2g. Email Address:* drew.havens@ape>Tic.org State / Rovince / legion NC Country USA 2f. Fax Number: r Yes r No r Yes r No 4. Agent/Consultant (if applicable) 4a. Name: Rob Crowther 4b. Business Name: Carolina Ecosystems, Inc. 4c.Address Street Address 3040 NC Hwy 42 West Address Line 2 City Clayton Postal / Zip Code 27520 4d. Telephone Number: (804)761-2455 4f. Email Address:* rob. crowther@carolinaeco.com Agent Authorization Letter* CE I_OI iveCha pel Road_Age ntAuthorizatio n. pdf State / Province / Region NC Country USA 4e. Fax Number: 146.96KB C. Project Information and Prior Project History C^U 1. Project Information 1b. Subdivision name: (if appropriate) 1c. Nearest municipality/ town: Apex 2. Project Identification 2a. Property Identification Number: 2c. Project Address Street Address 2925 Olive Chapel Road Address Line 2 city Apex Postal / Zip Code 27502 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* UT to Reedy Branch 3b. Water Resources Classification of nearest receiving water:* WS-IV; NSW 3c. What river basin(s) is your project located in?* Cape Fear 3d. Please provide the 12-digit HUC in which the project is located. 030300020609 4. Project Description and History 2b. Property size: 0.6 State Fnwince/ Region NC Country USA 4a. Describe the existing conditions on the site and the general land use in the vicinityof the project at the time of this application:* The proposed Apex West Greenway is situated on an existing multi -use easement owned by the Town of Apex Residential neighborhoods, as well as the American Tobacco Trail are in the vicinity of the project location. The site is currently forested, although encroached upon by a nearby development. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* F Yes G No F Unknown 4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) OliveChapel_Fig1_USGS.pdf 577.5KB 4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) OliveChapel_Fig2_NRCS.pdf 1.69MB 4f. List the total estimated acreage of all existing wetlands on the property: 0.06 4g. List the total estimated linear feet of all existing streams on the property: 151 4h. Explain the purpose of the proposed project:* The proposed Apex West Greenway would connect an eAsting multi -use path along Olive Chapel Road to the American Tobacco Trail. This approximate 700-foot addition would allow for the safe access to the American Tobacco Trail by pedestrians and other users from the nearby housing developments and greater community of Apex 4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* The Apex West Greenway, as proposed, would follow an existing multi -use easement. Tree clearing is anticipated in order to perform construction of the greenway trail, boardwalks, and culvert. Standard construction equipment is likely to be used including graders, backhoes, and cranes to construct the boardwalk sections. The proposed greenway will cross one modified (ditched) stream, with associated bank stabilization, and boardwalk over two wetland areas. 4j. Please upload project drawings for the proposed project. 2020-05-04-ApexWest_Combined.pdf 16.97MB 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the propertyor proposed impact areas?* r Yes r No C Unknown Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made?* r Preliminary r Approved r Not Verified r Unknown r N/A Corps AID Number: SAW-2020-00684 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Carolina Ecosystems, Inc Other: 5d1. Jurisdictional determination upload 6. Future Project Plans 6a. Is this a phased project?* r Yes r No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? This project will connect two eAsting greenway/pedestrian paths, and no additional segments are needed to complete the connection. D. Proposed Impacts Inventory 1. Impacts Summary la. Where are the impacts associated with your project? (check all that apply): W Wetlands W Streams -tributaries m Buffers r Open Waters r Pond Construction 2. Wetland Impacts 2a1 Reason (?) 2b. Impact type * M 2c. Type of W. �rW. name * 2e. Forested * �2f. Type of 2g. Impact Jurisdicition*(?) area* 2 Boardwalk P Headwater Forest WC Yes Corps 0.000 (acres) 4 Boardwalk P Headwater Forest WA Yes Corps 0.000 (acres) 2g. Total Temporary Wetland Impact 0.000 2g. Total Permanent Wetland Impact 0.000 2g. Total Wetland Impact 0.000 2h. Comments: Actual wetland impacts for boardwalk timber piles are approbmately 8 square feet at Site 2 (20 7.5-inch piles), and 4 square feet (9 7.5-inch piles) at Site 4. See attached Wetland Impact Summary Sheet. 3. Stream Impacts F 3a. Reason for impact (?) 3b.lmpact type * 3c. Type of impact* 3d. S. name * 3e. Stream Type * 3f. Type of 3h. Impact (?) ]3g.S.width* Jurisdiction* length* S1 Stream Crossing 9 Permanent Bank Stabilization SB Intermittent Both 2 25 Average (feet) (linearfeet) S2 Channel Stabilization Permanent Bank Stabilization SB Intermittent Corps p 2 155 Average (feet) (linearfeet) S3 Pipe Removal Temporary Other F Intermittent Corps 2 10 Average (feet) (linearfeet) S4 Rip Rap Outlet Permanent Rip Rap Fill �SA Intermittent Corps 2 10 Average (feet) (lir�rfeet) 31. Total jurisdictional ditch impact in square feet: 0 31. Total permanent stream impacts: 190 31. Total stream and ditch impacts: 200 3j. Comments: 6. Buffer Impacts (for DWR) 6a. Project is in which protect basin(s)? Check all that apply. r Neuse r Catawba r Goose Creek r Other 3i. Total temporary stream impacts: 10 r Tar -Pamlico f Randleman V Jordan Lake 6b. Impact Type 6c. Per or Temp 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact 6g. Zone 2 impact Stream Crossing P SB No 1,519 552 Bank Stabilization P SB No 2,968 0 6h. Total buffer impacts: Zone 1 Zone 2 Total Temporary impacts: 0.00 0.00 Zone 1 Zone 2 Total Permanent impacts: 4,487.00 552.00 ........ ......... ......... ......... Zone 1 ......... .............. Zone 2 Total combined buffer impacts: 4,487.00 552.00 6i. Comments: Supporting Documentation 01-ApexWest_Permit Drawings_ Buffer_20200417.pdf 01-ApexWest_Permit Drawings_20200417.pdf � E. Impact Justification and Mitigation 1. Avoidance and Minimization 718.75KB 1.3MB la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: The construction of two boardwalks will raise the greenway and span the wetlands that were identified on the site, therefore minimizing wetland fill and allowing natural hydrology. The greenway crossing of stream SB is approximately perpendicular. Site photos of feature stream SB have been attached to this application. The stream is ditched, and perched above the elevation of another non -jurisdictional ditch that parallels the American Tobacco Trail. This modified stream feature was included in the Preliminary Jurisdictional Determination that was previously submitted (SAW-2020-00684), but shows questionable jurisdictional characteristics given it's location within the landscape and small watershed size (>10 acres). The ditch carrying the stream will be lowered to allow the greenway to cross it, and the banks stabilized with riprap to prevent erosion and increase stability. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Sediment and erosion control measures will be implemented according to NC requirements, and approved by NCDEQ prior to implementation. Jurisdictional areas that are not permitted to be impacted and are adjacent to construction areas will be clearly marked with protection fencing or other similar method to avoid inadvertent encroachment. Copies of the issued buffer authorization and impact areas will be provided to the prime contractor and all subcontractors working in or near jurisdictional areas. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? r Yes r No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: Wetland impacts are minimal due to the proposed boardwalk. The stream impacts are mostly due to bank stabilization of an existing modified (ditched) stream channel. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes r No What type of SCM are you providing? r Level Spreader r Vegetated Conveyance (lower SHWT) r Wetland Swale (higher SMNT) r Other SCM that removes minimum 30 % nitrogen 17 Proposed project will not create concentrated stormwater flow through the buffer Diffuse Flow Documentation 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* r Yes r No 2b. Does this project meet the requirements for low density projects as defined in 15ANCAC 02H .1003(2)? r Yes r No 2c. Does this project have a stormwater management plan (SMP) reviewed and approved under a state stormwater program or state -approved local government stormwater program? r Yes r No r N/A - project disturbs < 1 acre 2d. Which of the following stormwater management program(s) apply: W Local Government F State Local Government Stormwater Programs W Phase II W NSW r USMP r Water Supply Please identify which local government stormwater program you are using. Apex Comments: Please refer to plans - stormwater will sheet flow across 3:1 and 4:1 vegetated side slopes and no new stormwater ouffalls are proposed. G. Supplementary Information 1. Environmental Documentation la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes r No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA /SEPA)? * r Yes r No Comments:* The proposed project is being funded by the Town of Apex which does not require further environmental documentation. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15ANCAC 21-1.0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)?* r Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* r Yes r No 3b. If you answered "no," provide a short narrative description. The project connects two eAsting pedestrian paths and is not anticipated to spur development. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* r Yes r No r N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* r Yes r No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes r No 5c. If yes, indicate the USFWS Field Office you have contacted. Raleigh 5d. Is another Federal agency involved?* r Yes r No 5e. Is this a DOT project located within Division's 1-8? r Yes r No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? r Yes r No 5g. Does this project involve bridge maintenance or removal? r Yes r No 5h. Does this project involve the construction/installation of a wind turbine(s)?* r Yes r No r Unknown Si. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? r Yes r No If yes, please provide details to include type of percussive activity, purpose, duration, and specific location of this activity on the property. 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS Information for Planning and Consulting. https://ecos.Nvs.gov/ipac/location/RCFJMXUEM5EGPOKOLE4GZJC414/resources Boardwalk piles will be installed using mechanized percussive means. Please refer to attached construction plans. Consultation Documentation Upload 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* r Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* NOAA Essential Fish Habitat Mapper. https://wmw.habitat.noaa.gov/protection/efh/efhmapper/ 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* r Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* NC Historic Preservation Office Web Mapper. https://ne.maps.arcgis.conilapps/v ebappvievver/ There are several surveyed sites within one mile of the proposed project along Olive Chapel Road, but none are adjacent to the project area. Appropmately 0.5 mile west of the site is a Study List Individual Entry (WA1047 H.T. Lawrence Farm) located on Lawson Lane. 7c. Historic or Prehistoric Information Upload 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain?* r' Yes r No 8c. What source(s) did you use to make the floodplain determination?* FEMA Floodmap Service Center. https:gmsc.fema.gov/portal/search Miscellaneous Comments Miscellaneous attachments not previously requested. ApexWestGreenway_StreamSB. pdf Signature W By checking the box and signing below, I certify that: 1.62MB • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Robert Crowther Signature �OG�EGC`�a� Date 5/6/2020 3040 NC Hwy 42 West; Clayton, NC 27520 P:919-359-1102 – F:919-585-5570 PROPERTY ACCESS AND AGENT AUTHORIZATION FORM Property Information Property Address and/or Description Olive Chapel Road Sidewalk Extension City: Apex State: NC County: Wake Property Size (Acres): 0.6 Property Owner Information Owner: Authorized Agent*: Name: Town of Apex Title: Mr. Andrew Havens, Town Manager Street Address: 73 Hunter Street City: Apex State: NC Zip Code: 27502 *Written proof of authorization from owner required. Authorization I hereby grant Carolina Ecosystems, Inc. (CEI) staff, their designated contractors and representatives, as well as other Federal, State or local authorities access to the above referenced property when necessary for the purposes of conducting on-site environmental consulting services. I also grant CEI the authority to act as authorized agent on behalf of the owner of the above listed property for the communication, submission, and/or application to relevant government entities, including local, state, and federal authorities, for the review, acceptance, concurrence, and/or approval of environmental information, documents, and/or permit requests concerning the above listed property. These services may include regulatory determinations of environmental features on my property such as issuing a determination associated with streams, wetlands, and/or coastal resources. I certify that I am the legal owner or authorized agent o f the legal owner of the above property and have authority to grant such access. I have made CEI aware of, and supplied all available records related to, previous environmental investigations on the subject property of which I have knowledge. Owner/Agent (signature) Date Parcel Identification Number(s) (PIN) Existing Town of Apex Multi-Use Easement 03/03/2020 Figure 1: USGS MapNew Hill (2016) USGS 1:24,000 Quadrangle Map³Study AreaMap Date:Revised: Revised: Revised: March 20200 750 1,500FeetOlive Chapel Road GreenwayWake County, NC Figure 2: NRCS MapWake County NRCS Soil Survey Map 64³Study AreaMap Date:Revised: Revised: Revised: April 20200 200 400FeetOlive Chapel Road GreenwayWake County, NC SITE PROJECTWAKE COUNTYCHATHAM COUNTY64 REEDY BRANCH 540 SR1163 KELLY RD.SR1160 OLIVE CHAPEL RD.SR1145 RICHARDSON RD.BEAVER CREEK BEAVER CREEK.DR LEPAHC EVILO - LLIH WEN 1411RS.DR EUCEBRAB XEPA 2611R SLIAR T OCCABOT NACIREMA VICINITY MAP 150 OLI VE CHAPEL RD.CONCEXI STI NG 30’ POW ER EASEM ENTEXI STI NG 30’ PO W ER EA SEM EN TEXISTING 40’ TOWN OF CARY UTILITY & PIPELINE EASEMENT(IN SI DE R/ W ) M ULTI-USE EASEM ENTEX I STI NG TO W N O F A PEX M U LTI- U SE EASEM EN TEXI STIN G TOW N OF APEX MULTI-USE EASEMENT EXISTING 20’ TOWN OF APEX MULTI-USE EASEMENTEXISTING 20’ TOWN OF APEX MON CONC EIP EIP EIP R/W MON R/W MON MON CONC SOI LGRAVELNC GRID NAD 83 NA 2011 WOODS WOODS WOODS SI DEW ALK EASEM ENTEX I STI NG R/ W EX I STIN G R/ W EXI STI NG R/ WAMERICAN TOBACCO TRAILAPPROXIM ATE EXI STI NG R/ W (CALCULATED)APPROXIM ATE EXI STI NG R/ W (CALCULATED) R/W MON WIDTH VARIESWETLANDS WETLANDS WETLANDS15+00BUFFER IMPACTS PERMIT SHEET 1 OF 3 BUFFER DRAWING PROJECT DATA -L- STA. 11+70.00 BEGIN BOARDWALK -L- STA. 12+80.00 END BOARDWALK -L- STA. 15+74.00 BEGIN BOARDWALK -L- STA. 16+44.00 END BOARDWALK TOBACCO TRAIL TIE TO AMERICAN -L- STA. 10+08.00 BEGIN PROJECT MULTI-USE PATH TIE TO EXISTING -L- STA. 17+00.00 END PROJECT SITE 1 REVISIONS: NO.DATE WEI PROJECT NO.: 20326.01 PLANS PREPARED BY: ENGINEERING ETHERILL DESCRIPTION UNLESS ALL SIGNATURES COMPLETED DOCUMENT NOT CONSIDERED FINAL ENGINEER ROADWAY ENGINEER HYDRAULICS Bus: 919 851 8077 Fax: 919 851 8107 License No. F-0377 1223 Jones Franklin Rd. Raleigh, N.C. 27606 PLANS PREPARED FOR: INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION APEX WEST GREENWAY TO AMERICAN TOBACCO TRAIL OLIVE CHAPEL ROAD CONNECTION FROM 919.372.7468 APEX, NC 27502 PO BOX 250 PARKS AND GREENWAY PLANNER ANGELA REINCKE PROJECT CONTACT: DATE: MARCH 4, 2020 Apex, NC 27502 73 Hunter Street TOWN OF APEX 1 NORTH CAROLINA TOWN OF APEX APEX WEST GREENWAY COVER SHEET GRADING, PAVING, STRUCTURE, DRAINAGE, & EROSION CONTROL TYPE OF WORK: FROM OLIVE CHAPEL RD. TO AMERICAN TOBACCO TRAIL LOCATION: CONSTRUCTION PLANS FOR: WETLANDS WETLANDS WETLANDS 100 YR. FLOOD FRINGE 500 YR. FLOOD FRINGE 15+00TIE TO EXIST TRAIL -L- STA. 10+08.00 BEGIN PROJECT TIE TO EXISTING DITCH -D- STA. 10+00.00 BEGIN CONTRUCTION TIE TO EXISTING DITCH -D- STA. 12+00.00 END CONTRUCTION TIE TO EXIST TRAIL -L- STA. 17+00.00 END PROJECT -L- STA. 15+74.00 BEGIN BOARDWALK -L- STA. 16+44.00 END BOARDWALK-L- STA. 11+70.00 BEGIN BOARDWALK -L- STA. 12+80.00 END BOARDWALK ALLOWABLE IMPACTS ZONE 1 ALLOWABLE IMPACTS ZONE 2 SHEET 2 OF 3 BUFFER DRAWING SEE DETAIL B SEE DETAIL A CL I RIP RAP SEE DETAIL D SEE DETAIL C CL B RIP RAP CL B RIP RAP RETAIN REMOVE DI SEE DETAIL D FES AT OUTLET FLARED END SECTION 15" RCP-IV WITH SECTIONS FLARED END 30" RCP-III WITH WITH FLARED END SECTIONS 18" RCP-III EXISTING MULTI-USE PATH END OF EXISTING MULTI-USE PATH Slope Ditch Front GROUND NATURAL SLOPE FILL Geotextile REVISIONS: NO.DATE WEI PROJECT NO.: 20326.01 PLANS PREPARED BY: ENGINEERING ETHERILL DESCRIPTION UNLESS ALL SIGNATURES COMPLETED DOCUMENT NOT CONSIDERED FINAL ENGINEER ROADWAY ENGINEER HYDRAULICS Bus: 919 851 8077 Fax: 919 851 8107 License No. F-0377 1223 Jones Franklin Rd. Raleigh, N.C. 27606 PLANS PREPARED FOR: INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION APEX WEST GREENWAY TO AMERICAN TOBACCO TRAIL OLIVE CHAPEL ROAD CONNECTION FROM 919.372.7468 APEX, NC 27502 PO BOX 250 PARKS AND GREENWAY PLANNER ANGELA REINCKE PROJECT CONTACT: DATE: MARCH 4, 2020 Apex, NC 27502 73 Hunter Street TOWN OF APEX 150 24" R C P15" HDPEN 1803’23" E271.03’N 6034’46" E 390.29’N 2001’07" E94.30’N 8932’22" E 364.47’ N 8932’22" E 115.10’S 1209’04" W264.90’OLI VE CHAPEL RD.CONCN 0244’33" E216.38’SSMH SSMH SSMH TOP=262.35’ TOP=250.26’ TOP=246.77’EXI STI NG 30’ POW ER EASEM ENTEXI STI NG 30’ POW ER EASEM ENTEXISTING 40’ TOWN OF CARY UTILITY & PIPELINE EASEMENT(I NSI DE R/ W ) M ULTI-USE EASEM ENTEXI STI NG TOW N OF APEX M ULTI-USE EASEM ENTEXI STI NG TOW N O F APEX MULTI-USE EASEMENT EXISTING 20’ TOWN OF APEX MULTI-USE EASEMENTEXISTING 20’ TOWN OF APEX MON CONC EIP EIP EIP R/W MON R/W MON MON CONC 36" W OOD SPLI T RAI LSOI LGRAVELNC GRID NAD 83 NA 2011 WOODS WOODS WOODS SI DEW ALK EASEM ENTEXI STI NG R/ W EXI STI NG R/ W EXI STI NG R/ W JV OWNER, LLC RREF II-SH RICHARDSON BM 2016 PG 1850-1853 DB 16296 PG 2213 JV OWNER, LLC RREF II-SH RICHARDSON BM 2016 PG 1850-1853 DB 16296 PG 2213 WAKE COUNTY RACHEL B. PRICE & DB 9276 PG 1339 WAKE COUNTY DB 9276 PG 1339 OF AMERICA UNITED STATES DB 1932 PG 120AMERICAN TOBACCO TRAILSB WC-01 WC-02 WC-03 WC-04 WC-101 WC-102 WC-103 WC-104 WC-105 WB-03 WB-02 SA WB-01 SA WA-10 WA-09 WA-06 WA-07 WA-08 WA-02 WA-03 WA-04 WA-11 WA-12 WA-13 WA-01 WA-14 WA-15 144 252.19 138 248.36 WA-05APPROXI M ATE EXI STI NG R/ W (CALCULATED)APPROXI M ATE EXI STI NG R/ W (CALCULATED) R/W MON SADDLEBROOK SUBDIVISIONWIDTH VARIES0 1"=30’ 1530 30 60 EXISTING CONDITIONS 4 ( Not to Scale) STANDARD BASE DITCH DETAIL A B= 2.0 Ft. Max. d= 2.0 Ft. Min. D= 2.0 Ft. *When B is < 6.0’ ( Not to Scale) STANDARD BASE DITCH DETAIL B B= 2.0 Ft. Min. D= 1.0 Ft. FROM STA 10+00. TO STA. 10+85 -D- FROM STA. 11+08 TO STA. 12+00 -D- Flatter4:1 or D ( Not to Scale) SPECIAL CUT DITCH FROM STA. 15+00 TO STA. 15+25 -L- RT DETAIL C Min. D= 0.5 Ft. Ground Natural ( Not to Scale) TOE PROTECTION d FLATTER2:1 ORDETAIL D b b= 5.0 Ft. d= 1.0 Ft. Type of Liner= COIR FIBER MATTING B 2:12:1D Ground Natural Ground Natural 2:12:1D B d Ground Natural Ground Natural Type of Liner= CLASS I Rip-Rap Flatter4:1 or FROM STA. 15+25 TO STA. 15+50 -L- RT FROM STA. 11+50 TO STA. 11+75 -L- RT ROAD CROSSING BRIDGE PARALLEL IMPACT ZONE 1 (ft2) ZONE 2 (ft2) TOTAL (ft2) ZONE 1 (ft2) ZONE 2 (ft2) TOTAL (ft2) ZONE 1 (ft2) ZONE 2 (ft2) 1 Boardwalk/Walkway/30" RCP -L-10+00 to 11+15 X 1519.0 552.0 Channel 2968.0 TOTAL:4487.0 552.0 0.0 0.0 0.0 0.0 0.0 0.0 IMPACT RIPARIAN BUFFER IMPACTS SUMMARY TYPE SITE NO.STRUCTURE SIZE / TYPE STATION (FROM/TO) ALLOWABLE MITIGABLE BUFFER REPLACEMENT SHEET 3 OF 3 Apex Greenway 4/16/2020 N.C. DEPT. OF TRANSPORTATION DIVISION OF HIGHWAYS Wake County Rev. May 2006 SITE PROJECTWAKE COUNTYCHATHAM COUNTY64 REEDY BRANCH 540 SR1163 KELLY RD.SR1160 OLIVE CHAPEL RD.SR1145 RICHARDSON RD.BEAVER CREEK BEAVER CREEK.DR LEPAHC EVILO - LLIH WEN 1411RS.DR EUCEBRAB XEPA 2611R SLIAR T OCCABOT NACIREMA VICINITY MAP 150 OLI VE CHAPEL RD.CONCEXI STI NG 30’ POW ER EASEM ENTEXI STI NG 30’ PO W ER EA SEM EN TEXISTING 40’ TOWN OF CARY UTILITY & PIPELINE EASEMENT(IN SI DE R/ W ) M ULTI-USE EASEM ENTEX I STI NG TO W N O F A PEX M U LTI- U SE EASEM EN TEXI STIN G TOW N OF APEX MULTI-USE EASEMENT EXISTING 20’ TOWN OF APEX MULTI-USE EASEMENTEXISTING 20’ TOWN OF APEX MON CONC EIP EIP EIP R/W MON R/W MON MON CONC SOI LGRAVELNC GRID NAD 83 NA 2011 WOODS WOODS WOODS SI DEW ALK EASEM ENTEX I STI NG R/ W EX I STIN G R/ W EXI STI NG R/ WAMERICAN TOBACCO TRAILAPPROXIM ATE EXI STI NG R/ W (CALCULATED)APPROXIM ATE EXI STI NG R/ W (CALCULATED) R/W MON WIDTH VARIESWETLANDS WETLANDS WETLANDS15+00SHEET 1 OF 4 PERMIT DRAWING PROJECT DATA -L- STA. 11+70.00 BEGIN BOARDWALK -L- STA. 12+80.00 END BOARDWALK -L- STA. 15+74.00 BEGIN BOARDWALK -L- STA. 16+44.00 END BOARDWALK TOBACCO TRAIL TIE TO AMERICAN -L- STA. 10+08.00 BEGIN PROJECT MULTI-USE PATH TIE TO EXISTING -L- STA. 17+00.00 END PROJECT SITE 1 SITE 4 SITE 3 SITE 2 REVISIONS: NO.DATE WEI PROJECT NO.: 20326.01 PLANS PREPARED BY: ENGINEERING ETHERILL DESCRIPTION UNLESS ALL SIGNATURES COMPLETED DOCUMENT NOT CONSIDERED FINAL ENGINEER ROADWAY ENGINEER HYDRAULICS Bus: 919 851 8077 Fax: 919 851 8107 License No. F-0377 1223 Jones Franklin Rd. Raleigh, N.C. 27606 PLANS PREPARED FOR: INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION APEX WEST GREENWAY TO AMERICAN TOBACCO TRAIL OLIVE CHAPEL ROAD CONNECTION FROM 919.372.7468 APEX, NC 27502 PO BOX 250 PARKS AND GREENWAY PLANNER ANGELA REINCKE PROJECT CONTACT: DATE: MARCH 4, 2020 Apex, NC 27502 73 Hunter Street TOWN OF APEX 1 NORTH CAROLINA TOWN OF APEX APEX WEST GREENWAY COVER SHEET GRADING, PAVING, STRUCTURE, DRAINAGE, & EROSION CONTROL TYPE OF WORK: FROM OLIVE CHAPEL RD. TO AMERICAN TOBACCO TRAIL LOCATION: CONSTRUCTION PLANS FOR: WETLAND AND SURFACE WATER IMPACTS PERMIT WETLANDS WETLANDS WETLANDS 100 YR. FLOOD FRINGE 500 YR. FLOOD FRINGE SITE 1 SITE 2 SITE 3 SITE 415+00TIE TO EXIST TRAIL -L- STA. 10+08.00 BEGIN PROJECT TIE TO EXISTING DITCH -D- STA. 10+00.00 BEGIN CONTRUCTION TIE TO EXISTING DITCH -D- STA. 12+00.00 END CONTRUCTION TIE TO EXIST TRAIL -L- STA. 17+00.00 END PROJECT -L- STA. 15+74.00 BEGIN BOARDWALK -L- STA. 16+44.00 END BOARDWALK-L- STA. 11+70.00 BEGIN BOARDWALK -L- STA. 12+80.00 END BOARDWALK SHEET 2 OF 4 PERMIT DRAWING SEE DETAIL B SEE DETAIL A CL I RIP RAP SEE DETAIL D SEE DETAIL C CL B RIP RAP CL B RIP RAP RETAIN REMOVE DI SEE DETAIL D FES AT OUTLET FLARED END SECTION 15" RCP-IV WITH SECTIONS FLARED END 30" RCP-III WITH WITH FLARED END SECTIONS 18" RCP-III EXISTING MULTI-USE PATH END OF EXISTING MULTI-USE PATH Slope Ditch Front GROUND NATURAL SLOPE FILL Geotextile REVISIONS: NO.DATE WEI PROJECT NO.: 20326.01 PLANS PREPARED BY: ENGINEERING ETHERILL DESCRIPTION UNLESS ALL SIGNATURES COMPLETED DOCUMENT NOT CONSIDERED FINAL ENGINEER ROADWAY ENGINEER HYDRAULICS Bus: 919 851 8077 Fax: 919 851 8107 License No. F-0377 1223 Jones Franklin Rd. Raleigh, N.C. 27606 PLANS PREPARED FOR: INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION APEX WEST GREENWAY TO AMERICAN TOBACCO TRAIL OLIVE CHAPEL ROAD CONNECTION FROM 919.372.7468 APEX, NC 27502 PO BOX 250 PARKS AND GREENWAY PLANNER ANGELA REINCKE PROJECT CONTACT: DATE: MARCH 4, 2020 Apex, NC 27502 73 Hunter Street TOWN OF APEX 150 24" R C P15" HDPEN 1803’23" E271.03’N 6034’46" E 390.29’N 2001’07" E94.30’N 8932’22" E 364.47’ N 8932’22" E 115.10’S 1209’04" W264.90’OLI VE CHAPEL RD.CONCN 0244’33" E216.38’SSMH SSMH SSMH TOP=262.35’ TOP=250.26’ TOP=246.77’EXI STI NG 30’ POW ER EASEM ENTEXI STI NG 30’ POW ER EASEM ENTEXISTING 40’ TOWN OF CARY UTILITY & PIPELINE EASEMENT(I NSI DE R/ W ) M ULTI-USE EASEM ENTEXI STI NG TOW N OF APEX M ULTI-USE EASEM ENTEXI STI NG TOW N O F APEX MULTI-USE EASEMENT EXISTING 20’ TOWN OF APEX MULTI-USE EASEMENTEXISTING 20’ TOWN OF APEX MON CONC EIP EIP EIP R/W MON R/W MON MON CONC 36" W OOD SPLI T RAI LSOI LGRAVELNC GRID NAD 83 NA 2011 WOODS WOODS WOODS SI DEW ALK EASEM ENTEXI STI NG R/ W EXI STI NG R/ W EXI STI NG R/ W JV OWNER, LLC RREF II-SH RICHARDSON BM 2016 PG 1850-1853 DB 16296 PG 2213 JV OWNER, LLC RREF II-SH RICHARDSON BM 2016 PG 1850-1853 DB 16296 PG 2213 WAKE COUNTY RACHEL B. PRICE & DB 9276 PG 1339 WAKE COUNTY DB 9276 PG 1339 OF AMERICA UNITED STATES DB 1932 PG 120AMERICAN TOBACCO TRAIL144 252.19 138 248.36APPROXI M ATE EXI STI NG R/ W (CALCULATED)APPROXI M ATE EXI STI NG R/ W (CALCULATED) R/W MON SADDLEBROOK SUBDIVISIONWIDTH VARIES0 1"=30’ 1530 30 60 EXISTING CONDITIONS 4 ( Not to Scale) STANDARD BASE DITCH DETAIL A B= 2.0 Ft. Max. d= 2.0 Ft. Min. D= 2.0 Ft. *When B is < 6.0’ ( Not to Scale) STANDARD BASE DITCH DETAIL B B= 2.0 Ft. Min. D= 1.0 Ft. FROM STA 10+00. TO STA. 10+85 -D- FROM STA. 11+08 TO STA. 12+00 -D- Flatter4:1 or D ( Not to Scale) SPECIAL CUT DITCH FROM STA. 15+00 TO STA. 15+25 -L- RT DETAIL C Min. D= 0.5 Ft. Ground Natural ( Not to Scale) TOE PROTECTION d FLATTER2:1 ORDETAIL D b b= 5.0 Ft. d= 1.0 Ft. Type of Liner= COIR FIBER MATTING B 2:12:1D Ground Natural Ground Natural 2:12:1D B d Ground Natural Ground Natural Type of Liner= CLASS I Rip-Rap Flatter4:1 or FROM STA. 15+25 TO STA. 15+50 -L- RT FROM STA. 11+50 TO STA. 11+75 -L- RT WETLAND DENOTES FILL INFF S S SURFACE WATER DENOTES IMPACTS IN TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY T T FILL IN WETLAND DENOTES TEMPORARY 150 N 1803’23" E271.03’N 6034’46" E 390.29’N 2001’07" E94.30’N 8932’22" E 364.47’ N 8932’22" E 115.10’S 1209’04" W264.90’OLI VE CHAPEL RD.CONCN 0244’33" E216.38’SSMH SSMH SSMH TOP=262.35’ TOP=250.26’ TOP=246.77’EXI STI NG 30’ POW ER EASEM ENTEXI STI NG 30’ POW ER EASEM ENTEXISTING 40’ TOWN OF CARY UTILITY & PIPELINE EASEMENT(I NSI DE R/ W ) M ULTI-USE EASEM ENTEXI STI NG TOW N OF APEX M ULTI-USE EASEM ENTEXI STI NG TOW N O F APEX MULTI-USE EASEMENT EXISTING 20’ TOWN OF APEX MULTI-USE EASEMENTEXISTING 20’ TOWN OF APEX MON CONC EIP EIP EIP R/W MON R/W MON MON CONC 36" W OOD SPLI T RAI LSOI LGRAVELNC GRID NAD 83 NA 2011 WOODS WOODS WOODS GPS-2 SI DEW ALK EASEM ENTEXI STI NG R/ W EXI STI NG R/ W EXI STI NG R/ W JV OWNER, LLC RREF II-SH RICHARDSON BM 2016 PG 1850-1853 DB 16296 PG 2213 JV OWNER, LLC RREF II-SH RICHARDSON BM 2016 PG 1850-1853 DB 16296 PG 2213 WAKE COUNTY RACHEL B. PRICE & DB 9276 PG 1339 WAKE COUNTY DB 9276 PG 1339 OF AMERICA UNITED STATES DB 1932 PG 120AMERICAN TOBACCO TRAILSB WC-01 WC-02 WC-03 WC-04 WC-101 WC-102 WC-103 WC-104 WC-105 WB-03 WB-02 SA WB-01 SA WA-10 WA-09 WA-06 WA-07 WA-08 WA-02 WA-03 WA-04 WA-11 WA-12 WA-13 WA-01 WA-14 WA-15 144 252.19 138 248.36 WA-05APPROXI M ATE EXI STI NG R/ W (CALCULATED)APPROXI M ATE EXI STI NG R/ W (CALCULATED) R/W MON SADDLEBROOK SUBDIVISIONWIDTH VARIESWETLANDS WETLANDS WETLANDS24" R C P15" HDPEREVISIONS: NO.DATE WEI PROJECT NO.: 20326.01 PLANS PREPARED BY: ENGINEERING ETHERILL DESCRIPTION UNLESS ALL SIGNATURES COMPLETED DOCUMENT NOT CONSIDERED FINAL ENGINEER ROADWAY ENGINEER HYDRAULICS Bus: 919 851 8077 Fax: 919 851 8107 License No. F-0377 1223 Jones Franklin Rd. Raleigh, N.C. 27606 PLANS PREPARED FOR: INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION APEX WEST GREENWAY TO AMERICAN TOBACCO TRAIL OLIVE CHAPEL ROAD CONNECTION FROM 919.372.7468 APEX, NC 27502 PO BOX 250 PARKS AND GREENWAY PLANNER ANGELA REINCKE PROJECT CONTACT: DATE: MARCH 4, 2020 Apex, NC 27502 73 Hunter Street TOWN OF APEX245 24 5250250250250 250 255 255 255 260 100 YR. FLOOD FRINGE 500 YR. FLOOD FRINGE SITE 1 SITE 2 SITE 3 SITE 4245245 245245245245 245 245245245245250250250250250250250250250250250250250 250 250 255255255255255255255255255260260260260260260260260260265265265265265265265270270270270275280SHEET 3 OF 4 PERMIT DRAWING TIE TO EXIST TRAIL -L- STA. 10+08.00 BEGIN PROJECT TIE TO EXISTING DITCH -D- STA. 10+00.00 BEGIN CONTRUCTION TIE TO EXISTING DITCH -D- STA. 12+00.00 END CONTRUCTION TIE TO EXIST TRAIL -L- STA. 17+00.00 END PROJECT -L- STA. 15+74.00 BEGIN BOARDWALK -L- STA. 16+44.00 END BOARDWALK-L- STA. 11+70.00 BEGIN BOARDWALK -L- STA. 12+80.00 END BOARDWALK SEE DETAIL B SEE DETAIL A CL I RIP RAP SEE DETAIL D SEE DETAIL C CL B RIP RAP CL B RIP RAP RETAIN REMOVE DI SEE DETAIL D FES AT OUTLET FLARED END SECTION 15" RCP-IV WITH SECTIONS FLARED END 30" RCP-III WITH WITH FLARED END SECTIONS 18" RCP-III EXISTING MULTI-USE PATH END OF EXISTING MULTI-USE PATH Slope Ditch Front GROUND NATURAL SLOPE FILL Geotextile 15+000 1"=30’ 1530 30 60 EXISTING CONDITIONS 4 ( Not to Scale) STANDARD BASE DITCH DETAIL A B= 2.0 Ft. Max. d= 2.0 Ft. Min. D= 2.0 Ft. *When B is < 6.0’ ( Not to Scale) STANDARD BASE DITCH DETAIL B B= 2.0 Ft. Min. D= 1.0 Ft. FROM STA 10+00. TO STA. 10+85 -D- FROM STA. 11+08 TO STA. 12+00 -D- Flatter4:1 or D ( Not to Scale) SPECIAL CUT DITCH FROM STA. 15+00 TO STA. 15+25 -L- RT DETAIL C Min. D= 0.5 Ft. Ground Natural ( Not to Scale) TOE PROTECTION d FLATTER2:1 ORDETAIL D b b= 5.0 Ft. d= 1.0 Ft. Type of Liner= COIR FIBER MATTING B 2:12:1D Ground Natural Ground Natural 2:12:1D B d Ground Natural Ground Natural Type of Liner= CLASS I Rip-Rap Flatter4:1 or FROM STA. 15+25 TO STA. 15+50 -L- RT FROM STA. 11+50 TO STA. 11+75 -L- RT WETLAND DENOTES FILL INFF S S SURFACE WATER DENOTES IMPACTS IN TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY T T FILL IN WETLAND DENOTES TEMPORARY Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No.(From/To)Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp.Design (ac)(ac)(ac)(ac)(ac)(ac)(ac)(ft)(ft)(ft) 1 -L- 10+39 Channel Stabilization 0.014 155 30" RCP 0.002 25 2 -L- 11+75 to 12+75 20x 7.5" timber piles 7 sq ft 3 -L- 15+00 LT RR outlet/Pipe Removal 0.001 0.001 10 10 4 -L- 15+70 to 16+40 9x 7.5" timber piles 3.2 sq ft 0.001 TOTALS*:0.00 0.00 0.00 0.00 0.00 0.02 0.00 190 10 0 *Rounded totals are sum of actual impacts NOTES: Revised 2018 Feb SHEET 4 OF 4 WETLAND AND SURACE WATER IMPACTS SUMMARY SURFACE WATER IMPACTSWETLAND IMPACTS DIVISION OF HIGHWAYS 4/16/2020 Wake Co. NC DEPARTMENT OF TRANSPORTATION Apex Greenway Boardwalk wetland impact footprint for stations -L- 11+75 to 12+75 is 0.02 ac. Boardwalk wetland impact footprint for stations -L- 15+70 to 16+40 is 0.01 ac. Photo 1. Stream SB Photo 2: Stream SB Photo 3: Stream SB 150 OLI VE CHAPEL RD.CONCEXI STI NG 30' POW ER EASEM ENTEXI STI NG 30' POW ER EASEM ENTEXISTING 40' TOWN OF CARY UTILITY & PIPELINE EASEMENT( I NSI DE R/ W ) M ULTI-USE EASEM ENTEXI STI NG TOW N OF APEX M ULTI-USE EASEM ENTEXI STI NG TOW N OF APEX MULTI-USE EASEMENT EXISTING 20' TOWN OF APEX EIP EIP EIP R/W MON R/W MON MON CONC SOI LGRAVELWOODS WOODS WOODS SI DEW ALK EASEM ENTEXI STI NG R/ W EXI STI NG R/ W EXI STI NG R/ WAMERICAN TOBACCO TRAILAPPROXI M ATE EXI STI NG R/ W (CALCULATED)APPROXI M ATE EXI STI NG R/ W (CALCULATED) R/W MON WIDTH VARIES2 0.0 0' MULTI-USE EASEMENT EXISTING 20' TOWN OF APEX 20.00' MULTI-USE EASEMENT EXISTING 20' TOWN OF APEX (FROM APEX GI S I NFO) SITE PROJECTWAKE COUNTYCHATHAM COUNTY64 REEDY BRANCH 540 SR1163 KELLY RD.SR1160 OLIVE CHAPEL RD .SR1145 RICHARDSON RD.BEAVER CREEK BEAVER CREEK.DR LEPAHC EVILO - LLIH WEN 1411RS.DR EUCEBRAB XEPA 2611R SLIAR T OCCABOT NACIREMA VICINITY MAP WETLANDS WETLANDS WETLANDS 15+00F T 10 0 2 02FT10F T 10 0 2 INDEX OF SHEETS PROJECT DATA -L- STA. 11+70.00 BEGIN BOARDWALK -L- STA. 12+80.00 END BOARDWALK -L- STA. 15+74.00 BEGIN BOARDWALK -L- STA. 16+44.00 END BOARDWALK TOBACCO TRAIL TIE TO AMERICAN -L- STA. 10+08.00 BEGIN PROJECT MULTI-USE PATH TIE TO EXISTING -L- STA. 17+00.00 END PROJECT REVISIONS: NO.DATE WEI PROJECT NO.: 20326.01 PLANS PREPARED BY: ENGINEERING ETHERILL DESCRIPTION UNLESS ALL SIGNATURES COMPLETED DOCUMENT NOT CONSIDERED FINAL ENGINEER ROADWAY Bus: 919 851 8077 Fax: 919 851 8107 License No. F-0377 1223 Jones Franklin Rd. Raleigh, N.C. 27606 PLANS PREPARED FOR: APEX WEST GREENWAY TO AMERICAN TOBACCO TRAIL OLIVE CHAPEL ROAD CONNECTION FROM 919.372.7468 APEX, NC 27502 PO BOX 250 PARKS AND GREENWAY PLANNER ANGELA REINCKE PROJECT CONTACT: Apex, NC 27502 73 Hunter Street TOWN OF APEX ENGINEER HYDRAULICS PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION DATE: MAY 4, 2020 1 NORTH CAROLINA TOWN OF APEX APEX WEST GREENWAY COVER SHEET GRADING, PAVING, STRUCTURE, DRAINAGE, & EROSION CONTROL TYPE OF WORK: FROM OLIVE CHAPEL RD. TO AMERICAN TOBACCO TRAIL LOCATION: CONSTRUCTION PLANS FOR: CROSS SECTIONSX-3 CROSS SECTIONSX-2 CROSS SECTIONSX-1 EROSION CONTROL FINALEC-6 EROSION CONTROL CLEARING AND GRUBBINGEC-5 EROSION CONTROL DETAILSEC-4 EROSION CONTROL NOTESEC-3 NCG01 SELF-INSPECTIONEC-2 NCG01 GROUND STABILIZATIONEC-1 CONSTRUCTION DETAILS7 CONSTRUCTION DETAILS6 PLAN, PROFILE, AND TYPICAL SECTIONS5 EXISTING CONDITIONS4 NOTES3 SYMBOLOGY SHEET2 COVER SHEET1 PUBLIC INFRASTRUCTURE TABLE NEW STREETS SIDEWALK GREENWAY STORM DRAIN CURB & GUTTEER SEWER LINES WATER LINES 0 LF 0 LF 692 LF 0 LF 0 LF 0 LF 0 LF @ $1.35/LF = $934.20 NC GRID NAD 83 NA 2011 ***CAUTION*** N.C. ONE CALL: UTILITY LOCATOR SERVICE TOLL FREE 1-800-632-4949 3 DAYS BEFORE DIGGING CALL A ONE CALL SYSTEM FOR COMMUNITY AND JOB SAFETY ***CAUTION*** UNDERGROUND UTILITIES. AVAILABLE. THE SURVEYOR HAS NOT PHYSICALLY LOCATED THE THEY ARE LOCATED AS ACCURATELY AS POSSIBLE FROM INFORMATION THE EXACT LOCATION INDICATED, ALTHOUGH HE DOES CERTIFY THAT NOT WARRANT THAT THE UNDERGROUND UTILITIES SHOWN ARE IN EITHER IN SERVICE OR ABANDONED. THE SURVEYOR FURTHER DOES UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, THE SURVEYOR MAKES NO GUARANTEE THAT THE UNDERGROUND FROM FIELD SURVEY INFORMATION AND EXISTING DRAWINGS. THE UNDERGROUND UTILITIES SHOWN HAVE BEEN LOCATED CONTRACTOR SHALL NOTIFY THE NCDOT DISTRICT ENGINEER, IN ACCORDANCE WITH ALL DRIVEWAY PERMITS & ENCROACHMENT AGREEMENTS, PRIOR TO BEGINNING ANY WORK WITHIN THE STATE MAINTAINED RIGHT OF WAY.23. ALL STRUCTURES/UTILITIES DESIGNATED FOR MODIFICATION SHALL BE PROTECTED BY THE CONTRACTOR DURING CONSTRUCTION.22. ANY NOTE, OR REFERENCE TO ANY ELEMENT, WHICH DOES NOT SPECIFY ACTION BY THE CONTRACTOR SHALL BE CONSTRUED AS INFORMATION ONLY.21. SALVAGEABLE FILL MATERIALS FROM SITE DEMOLITION DETERMINED TO BE ACCEPTABLE BY AN INDEPENDENT SOILS TESTING LABORATORY SHALL BE UTILIZED FOR FILL MATERIAL WHERE APPROPRIATE.20. ALL WASTE MATERIAL GENERATED FROM DEMOLITION WORK SHALL BE DISPOSED OF OFF SITE IN ACCORDANCE WITH TOWN OF APEX REGULATIONS.19. SHALL BE REPORTED TO THE ENGINEER AND OWNER BEFORE REMOVAL FOR FINAL DISPOSITION. WHICH COULD NOT BE PREDETERMINED UNTIL DEMOLITION WAS STARTED. ALL SUCH DISCOVERIES OF UTILITIES DURING THE DEMOLITION PROCESS WHICH ARE IN A LOCATION DIFFERENT FROM THAT INDICATED OR ARE UNIDENTIFIED, ALL DEMOLITION WORK SHALL BE PERFORMED WITH "DUE CARE AND DILIGENCE" SO AS TO PREVENT THE ARBITRARY DESTRUCTION OR INTERRUPTION OF CONCEALED UTILITIES WHICH ARE INTENDED TO REMAIN IN USE, THE ROUTING OF 18. ALL UTILITIES OR STRUCTURES NOT DESIGNATED FOR REMOVAL OR MODIFICATION ARE TO REMAIN AND BE PROTECTED FROM DAMAGE.17. THE CONTRACTOR SHALL PROVIDE 24 HOURS NOTICE TO THE TOWN OF APEX FOR ALL REQUIRED INSPECTIONS.16. ALL WORK TO BE PERFORMED ACCORDING TO OSHA SAFETY REGULATIONS.15. VERIFY ALL DIMENSIONS AND GRADES AT THE JOB SITE. IF DIFFERENCES ARE FOUND, NOTIFY ENGINEER SO THAT MODIFICATIONS TO THESE DRAWINGS CAN BE MADE.14. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LAYOUT OF ALL WORK AS ILLUSTRATED ON PLANS. IF EXISTING CONDITIONS DIFFER FROM THOSE ILLUSTRATED ON PLANS, NOTIFY ENGINEER PRIOR TO CONSTRUCTION ACTIVITIES.13. UNDER ABSOLUTELY NO CIRCUMSTANCES SHALL ANY UNMANNED EXCAVATION BE LEFT OPEN OR UNPROTECTED DURING NON-WORKED HOURS. UTILIZE SIGNS, BARRICADES, ETC. TO ENSURE THE SAFETY OF THE GENERAL PUBLIC.12. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER AND ADJACENT PROPERTY OWNERS AS REQUIRED FOR WORK OUTSIDE OF PROPERTY LINES.11. UTILIZE SIGNS, BARRICADES, FLAG MEN, OR GUARDS, PER NCDOT STANDARDS, AS REQUIRED TO ENSURE THE SAFETY OF ALL VEHICULAR AND PEDESTRIAN TRAFFIC DURING ALL CONSTRUCTION ACTIVITIES.10. SUCH WORK SHALL BE COORDINATED WITH THE ENGINEER. CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATION ADJUSTMENTS OF ALL EXISTING VAULTS (REGARDLESS OF FUNCTION), METER BOXES, FIRE HYDRANTS, CLEAN OUTS, MANHOLES ETC. TO MATCH FINISHED GRADES AND SITE PLAN. ALL 9. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGES DURING CONSTRUCTION AND SHALL MAKE REPAIRS AT HIS EXPENSE.8. CONTRACTOR SHALL PROVIDE EXCAVATION AND TRAFFIC CONTROL AS REQUIRED BY LOCAL AUTHORITIES AND ALL APPLICABLE OSHA REGULATIONS.7. CONTRACTOR SHALL BE RESPONSIBLE FOR SCHEDULING AND COORDINATION OF ALL ILLUSTRATED CONSTRUCTION ACTIVITIES AT THE JOB SITE.6. ALL ELEVATIONS ARE IN REFERENCE TO DESIGNATED BENCHMARKS.5. TREES AND EXISTING LANDSCAPING NOT DESIGNATED FOR REMOVAL SHALL BE PROTECTED DURING CONSTRUCTION.4. CONTRACTOR SHALL HOLD HARMLESS THE OWNER AND THE ENGINEER FOR DAMAGES, INJURIES OR OTHER ACCIDENTS WHICH OCCUR DURING THESE CONSTRUCTION ACTIVITIES.3. PROTECT ALL ADJACENT PROPERTIES, THE GENERAL PUBLIC, AND ALL OF THE OWNER'S FACILITIES. SHOULD DAMAGES OCCUR, CONTRACTOR SHALL REPAIR IMMEDIATELY AS DIRECTED BY THE ENGINEER.2. ANY UNKNOWN UNDERGROUND ELEMENTS. THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY IF UNKNOWN ELEMENTS ARE DISCOVERED THAT WOULD NECESSITATE MODIFICATION TO THE ILLUSTRATED DESIGN. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING ALL ILLUSTRATED KNOWN UNDERGROUND ELEMENTS. ADDITIONALLY, THE CONTRACTOR SHALL BE RESPONSIBLE FOR EXERCISING REASONABLE EFFORTS TO PROTECT 1. GENERAL NOTES REVISIONS: NO.DATE WEI PROJECT NO.: 20326.01 PLANS PREPARED BY: ENGINEERING ETHERILL DESCRIPTION UNLESS ALL SIGNATURES COMPLETED DOCUMENT NOT CONSIDERED FINAL ENGINEER ROADWAY Bus: 919 851 8077 Fax: 919 851 8107 License No. F-0377 1223 Jones Franklin Rd. Raleigh, N.C. 27606 PLANS PREPARED FOR: APEX WEST GREENWAY TO AMERICAN TOBACCO TRAIL OLIVE CHAPEL ROAD CONNECTION FROM 919.372.7468 APEX, NC 27502 PO BOX 250 PARKS AND GREENWAY PLANNER ANGELA REINCKE PROJECT CONTACT: Apex, NC 27502 73 Hunter Street TOWN OF APEX PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION DATE: MAY 4, 2020 2 Existing Edge of Pavement Existing Curb Proposed Slope Stakes Cut Proposed Slope Stakes Fill Existing Metal Guardrail Existing Cable Guiderail Proposed Guardrail Equality Symbol Pavement Removal Existing Right of Way Marker Existing Right of Way Line h Existing Control of Access C F Existing Easement Line HYDROLOGY: Stream or Body of Water Hydro, Pool or Reservoir Flow Arrow Disappearing Stream Spring ;zvW K Proposed Lateral, Tail, Head Ditch False Sump Proposed Cable Guiderail MAJOR: Bridge, Tunnel or Box Culvert Bridge Wing Wall, Head Wall and End Wall MINOR: Head and End Wall Pipe Culvert Footbridge Paved Ditch Gutter UTILITIES: ROADS AND RELATED FEATURES: Existing Power Pole Proposed Power Pole P U/G Power Cable Hand Hole Power Manhole Power Line Tower Power Transformer Existing Joint Use Pole Proposed Joint Use Pole Existing Telephone Pole Proposed Telephone Pole Telephone Manhole Telephone Pedestal U/G Telephone Cable Hand Hole R }Tp Q l ] / b H-Frame Pole O O POWER: TELEPHONE: Telephone Cell Tower WATER: Water Manhole Water Meter Water Valve Water Hydrant 4 I H a TV: TV Pedestal TV Tower U/G TV Cable Hand Hole | I ] GAS: Gas Valve Gas Meter n c SANITARY SEWER: Sanitary Sewer Manhole Sanitary Sewer Cleanout U/G Sanitary Sewer Line d o A/G Water Above Ground Gas Line A/G Gas Above Ground Water Line Above Ground Sanitary Sewer A/G Sanitary Sewer MISCELLANEOUS: Utility Pole O F S 3 Utility Pole with Base Utility Located Object Utility Traffic Signal Box ? CONC CONC WW vvDrainage Box: Catch Basin, DI or JB Storm Sewer Storm Sewer Manhole m U/G Tank; Water, Gas, Oil A/G Tank; Water, Gas, Oil BOUNDARIES AND PROPERTY: State Line County Line Township Line City Line Reservation Line Property Line Existing Iron Pin Property Monument Existing Fence Line Proposed Woven Wire Fence Proposed Chain Link Fence Proposed Barbed Wire Fence g F 123 Existing Wetland Boundary Proposed Wetland Boundary Existing Endangered Animal Boundary Existing Endangered Plant Boundary BUILDINGS AND OTHER CULTURE: Area Outline Gas Pump Vent or U/G Tank Cap Church School Dam Sign Small Mine Well V M W W S x Foundation S Building y y VEGETATION: Single Tree X Y Vineyard Single Shrub Hedge Woods Line Orchard Vineyard RAILROADS: Standard Gauge RR Signal Milepost Switch RR Abandoned RR Dismantled S FLOW *S.U.E. = Subsurface Utility Engineering WLB EIP BECM CONC HW CB CSX TRANSPORTATION MILEPOST 35 SWITCH Cemetery EXISTING STRUCTURES: Parcel / Sequence Number E AATUR End of Information E.O.I. Abandoned According to Utility Records WLB EAB EPB R W R W R W C A E TDE PDE PUE S P P T T TC TC T FO T FO W W TV TV TV FO TV FO G G SS FSS FSS ?UTL Jurisdictional Stream JS Buffer Zone 1 Buffer Zone 2 BZ 1 BZ 2 Wetland TUE DUE AUE CRProposed Curb Ramp CONVENTIONAL PLAN SHEET SYMBOLS Underground Storage Tank, Approx. Loc. Geoenvironmental Boring C A HPBExisting Historic Property Boundary U/G Power Line LOS B (S.U.E.*) U/G Power Line LOS C (S.U.E.*) U/G Power Line LOS D (S.U.E.*) P U/G Telephone Cable LOS B (S.U.E.*) U/G Telephone Cable LOS C (S.U.E.*) U/G Telephone Cable LOS D (S.U.E.*) T U/G Telephone Conduit LOS B (S.U.E.*) U/G Telephone Conduit LOS C (S.U.E.*) U/G Telephone Conduit LOS D (S.U.E.*) TC U/G Fiber Optics Cable LOS B (S.U.E.*) U/G Fiber Optics Cable LOS C (S.U.E.*) U/G Fiber Optics Cable LOS D (S.U.E.*) T FO U/G Water Line LOS B (S.U.E*) U/G Water Line LOS C (S.U.E*) U/G Water Line LOS D (S.U.E*) W U/G TV Cable LOS B (S.U.E.*) U/G TV Cable LOS C (S.U.E.*) U/G TV Cable LOS D (S.U.E.*) TV U/G Fiber Optic Cable LOS B (S.U.E.*) U/G Fiber Optic Cable LOS C (S.U.E.*) U/G Fiber Optic Cable LOS D (S.U.E.*) TV FO U/G Gas Line LOS B (S.U.E.*) U/G Gas Line LOS C (S.U.E.*) U/G Gas Line LOS D (S.U.E.*) G SS Forced Main Line LOS B (S.U.E.*) SS Forced Main Line LOS C (S.U.E.*) SS Forced Main Line LOS D (S.U.E.*) FSS Utility Unknown U/G Line LOS B (S.U.E.*) U/G Test Hole LOS A (S.U.E.*) Note: Not to Scale UST Contaminated Site: Known or Potential Known Contamination Area: Soil Potential Contamination Area: Soil Known Contamination Area: Water Potential Contamination Area: Water Primary Horiz Control Point Primary Horiz and Vert Control Point Secondary Horiz and Vert Control Point Exist Permanent Easment Pin and Cap New Permanent Easement Pin and Cap Vertical Benchmark New Right of Way Line Concrete or Granite R/W Marker New Right of Way Line with Concrete C/A Marker New Control of Access Line with New Control of Access New Temporary Construction Easement New Temporary Drainage Easement New Permanent Drainage Easement New Permanent Drainage / Utility Easement New Permanent Utility Easement New Temporary Utility Easement New Aerial Utility Easement Computed Property Corner RIGHT OF WAY & PROJECT CONTROL: New Right of Way Line with Pin and Cap CONVENTIONAL SYMBOLS EROSION CONTROL Temporary Silt Fence Temporary Silt Fence Outlet Temporary Rock Silt Check Dam Pipe Outlet Protection Limits of Disturbance Tree Protection Area Limits Yard Inlet Protection Pipe Inlet Protection REVISIONS: NO.DATE WEI PROJECT NO.: 20326.01 PLANS PREPARED BY: ENGINEERING ETHERILL DESCRIPTION UNLESS ALL SIGNATURES COMPLETED DOCUMENT NOT CONSIDERED FINAL ENGINEER ROADWAY Bus: 919 851 8077 Fax: 919 851 8107 License No. F-0377 1223 Jones Franklin Rd. Raleigh, N.C. 27606 PLANS PREPARED FOR: APEX WEST GREENWAY TO AMERICAN TOBACCO TRAIL OLIVE CHAPEL ROAD CONNECTION FROM 919.372.7468 APEX, NC 27502 PO BOX 250 PARKS AND GREENWAY PLANNER ANGELA REINCKE PROJECT CONTACT: Apex, NC 27502 73 Hunter Street TOWN OF APEX PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION DATE: MAY 4, 2020 3 Resources Department. and S&E measures and a Certificate of Compliance has been issued by the Water Inspections Division after the installation and approval of tree protection fencing A Grading Permit, when applicable, may only be issued by the Building 12) veneer that is a medium or dark brown or rust color. stained a medium or dark brown or rust color or be covered with a masonry retaining walls and other retention structures must be integrally tinted or criteria will require a separate building permit prior to the start of work. All aspects with the NC Building Code Sec. 1610. Retaining systems meeting these responsible charge of a registered professional engineer and comply in all mechanically stabilized earth walls, shall be designed and constructed under the height within a horizontal distance of 50 feet or less, including retaining walls or Retaining systems providing a cumulative vertical relief greater than five feet in 11) Master Sign Plan for approval. use lots, non-residential subdivisions and multiple tenant lots must submit a separate sign permit must be obtained prior to installation of the sign. Multiple Individual signs are not approved as part of the site plan approval process. A 10) & site stabilization, and parking and pavement marking) must be completed. mulching, screening for dumpsters, mechanical equipment, HVAC, etc., seeding Prior to scheduling a final site inspection, all site items (e.g. lighting, landscaping, 9) phase. before a final Certificate of Occupancy may be issued for any building within that All required site elements shown within a particular phase must be installed 8) appearance. other plants must be planted outside the enclosure to visually soften the of masonry material with opaque gates. Where practicable, shrubs or feet tall or the height of the dumpster, whichever is greater, and be built Dumpster enclosures must meet the above requirements plus be eight (8) e. (6) feet tall or higher must be fenced and landscaped. Any ground-mounted HVAC or other mechanical or utility equipment six d. streets, and a totally opaque screen is achieved. Screened items are out of view from adjacent properties and public c. color. materials of the building or landscape, and are similar in materials and Screening materials are not different from or inferior to the principal b. landscape. It is incorporated into the overall design theme of the building and a. screening must be done so that: ground, or building shall meet the requirements of UDO Sec. 8.2.8. Specifically, storage, mechanical and HVAC equipment, and similar facilities on the roof, The screening of loading docks, roll-out trash containers, dumpsters, outdoor 7) requirements of the Town of Apex Parks and Recreation Department. found in the Town of Apex Standard Specifications and Standard Details and the (benches, trash containers, signs, etc.) must meet any applicable standards limited to, play fields, greenway trails and items typically associated with them Site elements required to satisfy recreational requirements such as, but not 6) contained entirely on site. root zones of trees, public utility easements and rights-of-way), and shall be not encroach into any required buffer or protected area (e.g. RCA, the critical All grading and support structures associated with any retaining structure shall 5) demolition permit which must be obtained prior to start of the demolition. accredited asbestos inspector must accompany the application for the NC Health Hazard Control Unit and an asbestos inspection report from a NC If buildings are to be demolished, a copy of the Demolition Notification from the 4) near public areas (sidewalks, etc.). officer; such areas may include, but are not limited to, common property lines or construction activity where it is deemed necessary by the zoning enforcement Additional tree protection fencing may be required in other locations close to 3) limited to, historic buildings and structures, wetlands, and ponds. At least 10 feet away from any other designated RCA such as, but not c. any riparian buffer, and Along the outside line of the 100-year floodplain and the outside edge of b. height, One foot away from any saved tree for each inch of diameter at breast a. Tree protection fencing must be placed:2) http://www.apexnc.org/215/Applications- Schedules. Installation Permit may be obtained at the Planning Department or online at protection fencing has been installed and inspected. A Tree Protection Fencing installation of S&E measures, or grading shall occur until required tree No site development activity including, but not limited to, testing, clearing, 1) Required Site Plan Notes: proposed changes must be submitted to the Planning Department for approval. Architectural construction plans must adhere to the approved site plans. Any 36) standards, the approved plans, and any applicable conditions. lighting manufacturer verifying that all site lighting is installed according to Town the Town with a final letter of certification from the lighting engineer and/or Before certificates of occupancy are released, the owner/builder must supply 35) internally lit. Awnings and canopies used for accents over doors and windows shall not be 34) plan. through the development review process and reflected on the approved site Floodlights or other types of lighting are prohibited unless approval is given 33) wattage must not exceed 100 watts. concealed lamp/light source. The lighting must be directed downward and the Wall pack light fixtures must be fully shielded, true cutoff type fixtures with a 32) Lamps for non-cutoff light fixtures shall not exceed 100 watts. 31) streetscape buffer and tree save area. or right-of-way line, and at least two feet away from any required perimeter or All outdoor light fixtures shall be located a minimum of 10 feet from a property 30) groundcover, not with turf grass. Slopes steeper than 3:1 but less than 2:1 shall be stabilized with permanent 29) suitable combination of plantings and retention devices. All slopes equal to 2:1 shall be stabilized with permanent slope retention or a 28) form is impaired. their mature size. Plants shall not be cut or severely pruned so that their natural All plant material shall be allowed to reach their mature size and maintained at 27) or missing shall be replaced in conformance with Town standards. Any vegetation that is dead, substandard, unhealthy, of poor structural quality, 26) particular type of buffer as described in UDO Sec. 8.2.6. Required buffers must meet the minimum opacity requirements for the 25) Sec. 8.2.2.E. exceptions may be granted by the Planning Director in accordance with UDO received, to ensure installation of the required landscaping. Additional 150% of the cost of materials and installation, based on the highest estimate through September 1, then the applicant shall provide a cash bond equal to If the applicant chooses to delay the installation of landscaping from April 1 the project, or in the case of phased development, for the phase of the project. All landscaping is required to be installed prior to a Certificate of Occupancy for 24) for buffers, RCA, or required landscape areas. No private utility easements shall be allowed to be counted in the calculations 23) plans. all existing and proposed utilities and to clearly identify them on the approved It is the responsibility of the owner or his representative(s) to locate and identify 22) a third-party inspection agency. Inspections Director at 919-249-3381 for information including the utilization of approved by the plumbing inspector prior to covering. Contact the Building Right-of-Way or a Public Utility Easement. These systems shall be inspected and plumbing systems, including storm drainage systems, installed outside the Public A plumbing permit issued by the Building Inspection Division is required for all 21) Engineering Division at 919-249-3394 to obtain these permit applications. Sealed Engineer’s Report per the Town of Apex Spec Book. Please contact the Water Distribution Extension Permit Applications shall be accompanied by a Gravity Sewer Extension Permit to the release of construction drawings. All Utility Easement will require a Water Distribution Extension Permit and/or a All new public water and sewer lines contained within a Town of Apex Public 20) separation of at least three (3) feet. water main is at least 18 inches above the top of the sewer with a horizontal water main may be laid closer, provided that the elevation of the bottom of the sewers. Where local conditions prevent a separation of at least 10 feet, the Water and sewer shall be at least 10 feet laterally from existing or proposed 19) backflow prevention assembly installed. All metered connections to Town potable water shall have a Town-approved 18) companies as required. Contractor shall coordinate utility relocation or abandonment with local utility 17) if conflicts are encountered. Verify all illustrated utility crossings prior to construction and notify the engineer 16) Maintain a minimum of 18 inches of vertical separation between utilities. 15) cover. All water and sewer lines shall be installed with a minimum of three (3) feet of 14) the appropriate phase of construction. as part of a temporary erosion control measure, the inspection will occur during portions of UDO Sec. 6.1.12 Engineered Stormwater Controls. If the SCM is used required structure is in place, is operational, and complies with all relevant the Environmental Programs Manager at 919-249-3413 to demonstrate that the development where a Stormwater Control Measure (SCM) is required, contact Prior to approval of a Final Plat or issuance of a Certificate of Occupancy for any 13) NOTES Town of Apex Construction Sequence maintenance of the site. The Property Owner/Home Owners Association will be responsible for permanent erosion control 23. of Termination (e-NOT) to end coverage under the NCG01 permit. issuance of the Certificate of Completion. Visit the State website listed above and submit an electronic Notice and to request a Certificate of Completion. The S&E performance guarantee will be released with the When vegetation has been established, call Water Resources staff at (919) 362-8166 for a final site inspection 22. resulting bare areas. All permanent erosion control devices should be installed at this point. Remove all temporary diversions, silt fencing, sediment basins, etc. and provide adequate cover or pave any 21. Construction Plan set. devices. Follow the SCM Construction Sequence found on the Grading and/or SCM Detail sheet on the Flush and clean all stormwater system pipes. Clean and remove sediment from temporary sediment holding 20. contained within the plat. erosion control measures must be installed, be functioning properly and be maintained for the entire area Prior to plat approval, all disturbed areas both public and private, must be properly stabilized. All temporary 19. Stabilize site as areas are brought up to finished grade with vegetation or paving.18. slopes that are 3:1 or flatter must establish groundcover within 14 calendar days. establish groundcover on swales and ditches and graded slopes steeper than 3:1 within 7 calendar days; After completion of any phase of grading or when land-disturbing activities have temporarily ceased, 17. other approved measures as shown on plans. Maintain S&E measures as needed. Install storm sewer, if applicable, and protect inlets with inlet protection devices, sediment devices, and/or 16. Stockpile a sufficient amount of topsoil to cover 3 inches over landscaped areas at the end of the project.15. Begin clearing, grubbing, and rough grade of the site in accordance with the approved grading plan.14. Post Grading Permit prominently on site at all times.13. separate from any other pre-construction meetings required in the Construction Sequence. a pre-construction meeting with Rudy Baker at 249-3381 prior to any grading activities. This meeting is Once a Grading Permit is reviewed and issued by the Building Inspections & Permitting Department, arrange 12. Complete a Grading Permit Application, if required, from the Building Inspections & Permitting Department.11. Department. Certificate of Compliance. Water Resources will also forward a copy to the Building Inspections & Permitting When completed, call Water Resources staff at (919) 362-8166 for an on-site inspection and to request a 10. and/or other measures as shown on the approved plans. Clear only as necessary to install these devices. Install gravel construction entrance, temporary diversions, silt fencing, sediment basins, bypass channels, 9. The COC must be submitted to the Town prior to the commencement of any land disturbing activity. https://deq.nc.gov/about/divisions/energy-mineral-land-resources/energy-mineral-landpermits/stormwater-permits/construction-sw Coverage (COC) under the NCG01 Construction Stormwater General Permit. Visit the following website: Complete and submit an electronic Notice of Intent (e-NOI) form with NCDEMLR requesting a Certificate of 8. staff at (919) 362-8166. Request a Letter of Plan Approval for sedimentation and erosion control measures from Water Resources 7. control Letter of Plan Approval will not be issued until the guarantee has been submitted. Development Services. An invoice can be requested from Water Resources at (919) 362-8166. The erosion Submit the applicable S&E performance guarantee to the Development Services Supervisor at 249-3394 in 6. Water Resources, Erosion Control field staff. Call Planning at 249-3426 for a final inspection of protection measures. Planning will forward approval to Install approved tree protection fencing, signs, and/or any other protection measures that may be required. 5. tree protection fencing locations. Contact an Apex Planning Department Zoning Compliance Officer at (919)249-3426 to request approval for 4. Have a surveyor flag property lines, easements, buffers, tree protection areas, and flag the protection limits.3. Fill out Tree/Protection Fencing Installation Permit Application (obtain from Planning Department).2. with inspectors and other Town staff. Through the Infrastructure Inspections Manager at (919) 249-3386, schedule a pre-construction meeting 1. The following begins only after Construction Plans are approved, signed by Town staff and copies are received. WETLANDS WETLANDS WETLANDS 100 YR. FLOOD FRINGE 500 YR. FLOOD FRINGE REVISIONS: NO.DATE WEI PROJECT NO.: 20326.01 PLANS PREPARED BY: ENGINEERING ETHERILL DESCRIPTION UNLESS ALL SIGNATURES COMPLETED DOCUMENT NOT CONSIDERED FINAL ENGINEER ROADWAY Bus: 919 851 8077 Fax: 919 851 8107 License No. F-0377 1223 Jones Franklin Rd. Raleigh, N.C. 27606 PLANS PREPARED FOR: APEX WEST GREENWAY TO AMERICAN TOBACCO TRAIL OLIVE CHAPEL ROAD CONNECTION FROM 919.372.7468 APEX, NC 27502 PO BOX 250 PARKS AND GREENWAY PLANNER ANGELA REINCKE PROJECT CONTACT: Apex, NC 27502 73 Hunter Street TOWN OF APEX PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION DATE: MAY 4, 2020 150 24" R C P15" HDPEN 18°03'23" E271.03'N 60°34'46" E 390.29'N 20°01'07" E94.30'N 89°32'22" E 364.47' N 89°32'22" E 115.10'S 12°09'04" W264.90'OLI VE CHAPEL RD.CONCN 02°44'33" E216.38'SSMH SSMH SSMH TOP=262.35' TOP=250.26' TOP=246.77'EXI STI NG 30' POW ER EASEM ENTEXI STI NG 30' POW ER EASEM ENTEXISTING 40' TOWN OF CARY UTILITY & PIPELINE EASEMENT( I NSI DE R/ W ) M ULTI-USE EASEM ENTEXI STI NG TOW N OF APEX M ULTI-USE EASEM ENTEXI STI NG TOW N OF APEX MULTI-USE EASEMENT EXISTING 20' TOWN OF APEX MON CONC EIP EIP EIP R/W MON R/W MON MON CONC 36" W OOD SPLI T RAI LSOI LGRAVELWOODS WOODS WOODS GPS-1 GPS-2 Point North East Elevation 719877.715 2021171.367 273.147 720152.390 2020704.323 248.160 GPS-1 GPS-2 SI DEW ALK EASEM ENTEXI STI NG R/ W EXI STI NG R/ W EXI STI NG R/ W JV OWNER, LLC RREF II-SH RICHARDSON BM 2016 PG 1850-1853 DB 16296 PG 2213 JV OWNER, LLC RREF II-SH RICHARDSON BM 2016 PG 1850-1853 DB 16296 PG 2213 WAKE COUNTY RACHEL B. PRICE & DB 9276 PG 1339 WAKE COUNTY DB 9276 PG 1339 OF AMERICA UNITED STATES DB 1932 PG 120AMERICAN TOBACCO TRAILSB WC-01 WC-02 WC-03 WC-04 WC-101 WC-102 WC-103 WC-104 WC-105 WB-03 WB-02 SA WB-01 SA WA-10 WA-09 WA-06 WA-07 WA-08 WA-02 WA-03 WA-04 WA-11 WA-12 WA-13 WA-01 WA-14 WA-15 144 252.19 138 248.36 1 273.15 WA-05APPROXI M ATE EXI STI NG R/ W (CALCULATED)APPROXI MATE EXI STI NG R/ W (CALCULATED) R/W MON SADDLEBROOK SUBDIVISIONWIDTH VARIES2 0.0 0' MULTI-USE EASEMENT EXISTING 20' TOWN OF APEX 20.00' MULTI-USE EASEMENT EXISTING 20' TOWN OF APEX (FROM APEX GI S I NFO)245245250250250250 250 255 255 255 260 20' 30' 30' 20' EXISTING MULTI-USE PATH END OF EXISTING MULTI-USE PATH 0 1"=30' 1530 30 60 5. TREE SURVEY NOT COMPLETED. ALL TREES WITHIN THE EASEMENT AREA WILL BE CLEARED IN ORDER TO ACCOMMODATE THE MULTI-USE PATH. 4. SITE IS WITHIN THE PRIMARY WATERSHED OVERLAY DISTRICT. 3. WETLANDS AND STREAMS HAVE NOT BEEN VERIFIED BY THE US ARMY CORPS OF ENGINEERS. 2. WETLANDS EXIST WITHIN THE GREENWAY CORRIDOR. 1. FIELD SURVEY COMPLETED BY WETHERILL ENGINEERING IN JANUARY 2020. NOTES: NC GRID NAD 83 NA 2011 EXISTING CONDITIONS 4 WETLANDS WETLANDS WETLANDS 100 YR. FLOOD FRINGE 500 YR. FLOOD FRINGE 150 24" R C P15" HDPEN 18°03'23" E271.03'N 60°34'46" E 390.29'N 20°01'07" E94.30'N 89°32'22" E 364.47' N 89°32'22" E 115.10'S 12°09'04" W264.90'OLI VE CHAPEL RD.CONCN 02°44'33" E216.38'SSMH SSMH SSMH TOP=262.35' TOP=250.26' TOP=246.77'EXI STI NG 30' POW ER EASEM ENTEXI STI NG 30' POW ER EASEM ENTEXISTING 40' TOWN OF CARY UTILITY & PIPELINE EASEMENT(I NSI DE R/ W ) M ULTI-USE EASEM ENTEXI STI NG TOW N OF APEX M ULTI-USE EASEM ENTEXI STI NG TOW N OF APEX MULTI-USE EASEMENT EXISTING 20' TOWN OF APEX MON CONC EIP EIP EIP R/W MON R/W MON MON CONC 36" W OOD SPLI T RAI LSOI LGRAVELNC GRID NAD 83 NA 2011 WOODS WOODS WOODS GPS-1 GPS-2 Point North East Elevation 719877.715 2021171.367 273.147 720152.390 2020704.323 248.160 GPS-1 GPS-2 SI DEW ALK EASEM ENTEXI STI NG R/ W EXI STI NG R/ W EXI STI NG R/ W JV OWNER, LLC RREF II-SH RICHARDSON BM 2016 PG 1850-1853 DB 16296 PG 2213 JV OWNER, LLC RREF II-SH RICHARDSON BM 2016 PG 1850-1853 DB 16296 PG 2213 WAKE COUNTY RACHEL B. PRICE & DB 9276 PG 1339 WAKE COUNTY DB 9276 PG 1339 OF AMERICA UNITED STATES DB 1932 PG 120AMERICAN TOBACCO TRAILSB WC-01 WC-02 WC-03 WC-04 WC-101 WC-102 WC-103 WC-104 WC-105 WB-03 WB-02 SA WB-01 SA WA-10 WA-09 WA-06 WA-07 WA-08 WA-02 WA-03 WA-04 WA-11 WA-12 WA-13 WA-01 WA-14 WA-15 144 252.19 138 248.36 1 273.15 WA-05APPROXI M ATE EXI STI NG R/ W (CALCULATED)APPROXI M ATE EXI STI NG R/ W (CALCULATED) R/W MON SADDLEBROOK SUBDIVISIONWIDTH VARIES2 0.0 0' MULTI-USE EASEMENT EXISTING 20' TOWN OF APEX 20.00' MULTI-USE EASEMENT EXISTING 20' TOWN OF APEX (FROM APEX GI S I NFO) -D- POT Sta.12+00.57 -D- PT Sta.11+80.47 -D- PC Sta.11+38.21 -D- PRC Sta.11+56.84 -D- PT Sta.10+81.18 -D- PRC Sta.10+56.94 -D- PC Sta.10+00.00 TIE TO EXISTING DITCH -D- STA. 10+00.00 BEGIN CONTRUCTION TIE TO EXISTING DITCH -D- STA. 12+00.00 END CONTRUCTION -D- CURVE DATA PI Sta 10+28.48 D L T R = 800.00' = 28.48' = 56.94' PI Sta 10+69.08 D L = 24.23' T = 12.13' R = 200.00' PI Sta 11+47.55 D L = 18.63' T = 9.34' R = 100.00' PI Sta 11+68.71 D L = 23.63' T = 11.87' R = 100.00' ∆∆∆∆ F T 10 0 2 -D- POT Sta. 10+96.45 -L- POC Sta.10+46.94 = INSET - DITCH ALIGNMENT Slope Ditch Front GROUND NATURAL SLOPE FILL Geotextile WITH FLARED END SECTIONS 18" RCP-III SEE DETAIL A SEE DETAIL D SEE DETAIL B RETAIN SECTION AT OUTLET 15" RCP-IV WITH FLARED END CLASS B RIP RAP 6' L X 9' W X 12" D OUTLET PROTECTION CLASS I RIP RAP 10' L X 15' W X 15" D OUTLET PROTECTION CLASS B RIP RAP 5' L X 7.5' W X 12" D OUTLET PROTECTION REMOVE SEE DETAIL D SEE DETAIL C WITH FLARED END SECTIONS 30" RCP-III SLOPE STAKE SLOPE STAKE SLOPE STAKE SLOPE STAKE TIE TO EXIST TRAIL -L- STA. 10+08.00 BEGIN PROJECT TIE TO EXISTING DITCH -D- STA. 10+00.00 BEGIN CONTRUCTION TIE TO EXISTING DITCH -D- STA. 12+00.00 END CONTRUCTION TIE TO EXIST TRAIL -L- STA. 17+00.00 END PROJECT -L- STA. 15+74.00 BEGIN BOARDWALK -L- STA. 16+44.00 END BOARDWALK -L- STA. 12+80.00 END BOARDWALK -L- STA. 11+70.00 BEGIN BOARDWALKON SHEET 6 SEE DETAIL 200.06 (2 OF 2) -L- STA. 10+20, 8' LT YIELD SIGN ALONG EDGE OF EASEMENT. COMBO SILT FENCE/TREE PROTECT. FENCE INSTALL TREE PROTECT. FENCE OR EL. = 249.89 -D- STA. 10+00.00 TIE TO EXISTING DITCH BEGIN DITCH EL. = 244.80 -D- STA. 12+00.00 TIE TO EXISTING DITCH END DITCH EL. = 256.25 -L- STA. 17+00.00 TIE TO EXISTING TRAIL END GRADE EL. = 248.32 -L- STA. 10+08.00 TIE TO EXISTING TRAIL BEGIN GRADE EL. = 255.25 -L- STA. 16+34 EL. = 255.15 -L- STA. 16+24 EL. = 254.95 -L- STA. 16+14 EL. = 254.65 -L- STA. 16+04 EL. = 254.25 -L- STA. 15+94 EL. = 251.62 -L- STA. 12+30 EL. = 251.42 -L- STA. 12+40 EL. = 251.12 -L- STA. 12+50 EL. = 250.72 -L- STA. 12+60 EL. = 251.72 -L- STA. 12+20 EL. = 251.72 -L- STA. 12+10 EL. = 251.62 -L- STA. 12+00 EL. 250.72 -L- STA. 11+70.00 BEGIN BOARDWALK EL. 249.72 -L- STA. 12+80.00 END BOARDWALK EL. 255.25 -L- STA. 16+44.00 END BOARDWALK EL. 253.25 -L- STA. 15+74.00 BEGIN BOARDWALK EL. = 251.42 -L- STA. 11+90 EL. = 251.12 -L- STA. 11+80 30" RCP EL. 249.00 -L- STA. 15+00 RT BEGIN DITCH EL. 249.30 -L- STA. 15+25 END DITCH 18" RCP 15" RCP GRADE TO THIS LINE COMPACTED SUBGRADE 6" AGGREGATE BASE COURSE WOVEN GEOTEXTILE FABRIC 2" GRANITE SCREENINGS 2" GRANITE SCREENINGS PATH MULTI-USE EXISTING S9.5B SURFACE COURSE 2" ASPHALT CONCRETE EXISTING SLOPES TO CREATE AN EVEN TRANSITION. CUT AND FILL SLOPES SHALL TIE INTO UNLESS OTHERWISE INDICATED ON PLANS. SIDE SLOPES SHALL BE LESS THAN 3:1 (TYP.) ( Not to Scale) STANDARD BASE DITCH DETAIL A B= 2.0 Ft. Max. d= 2.0 Ft. Min. D= 2.0 Ft. *When B is < 6.0' ( Not to Scale) STANDARD BASE DITCH DETAIL B B= 2.0 Ft. Min. D= 1.0 Ft. FROM STA 10+00. TO STA. 10+85 -D-FROM STA. 11+08 TO STA. 12+00 -D- Flatter4:1 or D ( Not to Scale) SPECIAL CUT DITCH FROM STA. 15+00 TO STA. 15+25 -L- RT DETAIL C Min. D= 0.5 Ft. Ground Natural ( Not to Scale) TOE PROTECTION d FLATTER2:1 ORDETAIL D b Type of Liner= COIR FIBER MATTING B 2:12:1D Ground Natural Ground Natural2:12:1D B d Ground Natural Ground Natural Type of Liner= CLASS I Rip-Rap 100 YR. FLOOD FRINGE 500 YR. FLOOD FRINGE DI Flatter4:1 or FROM STA. 15+25 TO STA. 15+50 -L- RT **b=5' FROM STA. 11+50 TO STA. 11+62 -L- RT **b= To Easement b= ** d= 1.0 Ft. Liner=CL I RIP RAP n=0.061 s= 5.5% d= 1.22 ft V= 4.6 fps Q= 25 cfs Liner=GRASS n=0.04 s= 0.58% d= 1.7 ft V= 2.74 fps Q= 25 cfs Liner=GRASS n=0.04 s= 6.8% d= 0.33 ft V=2.8 fps Q= 0.9 cfs15+00-L- PC Sta.10+28.48 -L- PT Sta.10+72.00 -L- PC Sta.14+34.13 -L- PT Sta.14+78.90 -L- POT Sta.10+00.00 PI Sta 10+51.73 D L = 43.52' T = 23.25' R = 50.00' PI Sta 14+58.14 D L = 44.77' T = 24.01' R = 50.00' ∆∆ -L- CURVE DATA F T 10 0 2 02FT10F T 10 0 2 -L- POT Sta.17+27.80 REVISIONS: NO.DATE WEI PROJECT NO.: 20326.01 PLANS PREPARED BY: ENGINEERING ETHERILL DESCRIPTION UNLESS ALL SIGNATURES COMPLETED DOCUMENT NOT CONSIDERED FINAL ENGINEER ROADWAY Bus: 919 851 8077 Fax: 919 851 8107 License No. F-0377 1223 Jones Franklin Rd. Raleigh, N.C. 27606 PLANS PREPARED FOR: APEX WEST GREENWAY TO AMERICAN TOBACCO TRAIL OLIVE CHAPEL ROAD CONNECTION FROM 919.372.7468 APEX, NC 27502 PO BOX 250 PARKS AND GREENWAY PLANNER ANGELA REINCKE PROJECT CONTACT: Apex, NC 27502 73 Hunter Street TOWN OF APEX PROFILES ENGINEER HYDRAULICS PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION DATE: MAY 4, 2020 VC = EL = PI = 10.00 245.49 10+80.00 (-)5.50% (-)0.58% -D- -D- Sta. 10+96.45 -L- Sta.10+46.94 0 0 0 PLANS - 1"=50' 0 00 50 50 50 50 100 100 25 25 510 10 20 PROFILE (HORIZONTAL) - 1"=50' PROFILE (VERTICAL) - 1"=50' CHAIN BEGIN STATION END STATION -L- SHLD 2' 5'5' 10' SHLD 2' ASPHALT TRAIL TYPICAL SECTION { -L- 2% MAX.2% MAX.4% MAX. 4% MAX. 3:1 M AX. 3:1 M AX. SEE APEX STD. 200.03 ON SHEET 6 (TIE TO AMERICAN TOBACCO TRAIL)10+08.00 11+70.00 (BEGIN BOARDWALK) (END BOARDWALK)12+80.00 15+74.00 (BEGIN BOARDWALK) (END BOARDWALK)16+44.00 17+00.00 -L- -L-(TIE TO EXISTING TRAIL) PLAN & PROFILE SHEET 5 10+00 230 240 250 260 240 250 260 270 270 260 250 230 240 240 250 260 11+00 12+00 13+00 14+00 15+00 16+00 17+00 USE 10' INCREMENT TO TRANSITION CROSS SLOPE TO EXISTING TRAIL. TRANSITION FROM 2% CROSS SLOPE TO 0% CROSS SLOPE AT BOARDWALK USING A 10' INCREMENT. NOTE: VC = EL = PI = 44.00 248.47 10+33.00 VC = EL = PI = 30.00 251.57 10+95.00 VC = EL = PI = 20.00 249.12 14+65.00 VC = EL = PI = 20.00 249.45 14+98.00 VC = EL = PI = 40.00 254.95 16+74.00 VC = EL = PI = 80.00 247.35 14+15.00 VC = EL = PI = 40.00 247.97 13+15.00 VC = EL = PI = 20.00 249.92 11+50.00 1.2% (+)0.60% (+)5.00% (-)3 .00% (+)4.00%(+)3.00%(+)2.00%(+)1.00%(+)0.00%(-)1.00%(-)2.00%(-)3.00%(-)4.00%(-)5. 0 0%(-)0.62%(+)3.54% (+)1.00%(+)5.00%(+)4.00%(+)3.00%(+)2.00%(+)1.00%(+)0.00%(+)5.00% (-)1.00% -L-OVERTOPPING ELEVATION = OVERTOPPING FREQUENCY = OVERTOPPING DISCHARGE = BASE HW ELEVATION = BASE FREQUENCY = BASE DISCHARGE = DESIGN HW ELEVATION = DESIGN FREQUENCY = DESIGN DISCHARGE = FT YRS CFS FT YRS CFS FT YRS CFS PIPE HYDRAULIC DATA 10+21 -L- 10+47 -L- 248.3 500+ 15 245.7 100 2.2 245.6 10 1.8 248.6 500 33 248.4 100 31 248.0 10 25.0 2'10'2' 2'10'2' 1' 1' AcDbArcAlignedText (ATEXT) 1873 APEX 46" 6" 72" 36" 12"12"6" 4" 12"12" 4"4" AcDbArcAlignedText (ATEXT) 1873 APEX AcDbArcAlignedText (ATEXT) 1873 APEX AcDbArcAlignedText (ATEXT) 1873 APEX AcDbArcAlignedText (ATEXT) 1873 APEX 46" 6" 72" 36" 12"12"6" 4" 12"12" 4"4" AcDbArcAlignedText (ATEXT) 1873 APEX AcDbArcAlignedText (ATEXT) 1873 APEX AcDbArcAlignedText (ATEXT) 1873 APEX FENCE POST' COATED BLACK VINYL 2" x 2" x 7' REVISIONS: NO.DATE WEI PROJECT NO.: 20326.01 PLANS PREPARED BY: ENGINEERING ETHERILL DESCRIPTION UNLESS ALL SIGNATURES COMPLETED DOCUMENT NOT CONSIDERED FINAL ENGINEER ROADWAY Bus: 919 851 8077 Fax: 919 851 8107 License No. F-0377 1223 Jones Franklin Rd. Raleigh, N.C. 27606 PLANS PREPARED FOR: APEX WEST GREENWAY TO AMERICAN TOBACCO TRAIL OLIVE CHAPEL ROAD CONNECTION FROM 919.372.7468 APEX, NC 27502 PO BOX 250 PARKS AND GREENWAY PLANNER ANGELA REINCKE PROJECT CONTACT: Apex, NC 27502 73 Hunter Street TOWN OF APEX PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION DATE: MAY 4, 2020 6 CONSTRUCTION DETAILS MAY BE USED SUBJECT TO REVIEW AND APPROVAL. GREENWAY STANDARDS AND SPECIFICATIONS. IN LOW LYING AREAS PRONE TO FLOODING, 4-INCH DEEP GRAVEL SHOULDER ALL GREENWAYS SHALL HAVE A 2-FOOT WIDE SHOULDER. REFER TO THE CRUSHED GRANITE SCREENING SECTION OF THE 5. SUBGRADE SHALL BE STABLE AND COMPACTED.4. ALL LUMBER USED SHALL BE PRESSURE TREATED AND RATED FOR GROUND CONTACT.3. ALL DRAIN PIPE BELOW THE GREENWAY SHALL BE 15" MINIMUM DIAMETER RCP.2. DEPARTMENT. ALL LOCATION & SIZES OF DRAIN PIPE TO BE VERIFIED AND APPROVED BY THE TOWN OF APEX CONSTRUCTION MANAGEMENT 1. NOTES: GREENWAY SECTIONS 200.03 STD. NO. SHEET 1 OF 1 CONTROL JOINTS 1 8" WIDE, 1" DEEP, 6' O.C. PERPENDICULAR TO RUN OF WALK EXPANSION JOINTS 1 2" RECESS, 1 2" WIDE, 30' MAX O.C. PERPENDICULAR TO RUN OF WALK ASPHALT PAVED PATH 2% MAX. CROSS SLOPE 4% MAX.4% MAX. CONCRETE PAVED PATH 4% MAX.4% MAX. 6x6x10 WELDED WIRE SET 2" BELOW SURFACE 2% MAX. CROSS SLOPE PAVEMENT DESIGN: 4" CONCRETE 6" AGGREGATE BASE COURSE 2" GRANITE SCREENING SHOULDER PAVEMENT DESIGN: 2" ASPHALT CONCRETE SURFACE COURSE 6" AGGREGATE BASE COURSE WOVEN GEOTEXTILE FABRIC 2" GRANITE SCREENING SHOULDER GREENWAY SIGNAGE 200.06 STD. NO. SHEET 1 OF 2 " THICK ALUMINUM PANEL MOUNTED TO POSTS4 1NOTE: SIGNS SHALL BE PARK NAME x 4 x 12 ʺʺʺ72 ID SIGN x 4 x 12 ʺʺʺ46 DIRECTIONAL TRAILMILEPARK NAME x 4 x 6 ʺʺʺ36 MILEAGE LOOP REFERENCE: TBD DOUBLE-SIDED LOCATED AT TRAIL START ARROW DIRECTION: TBD DOUBLE-SIDED LOCATE AT STREET/SIDEWALK MILEAGE NUMBER: TBD SINGLE-SIDED Name Trail TRAILXX MILES TRAIL LOOP XX MILES TRAIL LOOP Name Trail PARK NAMEGREENWAY SIGNAGE 200.06 STD. NO. " THICK ALUMINUM PANEL MOUNTED TO POSTS4 1NOTE: SIGNS SHALL BE PARK NAME x 4 x 12 ʺʺʺ72 ID SIGN x 4 x 12 ʺʺʺ46 DIRECTIONAL TRAILMILEPARK NAME x 4 x 6 ʺʺʺ36 MILEAGE LOOP REFERENCE: TBD DOUBLE-SIDED LOCATED AT TRAIL START ARROW DIRECTION: TBD DOUBLE-SIDED LOCATE AT STREET/SIDEWALK MILEAGE NUMBER: TBD SINGLE-SIDED Name Trail TRAILXX MILES TRAIL LOOP XX MILES TRAIL LOOP Name Trail PARK NAME(BENCH, TRASH, RECYCLING, DOG STATION) GREENWAY DETAILS 200.08 STD. NO. SHEET 1 OF 1 8" DIA. MIN. HOLE W/ CONC. AROUND LEG (FRONT VIEW) BENCH DETAILS (SIDE VIEW) BENCH DETAILS RECREATION BENCH WITH 2"X4" TREATED SOUTHERN YELLOW PINE SLATING NOTES: 1.BENCHES SHALL BE KAY PARK RECREATION MODEL NO 6CB2SYPIG OR EQUIVALENT. 2.BENCHES TO BE INSTALLED BY THE CONTRACTOR IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS AND DETAILS. 3.PROVIDE MIN 2 FEET OF SEPARATION BETWEEN TRAIL AND BENCHES. 4.BENCHES SHALL BE MOUNTED IN CONCRETE AND PAD POURED AFTER BENCHES ARE SECURED. 5.TRASH RECEPTACLE SHALL BE OCC OUTDOORS REC-S8331A-00-092 (BLACK) WITH DOME LID AND PUSH DOOR (BLACK) OR EQUIVALENT. 6.RECYCLING RECEPTACLE SHALL BE OCC OUTDOORS REC-S8331A-00-055 (BLUE) WITH DOME LID AND PUSH DOOR (BLUE) OR EQUIVALENT. 7.TRASH BAG DISPENSER SHALL BE PROJANSAN ECO HEADER DISPENSER OR EQUIVALENT. 8.DOG STATION, TRASH AND RECYCLE RECEPTACLES TO BE INSTALLED BY THE CONTRACTOR IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS AND DETAILS. 9.PROVIDE MIN 2 FEET OF SEPARATION BETWEEN DOG STATION AND TRASH/ RECYCLE RECEPTACLES. 10.TRASH AND RECYCLE RECEPTACLES TO BE MOUNTED ON 3-FOOT BY 6-FOOT CONCRETE PAD. TRASH, RECYCLING AND DOG STATION DETAILS RECYCLE RECEPTACLE WITH DOME LID (BLUE) TRASH RECEPTACLE WITH DOME LID (BLACK) FILL POST HOLE WITH CONCRETE TOWN OF APEX DOG STATION SIGN TRASH BAG DISPENSER WHEEL CHAIR ACCESSIBLE CONCRETE PAD TRAIL (STANDARD BOLLARD) GREENWAY DETAILS 200.09 STD. NO. SHEET 1 OF 1 RETROREFLECTIVE TAPE (WHITE) 38" - #4 VERTICAL REBAR (x4) #3 REBAR HOOP (x6) GRAVEL FRENCH DRAIN SQUARE POST ANCHOR SLEEVE WITH LID PVC DRAIN PIPE REMOVABLE BOLLARD FIXED BOLLARD 12" - #5 REBAR DRIVEN THROUGH POST THERMOPLASTIC 4" YELLOW, 120 MILS FIXED BOLLARDFIXED BOLLARD REMOVABLE BOLLARD TYPICAL BOLLARD PLACEMENT AT ENTRANCE PAVEMENT MARKING DETAIL (TOP VIEW) (2')(2')(4')(4') FIXED BOLLARD EDGE OF PAVED TRAIL FIXED BOLLARD PEDESTRIAN RAILING OR FENCING. FIXED BOLLARDS SHALL NOT BE REQUIRED WHEN MOTOR VEHICLE ACCESS IS BLOCKED BY 6. PROVIDE A 2-FOOT SEPARATION BETWEEN TRAIL AND BOLLARDS WHEN TRAIL IS 8 FEET IN WIDTH.5. APPLICABLE. BOLLARDS SHALL BE INSTALLED MINIMUM 10 FEET FROM THE BACK OF CURB RAMP WHEN BOLLARDS SHALL BE INSTALLED OUTSIDE THE CLEAR ZONE WHEN ADJACENT TO ROADWAY. 4. 27 INCHES ABOVE GRADE PER MANUFACTURER SPECIFICATIONS. CONCRETE FOUNDATIONS SHALL BE CONSTRUCTED TO WITHSTAND 6,000 LBS OF STATIC LOAD AT 3. BOLLARDS AND SIGNS SHALL BE INSTALLED PER MANUFACTURER DETAILS AND SPECIFICATIONS2. TRAFFICGUARD RP3500 SERIES. FIXED BOLLARDS SHALL BE TRAFFICGUARD RFP SERIES. REMOVABLE BOLLARDS SHALL BE 1. NOTES: 3'6' 3.5" 6" MIN. 2' MIN. 17.5" 5'MIN.19" 18" 2' 6'3' 3.5" 2" 2"36" 4.5" O.D. 42" 24" 3" 18" DIA. 36" 4.5" O.D. 12" 2"2" 2"2" 18" DIA. 1' 5' 1'5'5'1' 200.06 STD. NO. 200.06 STD. NO. SHEET 2 OF 2GENERAL GREENWAY SIGNAGE NCG01 GROUND STABILIZATION EC-1 REVISIONS: NO.DATE WEI PROJECT NO.: 20326.01 PLANS PREPARED BY: ENGINEERING ETHERILL DESCRIPTION UNLESS ALL SIGNATURES COMPLETED DOCUMENT NOT CONSIDERED FINAL ENGINEER HYDRAULICS Bus: 919 851 8077 Fax: 919 851 8107 License No. F-0377 1223 Jones Franklin Rd. Raleigh, N.C. 27606 PLANS PREPARED FOR: APEX WEST GREENWAY TO AMERICAN TOBACCO TRAIL OLIVE CHAPEL ROAD CONNECTION FROM 919.372.7468 APEX, NC 27502 PO BOX 250 PARKS AND GREENWAY PLANNER ANGELA REINCKE PROJECT CONTACT: Apex, NC 27502 73 Hunter Street TOWN OF APEX PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION DATE: MAY 4, 2020 REVISIONS: NO.DATE WEI PROJECT NO.: 20326.01 PLANS PREPARED BY: ENGINEERING ETHERILL DESCRIPTION UNLESS ALL SIGNATURES COMPLETED DOCUMENT NOT CONSIDERED FINAL ENGINEER HYDRAULICS Bus: 919 851 8077 Fax: 919 851 8107 License No. F-0377 1223 Jones Franklin Rd. Raleigh, N.C. 27606 PLANS PREPARED FOR: APEX WEST GREENWAY TO AMERICAN TOBACCO TRAIL OLIVE CHAPEL ROAD CONNECTION FROM 919.372.7468 APEX, NC 27502 PO BOX 250 PARKS AND GREENWAY PLANNER ANGELA REINCKE PROJECT CONTACT: Apex, NC 27502 73 Hunter Street TOWN OF APEX PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION DATE: MAY 4, 2020 EC-2 NCG01 SELF INSPECTION REVISIONS: NO.DATE WEI PROJECT NO.: 20326.01 PLANS PREPARED BY: ENGINEERING ETHERILL DESCRIPTION UNLESS ALL SIGNATURES COMPLETED DOCUMENT NOT CONSIDERED FINAL ENGINEER HYDRAULICS Bus: 919 851 8077 Fax: 919 851 8107 License No. F-0377 1223 Jones Franklin Rd. Raleigh, N.C. 27606 PLANS PREPARED FOR: APEX WEST GREENWAY TO AMERICAN TOBACCO TRAIL OLIVE CHAPEL ROAD CONNECTION FROM 919.372.7468 APEX, NC 27502 PO BOX 250 PARKS AND GREENWAY PLANNER ANGELA REINCKE PROJECT CONTACT: Apex, NC 27502 73 Hunter Street TOWN OF APEX PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION DATE: MAY 4, 2020 EROSION CONTROL NOTES EC-3 Town of Apex Construction Sequence maintenance of the site. The Property Owner/Home Owners Association will be responsible for permanent erosion control 23. of Termination (e-NOT) to end coverage under the NCG01 permit. issuance of the Certificate of Completion. Visit the State website listed above and submit an electronic Notice and to request a Certificate of Completion. The S&E performance guarantee will be released with the When vegetation has been established, call Water Resources staff at (919) 362-8166 for a final site inspection 22. resulting bare areas. All permanent erosion control devices should be installed at this point. Remove all temporary diversions, silt fencing, sediment basins, etc. and provide adequate cover or pave any 21. Construction Plan set. devices. Follow the SCM Construction Sequence found on the Grading and/or SCM Detail sheet on the Flush and clean all stormwater system pipes. Clean and remove sediment from temporary sediment holding 20. contained within the plat. erosion control measures must be installed, be functioning properly and be maintained for the entire area Prior to plat approval, all disturbed areas both public and private, must be properly stabilized. All temporary 19. Stabilize site as areas are brought up to finished grade with vegetation or paving.18. slopes that are 3:1 or flatter must establish groundcover within 14 calendar days. establish groundcover on swales and ditches and graded slopes steeper than 3:1 within 7 calendar days; After completion of any phase of grading or when land-disturbing activities have temporarily ceased, 17. other approved measures as shown on plans. Maintain S&E measures as needed. Install storm sewer, if applicable, and protect inlets with inlet protection devices, sediment devices, and/or 16. Stockpile a sufficient amount of topsoil to cover 3 inches over landscaped areas at the end of the project.15. Begin clearing, grubbing, and rough grade of the site in accordance with the approved grading plan.14. Post Grading Permit prominently on site at all times.13. separate from any other pre-construction meetings required in the Construction Sequence. a pre-construction meeting with Rudy Baker at 249-3381 prior to any grading activities. This meeting is Once a Grading Permit is reviewed and issued by the Building Inspections & Permitting Department, arrange 12. Complete a Grading Permit Application, if required, from the Building Inspections & Permitting Department.11. Department. Certificate of Compliance. Water Resources will also forward a copy to the Building Inspections & Permitting When completed, call Water Resources staff at (919) 362-8166 for an on-site inspection and to request a 10. and/or other measures as shown on the approved plans. Clear only as necessary to install these devices. Install gravel construction entrance, temporary diversions, silt fencing, sediment basins, bypass channels, 9. The COC must be submitted to the Town prior to the commencement of any land disturbing activity. https://deq.nc.gov/about/divisions/energy-mineral-land-resources/energy-mineral-landpermits/stormwater-permits/construction-sw Coverage (COC) under the NCG01 Construction Stormwater General Permit. Visit the following website: Complete and submit an electronic Notice of Intent (e-NOI) form with NCDEMLR requesting a Certificate of 8. staff at (919) 362-8166. Request a Letter of Plan Approval for sedimentation and erosion control measures from Water Resources 7. control Letter of Plan Approval will not be issued until the guarantee has been submitted. Development Services. An invoice can be requested from Water Resources at (919) 362-8166. The erosion Submit the applicable S&E performance guarantee to the Development Services Supervisor at 249-3394 in 6. Water Resources, Erosion Control field staff. Call Planning at 249-3426 for a final inspection of protection measures. Planning will forward approval to Install approved tree protection fencing, signs, and/or any other protection measures that may be required. 5. tree protection fencing locations. Contact an Apex Planning Department Zoning Compliance Officer at (919)249-3426 to request approval for 4. Have a surveyor flag property lines, easements, buffers, tree protection areas, and flag the protection limits.3. Fill out Tree/Protection Fencing Installation Permit Application (obtain from Planning Department).2. with inspectors and other Town staff. Through the Infrastructure Inspections Manager at (919) 249-3386, schedule a pre-construction meeting 1. The following begins only after Construction Plans are approved, signed by Town staff and copies are received. SITE DESCRIPTION SOIL STABILIZATION TIMEFRAMES STABILIZATION TIME 7 DAYS TIMEFRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITCHES AND SLOPES HIGH QUALITY WATER (HQW) ZONES 7 DAYS NONE SLOPES STEEPER THAN 3:1 7 DAYS IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED. NONE SLOPES 3:1 OR FLATTER 14 DAYS 14 DAYS 7 DAYS FOR SLOPES GREATER THAN 50' IN LENGTH. ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 NONE, EXCEPT FOR PERIMETERS AND HQW ZONES. ENGINEER. NEED TO BE INSTALLED AS DIRECTED BY THE ADDITIONAL EROSION CONTROL DEVICES MAY REQUIRE PRIOR APPROVAL BY ENGINEER. NOTES: ANY DEVIATION FROM OPTIONS GIVEN WILL CAPE FEAR RIVER BASIN. CLASSIFICATION: WS-IV;NSW WATER SOURCE: REEDY BRANCH, FROM SOURCE TO BEAVER CREEK, DISTURBED AREA: 0.6 ACRES PROTECTION, AND SEDIMENT CHECK DAMS. FENCE, SPECIAL SEDIMENT CONTROL FENCE OUTLETS, PIPE INLET BRIDGES. EROSION AND SEDIMENT CONTROL MEASURES INLCUDE SILT TRAIL, DRIVE PIPE INSTALLATION, CHANNEL WORK, AND PEDESTRAIN THIS PROJECT CONSISTS OF THE CONSTRUCTION OF A GREENWAY EROSION CONTROL NARRATIVE Temporary Silt Fence Std. #Description Symbol 400.01 400.02 Temporary Silt Fence Outlet 400.05 Temporary Rock Silt Check Dam Tree Protection Area Limits Pipe Inlet Protection (Plywood & Stone)400.10 400.18 Pipe Outlet Protection Limits of Disturbance 400.04 Yard Inlet Protection thereof. For information contact James Lastinger, Raleigh Field Office, U.S. Army Corps of Engineers, (919) 554-4884 ext. 32. boundaries should be investigated by the U.S. Army Corps of Engineers prior to any disturbance to determine the existence of wetlands and any requirement Any project having the possibility of wetlands (indicators being flood hazard solid or alluvial soils, wetland vegetation, blueline streams, etc.) within its Wetlands Approval is issued. Shoul you have questions regarding NPDES permit, please contact Sara Knies, (DENR-Surface Water Protection) at (919) 791-4258. Control Plan. Applicants will receive a copy of the permit once the Soil Erosion and Sedimentation Control Plan has been reviewed and a Letter of Plan considered automatically effective once the NC Division of Land Resources or the delegated local program approves the Soil Erosion and Sedimentation runoff from construction activities disturbing one or more acres. In North Carolina, the NPDES stormwater discharge permit for construction activities is The Federeal Clean Water Act requires that National Pollutant Discharge Elimination Systems (NPDES) permits be obtained for discharges of stormwater NPDES REVISIONS: NO.DATE WEI PROJECT NO.: 20326.01 PLANS PREPARED BY: ENGINEERING ETHERILL DESCRIPTION UNLESS ALL SIGNATURES COMPLETED DOCUMENT NOT CONSIDERED FINAL ENGINEER HYDRAULICS Bus: 919 851 8077 Fax: 919 851 8107 License No. F-0377 1223 Jones Franklin Rd. Raleigh, N.C. 27606 PLANS PREPARED FOR: APEX WEST GREENWAY TO AMERICAN TOBACCO TRAIL OLIVE CHAPEL ROAD CONNECTION FROM 919.372.7468 APEX, NC 27502 PO BOX 250 PARKS AND GREENWAY PLANNER ANGELA REINCKE PROJECT CONTACT: Apex, NC 27502 73 Hunter Street TOWN OF APEX PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION DATE: MAY 4, 2020 EC-4 EROSION CONTROL DETAILS STEEL POST FRONT VIEW SIDE VIEW2'-0"3'-0"FILL SLOPE GRADE WOVEN WIRE FABRIC WARNING SIGN VARIABLE AS DIRECTED BY THE ENGINEER 8' MAX. GRADE SILT FENCE FABRIC INSTALLED TO SECOND WIRE FROM TOP MIN. 12-1/2 GA. INTERMEDIATE WIRES MIN. 10 GA. LINE WIRES TREE PROTECTION AREA DO NOT ENTER SILT FENCE GEOTEXTILE FABRIC 4" MIN MIN PLASTIC OR WIRE TIES 8" MIN 5" MAINTENANCE: CLEAN OUT AT 50% CAPACITY LIFE OF FENCING: 6-9 MONTHS DO NOT DISTURB TREE CONSERVATION AREAS WARNING SIGN DETAIL DO NOT ENTER TREE PROTECTION AREA PROVIDE WARNING LANGUAGE IN BOTH ENGLISH AND SPANISH, AS SHOWN PARA ARBOLES - NO ENTRE ZONA DE PROTECCION 40"4"4"4"4"4"4"GRADED SLOPES GREATER THAN 10' IN HEIGHT. SILT FENCE SHOULD NOT BE USED ALONE BELOW 36"NOTES: (SEDIMENT/SILT) / TREE PROTECTION FENCE STANDARD TEMPORARY AND/OR PERMIT REVOCATION. FAILING TO MAINTAIN TREE PROTECTION MEASURES MAY RESULT IN FINES • PLANNING DEPARTMENT BASED UPON ACTUAL FIELD CONDITIONS. ADDITIONAL SIGNS AND/OR PROTECTION MEASURES MAY BE REQUIRED BY THE • FENCING MUST REMAIN UPRIGHT AND SLACK FREE. MAINTAIN TREE PROTECTION FENCE THROUGHOUT DURATION OF PROJECT - • TREES. FABRIC MUST BE ATTACHED TO APPROVED POSTS ONLY. DO NOT ATTACH TO • ATTACH SIGNS SECURELY TO FENCE POSTS AND FABRIC.• LESS THAN ONE SIGN PER PROTECTION AREA AND/OR SIDE. FOR TREE PROTECTION AREAS LESS THAN 200-FEET IN PERIMETER, PROVIDE NO • 200-FEET ON CENTER THEREAFTER. SIGNS TO BE PLACED AT EACH END OF LINEAR TREE PROTECTION AREA AND • SIGNS TO BE PLACED 200-FEET ON CENTER, MAX.• AS INDICATED ABOVE. ALL LETTERS TO BE AT LEAST 3-INCHES HIGH, CLEARLY LEGIBLE AND SPACED • WARNING SIGNS TO BE MADE OF DURABLE WATERPROOF MATERIAL.•26"TREE PROTECTION FENCE STANDARD TEMPORARY STEEL POST 2'-0"WOVEN WIRE FABRIC VARIABLE AS DIRECTED BY THE ENGINEER 8' MAX. GRADE MIN. 12-1/2 GA. INTERMEDIATE WIRES MIN. 10 GA. LINE WIRES TREE PROTECTION AREA DO NOT ENTER ORANGE, UV RESISTANT HIGH - TENSILE STRENGTH POLY BARRICADE FABRIC (TYPICAL) ORANGE, UV RESISTANT HIGH - TENSILE STRENGTH POLY BARRICADE FABRIC (TYPICAL) WARNING SIGN PLASTIC OR WIRE TIES FRONT VIEW SIDE VIEW WARNING SIGN NOTE: FOR TREE PROTECTION ONLY36"4'-0"WARNING SIGN DETAIL DO NOT ENTER TREE PROTECTION AREA PROVIDE WARNING LANGUAGE IN BOTH ENGLISH AND SPANISH, AS SHOWN PARA ARBOLES - NO ENTRE ZONA DE PROTECCION 40"4"4"4"4"4"4"36"AND/OR PERMIT REVOCATION. FAILING TO MAINTAIN TREE PROTECTION MEASURES MAY RESULT IN FINES • PLANNING DEPARTMENT BASED UPON ACTUAL FIELD CONDITIONS. ADDITIONAL SIGNS AND/OR PROTECTION MEASURES MAY BE REQUIRED BY THE • FENCING MUST REMAIN UPRIGHT AND SLACK FREE. MAINTAIN TREE PROTECTION FENCE THROUGHOUT DURATION OF PROJECT - • TREES. FABRIC MUST BE ATTACHED TO APPROVED POSTS ONLY. DO NOT ATTACH TO • ATTACH SIGNS SECURELY TO FENCE POSTS AND FABRIC.• LESS THAN ONE SIGN PER PROTECTION AREA AND/OR SIDE. FOR TREE PROTECTION AREAS LESS THAN 200-FEET IN PERIMETER, PROVIDE NO • 200-FEET ON CENTER THEREAFTER. SIGNS TO BE PLACED AT EACH END OF LINEAR TREE PROTECTION AREA AND • SIGNS TO BE PLACED 200-FEET ON CENTER, MAX.• AS INDICATED ABOVE. ALL LETTERS TO BE AT LEAST 3-INCHES HIGH, CLEARLY LEGIBLE AND SPACED • WARNING SIGNS TO BE MADE OF DURABLE WATERPROOF MATERIAL.• NOTES: WETLANDS WETLANDS WETLANDS 100 YR. FLOOD FRINGE 500 YR. FLOOD FRINGE245 245245245245245 2 4 5 245245245245250250250250250250250250250250250250250 250 250 255255255255255255255255255260260260260260260260260260265265265265265265265265270270270270270270270275275150 24" R C P15" HDPEN 18°03'23" E271.03'N 60°34'46" E 390.29'N 20°01'07" E94.30'N 89°32'22" E 364.47' N 89°32'22" E 115.10'S 12°09'04" W264.90'OLI VE CHAPEL RD.CONCN 02°44'33" E216.38'SSMH SSMH SSMH TOP=262.35' TOP=250.26' TOP=246.77'EXI STI NG 30' POW ER EASEM ENTEXI STI NG 30' POW ER EASEM ENTEXISTING 40' TOWN OF CARY UTILITY & PIPELINE EASEMENT( I NSI DE R/ W ) M ULTI-USE EASEM ENTEXI STI NG TOW N OF APEX M ULTI-USE EASEM ENTEXI STI NG TOW N OF APEX MULTI-USE EASEMENT EXISTING 20' TOWN OF APEX MON CONC EIP EIP EIP R/W MON R/W MON MON CONC 36" W OOD SPLI T RAI LSOI LGRAVELWOODS WOODS WOODS GPS-2 SI DEW ALK EASEM ENTEXI STI NG R/ W EXI STI NG R/ W EXI STI NG R/ W JV OWNER, LLC RREF II-SH RICHARDSON BM 2016 PG 1850-1853 DB 16296 PG 2213 JV OWNER, LLC RREF II-SH RICHARDSON BM 2016 PG 1850-1853 DB 16296 PG 2213 WAKE COUNTY RACHEL B. PRICE & DB 9276 PG 1339 WAKE COUNTY DB 9276 PG 1339 OF AMERICA UNITED STATES DB 1932 PG 120AMERICAN TOBACCO TRAILSB WC-01 WC-02 WC-03 WC-04 WC-101 WC-102 WC-103 WC-104 WC-105 WB-03 WB-02 SA WB-01 SA WA-10 WA-09 WA-06 WA-07 WA-08 WA-02 WA-03 WA-04 WA-11 WA-12 WA-13 WA-01 WA-14 WA-15 144 252.19 138 248.36 WA-05APPROXI M ATE EXI STI NG R/ W (CALCULATED)APPROXI MATE EXI STI NG R/ W (CALCULATED) R/W MON SADDLEBROOK SUBDIVISIONWIDTH VARIES2 0.0 0' MULTI-USE EASEMENT EXISTING 20' TOWN OF APEX 20.00' MULTI-USE EASEMENT EXISTING 20' TOWN OF APEX (FROM APEX GI S I NFO) 20' 30' 30' 20'STAGI NG AREA80' x 40' REVISIONS: NO.DATE WEI PROJECT NO.: 20326.01 PLANS PREPARED BY: ENGINEERING ETHERILL DESCRIPTION UNLESS ALL SIGNATURES COMPLETED DOCUMENT NOT CONSIDERED FINAL ENGINEER HYDRAULICS Bus: 919 851 8077 Fax: 919 851 8107 License No. F-0377 1223 Jones Franklin Rd. Raleigh, N.C. 27606 PLANS PREPARED FOR: APEX WEST GREENWAY TO AMERICAN TOBACCO TRAIL OLIVE CHAPEL ROAD CONNECTION FROM 919.372.7468 APEX, NC 27502 PO BOX 250 PARKS AND GREENWAY PLANNER ANGELA REINCKE PROJECT CONTACT: Apex, NC 27502 73 Hunter Street TOWN OF APEX PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION DATE: MAY 4, 2020 WITH FLARED END SECTIONS 18" RCP-III SEE DETAIL A SEE DETAIL D SEE DETAIL B RETAIN SECTION AT OUTLET 15" RCP-IV WITH FLARED END CLASS B RIP RAP 6' L X 9' W X 12" D OUTLET PROTECTION CLASS I RIP RAP 10' L X 15' W X 15" D OUTLET PROTECTION CLASS B RIP RAP 5' L X 7.5' W X 12" D OUTLET PROTECTION REMOVE SEE DETAIL D SEE DETAIL C WITH FLARED END SECTIONS 30" RCP-III NOTE: PLACE TEMPORARY ROCK SEDIMENT DAMS TYPE - B DRAINAGE OUTLETS. AND TEMPORARY ROCK SILT CHECKS TYPE - A AT INSTALLED DURING CLEARING AND GRUBBING PHASE. PERIMETER EROSION CONTROL MEASURES SHALL BE NOTE: GRAPHIC SCALE 0'30'30' NC GRID NAD 83 NA 2011 CLEARING AND GRUBBING PHASE EROSION CONTROL PLAN EC-5 100 YR. FLOOD FRINGE 500 YR. FLOOD FRINGE DI15+00-L- PC Sta.10+28.48 -L- PT Sta.10+72.00 -L- PC Sta.14+34.13 -L- PT Sta.14+78.90 -L- POT Sta.10+00.00 F T 10 0 2 02FT10F T 10 0 2 -L- POT Sta.17+27.80 WETLANDS WETLANDS WETLANDS 100 YR. FLOOD FRINGE 500 YR. FLOOD FRINGE 150 24" R C P15" HDPEN 18°03'23" E271.03'N 60°34'46" E 390.29'N 20°01'07" E94.30'N 89°32'22" E 364.47' N 89°32'22" E 115.10'S 12°09'04" W264.90'OLI VE CHAPEL RD.CONCN 02°44'33" E216.38'SSMH SSMH SSMH TOP=262.35' TOP=250.26' TOP=246.77'EXI STI NG 30' POW ER EASEM ENTEXI STI NG 30' POW ER EASEM ENTEXISTING 40' TOWN OF CARY UTILITY & PIPELINE EASEMENT( I NSI DE R/ W ) M ULTI-USE EASEM ENTEXI STI NG TOW N OF APEX M ULTI-USE EASEM ENTEXI STI NG TOW N OF APEX MULTI-USE EASEMENT EXISTING 20' TOWN OF APEX MON CONC EIP EIP EIP R/W MON R/W MON MON CONC 36" W OOD SPLI T RAI LSOI LGRAVELWOODS WOODS WOODS GPS-2 SI DEW ALK EASEM ENTEXI STI NG R/ W EXI STI NG R/ W EXI STI NG R/ W JV OWNER, LLC RREF II-SH RICHARDSON BM 2016 PG 1850-1853 DB 16296 PG 2213 JV OWNER, LLC RREF II-SH RICHARDSON BM 2016 PG 1850-1853 DB 16296 PG 2213 WAKE COUNTY RACHEL B. PRICE & DB 9276 PG 1339 WAKE COUNTY DB 9276 PG 1339 OF AMERICA UNITED STATES DB 1932 PG 120AMERICAN TOBACCO TRAILSB WC-01 WC-02 WC-03 WC-04 WC-101 WC-102 WC-103 WC-104 WC-105 WB-03 WB-02 SA WB-01 SA WA-10 WA-09 WA-06 WA-07 WA-08 WA-02 WA-03 WA-04 WA-11 WA-12 WA-13 WA-01 WA-14 WA-15 144 252.19 138 248.36 WA-05APPROXI M ATE EXI STI NG R/ W (CALCULATED)APPROXI MATE EXI STI NG R/ W (CALCULATED) R/W MON SADDLEBROOK SUBDIVISIONWIDTH VARIES2 0.0 0' MULTI-USE EASEMENT EXISTING 20' TOWN OF APEX 20.00' MULTI-USE EASEMENT EXISTING 20' TOWN OF APEX (FROM APEX GI S I NFO) 20' 30' 30' 20'STAGI NG AREA80' x 40' REVISIONS: NO.DATE WEI PROJECT NO.: 20326.01 PLANS PREPARED BY: ENGINEERING ETHERILL DESCRIPTION UNLESS ALL SIGNATURES COMPLETED DOCUMENT NOT CONSIDERED FINAL ENGINEER HYDRAULICS Bus: 919 851 8077 Fax: 919 851 8107 License No. F-0377 1223 Jones Franklin Rd. Raleigh, N.C. 27606 PLANS PREPARED FOR: APEX WEST GREENWAY TO AMERICAN TOBACCO TRAIL OLIVE CHAPEL ROAD CONNECTION FROM 919.372.7468 APEX, NC 27502 PO BOX 250 PARKS AND GREENWAY PLANNER ANGELA REINCKE PROJECT CONTACT: Apex, NC 27502 73 Hunter Street TOWN OF APEX PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION DATE: MAY 4, 2020 Slope Ditch Front GROUND NATURAL SLOPE FILL Geotextile WITH FLARED END SECTIONS 18" RCP-III SEE DETAIL A SEE DETAIL D SEE DETAIL B RETAIN SECTION AT OUTLET 15" RCP-IV WITH FLARED END CLASS B RIP RAP 6' L X 9' W X 12" D OUTLET PROTECTION CLASS I RIP RAP 10' L X 15' W X 15" D OUTLET PROTECTION CLASS B RIP RAP 5' L X 7.5' W X 12" D OUTLET PROTECTION REMOVE SEE DETAIL D SEE DETAIL C WITH FLARED END SECTIONS 30" RCP-III TIE TO EXIST TRAIL -L- STA. 10+08.00 BEGIN PROJECT TIE TO EXISTING DITCH -D- STA. 10+00.00 BEGIN CONTRUCTION TIE TO EXISTING DITCH -D- STA. 12+00.00 END CONTRUCTION TIE TO EXIST TRAIL -L- STA. 17+00.00 END PROJECT -L- STA. 15+74.00 BEGIN BOARDWALK -L- STA. 16+44.00 END BOARDWALK -L- STA. 12+80.00 END BOARDWALK -L- STA. 11+70.00 BEGIN BOARDWALKON SHEET 6 SEE DETAIL 200.06 (2 OF 2) -L- STA. 10+20, 8' LT YIELD SIGN ALONG EDGE OF EASEMENT. COMBO SILT FENCE/TREE PROTECT. FENCE INSTALL TREE PROTECT. FENCE OR FINAL EROSION CONTROL PHASE NC GRID NAD 83 NA 2011 GRAPHIC SCALE 0'30'30' EC-6 FINAL PHASE EROSION CONTROL PLAN ( Not to Scale) STANDARD BASE DITCH DETAIL A B= 2.0 Ft. Max. d= 2.0 Ft. Min. D= 2.0 Ft. *When B is < 6.0' ( Not to Scale) STANDARD BASE DITCH DETAIL B B= 2.0 Ft. Min. D= 1.0 Ft.Q=0.9 cfsDA=0.3 AcQ=0.24 cfsDA=0.15 AcFROM STA 10+00. TO STA. 10+85 -D-FROM STA. 11+08 TO STA. 12+00 -D- Flatter4:1 or D ( Not to Scale) SPECIAL CUT DITCH FROM STA. 15+00 TO STA. 15+25 -L- RT DETAIL C Min. D= 0.5 Ft. Ground Natural ( Not to Scale) TOE PROTECTION d FLATTER2:1 ORDETAIL D b Type of Liner= COIR FIBER MATTING B 2:12:1D Ground Natural Ground Natural2:12:1D B d Ground Natural Ground Natural Type of Liner= CLASS I Rip-Rap 100 YR. FLOOD FRINGE 500 YR. FLOOD FRINGE 403 DI Flatt er4:1 or FROM STA. 15+25 TO STA. 15+50 -L- RT **b=5' FROM STA. 11+50 TO STA. 11+62 -L- RT **b= To Easement b= ** d= 1.0 Ft. Liner=CL I RIP RAP n=0.061 s= 5.5% d= 1.22 ft V= 4.6 fps Q= 25 cfs Liner=GRASS n=0.04 s= 0.58% d= 1.7 ft V= 2.74 fps Q= 25 cfs Liner=GRASS n=0.04 s= 6.8% d= 0.33 ft V=2.8 fps Q= 0.9 cfs15+00-L- PC Sta.10+28.48 -L- PT Sta.10+72.00 -L- PC Sta.14+34.13 -L- PT Sta.14+78.90 -L- POT Sta.10+00.00 F T 10 0 2 02FT10F T 10 0 2 -L- POT Sta.17+27.80 248.31 0.02 4:14 :1PGL EL. =248.32 246.38 0.02 PGL EL. =248.52 3:1 3:1250.90 0.02 PGL EL. =249.33 3:13:1 251.01 PGE EX PGE EX 0.02 3:1 4 :1PGL EL. =250.57 250.85 PGE EX PGE EX 0.02 4:14:14:1 PGL EL. =251.29 250.33 PGE EX PGE EX 0.02 4:14:1 PGL EL. =250.67 249.60 PGE EX PGE EX 0.02 4:14:1 PGL EL. =250.10 248.90 PGE EX PGE EX PGL EL. =250.72 0.00 248.18 PGE EX PGE EX 0.00 247.86 PGE EX PGE EX0.00 247.70 PGE EX PGE EX 0.00 247.98 PGE EX PGE EX 0.00 PGE EX PGE EX 248.03 PGL EL. =249.72 0.00 248.01 PGE EX PGE EX 0.02 4:13:1 PGL EL. =248.73 REVISIONS: NO.DATE WEI PROJECT NO.: 20326.01 PLANS PREPARED BY: ENGINEERING ETHERILL DESCRIPTION UNLESS ALL SIGNATURES COMPLETED DOCUMENT NOT CONSIDERED FINAL ENGINEER ROADWAY Bus: 919 851 8077 Fax: 919 851 8107 License No. F-0377 1223 Jones Franklin Rd. Raleigh, N.C. 27606 PLANS PREPARED FOR: APEX WEST GREENWAY TO AMERICAN TOBACCO TRAIL OLIVE CHAPEL ROAD CONNECTION FROM 73 Hunter Street, Apex, NC 27606 TOWN OF APEX 919.372.7468 APEX, NC 27502 PO BOX 250 PARKS AND GREENWAY PLANNER ANGELA REINCKE PROJECT CONTACT: CROSS SECTIONS PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION DATE: MAY 4, 2020 00 00 55 55 1010 1010 1515 1515 2020 2020 245 245 250 250 10+08.00 245 245 250 250 10+25.00 245 245 250 250 10+50.00 245 245 250 250 255 255 10+75.00 245 245 250 250 255 255 11+00.00 00 00 55 55 1010 1010 1515 1515 2020 2020 245 245 250 250 255 255 11+25.00 245 245 250 250 11+50.00 245 245 250 250 255 255 11+70.00 245 245 250 250 255 255 12+00.00 00 00 55 55 10 1010 15 1515 20 2020 245 245 250 250 255 255 12+25.00 245 245 250 250 255 255 12+50.00 245 245 250 250 12+75.00 245 245 250 250 12+80.00 245 245 250 250 13+00.00 -L--L--L- X-1 247.90 PGE EX PGE EX 0.02 3:13:14:1 PGL EL. =247.96 247.74 PGE EX PGE EX 0.02 3:14:1 PGL EL. =247.75 247.61 PGE EX PGE EX 0.02 3:14:1 PGL EL. =247.60 247.53 PGE EX PGE EX 0.02 4:14:14:1 PGL EL. =247.61 247.76 PGE EX PGE EX 0.02 3:14:1 PGL EL. =247.94 248.49 PGE EX PGE EX 0.02 4:14:1 PGL EL. =248.60 249.21 PGE EX PGE EX 0.02 4 :150:1 PGL EL. =249.22 R W 249.00 PGE EX PGE EX 0.02 4:1 PGL EL. =249.61 R W 3:1 4:1 249.00 249.63 PGE EX PGE EX 0.02 3:1PGL EL. =250.80 R W 3:1 250.87 PGE EX PGE EX 0.02 3:1PGL EL. =252.05 R W 3:1 251.44 PGE EX PGE EX PGL EL. =253.25 R W 0.00 252.14 PGE EXR W 0.00 253.01 PGE EXR W 0.00 253.63 PGE EX PGL EL. =255.25 R W 0.00 253.82 PGE EX 0.02 PGL EL. =255.19 R W 3:1 3:1REVISIONS: NO.DATE WEI PROJECT NO.: 20326.01 PLANS PREPARED BY: ENGINEERING ETHERILL DESCRIPTION UNLESS ALL SIGNATURES COMPLETED DOCUMENT NOT CONSIDERED FINAL ENGINEER ROADWAY Bus: 919 851 8077 Fax: 919 851 8107 License No. F-0377 1223 Jones Franklin Rd. Raleigh, N.C. 27606 PLANS PREPARED FOR: APEX WEST GREENWAY TO AMERICAN TOBACCO TRAIL OLIVE CHAPEL ROAD CONNECTION FROM 73 Hunter Street, Apex, NC 27606 TOWN OF APEX 919.372.7468 APEX, NC 27502 PO BOX 250 PARKS AND GREENWAY PLANNER ANGELA REINCKE PROJECT CONTACT: CROSS SECTIONS PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION DATE: MAY 4, 2020 00 00 55 55 1010 1010 1515 1515 2020 2020 245 245 250 250 13+25.00 245 245 250 250 13+50.00 245 245 250 250 13+75.00 245 245 250 250 14+00.00 245 245 250 250 14+25.00 00 00 55 55 1010 1010 1515 1515 2020 2020 245 245 250 250 14+50.00 245 245 250 250 14+75.00 245 245 250 250 15+00.00 245 245 250 250 255 255 15+25.00 245 245 250 250 255 255 15+50.00 00 00 55 55 10 1010 15 1515 20 2020 250 250 255 255 15+74.00 250 250 255 255 16+00.00 250 250 255 255 16+25.00 250 250 255 255 16+44.00 250 250 255 255 16+50.00 -L--L--L- X-2 254.96 PGE EX 0.02 3:13:13:1 PGL EL. =255.27 R W 256.25 PGE EX 0.02 3:14:1 PGL EL. =256.25 R W 253.47 2:12:1 249.89 250.66 2:12:1 248.52 251.44 2:12:1 247.14 251.35 2:12:1 245.77 251.15 2:12:1 245.46 250.51 2:12:1 245.33 249.92 2:12:1 245.23 248.86 2:12:1 245.09 247.66 2:12:1 244.94 246.64 2:12:1 244.80 REVISIONS: NO.DATE WEI PROJECT NO.: 20326.01 PLANS PREPARED BY: ENGINEERING ETHERILL DESCRIPTION UNLESS ALL SIGNATURES COMPLETED DOCUMENT NOT CONSIDERED FINAL ENGINEER ROADWAY Bus: 919 851 8077 Fax: 919 851 8107 License No. F-0377 1223 Jones Franklin Rd. Raleigh, N.C. 27606 PLANS PREPARED FOR: APEX WEST GREENWAY TO AMERICAN TOBACCO TRAIL OLIVE CHAPEL ROAD CONNECTION FROM 73 Hunter Street, Apex, NC 27606 TOWN OF APEX 919.372.7468 APEX, NC 27502 PO BOX 250 PARKS AND GREENWAY PLANNER ANGELA REINCKE PROJECT CONTACT: CROSS SECTIONS PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION DATE: MAY 4, 2020 00 00 55 55 1010 1010 1515 1515 2020 2020 250 250 255 255 16+75.00 255 255 260 260 17+00.00 -L- 00 00 55 55 1010 1010 1515 1515 2020 2020 250 250 255 255 10+00.00 250 250 255 255 10+25.00 245 245 250 250 255 255 10+50.00 245 245 250 250 255 255 10+75.00 245 245 250 250 10+85.00 00 00 55 55 10 1010 15 1515 20 2020 245 245 250 250 11+08.00 245 245 250 250 11+25.00 245 245 250 250 11+50.00 245 245 250 250 11+75.00 245 245 12+00.00 -D--D- X-3 REVISIONS: NO.DATE WEI PROJECT NO.: 20326.01 PLANS PREPARED BY: ENGINEERING ETHERILL DESCRIPTION UNLESS ALL SIGNATURES COMPLETED DOCUMENT NOT CONSIDERED FINAL Bus: 919 851 8077 Fax: 919 851 8107 License No. F-0377 1223 Jones Franklin Rd. Raleigh, N.C. 27606 PLANS PREPARED FOR: APEX WEST GREENWAY TO AMERICAN TOBACCO TRAIL OLIVE CHAPEL ROAD CONNECTION FROM 919.372.7468 APEX, NC 27502 PO BOX 250 PARKS AND GREENWAY PLANNER ANGELA REINCKE PROJECT CONTACT: Apex, NC 27502 73 Hunter Street TOWN OF APEX ENGINEER STRUCTURES PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION DATE: MAY 4, 20204'-0"GROUNDLINE APPROX. DRIVEN TO REFUSAL DIA. PILING 7•" MIN. TIP DECKING 2x6 (TYP. EA. JOIST) TWIST STRAP SIMPSON LTS12 (EA. SIDE) (TYP.) FLAT STRAP SIMPSON LSTA12 (TYP.) JOIST 3x12 (TYP.) 3x12 SPACER PILE (TYP.) DRILLED INTO LAG SCREWS ƒ" x 16" HEX 10'-0" CLEAR WIDTH (TYP.) PROVIDE •" RADIUS CORNERS 20° CANTED 2x8 TOP RAIL (TYP.) @ 5'-0" O.C. 4x6 RAIL POST 2" TYPICAL BOARDWALK DETAILS FOUNDATION NOTES: NOTES: 180.00 LIN. FT. PAY ITEMS CONCRETE APPROACH SLAB SECTION No.BEGIN STATION END STATION LENGTH 1 11+70.00 110'-0"12+80.00 2 15+74.00 16+44.00 ELEVATED TIMBER GREENWAY LOCATIONS 70'-0" 8x10 PILE CAP FLAT STRAP SIMPSON LSTA12 3x12 JOIST 2x6 DECKING 1•" 1•" PILE CAP 8x10 2x6 DECKING JOIST 3x12 TIMBER PILE { 7•" MIN. TIP DIA. END VIEW ELEVATION 8x10 CAP CONNECTION TO PILE 11" 1'-5" INTO PILE SCREWS DRILLED " ~ x 16" LAG4 -32 INTO PILE SCREWS DRILLED " ~ x 16" LAG4 -32 (EA. SIDE) FLAT STRAP SIMPSON LSTA12 (TYP.) 8x10 PILE CAP CLASS I RIP RAP 5•" (TYP.) SECTION A-A TIMBER BOARDWALK 4 EACH RAIL (TYP.) 2x6 CONTINUOUS POST (TYP.) 2x6 RAIL BETWEEN POST (TYP.) FENCE BETWEEN COATED CHAIN-LINK 42" BLACK VINYL TYPICAL BOARDWALK DETAILS S-11'-3"(TYP.)NUTS (TYP.) WASHERS AND W/OVERSIZED OGEE 2-†" BOLTS GROUNDLINE APPROX. 8'-3" 2x6 X-BRACING SPACER PILE CUT-OFF (TYP.) TIMBER PILES (MAX.) 1'-0"USE TRANSVERSE BRACINGWHEN THIS HEIGHT EXCEEDS 5'(TYP.) W/WASHER & NUT †" THRU BOLT (MAX.) 1'-0" X-BRACING DETAILS PILE CAP VINYL COATED CHAIN LINK FENCE SHALL BE KNUCKLED AT BOTH ENDS. IN THE LONGITUDINAL DIRECTION WILL NOT BE ALLOWED. FOR X-BRACING, SEE DETAIL. NATURAL GROUND SURFACE EXCEEDS 5'. ATTACH X-BRACING TO THE PILES WITH †" HEX BOLTS AT EACH END. X-BRACING X-BRACE TIMBER PILES IN THE TRANSVERSE DIRECTION WHEN THE HEIGHT FROM THE BOTTOM OF THE PILE CAP TO THE COST OF FILTER FABRIC SHALL BE INCLUDED IN LIN. FT. OF TIMBER BOARDWALK. COST OF APPROACH RAILS SHALL BE INCLUDED IN THE PRICE BID FOR TIMBER BOARDWALK. CLASS I RIP RAP SHALL BE IN ACCORDANCE WITH NCDOT STANDARD SPECIFICATIONS. CHAIN LINK FENCE SHALL BE INSTALLED PRIOR TO THE INSTALLATION OF THE TOP AND BOTTOM RAILS. CHAIN LINK FENCE FABRIC SHALL BE INSTALLED USING A FENCE STRETCHER TO ACHIEVE ADEQUATE TENSION. ACCORDANCE WITH ARTICLE 1050 OF THE NCDOT STANDARD SPECIFICATIONS. ALL CHAIN LINK FENCE FABRIC, POSTS, RAILS, FITTINGS, HARDWARE AND ACCESSORIES SHALL BE BLACK VINYL COATED IN ALL STEEL PARTS AND HARDWARE IN ACCORDANCE WITH ARTICLE 1076 OF THE NCDOT STANDARD SPECIFICATIONS. ALL FENCE MATERIAL SHALL MEET THE REQUIREMENTS OF SECTION 1050 OF THE NCDOT STANDARD SPECIFICATIONS. GALVANIZE 2x6 BOTTOM SUPPORT RAIL TO BE INSTALLED 2" ABOVE DECK SURFACE. BE BROUGHT TO THE ATTENTION OF THE ENGINEER BEFORE PROCEEDING. ALL WORK SHALL BE ACCOMPLISHED AS DIRECTED BY THE ENGINEER. ANY DISCREPANCIES FOUND ON THIS DRAWING SHALL SIMPSON STRONG TIE CONNECTORS (WHERE USED) SHALL BE GALVANIZED. ALL BOLTS, NUTS, WASHERS, STAPLES ETC. SHALL BE HOT DIPPED GALVANIZED AFTER FABRICATION IN ACCORDANCE WITH ASTM A153. SCREWS. RAILING SHALL BE PLACED TO AVOID CUPPING. 2x6 RAILING TO BE ATTACHED TO EACH RAIL POST USING 4- NO. 10 x 3•" GALVANIZED OR STAINLESS STEEL STEEL SCREWS AT EVERY JOIST. DECKING SHALL BE PLACED TO AVOID CUPPING. BE ATTACHED TO JOIST USING 3" x „" SCREWS. DECKING SHALL BE ATTACHED WITH TWO GALVANIZED OR STAINLESS PRE-DRILLED HOLES MAY BE NECESSARY TO PREVENT SPLITTING OF TIMBERS DURING CONSTRUCTION. 2x6 DECKING TO ALL EXPOSED CORNERS OF 2x8 TOP RAILS SHALL BE FINISHED WITH •" MINIMUM RADIUS. ALL TIMBER DIMENSIONS ARE BASED ON NOMINAL TIMBER SIZES. FOR CONCRETE APPROACH SLABS, SEE PROJECT SPECIFICATIONS. FOR TIMBER BOARDWALK, SEE PROJECT SPECIFICATIONS. OF 10,000 LBS. (H-5) AND A WIND LOAD ON SUPERSTRUCTURE OF 54 PSF. THE ELEVATED TIMBER BOARDWALK HAS BEEN DESIGNED FOR A PEDESTRIAN LIVE LOAD OF 90 PSF OR A VEHICULAR LOAD 10 TONS BOARDWALK PILES ? LIN. FT. REVISIONS: NO.DATE WEI PROJECT NO.: 20326.01 PLANS PREPARED BY: ENGINEERING ETHERILL DESCRIPTION UNLESS ALL SIGNATURES COMPLETED DOCUMENT NOT CONSIDERED FINAL Bus: 919 851 8077 Fax: 919 851 8107 License No. F-0377 1223 Jones Franklin Rd. Raleigh, N.C. 27606 PLANS PREPARED FOR: APEX WEST GREENWAY TO AMERICAN TOBACCO TRAIL OLIVE CHAPEL ROAD CONNECTION FROM 919.372.7468 APEX, NC 27502 PO BOX 250 PARKS AND GREENWAY PLANNER ANGELA REINCKE PROJECT CONTACT: Apex, NC 27502 73 Hunter Street TOWN OF APEX ENGINEER STRUCTURES PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION DATE: MAY 4, 2020 10'-0"10'-0" A A 5'-0"5'-0"2'-6"5'-0"5'-0" GROUNDLINE APPROX. DRIVEN TO REFUSAL DIA. PILING 7•" MIN. TIP 2x6 DECKING 5•"9•"9•"8'-3"(TYP. EA. SIDE)1'-7"1'-7"A A B B 6" MIN. (TYP.) SPACER (TYP.) 3" SOLID WOOD (SEE VIEW B-B) (TYP.) 2-†" THRU BOLTS (SEE VIEW B-B) (TYP.) 2-†" THRU BOLTS AND JOIST ENDS POST COVERING 3x12 SINGLE 2x6 OUTSIDE VIEW B-B 2•"2•"3x12 JOIST 2'-6"2'-6" PILING (TYP.) DIA. TIMBER 7•" MIN. TIP (TYP.) 3x12 JOIST (TYP.) SIMPSON BP †-3 JOIST 3x12 PILE CAP 8x10 5-3x12 JOISTS @ 1'-8" CTS.RAILS (TYP.) HORIZONTAL 2x6 DECKING 2x6 3x12 JOIST (TYP.) PILE CAP 8x106"1'-3•"1'-3•"6"(EXT. JOIST ONLY) SPLICE BLOCK 3x12x1'-6" WOOD SPACER 3x12 SOLID TOP RAIL 2x8 20° CANTED POST (TYP.) 4x6 RAIL 6" COMPACTED ABC 2x6 DECKING (TYP.) PILE CAP 8x10 (END SPAN) PLAN OF GREENWAY SECTION ELEVATION OF GREENWAY SECTION POST (TYP.) 4x6 RAIL 1'-0"(TYP.)COMPACTED FILL FILTER FABRIC1'-0"(MIN.)(APPROACH RAILING AND WING WALL NOT SHOWN FOR CLARITY) BOTTOM) (TYP.) MAX. (TOP AND SPA. @ 18" O.C. FENCE STAPLES GALVANIZED TO MATCH FENCE) (TYP.) TO TOP RAIL) (VINYL COATED TENSION BAR (FROM DECK ATTACHMENT DETAIL CHAIN LINK TO POST SEE ``DETAIL A'' FOR ``DETAIL A'' BETWEEN POST 2x6 RAIL RAIL 2x6 CONTINUOUS AND BOTTOM RAILS SPACED AT 18" O.C. MAX. TOP GALVANIZED FENCE STAPLES CHAIN LINK FENCE (TYP.) 42" BLACK VINYL COATED POST 4x6 RAIL POST (TYP.) FENCE BETWEEN COATED CHAIN-LINK 42" BLACK VINYL TYPICAL BOARDWALK DETAILS S-2 SHEET S-1 TO PILES DETAIL, SEE CAP CONNECTION MINIMUM OF 3 REQUIRED 3x12 WALL BOARDS, FOR DETAILS) (SEE SHEET S-3, APPROACH SLAB 6" CONCRETE STAINLESS STEEL SCREWS (TYP.) USING NO. 10x3" GALVANIZED OR ATTACH TENSION BAR TO POST PER POST SCREWS PER RAIL OR STAINLESS STEEL 4-NO. 10x3•" GALVANIZED (APPROACH RAILING, WING WALL AND APPROACH SLAB NOT SHOWN FOR CLARITY) (FOR SECTION A-A, SEE SHEET S-1) 3" WOOD SCREWS AT 1'-0" CTS. ATTACH 2x8 TOP RAIL W/ 2-No. 10 WASHERS AND NUT W/ OVERSIZED OGEE 2-†" HEX BOLT 4x6 RAIL POST MINIMUM OF 3 REQUIRED 3x12x13'-1" (MIN.) WALL BOARDS, 3x12 BLOCKING (TYP.) @ POST 3x12 BLOCKING REVISIONS: NO.DATE WEI PROJECT NO.: 20326.01 PLANS PREPARED BY: ENGINEERING ETHERILL DESCRIPTION UNLESS ALL SIGNATURES COMPLETED DOCUMENT NOT CONSIDERED FINAL Bus: 919 851 8077 Fax: 919 851 8107 License No. F-0377 1223 Jones Franklin Rd. Raleigh, N.C. 27606 PLANS PREPARED FOR: APEX WEST GREENWAY TO AMERICAN TOBACCO TRAIL OLIVE CHAPEL ROAD CONNECTION FROM 919.372.7468 APEX, NC 27502 PO BOX 250 PARKS AND GREENWAY PLANNER ANGELA REINCKE PROJECT CONTACT: Apex, NC 27502 73 Hunter Street TOWN OF APEX ENGINEER STRUCTURES PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION DATE: MAY 4, 2020 PLAN ELEVATION 10'-0"10'-0"10'-0"3"6" COMPACTED ABC APPROACH SLAB 6" CONCRETE ASPHALT PATH DECKING 2x6 FABRIC FILTER PILE CAP 8x10 DRIVEN TO REFUSAL DIA. PILING 7•" MIN. TIP 3x12 JOIST DRIVEN TO REFUSAL DIA. PILING 7•" MIN. TIP FABRIC FILTER APPROACH SLAB 6" CONCRETE ASPHALT PATH (TYP.) (RAILING NOT SHOWN FOR CLARITY)6'-3"2' -0"4'-6"6' -0"2'-0"6'-0" REFUSAL (TYP.) DRIVEN TO DIA. PILING 7•" MIN. TIP (TYP.) FABRIC FILTER POST (TYP.) 4x6 RAIL BOARDWALK { TIMBER (TYP.) 20° (TYP.) 15° 5'-0" (TYP.) PROVIDE •" RADIUS CORNERS 20° CANTED 2x8 TOP RAIL CC 10'-0" 2'-6"5'-0" GROUNDLINE APPROX. DRIVEN TO REFUSAL DIA. PILING 7•" MIN. TIP JOIST 3x12 PILE CAP 8x10 RAILS (TYP.) HORIZONTAL 2x6 DECKING 2x6 TOP RAIL 2x8 20° CANTED POST (TYP.) 4x6 RAIL 6" COMPACTED ABC (END SPAN) POST (TYP.) FENCE BETWEEN COATED CHAIN-LINK BLACK VINYL COMPACTED FILL FILTER FABRIC1'-0"(TYP.)4'-6"4'-6"5'-0"5'-0"6" (MAX.) VIEW C-C APPROACH SLAB 6" CONCRETE WING WALL NOT SHOWN FOR CLARITY6'-3"(TYP.) 1'-0" THICK (MIN.) CLASS I RIP RAP 2'-0" (TYP.) APPROACH RAIL A PP R O A C H R A IL (TYP.) AROUND POSTS 1'-0" ~ CONCRETE6"2'-0"2"AROUND POST 1'-0" ~ CONCRETE SAND 2" COMPACTED COMPACTED FILL 4000 PSI. SHALL BE A MIN. CONCRETE FOR POSTS APPROACH RAIL POST DETAIL RAIL POST 4x6 APPROACH POST DETAIL'' ``APPROACH RAIL FOR DETAILS, SEE CONCRETE APPROACH SLAB S-3 MINIMUM OF 3 REQUIRED 3x12 WALL BOARDS, (TYP. EA. WING) MINIMUM OF 3 REQUIRED 3x12 WALL BOARDS, MESH WELDED WIRE 6x6 W2.9xw2.9 MINIMUM OF 3 REQUIRED 3x12 WALL BOARDS, 2" CL. MAX. MINIMUM OF 3 REQUIRED 3x12 WALL BOARDS,RIP RAP(TYP).OF EASEMENTTO EDGE