Loading...
HomeMy WebLinkAbout20091330 Ver 1_Application_20091218A`\?l Il V L. L a STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION Beverly Eaves Purdue GOVERNOR Gene Conti SECRETARY ?V OFC ?lj? lib R e0o ie December 10, 2009 U.S. Army Corps of Engineers Regulatory Field Office Post Office Box 1000 Washington, N.C. 27889-1000 Attention: Bill Biddlecome 001330 Subject: Request for a NW 3 Permit and DWQ 401 for the replacement of Bridge # 90 over Cypress Creek on SR 1324 in Northampton County. The North Carolina Department of Transportation is requesting the issuance of a NW 3 permit and corresponding DWQ certification for the replacement of bridge # 90 in Northampton County. The bridge is located on SR 1324 Peanut Market Rd approximately 2 miles north of the intersection of NC 186. The bridge spans Cypress Creek, which is classified by DWQ as class "C, NSW" waters. Bridge # 90 is currently a concrete structure that is 50 ft. long by 25 ft. wide. This structure will be removed using NCDOT's guidelines for bridge removal. The proposed bridge will be replaced on its existing alignment. The new bridge structure will be 90 ft. in length by 30 ft. wide and built with precast cored slab concrete deck, support piles and bents. The bridge roadway approaches will not have to be reconstructed. An off- site detour will be used during construction. Included with this letter are the location map, permit drawings, and PCN. If you have questions please call me at (252) 482-7977. Cc: Garcy Ward, DWQ Sonja Gregory, DWQ Sincerely, Jerry Jennings Division One Engineer C Clay Willis ? Division One Environmetftal Officer .,)" OF W A )'F19 o /a, •?' Imo- ?\o? . 1 L LUa) E Office Use Only: Corps action ID no. DWQ project no. Form Version 1.0 November 2008 Pre-Construction Notification (PCN) Form A. Applicant Information 1. Processing 1a. Type(s) of approval sought from the Corps: Section 404 Permit E] Section 10 Permit I 1 b. Specify Nationwide Permit (NW P) number: NW 3 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ® Yes ? No 1d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit ? 401 Water Quality Certification - Express ? Riparian Buffer Authorization 1e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ® Yes ? No For the record only for Corps Permit: ? Yes ® No If. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. ? Yes ® No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1h below. ? Yes ® No 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ® No 2. Project Information 2a. Name of project: Bridge Replacement # 90 over Cypress Creek 2b. County: Northampton 2c. Nearest municipality / town: Seaboard 2d. Subdivision name: n/a 2e. NCDOT only, T.I.P. or state project no: Bridge # 90 W BS # 41665.3 3. Owner Information 3a. Name on Recorded Deed: NCDOT 3b. Deed Book and Page No. n/a 3c. Responsible Party (for LLC if applicable): NCDOT Division One 3d. Street address: 113 Airport Drive Suite 100 3e. City, state, zip: Edenton, NC 27932 3f. Telephone no.: 252482-5889 3g. Fax no.: 252-482-8722 3h. Email address: tcwillis@ncdot.gov Page 1 of 12 PCN Form - Version 1.0 November 2008 Version Section A. Applicant Information, continued 4. Applicant Information (if different from owner) 4a. Applicant is: ? Agent ? Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: Page 2 of 12 . PCN Form - November 2008 Version B. Project Information and Prior Project History 1. Property Identification la. Property identification no. (tax PIN or parcel ID): 1b. Site coordinates (in decimal degrees): 36.5195132'N - 77.4502769'W 1c. Property size: 0.16 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to Cypress Creek proposed project: 21b. Water Quality Classification of nearest receiving water: class C, NSW 2c. River basin: Chowan 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The existing bridge is a 25' X 50' concrete bridge with 1 interior bent which is constructed of wooden piles with a concrete cap . The existing roadway is a 20 ft. asphalt surface with 6-8 ft. grassed shoulders. This bridge crosses Cypress Creek, which is classified as Class "C, NSW". Land use within the project area is agricultural, and undeveloped forrest. 3b. List the total estimated acreage of all existing wetlands on the property: 0.02 acres 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 60 feet 3d. Explain the purpose of the proposed project: Replace bridge # 90, which has had recent damage to the support structure and as a result was closed to traffic. 3e. Describe the overall project in detail, including the type of equipment to be used: The existing concrete bridge deck and interior bent will be removed in accordance with NCDOT guidelines for bridge demolition and removal. The new bridge will be 90 feet in length by 30 feet wide. The new bridge will be a three span cored slab concrete structure supported by concrete piles. The approaches will remain the same width, resulting in no wetland impacts. Approximately 40' of the old causeway will be removed. Equipment used during this project will include a crane, excavator, grading equipment, and dump trucks. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ? Yes ® No ? Unknown project (including all prior phases) in the past? 41b. If the Corps made the jurisdictional determination, what type ? Preliminary ? Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Name (if known): Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for ? Yes ®No ? Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. Page 3 of 12 PCN Form - Version 1.0 November 2008 Version B. Project Information and Prior Project History 6. Future Project Plans 6a. Is this a phased project? ? Yes No 6b. If yes, explain. Page 4 of 12 PCN Form - November 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): ? Wetlands ? Streams - tributaries ? Buffers ? Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number - Type of Type of wetland Forested (Corps - 404, 10 Area of impact (acres) Permanent (P) or impact (if known) DWQ - non-404, other) Temporary T W1 ? P ? T ? Yes ? No ? Corps ? DWQ W2 ? P ? T ? Yes ? No ? Corps ? DWQ W3 E] P ? T El Yes El No El Corps ? DWQ W4 ? P ? T ? Yes ? No ? Corps ? DWQ W5 [I P ? T ? Yes [I No E] Corps ? DWQ W6 ? P ? T ? Yes ? No ? Corps ? DWQ 2g. Total wetland impacts 0 21h. Comments: There will be no wetland impacts. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 31b. 3c. 3d. 3e. 3f. Stream impact Type of Stream name Perennial (PER) or Average stream width (feet) Impact number - impact intermittent (INT)? length Permanent (P) or (linear feet) Temporary (T) S1 ?P?T ?PER ?INT S2 ?P?T ?PER ?INT S3 ?P?T ?PER ?INT S4 ? P ? T ? PER ? INT S5 ? P ? T ? PER ? INT S6 ? P ? T ? PER ? INT 3g. Total stream and tributary impacts 0 3h. Comments: There will be no stream impacts. Page 5 of 12 PCN Form -Version 1.0 November 2008 Version C. Proposed Impacts Inventory, continued 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individual) list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of impact number waterbody Type of impact Waterbody type Area of impact (acres) - Permanent (if (P) or applicable) Temporary T 01 ?P?T 02 ?P?T 03 ?P?T 04 ?P?T 4f. Total open water impacts 0 4g. Comments: There will be no open water impacts. Page 6 of 12 PCN Form - November 2008 Version C. Proposed Impacts Inventory, continued 5. Pond or Lake Construction If and or lake construction pro osed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or (acres) number purpose of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 51h. Is a dam high hazard permit required? ? Yes ? No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require mitigation, then ou MUST fill out Section D of this form. 6a. ? Neuse ?Tar-Pamlico ? Other: Project is in which protected basin? ? Catawba ? Randleman 61b. 6c. 6d. 6e. 6f. 6g. Buffer impact number- Reason Buffer Zone 1 impact (square Zone 2 impact Permanent (P) for impact -Stream name mitigation feet) (square feet) or Temporary required? T B1 ?P?T ?Yes ?No B2 ?P?T ?Yes ?No B3 ?P?T ?Yes ?No 6h. Total buffer impacts 0 61. Comments: Page 7 of 12 PCN Form - November 2008 Version y D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The new bridge will be 40 ft. longer, which will enhance the ability of the floodplain to function. There will be an off-site detour which will avoid any additional wetland or stream impacts. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. The bridge is being built using top-down construction technique and an off-site detour is being used. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ? Yes ®No 2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps 2c. If yes, which mitigation option will be used for this project? ? Mitigation bank ? Payment to in-lieu fee program ? Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ? Yes 4b. Stream mitigation requested: n/a linear feet 4c. If using stream mitigation, stream temperature: n/a warm, cool, cold 4d. Buffer mitigation requested (DWQ only): n/a square feet 4e. Riparian wetland mitigation requested: n/a acres 4f. Non-riparian wetland mitigation requested: n/a acres 4g. Coastal (tidal) wetland mitigation requested: n/a acres 4h. . Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 8 of 12 PCN Form -Version 1.0 November 2008 Version D. Impact Justification and Mitigation, continued 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ 6a . Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ? Yes ® No 6b . If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone Reason for impact Total impact (square feet) Multiplier Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 Total buffer mitigation required: 6c. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6d . Comments: Page 9 of 12 PCN Form - November 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan la. Does the project include or is it adjacent to protected riparian buffers identified ? Yes N No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? ? Yes ? No 2. Determination if the Project Requires a Stormwater Management Plan 2a. Does the project require a Nan-404 Jurisdictional General Permit? ? Yes N No 2b. Is the project subject to General Certification 3704 or 3705? ? Yes Z No 3. Determination of Stormwater Review Jurisdiction 3a. Is this project subject to any of the following state-implemented stormwater ? Coastal counties management programs (check all that apply)? ? HOW ? ORW If so, attach one copy of the approval letter from the DWQ and one copy of the ? Session Law 2006-246 approved stormwater management plan. ® Other: NCDOT 5000250 3b. In which local government's jurisdiction is this project? n/a 3c. Is this local government certified to implement a state stormwater program? ? Yes N No If so, attach one copy of the approval letter from the local government and one copy of the approved stormwater management plan (or one copy of the approved Stormwater management plan stamped as approved). 4. Information Required for DWQ 401 Unit Stormwater Review 4a . What is the overall percent imperviousness according to the most current site plan? n/a 4b. Does this project contain any areas that meet the criteria for "high density" per ? Yes N No General Certifications 3704 and 3705? 4c. If the site is over 24% impervious and/or contains high density areas, then provide a brief narrative description of the stormwater management plan. NCDOT will follow BMP's and implement the erosion control plan for the construction site. There will be no additional roadway work associated with this project and rip rap slope protection will be added to the existing slopes adjacent to the approaches. 4d. Has a completed BMP Supplement Form with all required items been submitted ? Yes N No for each stormwater BMP? Page 10 of 12 PCN Form - Version 1.0 November 2008 Version . F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) la. Does the project involve an expenditure of public (federal/state/local) funds or the ® Yes ? No use of public (federal/state) land? 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ? Yes ® No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ? Yes ®No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after-the-fact permit application? ? Yes ® No 2c. If you answered 'yes' to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes ®No additional development, which could impact nearby downstream water quality? 3b. If you answered 'yes' to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. n/a Page 11 of 12 PCN Form -Version 1.0 November 2008 Version (L • r F. Supplementary Information, continued 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a . Will this project occur in or near an area with federally protected species or ? Yes ® No habitat? 51b. Have you checked with the USFWS concerning Endangered Species Act ? Yes ® No impacts? ? Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ? Asheville 5d . What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Natural Heritage Database and USFWS information for Northampton County 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ® No 61b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? Marine Fisheries 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ? Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? SHPO information 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ® Yes ? No 81b. If yes, explain how project meets FEMA requirements: n/a 8c. What source(s) did you use to make the floodplain determination? FEMA maps Clay Willis /4 i? 12/9/09 Applicant/Agent's Printed Name Applic l/ ge 's igrature (Agent's signature is valid only if an uthorization letter from the applicant Date is pr vided.) Page 12 of 12 PCN Form - November 2008 Version t N M C'7 C f) O m it cn U s= 0 0- E 0 z t? ?E: ?iiiil l Northamtpon Co. Bridge #90 SR 1324 bridge replacement, 2 miles N. of NC 186 ft WlylrG My ?r ? ?? J i?. ,, r`' ?-?,!yr + Y•t 00 _ _ ?..s•?'?I'e 7 r ps{?. ??; ? ?•? y?in•_J.._.._s h. ,? ?. ? ? w..?? r?+ t ? . • s ? - t ??ypr???- . ?.^! s%r. ?,. i R .... 17- y s ? ?.. ? fib; ? . .? ,?? '?` ? '? ; ? r '. =',` Bridge #9 6.5194 r V `?,. ?. )7.45021 .N • : L ti.: .` t ? - 11 ??r? "` ?? --4. .? > .. i ?iy' 4A2 ??L. ?;1 ?.t ?+r. 0 .1, 'nom"W r• •s' ??1 •Sr 71f T a f ?f -? ri"•r? x - .?. {•• PST ?•? !'? ---M',. ?' a .erp.O ?.z -. ? ?'?G Y^ • ?n' ` '? =r T r ? .r +J ??_ * ?R t .1 t y sue. ?3" ' •"..^r1(k A k' ?-y__ q-_ ,r?,5 I`y 1 'T+'sw ...? `??1. 'J' fit'[ kbr?' L lg .- ?6,:. " .??L' .es?r-ti?dty `?'`?}aye f- ... IOU Slow L 44 -pe , C-11,111"t J u ` .N r ..{? ? a • so- d ?..?i'?•? - ... '*r - - '. :?' 'r ,y t.•? 4 V ''j it __ ? ?. . T Dl" s.. 4., ?,fu .. O,r sY ? x USGS Quad - Claresville N Chowan River Basin 0 0.2 0.4 0.8 Miles w E F, w Northampton Co. Bridge #90 SIR 1324 bridge replacement, 2 miles N. of NC 186 IJA it ! ?4 I % Bridge #90 ?? . ` rnR "3 r I i ``? ¢ 36.51947 I M1 J?' ?,t 77.45021 1? 'car' I ,,.... I I ? .r' - i 3A -11,,.` , }} i r. ?I? ? ? ? `! I Z? _ .• ?'! 'e ~l?j .V? y ?, ?,, L ? + ? ? I r ?? I r I 1 ve- . t ?.,.. - cam,' - ! ?e,?• - I + / ;?FrJ rj. r` ? ?I+ ??,??? ? }'`. 1 . 1 ? ,? ti I_?'..• ?:?S?ff ? ?6 ,*.* e l " I 1 ' ?I I S lr - 1 I I { ,. 1_ '_?y? r j4) ?? I i l'.E3,G1!'.a? l? ,?^ ? I -.? ,,.j i'l.i' - .•r a?`'?/ USCS Quad - Claresville N C! Iowan River Basin 0 02 0.4 0.8 Miles W I 1 I I 1 I t I I o, m z h L? pC ee, ? ?A _ N ?m i ?m = s 11 m moo r p ? I O D ? m O -p o Fri ? N n m p N oI I Z n ?% ? \ m C _ flENwNi ENB BFNi i0 BE PEUBVEO r ? 7 o ac 7? O ? D 0 z + r v -_ W O O L N ? D D W ? / @ m D @ m O D ? n ? - - G m cn n m m t OJ / O N o N Cf) N D Z N Q, m m I I I + w CD ca ,' I I I n ? p ? r N v' p m n A p ?' ry 1 f T 6 0 z n m m 0 f o 0 3 N O Z O r vr^ N O P A W V