Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW3200501_The Grove at Chestnut Park Storm & EC Report 4-24-20_5/5/2020
EROSION CONTROL, STORM DRAINAGE & BMP CALCULATION PACKAGE THE GROVE AT CHESTNUT PARK Prepared for: Mattamy Homes 2127 Ayrsley Town Blvd. Suite 202 Charlotte, NC 28273 (704) 507-7547 Prepared by: ESP Associates, Inc. 3475 Lakemont Blvd Fort Mill, SC 29708 (803) 802-2440 Project Number HT35.400 Original: April 24, 2020 04/01/202004/02/202004/17/202004/23/202004/24/2020 Table of Contents 1. Project Narrative & Summary 2. Location & USGS Map 3. Soils Map & Information 4. FEMA Flood Insurance Map 5. Erosion Control Calculations A. Temporary Sediment Basin SB-A B. Sediment Basin SB-1 C. Ditch Calculations D. Ditch Matting Calculations E. Temporary HDPE Slope Drain Calculations 6. Storm Drainage Calculations A. Storm A Tabulation Report B. Storm B Tabulation Report C. Storm C Tabulation Report D. Inlet Capacity Chart / Spread Calculations 7. Rip Rap Calculations 8. Wet Pond A. Pre-Development B. Wet Pond Post-Development C. Pond Calculations D. Post-Development Bypass Area E. Total Post Development Flows F. Watershed Schematic 9. Drainage Area Maps 10. Post Construction Controls Worksheet 11. Appendix A. Runoff Coefficients B. Rainfall Data C. Faircloth Skimmer Design 1. Project Narrative & Summary PROJECT NARRATIVE The project “The Grove at Chestnut Park” is a proposed multi-family townhouse development located at the intersection of Matthews Indian Trail Road and Chestnut Parkway in the Town of Indian Trail, Union County, North Carolina. The existing site is 7.87 acres and being developed as a multi-family community with public streets and utilities consisting of 90 3-story townhome units. The project site is located in Zone X per FEMA FIRM Map for Town of Indian Trail, North Carolina –Map Number 3710540900J and 3710540800J, both with an effective date of October, 16, 2008. The existing site mostly consists of trees to the southeast with an open gravel lot in the north east portion of the site and a group of single-family lots in the southwest corner. The existing area drains to drop inlets located on each side of the site in the southeast and southwest corners. Approximately 6.8 acres of the post development runoff will first be conveyed to a proposed wet detention pond, to control the peak flow for the 10 and 25-year 6-hour storm events and provide water quality treatment for TSS and TP removal. On site erosion control measures will be provided throughout the construction phases. The erosion control plan will have two (2) phases. In Erosion Control Phase 1, one (1) sediment basin SB-A – designed to meet the NC Erosion and Sediment Control Planning and Design Manual – shall be installed to treat the runoff from the disturbed area. Temporary diversion ditches shall be installed to convey the runoff to the sediment basin. In Erosion Control Phase 2, once the on-site storm drainage system is installed, inlet protection shall be installed in applicable storm structures. Sediment basin SB-1 is proposed to be graded per the final permanent BMP. The temporary sediment basin SB-A can be removed upon inspector approval. The Erosion Control Phase 2 sediment basin SB-1 has been sized to treat the flow from The Grove at Chestnut Park. The site will be mass graded and disturb approximately 8.22 acres. CONCLUSION The proposed sediment basins, associated Faircloth skimmers, and outfall pipes have been designed to meet the erosion and sedimentation control requirements for a 10-year storm event. The Faircloth Skimmers have been adequately sized to control site runoff and release the site’s storm water runoff over a minimum 2- day period and a maximum 5-day period. One (1) permanent wet pond, has been designed for the site to control the storm drainage runoff peak flow for the 10, and 25-year storms for the entire contributing drainage area. The proposed wet pond has been designed to reduce the runoff to below pre-development conditions. In conclusion, due to existing site conditions and proposed runoff control measures, the proposed project is not anticipated to have negative impacts on downstream or adjacent properties. 2. Location & USGS Map Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, EsriChina (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and theGIS User C ommunity SITE I LOCATION MAPTHE GROVE AT CHESTNUT PARKINDIAN TRAIL, NC 1 " = 1,000 ' Copyright:© 2013 National Geographic Society, i-cubed SITE I USGS MAPTHE GROVE AT CHESTNUT PARKINDIAN TRAIL, NC 1 " = 1,000 ' 3. Soils Map & Information 4. FEMA Flood Insurance Maps USGS The National Map: Orthoimagery. Data refreshed April, 2019. National Flood Hazard Layer FIRMette 0 500 1,000 1,500 2,000250Feet Ü80°40'18.45"W 35°5'18.94"N 80°39'41.00"W 35°4'49.50"N SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT SPECIAL FLOODHAZARD AR EAS Without Base Flood Elevation (BFE)Zone A, V, A99With BFE or Depth Zone AE, AO, AH, VE, AR Regulator y Floodway 0.2% Annual Chance Flood Hazard, Areasof 1% annual chance flood with averagedepth less than one foot or with drainageareas of less than one square mile Zone X Future Conditions 1% AnnualChance Flood Hazard Zone XArea with Reduced Flood Risk due toLevee. See Notes.Zone X Area with Flood Risk due to Levee Zone D NO SCREE N Area of Minimal Flood Hazard Zone X Area of Undetermined Flood Hazard Zone D Channel, Culver t, or Storm SewerLevee, Dike, or Floodwall Cross Sections with 1% Annual Chance17.5 Water Surface ElevationCoastal Transect Coastal Transect BaselineProfile BaselineHydrographic Feature Base Flood Elevation Line (BFE) Effective LOMRs Limit of StudyJurisdiction Boundar y Digital Data Available No Digital Data Available Unmapped This map complies with FEMA's standards for the use of digital flood maps if it is not void as described below. The basemap shown complies with FEMA's basemap accuracy standards The flood hazard information is derived directly from theauthoritative NFHL web ser vices provided by FEMA. This mapwas exported on 4/27/2020 at 10:36:25 AM and does notreflect changes or amendments subsequent to this date andtime. The NFHL and effective information may change orbecome superseded by new data over time. This map image is void if the one or more of the following mapelements do not appear: basemap imagery, flood zone labels,legend, scale bar, map creation date, community identifiers,FIRM panel number, and FIRM effective date. Map images forunmapped and unmodernized areas cannot be used forregulatory purposes. Legend OTHER AREAS OFFLOOD HAZARD OTHER AREAS GENERALSTRUCTURES OTHERFEATURES MAP PANELS 8 1:6,000 B 20.2 The pin displayed on the map is an approximate point selected by the user and does not represent an authoritative proper ty location. 5. Erosion Control Calculations 5A. Temporary Sediment Basin SB-A ESP Associates, Inc. 3475 Lakemont Blvd. Fort Mill, SC 29708 Phone 803-802-2440 Fax 803-802-2515 Time of Concentration (Tc) or Travel Time (Tt) Project By Date Location Checked Date Circle One: Present Developed 1. SHEET FLOW 1. Surface description (table 3-1) 2. Manning's roughness coefficient, n (table 3-1).. 3. Flow length, L (total L ≤ 300 ft)....ft 4. Two-year 24-hour rainfall, P .....in 5. Land slope, s .....ft/ft 6. Tt = 0.007 (nL)^0.8 ......hr 0.25 2. SHALLOW CONCENTRATED FLOW 7. Surface description (paved or unpaved).... 8. Flow length, L ................ft 9. Watercourse slope, s ............ft/ft 10. Average velocity, V (figure 3-1). 11. Tt = L .....hr 0.02 3. CHANNEL FLOW 12. Channel type (Pipe or Open Channel) 13. Cross sectional flow area, a ................ft² 14. Wetted perimeter, pw ........ft 15. Hydraulic radius r = a/pw ..ft 16. Channel slope, s .......ft/ft 17. Manning's roughness coefficient, n ............... 18. V = [1.49 r^(2/3) s^(1/2)] / n Compute V ..ft/s 19. Flow length, L ...ft 20. Tt = L ......hr 0.00 21. Watershed or subarea Tc or Tt (add Tt in steps 6, 11, and 19)Hr = 0.27 Min = 16.2 Reference:Urban Hydrology for Small Watersheds Rainfall, P, taken from Technical Release 55, Soil Conservation Service U.S. Department of Agriculture, June 1986 NOAA Rainfall Data, April 2020 Compute r 0.50 0.50 0.005 Compute Tt 0.25 +0.00 Woods-Light Woods-Light 0.4 0.4 100 21 3.54 3.54 0.0447 0.0654 Unpaved 3600 V 0.005 0.012 0.012 5.53 5.53 558 1733 Compute Tt 0.00 +0.00 Unpaved 3600 V SEGMENT ID 4/24/2020 4/24/2020 SEGMENT ID A RHJ MRR THE GROVE AT CHESTNUT PARK INDIAN TRAIL, NC SB-A EC PH1 P2^0.5 s^0.4 SEGMENT ID B 262.74 50 0.0601 0.0200 3.955 2.28 Compute Tt 0.02 +0.00 6.28 6.28 Pipe Pipe 3.14 3.14 ESP Associates, Inc. Po Box 7030 Charlotte NC 28241 SB-A EC PH1 SB-A EC PH 1 TOC CALCS 4/27/2020 Project: County/City:Designed By:RHJ Date:4/24/2020 State:Checked By:MRR Date:4/24/2020 Basin:1 Total Drainage Area to Basin:5.98 Acres Potential Max. Disturbed Area to Basin:5.44 Acres Area C Value Area (Acres)Composite C Denuded 0.60 5.44 0.55 Woods 0.25 0.54 0.02 Grass 0.30 0.00 0.00 Open Space 0.40 0.00 0.00 Impervious 0.95 0.00 0.00 TOTAL:-5.98 0.57 Minimum Volume Requirement: Minimum Volume = 1800 ft3/disturbed acre Minimum Volume = 9,796 ft3 OK Volume Provided = 38,586 ft3 Peak Inflows: 16.2 min. 3.86 in/hr 4.98 in/hr 5.49 in/hr 0.57 Q2 =13.24 cfs (Calculated by Rational Method) Q10 =17.07 cfs (Calculated by Rational Method) Minimum Basin Surface Area: Minimum Surface Area =435 sf/cfs (10-year, 24 hour storm peak inflow) Minimum Surface Area =7,424 sf OK Surface Area Provided =15,010 sf Elevation (FT)Area (SF)Incremental Volume(CF) Cumulative Volume(CF) 692.00 10,747 0 0 693.00 12,143 11,445 11,445 694.00 13,564 12,854 24,299 695.00 15,010 14,287 38,586 696.00 16,482 15,746 54,332 697.00 17,978 17,230 71,562 2-Year rainfall intensity = 10-Year rainfall intensity = 25-Year rainfall intensity = Runoff Coefficient (C) = THE GROVE AT CHESTNUT PARK INDIAN TRAIL NC SB-A Erosion Control Phase Time of Concentration = ESP Assocates, Inc. PoBox 7030 Charlotte NC 28241 SB-A EC PH 1 SB-A EC PH 1 DESIGN Principal Spillway - Riser: 695.00 4.00-ft 12.57-ft 3.33 1.00-ft (Must be 1' Minimum) Q2 IN = 13.24 cfs (Calculated by Rational Method) Q2 OUT = 41.85 cfs 0.60 12.57-sf 32.20 ft/sec2 1.00-ft Q2 IN = 13.24 cfs (Calculated by Rational Method) Q2 OUT = 60.51 cfs Pipe Flow Check: 2.00-ft 692.00 691.47 3.14-sf 32.20 ft/sec2 2.53-ft (Measured at Outfall) 1.0 102.00-ft 0.0165 (Taken from Table 8.07a, n=0.015) Q2 IN = 13.24 cfs (Routed in Hydraflow using Rational Method) Q2 OUT = 20.90 cfs Emergency Spillway Design: 12.57-ft 695.00 3.32 Q10 Less Q2 = 3.83 cfs (Calculated by Rational Method) 1.20 ft (Based on Weir Equation) 12.20 % (from Table 8.07c) 697.00 Freeboard = 0.80 ft OK Skimmer Design - Volume Required: Volume Required = 9,796 ft3 2.69 days (From NCDENR)OK 1.0 2.0 2.0 C = 0.59 (From Faircloth Skimmer Packet) A = 3.14 in2 (From Faircloth Skimmer Packet) g = 32.2 ft/sec H =2.00 in (From Faircloth Skimmer Packet) Qout = 0.04 Orifice Size (diameter) = inches (From Faircloth Skimmer Packet) Spillway length : Spillway elevation : Weir Coef. (c): Spillway stage (H): Maximum slope: Top of berm elevation: Km: Barrel Length (L): Drawdown Time = Number of Skimmers = Skimmer Size = inches (From Faircloth Skimmer Packet) Cross Sectional Area (A): Accel. Of Gravity (g): Head (H): Barrel Diameter: Invert In: Kp: Invert Out: Cross Sectional Area (A): Accel. Of Gravity (g): Head (H): Riser Diameter: Spillway Length (L): Weir Coef. (C): Head (H): Orifice Flow Check Orifice Coef. (C): Weir Flow Check Spillway Elevation: .= 2 .= A* . = 2 .= = ESP Assocates, Inc. PoBox 7030 Charlotte NC 28241 SB-A EC PH 1 SB-A EC PH 1 DESIGN 5B. Sediment Basin SB-1 ESP Associates, Inc. 3475 Lakemont Blvd. Fort Mill, SC 29708 Phone 803-802-2440 Fax 803-802-2515 Time of Concentration (Tc) or Travel Time (Tt) Project By Date Location Checked Date Circle One: Present Developed 1. SHEET FLOW 1. Surface description (table 3-1) 2. Manning's roughness coefficient, n (table 3-1).. 3. Flow length, L (total L ≤ 300 ft)....ft 4. Two-year 24-hour rainfall, P .....in 5. Land slope, s .....ft/ft 6. Tt = 0.007 (nL)^0.8 ......hr 0.07 2. SHALLOW CONCENTRATED FLOW 7. Surface description (paved or unpaved).... 8. Flow length, L ................ft 9. Watercourse slope, s ............ft/ft 10. Average velocity, V (figure 3-1). 11. Tt = L .....hr 0.02 3. CHANNEL FLOW 12. Channel type (Pipe or Open Channel) 13. Cross sectional flow area, a ................ft² 14. Wetted perimeter, pw ........ft 15. Hydraulic radius r = a/pw ..ft 16. Channel slope, s .......ft/ft 17. Manning's roughness coefficient, n ............... 18. V = [1.49 r^(2/3) s^(1/2)] / n Compute V ..ft/s 19. Flow length, L ...ft 20. Tt = L ......hr 0.05 21. Watershed or subarea Tc or Tt (add Tt in steps 6, 11, and 19)Hr = 0.14 Min = 8.4 Reference:Urban Hydrology for Small Watersheds Rainfall, P, taken from Technical Release 55, Soil Conservation Service U.S. Department of Agriculture, June 1986 NOAA Rainfall Data, April 2020 Compute r 0.38 0.50 0.005 Compute Tt 0.07 +0.00 Grass-Short Woods-Light 0.15 0.4 53 21 3.54 3.54 0.0400 0.0654 Unpaved 3600 V 0.005 0.012 0.012 4.57 5.53 521 302 Compute Tt 0.03 +0.02 Unpaved 3600 V SEGMENT ID 4/24/2020 4/24/2020 SEGMENT ID A RCT MRR The Grove at Chestnut Park Indian Trail, Union County, NC Post-Dev TOC P2^0.5 s^0.4 SEGMENT ID B 190 50 0.0252 0.0200 2.561 2.28 Compute Tt 0.02 +0.00 4.71 6.28 Pipe Pipe 1.77 3.14 C D ESP Associates, Inc. Po Box 7030 Charlotte NC 28241 Post-Dev TOC SB-1 EC PH 2 TOC CALCS 4/27/2020 Project: County/City:Designed By:RHJ Date:4/24/2020 State:Checked By:MRR Date:4/24/2020 Basin:2 Total Drainage Area to Basin:6.69 Acres Potential Max. Disturbed Area to Basin:4.73 Acres Area C Value Area (Acres)Composite C Denuded 0.60 4.73 0.42 Woods 0.25 0.55 0.02 Grass 0.30 0.00 0.00 Open Space 0.40 0.00 0.00 Impervious 0.95 1.41 0.20 TOTAL:-6.69 0.64 Minimum Volume Requirement: Minimum Volume = 1800 ft3/disturbed acre Minimum Volume = 8,516 ft3 OK Volume Provided = 79,898 ft3 Peak Inflows: 8.4 min. 5.10 in/hr 6.52 in/hr 7.18 in/hr 0.64 Q2 =22.17 cfs (Calculated by Rational Method) Q10 =28.36 cfs (Calculated by Rational Method) Minimum Basin Surface Area: Minimum Surface Area =435 sf/cfs (10-year, 24 hour storm peak inflow) Minimum Surface Area =12,338 sf OK Surface Area Provided =12,511 sf Elevation (FT)Area (SF)Incremental Volume(CF) Cumulative Volume(CF) 672.00 0 0 0 673.00 117 59 59 674.00 435 276 335 675.00 787 611 946 676.00 1,174 981 1,926 677.00 1,599 1,387 3,313 678.00 2,061 1,830 5,143 679.00 2,565 2,313 7,456 680.00 3,117 2,841 10,297 681.00 3,708 3,413 13,709 682.00 4,331 4,020 17,729 683.00 4,988 4,660 22,388 684.00 5,677 5,333 27,721 685.00 6,398 6,038 33,758 686.00 12,085 9,242 43,000 687.00 12,229 12,157 55,157 688.00 12,371 12,300 67,457 689.00 12,511 12,441 79,898 690.00 12,651 12,581 92,479 691.00 12,791 12,721 105,200 692.00 12,931 12,861 118,061 2-Year rainfall intensity = 10-Year rainfall intensity = 25-Year rainfall intensity = Runoff Coefficient (C) = THE GROVE AT CHESTNUT PARK INDIAN TRAIL NC SB-1 Erosion Control Phase Time of Concentration = ESP Assocates, Inc. PoBox 7030 Charlotte NC 28241 SB-A EC PH 1 SB-1 EC PH 2 DESIGN Principal Spillway - Riser: 689.25 5.00-ft 20.00-ft 3.33 1.00-ft (Must be 1' Minimum) Q2 IN = 22.17 cfs (Calculated by Rational Method) Q2 OUT = 66.60 cfs 0.60 25.00-sf 32.20 ft/sec2 1.00-ft Q2 IN = 22.17 cfs (Calculated by Rational Method) Q2 OUT = 120.37 cfs Pipe Flow Check: 2.00-ft 681.28 681.50 3.14-sf 32.20 ft/sec2 6.75-ft (Measured at Outfall) 1.0 19.00-ft 0.0165 (Taken from Table 8.07a, n=0.015) Q2 IN = 22.17 cfs (Routed in Hydraflow using Rational Method) Q2 OUT = 43.06 cfs Emergency Spillway Design: 20.00-ft 689.25 3.32 Q10 Less Q2 = 6.20 cfs (Calculated by Rational Method) 1.21 ft (Based on Weir Equation) 12.20 % (from Table 8.07c) 692.00 Freeboard = 1.54 ft OK Skimmer Design - Volume Required: Volume Required = 8,516 ft3 2.34 days (From NCDENR)OK 1.0 2.0 2.0 C = 0.59 (From Faircloth Skimmer Packet) A = 3.14 in2 (From Faircloth Skimmer Packet) g = 32.2 ft/sec H =2.00 in (From Faircloth Skimmer Packet) Qout = 0.04 Orifice Size (diameter) = inches (From Faircloth Skimmer Packet) Spillway length : Spillway elevation : Weir Coef. (c): Spillway stage (H): Maximum slope: Top of berm elevation: Km: Barrel Length (L): Drawdown Time = Number of Skimmers = Skimmer Size = inches (From Faircloth Skimmer Packet) Cross Sectional Area (A): Accel. Of Gravity (g): Head (H): Barrel Diameter: Invert In: Kp: Invert Out: Cross Sectional Area (A): Accel. Of Gravity (g): Head (H): Riser Diameter: Spillway Length (L): Weir Coef. (C): Head (H): Orifice Flow Check Orifice Coef. (C): Weir Flow Check Spillway Elevation: .= 2 .= A* . = 2 .= = ESP Assocates, Inc. PoBox 7030 Charlotte NC 28241 SB-A EC PH 1 SB-1 EC PH 2 DESIGN 5C. Ditch Calculations ESP Associates, Inc. 3475 Lakemont Blvd. Fort Mill, SC 29708 Phone 803-802-2440 Fax 803-802-2515 Time of Concentration (Tc) or Travel Time (Tt) Project By Date Location Checked Date Circle One: Present Developed 1. SHEET FLOW 1. Surface description (table 3-1) 2. Manning's roughness coefficient, n (table 3-1).. 3. Flow length, L (total L ≤ 300 ft)....ft 4. Two-year 24-hour rainfall, P .....in 5. Land slope, s .....ft/ft 6. Tt = 0.007 (nL)^0.8 ......hr 0.37 2. SHALLOW CONCENTRATED FLOW 7. Surface description (paved or unpaved).... 8. Flow length, L ................ft 9. Watercourse slope, s ............ft/ft 10. Average velocity, V (figure 3-1). 11. Tt = L .....hr 0.01 3. CHANNEL FLOW 12. Channel type (Pipe or Open Channel) 13. Cross sectional flow area, a ................ft² 14. Wetted perimeter, pw ........ft 15. Hydraulic radius r = a/pw ..ft 16. Channel slope, s .......ft/ft 17. Manning's roughness coefficient, n ............... 18. V = [1.49 r^(2/3) s^(1/2)] / n Compute V ..ft/s 19. Flow length, L ...ft 20. Tt = L ......hr 0.03 21. Watershed or subarea Tc or Tt (add Tt in steps 6, 11, and 19)Hr = 0.41 Min = 24.6 Reference:Urban Hydrology for Small Watersheds Rainfall, P, taken from Technical Release 55, Soil Conservation Service U.S. Department of Agriculture, June 1986 THE GROVE AT CHESTNUT PARK RHJ 4/24/2020 INDIAN TRAIL, NC MRR 4/24/2020 DITCH 1A SEGMENT ID A Woods-Light Fallow 0.4 0.05 100 45 3.54 3.54 0.0158 0.0126 Compute Tt 0.37 +0.00 SEGMENT ID B Unpaved Unpaved Compute Tt 0.01 +0.00 P2^0.5 s^0.4 164.68 561 0.0373 0.0587 3.116 3.91 3600 V 0.040 0.040 Open Channel Open Channel 16.00 132.75 14.65 14.65 Compute r 1.09 9.06 0.014 0.002 SEGMENT ID C 3600 V NOAA Rainfall Data, April 2020 4.71 7.24 461.44 100 Compute Tt 0.03 +0.00 ESP Associates, Inc. Po Box 7030 Charlotte NC 28241 DITCH 1A DITCH 1A - TOC CALC 4/27/2020 Hydrology Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc.Thursday, Apr 23 2020 DITCH 1A (ECP1) Hydrograph type = Rational Peak discharge (cfs) = 2.326 Storm frequency (yrs) = 10 Time interval (min) = 1 Drainage area (ac) = 1.140 Runoff coeff. (C) = 0.5 Rainfall Inten (in/hr) = 4.081 Tc by User (min) = 25 IDF Curve = Indian Trail.IDF Rec limb factor = 1.00 Hydrograph Volume = 3,490 (cuft); 0.080 (acft) 0 5 10 15 20 25 30 35 40 45 50 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 Q (cfs) Time (min) Runoff Hydrograph 10-yr frequency Runoff Hyd - Qp = 2.33 (cfs) Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc.Monday, Apr 27 2020 DITCH 1A (ECP1) Trapezoidal Bottom Width (ft) = 2.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 2.00 Invert Elev (ft) = 700.00 Slope (%) = 1.00 N-Value = 0.018 Calculations Compute by: Known Q Known Q (cfs) = 2.33 Highlighted Depth (ft) = 0.29 Q (cfs) = 2.330 Area (sqft) = 0.83 Velocity (ft/s) = 2.80 Wetted Perim (ft) = 3.83 Crit Depth, Yc (ft) = 0.30 Top Width (ft) = 3.74 EGL (ft) = 0.41 0 2 4 6 8 10 12 14 16 18 Elev (ft)Depth (ft)Section 699.50 -0.50 700.00 0.00 700.50 0.50 701.00 1.00 701.50 1.50 702.00 2.00 702.50 2.50 703.00 3.00 Reach (ft) ESP Associates, Inc. 3475 Lakemont Blvd. Fort Mill, SC 29708 Phone 803-802-2440 Fax 803-802-2515 Time of Concentration (Tc) or Travel Time (Tt) Project By Date Location Checked Date Circle One: Present Developed 1. SHEET FLOW 1. Surface description (table 3-1) 2. Manning's roughness coefficient, n (table 3-1).. 3. Flow length, L (total L ≤ 300 ft)....ft 4. Two-year 24-hour rainfall, P .....in 5. Land slope, s .....ft/ft 6. Tt = 0.007 (nL)^0.8 ......hr 0.27 2. SHALLOW CONCENTRATED FLOW 7. Surface description (paved or unpaved).... 8. Flow length, L ................ft 9. Watercourse slope, s ............ft/ft 10. Average velocity, V (figure 3-1). 11. Tt = L .....hr 0.02 3. CHANNEL FLOW 12. Channel type (Pipe or Open Channel) 13. Cross sectional flow area, a ................ft² 14. Wetted perimeter, pw ........ft 15. Hydraulic radius r = a/pw ..ft 16. Channel slope, s .......ft/ft 17. Manning's roughness coefficient, n ............... 18. V = [1.49 r^(2/3) s^(1/2)] / n Compute V ..ft/s 19. Flow length, L ...ft 20. Tt = L ......hr 0.01 21. Watershed or subarea Tc or Tt (add Tt in steps 6, 11, and 19)Hr = 0.30 Min = 18.0 Reference:Urban Hydrology for Small Watersheds Rainfall, P, taken from Technical Release 55, Soil Conservation Service U.S. Department of Agriculture, June 1986 THE GROVE AT CHESTNUT PARK RHJ 4/24/2020 INDIAN TRAIL, NC MRR 4/24/2020 DITCH 2A SEGMENT ID A Woods-Light Fallow 0.4 0.05 100 45 3.54 3.54 0.0354 0.0126 Compute Tt 0.27 +0.00 SEGMENT ID B Unpaved Unpaved Compute Tt 0.02 +0.00 P2^0.5 s^0.4 D 186.46 561 0.0285 0.0587 2.724 3.91 3600 V 0.040 0.040 Open Channel Open Channel 16.00 16.00 14.65 14.65 Compute r 1.09 1.09 0.070 0.015 SEGMENT ID C 3600 V NOAA Rainfall Data, April 2020 10.45 4.81 130.77 206.14 Compute Tt 0.00 +0.01 ESP Associates, Inc. Po Box 7030 Charlotte NC 28241 DITCH 2A DITCH 2A - TOC CALC 4/27/2020 Hydrology Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc.Monday, Apr 27 2020 DITCH 2A (ECP1) Hydrograph type = Rational Peak discharge (cfs) = 3.326 Storm frequency (yrs) = 10 Time interval (min) = 1 Drainage area (ac) = 1.380 Runoff coeff. (C) = 0.5 Rainfall Inten (in/hr) = 4.820 Tc by User (min) = 18 IDF Curve = Indian Trail.IDF Rec limb factor = 1.00 Hydrograph Volume = 3,592 (cuft); 0.082 (acft) 0 5 10 15 20 25 30 35 40 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 Q (cfs) Time (min) Runoff Hydrograph 10-yr frequency Runoff Hyd - Qp = 3.33 (cfs) Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc.Monday, Apr 27 2020 DITCH 2A (ECP1) Trapezoidal Bottom Width (ft) = 2.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 2.00 Invert Elev (ft) = 700.00 Slope (%) = 1.00 N-Value = 0.018 Calculations Compute by: Known Q Known Q (cfs) = 3.33 Highlighted Depth (ft) = 0.34 Q (cfs) = 3.330 Area (sqft) = 1.03 Velocity (ft/s) = 3.24 Wetted Perim (ft) = 4.15 Crit Depth, Yc (ft) = 0.37 Top Width (ft) = 4.04 EGL (ft) = 0.50 0 2 4 6 8 10 12 14 16 18 Elev (ft)Depth (ft)Section 699.50 -0.50 700.00 0.00 700.50 0.50 701.00 1.00 701.50 1.50 702.00 2.00 702.50 2.50 703.00 3.00 Reach (ft) 5D. Ditch Matting Calculations North American Green 5401 St. Wendel-Cynthiana Rd. Poseyville, Indiana 47633 Tel. 800.772.2040 >Fax 812.867.0247 www.nagreen.com ECMDS v7.0 CHANNEL ANALYSIS > > > DITCH 1A Name DITCH 1A Discharge 2.33 Peak Flow Period 6 Channel Slope 0.014 Channel Bottom Width 2 Left Side Slope 3 Right Side Slope 3 Low Flow Liner Retardence Class C 6-12 in Vegetation Type Mix (Sod and Bunch) Vegetation Density Good 75-95% Soil Type Clay Loam (CL) C125 C125 Unvegetated Straight 2.33 cfs 2.24 ft/s 0.34 ft 0.031 2.3 lbs/ft2 0.3 lbs/ft2 7.68 STABLE D Underlying Substrate Straight 2.33 cfs 2.24 ft/s 0.34 ft 0.031 2.51 lbs/ft2 0.22 lbs/ft2 11.52 STABLE D SC150 SC150 Unvegetated Straight 2.33 cfs 1.58 ft/s 0.44 ft 0.051 1.6 lbs/ft2 0.39 lbs/ft2 4.13 STABLE E Underlying Substrate Straight 2.33 cfs 1.58 ft/s 0.44 ft 0.051 1.74 lbs/ft2 0.27 lbs/ft2 6.49 STABLE E S150 S150 Unvegetated Straight 2.33 cfs 1.58 ft/s 0.44 ft 0.051 1.8 lbs/ft2 0.39 lbs/ft2 4.65 STABLE E Underlying Substrate Straight 2.33 cfs 1.58 ft/s 0.44 ft 0.051 1.96 lbs/ft2 0.27 lbs/ft2 7.3 STABLE E DS150 DS150 Unvegetated Straight 2.33 cfs 1.58 ft/s 0.44 ft 0.051 1.8 lbs/ft2 0.39 lbs/ft2 4.65 STABLE D Underlying Substrate Straight 2.33 cfs 1.58 ft/s 0.44 ft 0.051 1.96 lbs/ft2 0.27 lbs/ft2 7.3 STABLE D S75 S75 Unvegetated Straight 2.33 cfs 2 ft/s 0.37 ft 0.036 1.6 lbs/ft2 0.33 lbs/ft2 4.91 STABLE D Phase Reach Discharge Velocity Normal Depth Mannings N Permissable Shear Stress Calculated Shear Stress Safety Factor Remarks Staple Pattern Phase Reach Discharge Velocity Normal Depth Mannings N Permissable Shear Stress Calculated Shear Stress Safety Factor Remarks Staple Pattern Phase Reach Discharge Velocity Normal Depth Mannings N Permissable Shear Stress Calculated Shear Stress Safety Factor Remarks Staple Pattern Phase Reach Discharge Velocity Normal Depth Mannings N Permissable Shear Stress Calculated Shear Stress Safety Factor Remarks Staple Pattern Phase Reach Discharge Velocity Normal Depth Mannings N Permissable Shear Stress Calculated Shear Stress Safety Factor Remarks Staple Pattern ECMDS 7.0 https://ecmds.com/project/143839/channel-analysis/182018/show 1 of 2 4/27/2020, 3:33 PM Underlying Substrate Straight 2.33 cfs 2 ft/s 0.37 ft 0.036 1.74 lbs/ft2 0.23 lbs/ft2 7.47 STABLE D Unreinforced Vegetation Unreinforced Vegetation Straight 2.33 cfs 1.2 ft/s 0.54 ft 0.074 4 lbs/ft2 0.47 lbs/ft2 8.51 STABLE -- Underlying Substrate Straight 2.33 cfs 1.2 ft/s 0.54 ft 0.074 12.47 lbs/ft2 0.31 lbs/ft2 39.65 STABLE -- DS75 DS75 Unvegetated Straight 2.33 cfs 2 ft/s 0.37 ft 0.036 1.6 lbs/ft2 0.33 lbs/ft2 4.91 STABLE D Underlying Substrate Straight 2.33 cfs 2 ft/s 0.37 ft 0.036 1.74 lbs/ft2 0.23 lbs/ft2 7.47 STABLE D Phase Reach Discharge Velocity Normal Depth Mannings N Permissable Shear Stress Calculated Shear Stress Safety Factor Remarks Staple Pattern Phase Reach Discharge Velocity Normal Depth Mannings N Permissable Shear Stress Calculated Shear Stress Safety Factor Remarks Staple Pattern ECMDS 7.0 https://ecmds.com/project/143839/channel-analysis/182018/show 2 of 2 4/27/2020, 3:33 PM North American Green 5401 St. Wendel-Cynthiana Rd. Poseyville, Indiana 47633 Tel. 800.772.2040 >Fax 812.867.0247 www.nagreen.com ECMDS v7.0 CHANNEL ANALYSIS > > > DITCH 2A (LOWER) Name DITCH 2A (LOWER) Discharge 3.33 Peak Flow Period 6 Channel Slope 0.015 Channel Bottom Width 2 Left Side Slope 3 Right Side Slope 3 Low Flow Liner Retardence Class C 6-12 in Vegetation Type Mix (Sod and Bunch) Vegetation Density Good 75-95% Soil Type Clay Loam (CL) C125 C125 Unvegetated Straight 3.33 cfs 2.55 ft/s 0.41 ft 0.031 2.3 lbs/ft2 0.38 lbs/ft2 6.06 STABLE D Underlying Substrate Straight 3.33 cfs 2.55 ft/s 0.41 ft 0.031 2.51 lbs/ft2 0.27 lbs/ft2 9.36 STABLE D SC150 SC150 Unvegetated Straight 3.33 cfs 1.85 ft/s 0.51 ft 0.048 1.6 lbs/ft2 0.48 lbs/ft2 3.36 STABLE E Underlying Substrate Straight 3.33 cfs 1.85 ft/s 0.51 ft 0.048 1.74 lbs/ft2 0.32 lbs/ft2 5.41 STABLE E S150 S150 Unvegetated Straight 3.33 cfs 1.85 ft/s 0.51 ft 0.048 1.8 lbs/ft2 0.48 lbs/ft2 3.78 STABLE E Underlying Substrate Straight 3.33 cfs 1.85 ft/s 0.51 ft 0.048 1.96 lbs/ft2 0.32 lbs/ft2 6.09 STABLE E DS150 DS150 Unvegetated Straight 3.33 cfs 1.85 ft/s 0.51 ft 0.048 1.8 lbs/ft2 0.48 lbs/ft2 3.78 STABLE D Underlying Substrate Straight 3.33 cfs 1.85 ft/s 0.51 ft 0.048 1.96 lbs/ft2 0.32 lbs/ft2 6.09 STABLE D S75 S75 Unvegetated Straight 3.33 cfs 2.31 ft/s 0.44 ft 0.036 1.6 lbs/ft2 0.41 lbs/ft2 3.92 STABLE D Phase Reach Discharge Velocity Normal Depth Mannings N Permissable Shear Stress Calculated Shear Stress Safety Factor Remarks Staple Pattern Phase Reach Discharge Velocity Normal Depth Mannings N Permissable Shear Stress Calculated Shear Stress Safety Factor Remarks Staple Pattern Phase Reach Discharge Velocity Normal Depth Mannings N Permissable Shear Stress Calculated Shear Stress Safety Factor Remarks Staple Pattern Phase Reach Discharge Velocity Normal Depth Mannings N Permissable Shear Stress Calculated Shear Stress Safety Factor Remarks Staple Pattern Phase Reach Discharge Velocity Normal Depth Mannings N Permissable Shear Stress Calculated Shear Stress Safety Factor Remarks Staple Pattern ECMDS 7.0 https://ecmds.com/project/143839/channel-analysis/182023/show# 1 of 2 4/27/2020, 3:43 PM Underlying Substrate Straight 3.33 cfs 2.31 ft/s 0.44 ft 0.036 1.74 lbs/ft2 0.28 lbs/ft2 6.14 STABLE D Unreinforced Vegetation Unreinforced Vegetation Straight 3.33 cfs 1.42 ft/s 0.61 ft 0.069 4 lbs/ft2 0.57 lbs/ft2 6.99 STABLE -- Underlying Substrate Straight 3.33 cfs 1.42 ft/s 0.61 ft 0.069 10.86 lbs/ft2 0.37 lbs/ft2 29.04 STABLE -- DS75 DS75 Unvegetated Straight 3.33 cfs 2.31 ft/s 0.44 ft 0.036 1.6 lbs/ft2 0.41 lbs/ft2 3.92 STABLE D Underlying Substrate Straight 3.33 cfs 2.31 ft/s 0.44 ft 0.036 1.74 lbs/ft2 0.28 lbs/ft2 6.14 STABLE D Phase Reach Discharge Velocity Normal Depth Mannings N Permissable Shear Stress Calculated Shear Stress Safety Factor Remarks Staple Pattern Phase Reach Discharge Velocity Normal Depth Mannings N Permissable Shear Stress Calculated Shear Stress Safety Factor Remarks Staple Pattern ECMDS 7.0 https://ecmds.com/project/143839/channel-analysis/182023/show# 2 of 2 4/27/2020, 3:43 PM North American Green 5401 St. Wendel-Cynthiana Rd. Poseyville, Indiana 47633 Tel. 800.772.2040 >Fax 812.867.0247 www.nagreen.com ECMDS v7.0 CHANNEL ANALYSIS > > > DITCH 2A (UPPER) Name DITCH 2A (UPPER) Discharge 3.33 Peak Flow Period 6 Channel Slope 0.068 Channel Bottom Width 2 Left Side Slope 3 Right Side Slope 3 Low Flow Liner Retardence Class C 6-12 in Vegetation Type Mix (Sod and Bunch) Vegetation Density Good 75-95% Soil Type Clay Loam (CL) C125 C125 Unvegetated Straight 3.33 cfs 4.35 ft/s 0.27 ft 0.031 2.3 lbs/ft2 1.15 lbs/ft2 2 STABLE D Underlying Substrate Straight 3.33 cfs 4.35 ft/s 0.27 ft 0.031 2.51 lbs/ft2 0.87 lbs/ft2 2.87 STABLE D SC150 SC150 Unvegetated Straight 3.33 cfs 3.95 ft/s 0.29 ft 0.036 1.6 lbs/ft2 1.24 lbs/ft2 1.29 STABLE E Underlying Substrate Straight 3.33 cfs 3.95 ft/s 0.29 ft 0.036 1.74 lbs/ft2 0.93 lbs/ft2 1.88 STABLE E S150 S150 Unvegetated Straight 3.33 cfs 3.95 ft/s 0.29 ft 0.036 1.8 lbs/ft2 1.24 lbs/ft2 1.45 STABLE E Underlying Substrate Straight 3.33 cfs 3.95 ft/s 0.29 ft 0.036 1.96 lbs/ft2 0.93 lbs/ft2 2.11 STABLE E DS150 DS150 Unvegetated Straight 3.33 cfs 3.95 ft/s 0.29 ft 0.036 1.8 lbs/ft2 1.24 lbs/ft2 1.45 STABLE D Underlying Substrate Straight 3.33 cfs 3.95 ft/s 0.29 ft 0.036 1.96 lbs/ft2 0.93 lbs/ft2 2.11 STABLE D S75 S75 Unvegetated Straight 3.33 cfs 4.39 ft/s 0.27 ft 0.031 1.6 lbs/ft2 1.15 lbs/ft2 1.4 STABLE D Phase Reach Discharge Velocity Normal Depth Mannings N Permissable Shear Stress Calculated Shear Stress Safety Factor Remarks Staple Pattern Phase Reach Discharge Velocity Normal Depth Mannings N Permissable Shear Stress Calculated Shear Stress Safety Factor Remarks Staple Pattern Phase Reach Discharge Velocity Normal Depth Mannings N Permissable Shear Stress Calculated Shear Stress Safety Factor Remarks Staple Pattern Phase Reach Discharge Velocity Normal Depth Mannings N Permissable Shear Stress Calculated Shear Stress Safety Factor Remarks Staple Pattern Phase Reach Discharge Velocity Normal Depth Mannings N Permissable Shear Stress Calculated Shear Stress Safety Factor Remarks Staple Pattern ECMDS 7.0 https://ecmds.com/project/143839/channel-analysis/182022/show 1 of 2 4/27/2020, 3:34 PM Underlying Substrate Straight 3.33 cfs 4.39 ft/s 0.27 ft 0.031 1.74 lbs/ft2 0.87 lbs/ft2 2.01 STABLE D Unreinforced Vegetation Unreinforced Vegetation Straight 3.33 cfs 3.29 ft/s 0.34 ft 0.046 4 lbs/ft2 1.43 lbs/ft2 2.81 STABLE -- Underlying Substrate Straight 3.33 cfs 3.29 ft/s 0.34 ft 0.046 4.79 lbs/ft2 1.04 lbs/ft2 4.61 STABLE -- DS75 DS75 Unvegetated Straight 3.33 cfs 4.39 ft/s 0.27 ft 0.031 1.6 lbs/ft2 1.15 lbs/ft2 1.4 STABLE D Underlying Substrate Straight 3.33 cfs 4.39 ft/s 0.27 ft 0.031 1.74 lbs/ft2 0.87 lbs/ft2 2.01 STABLE D Phase Reach Discharge Velocity Normal Depth Mannings N Permissable Shear Stress Calculated Shear Stress Safety Factor Remarks Staple Pattern Phase Reach Discharge Velocity Normal Depth Mannings N Permissable Shear Stress Calculated Shear Stress Safety Factor Remarks Staple Pattern ECMDS 7.0 https://ecmds.com/project/143839/channel-analysis/182022/show 2 of 2 4/27/2020, 3:34 PM 5E. Temporary HDPE Slope Drain Calculations Culvert Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc.Thursday, Apr 23 2020 SLOPE DRAIN 1A Invert Elev Dn (ft) = 692.00 Pipe Length (ft) = 60.00 Slope (%) = 8.33 Invert Elev Up (ft) = 697.00 Rise (in) = 15.0 Shape = Circular Span (in) = 15.0 No. Barrels = 1 n-Value = 0.012 Culvert Type = Circular Concrete Culvert Entrance = Square edge w/headwall (C) Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 Embankment Top Elevation (ft) = 699.00 Top Width (ft) = 8.00 Crest Width (ft) = 20.00 Calculations Qmin (cfs) = 2.33 Qmax (cfs) = 2.33 Tailwater Elev (ft) = (dc+D)/2 Highlighted Qtotal (cfs) = 2.33 Qpipe (cfs) = 2.33 Qovertop (cfs) = 0.00 Veloc Dn (ft/s) = 2.38 Veloc Up (ft/s) = 3.92 HGL Dn (ft) = 692.93 HGL Up (ft) = 697.61 Hw Elev (ft) = 697.83 Hw/D (ft) = 0.67 Flow Regime = Inlet Control Culvert Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc.Monday, Apr 27 2020 SLOPE DRAIN 2A Invert Elev Dn (ft) = 692.00 Pipe Length (ft) = 87.00 Slope (%) = 1.15 Invert Elev Up (ft) = 693.00 Rise (in) = 15.0 Shape = Circular Span (in) = 15.0 No. Barrels = 1 n-Value = 0.012 Culvert Type = Circular Concrete Culvert Entrance = Square edge w/headwall (C) Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 Embankment Top Elevation (ft) = 699.00 Top Width (ft) = 8.00 Crest Width (ft) = 20.00 Calculations Qmin (cfs) = 3.33 Qmax (cfs) = 3.33 Tailwater Elev (ft) = (dc+D)/2 Highlighted Qtotal (cfs) = 3.33 Qpipe (cfs) = 3.33 Qovertop (cfs) = 0.00 Veloc Dn (ft/s) = 3.19 Veloc Up (ft/s) = 4.44 HGL Dn (ft) = 692.99 HGL Up (ft) = 693.73 Hw Elev (ft) = 694.11 Hw/D (ft) = 0.88 Flow Regime = Inlet Control 6. Storm Drainage Calculations 6A. Storm A Tabulation Report 6B. Storm B Tabulation Report 6C. Storm C Tabulation Report 6D. Inlet Capacity Chart/ Spread Calculations PROJECT:The Grove at Chestnut ParkDESIGNED BY:DJBDATE: 4/24/2020MAXIMUM ALLOWABLE SPREAD FOR:LOCATION:Indian Trail, NCCHECKED BY: MRRDATE:4/24/20202'-6" STANDARD CURB & GUTTER = 8' VALLEY CURB AND GUTTER = 7'RAINFALL INTENSITY 4.00 IN/HR REFERENCE: "Indian Trail Stormwater Ordinance" INLET #SUB. TOTAL LONG. TRANS. K Q CAP SPREAD DEPTHREMARKSCB#A20.19 0.85ON GRADE 0.65 0.82 1.00% 2.08% N/A 0.71 6.54 0.14 CB#A32 0.110CB#A30.08 0.85ON GRADE 0.27 0.34 1.00% 2.08% N/A 0.46 4.68 0.10 CB#A11 0.000CB#A40.11 0.85ON GRADE 0.37 0.51 2.00% 2.08% N/A 0.45 4.81 0.10 CB#A3 0.065CB#A50.23 0.85ON GRADE 0.78 0.91 2.00% 2.08% N/A 0.77 5.96 0.12 CB#A4 0.140CB#A70.15 0.85ON GRADE 0.51 0.57 2.00% 2.08% N/A 0.51 5.01 0.10 CB#A5 0.064CB#A80.16 0.85ON GRADE 0.54 0.56 3.00% 2.08% N/A 0.50 4.60 0.10 CB#A7 0.062CB#A90.03 0.85ON GRADE 0.10 0.10 1.00% 2.08% N/A 0.09 2.99 0.06 CB#A10 0.014CB#A100.23 0.85ON GRADE 0.78 0.80 3.00% 2.08% N/A 0.65 5.25 0.11 CB#B11 0.146CB#A110.12 0.85ON GRADE 0.41 0.41 1.00% 2.08% N/A 0.37 5.03 0.10 CB#C1 0.043CB#A130.07 0.85ON GRADE 0.24 0.24 2.00% 2.08% N/A 0.43 3.61 0.07 CB#C1 0.000CB#A140.13 0.85ON GRADE 0.44 0.44 4.00% 2.08% N/A 0.57 3.99 0.08 CB#A13 0.000CB#A150.13 0.85ON GRADE 0.44 0.50 3.00% 2.08% N/A 0.53 4.42 0.09 CB#A14 0.000CB#A160.09 0.85ON GRADE 0.31 0.45 1.00% 2.08% N/A 0.40 5.20 0.11 CB#A15 0.052CB#A170.15 0.85ON GRADE 0.51 0.58 1.00% 2.08% N/A 0.44 5.74 0.12 CB#A16 0.142CB#A180.15 0.85ON GRADE 0.51 0.51 1.00% 2.08% N/A 0.44 5.47 0.11 CB#A36 0.072CB#A200.01 0.95ON GRADE 0.04 0.08 3.00% 2.08% N/A 0.03 2.22 0.05 CB#A5 0.047CB#A210.12 0.85ON GRADE 0.41 0.42 3.00% 2.08% N/A 0.38 4.14 0.09 CB#A20 0.042CB#A220.08 0.85ON GRADE 0.27 0.28 4.00% 2.08% N/A 0.27 3.36 0.07 CB#A21 0.014CB#A230.08 0.85ON GRADE 0.27 0.27 4.00% 2.08% N/A 0.27 3.33 0.07 CB#A25 0.007CB#A240.03 0.85ON GRADE 0.10 0.10 4.00% 2.08% N/A 0.10 2.30 0.05 CB#A18 0.002CB#A270.22 0.85ON GRADE 0.75 0.88 2.00% 2.08% N/A 0.71 5.89 0.12 CB#A2 0.176CB#A280.15 0.85ON GRADE 0.51 0.58 2.00% 2.08% N/A 0.45 5.04 0.10 CB#A27 0.133CB#A290.16 0.85ON GRADE 0.54 0.55 3.00% 2.08% N/A 0.48 4.58 0.10 CB#A28 0.072CB#A300.06 0.85ON GRADE 0.20 0.20 1.50% 2.08% N/A 0.20 3.59 0.07 CB#B9 0.009CB#A320.04 0.85ON GRADE 0.14 0.25 1.00% 2.08% N/A 0.14 4.16 0.09 CB#C1 0.108CB#A330.04 0.85ON GRADE 0.14 0.34 2.00% 2.08% N/A 0.14 4.10 0.09 CB#C2 0.195CB#A340.18 0.85ON GRADE 0.61 0.74 3.50% 2.08% N/A 0.54 4.96 0.10 CB#A33 0.199CB#A360.20 0.85ON GRADE 0.68 0.70 2.00% 2.08% N/A 0.57 5.39 0.11 CB#A34 0.124CB#A390.13 0.65ON GRADE 0.34 0.34 3.00% 2.08% N/A 0.32 3.81 0.08 CB#A5 0.01610-YR STORM: SPREAD CALCULATIONS / INLET CAPACITY CHARTSURFACE 'Q' SLOPEINLET TYPE INLETDRAINAGE AREAINLET 'C'STORM SYSTEM ABYPASS To Inlet #BYPASS Q PROJECT:The Grove At Chestnut ParkDESIGNED BY:DJBDATE: 4/24/2020MAXIMUM ALLOWABLE SPREAD FOR:LOCATION:Indian Trail, NCCHECKED BY: MRRDATE:4/24/20202'-6" STANDARD CURB & GUTTER = 8' VALLEY CURB AND GUTTER = 7'RAINFALL INTENSITY4.00 IN/HRREFERENCE: "Indian Trail Stormwater Ordinance" INLET #SUB. TOTAL LONG. TRANS. K Q CAP SPREAD DEPTHREMARKSCB#B90.22 0.85ON GRADE 0.75 0.75 3.00% 2.08% N/A 0.63 5.13 0.11 CB#B10 0.116CB#B100.11 0.85ON GRADE 0.37 0.37 3.00% 2.08% N/A 0.45 3.96 0.08 N/A 0.000CB#B110.12 0.85ON GRADE 0.41 0.41 3.00% 2.08% N/A 0.49 4.09 0.09 N/A 0.000BYPASS Q10-YR STORM: SPREAD CALCULATIONS / INLET CAPACITY CHARTSTORM SYSTEM BDRAINAGE AREAINLET 'C' INLET TYPESURFACE 'Q' SLOPE INLETBYPASS To Inlet # PROJECT:The Grove at Chestnut ParkDESIGNED BY:DJBDATE: 4/24/2020MAXIMUM ALLOWABLE SPREAD FOR:LOCATION:Indian Trail, NCCHECKED BY: MRRDATE:4/24/20202'-6" STANDARD CURB & GUTTER = 8' VALLEY CURB AND GUTTER = 7'RAINFALL INTENSITY4.00 IN/HRREFERENCE: "Indian Trail Stormwater Ordinance" INLET #SUB. TOTAL LONG. TRANS. K Q CAP SPREAD DEPTHREMARKSCB#C10.13 0.85ON GRADE 0.44 0.44 2.00% 2.08% N/A 0.40 4.55 0.09 N/A 0.046CB#C20.10 0.85ON GRADE 0.34 0.34 2.00% 2.08% N/A 0.32 4.12 0.09 N/A 0.023BYPASS Q10-YR STORM: SPREAD CALCULATIONS / INLET CAPACITY CHARTSTORM SYSTEM BDRAINAGE AREAINLET 'C' INLET TYPESURFACE 'Q' SLOPE INLETBYPASS To Inlet # 7. Rip Rap Calculations La= 10’ Q= 2.33 SLOPE DRAIN 1A FLOW= 2.33 cfs D50= 0.5’ D0= 15” 3D0 = 3.75’ W=11.25’ RIP RAP MINIMUM MIDRANGE MAXIMUM CLASS (IN.) (IN.) (IN.) 1 5 10 17 2 9 14 23 # La= 10’ Q= 3.33 SLOPE DRAIN 2A FLOW= 3.33 cfs D50= 0.5’ D0= 15” 3D0 = 3.75’ W=11.25’ RIP RAP MINIMUM MIDRANGE MAXIMUM CLASS (IN.) (IN.) (IN.) 1 5 10 17 2 9 14 23 # La= 11’ Q= 17.07 SB-A OUTFALL FLOW= 17.07 cfs D50= 0.5’ D0= 24” 3D0 = 6’ W=13’ RIP RAP MINIMUM MIDRANGE MAXIMUM CLASS (IN.) (IN.) (IN.) 1 5 10 17 2 9 14 23 # La= 16’ Q= 27.80 STORM A OUTFALL FLOW= 27.80 cfs D50= 0.6’ D0= 30” 3D0 = 7.5’ W=18.5’ RIP RAP MINIMUM MIDRANGE MAXIMUM CLASS (IN.) (IN.) (IN.) 1 5 10 17 2 9 14 23 # La= 14’ Q= 5.61 STORM B OUTFALL FLOW= 5.61 cfs D50= 0.5’ D0= 24” 3D0 = 6’ W=16’ RIP RAP MINIMUM MIDRANGE MAXIMUM CLASS (IN.) (IN.) (IN.) 1 5 10 17 2 9 14 23 8. Wet Pond No. 1 A. Pre-Development ESP Associates, Inc. 3475 Lakemont Blvd. Fort Mill, SC 29708 Phone 803-802-2440 Fax 803-802-2515 Time of Concentration (Tc) or Travel Time (Tt) Project By Date Location Checked Date Circle One: Present Developed 1. SHEET FLOW 1. Surface description (table 3-1)…………………………… 2. Manning's roughness coefficient, n (table 3-1)…………….. 3. Flow length, L (total L ≤ 300 ft)………………………....ft 4. Two-year 24-hour rainfall, P ………...…………………..in 5. Land slope, s …………………....……………………….ft/ft 6. Tt = 0.007 (nL)^0.8 …...………...hr 0.23 2. SHALLOW CONCENTRATED FLOW 7. Surface description (paved or unpaved)……………....… 8. Flow length, L …………….……….…......……...…….....ft 9. Watercourse slope, s …………….……..........……….ft/ft 10. Average velocity, V (figure 3-1)……………………….… 11. Tt = L …...……..hr 0.07 3. CHANNEL FLOW 12. Channel type (Pipe or Open Channel) 13. Cross sectional flow area, a ……………................……ft² 14. Wetted perimeter, pw ……………………..….…...…..ft 15. Hydraulic radius r = a/pw ……………..ft 16. Channel slope, s …………...…………….…………...ft/ft 17. Manning's roughness coefficient, n …...……….....…....... 18. V = [1.49 r^(2/3) s^(1/2)] / n Compute V …………..ft/s 19. Flow length, L …………….……………………………..ft 20. Tt = L …...……...hr 0.00 21. Watershed or subarea Tc or Tt (add Tt in steps 6, 11, and 19)Hr = 0.30 Min = 18.0 Reference:Urban Hydrology for Small Watersheds Rainfall, P, taken from Technical Release 55, Soil Conservation Service U.S. Department of Agriculture, June 1986 NCDENR BMP Design Manual, July 2007 Compute r 0.38 0.50 0.006 Compute Tt 0.23 +0.00 Woods-Light Fallow 0.4 0.05 100 52 3.54 3.54 0.0550 0.057 Unpaved 3600 V 0.012 0.012 0.012 4.84 8.42 32 67 Compute Tt 0.00 +0.00 Unpaved 3600 V SEGMENT ID 4/24/2020 4/24/2020 SEGMENT ID A RCT MRR The Grove at Chestnut Park Indian Trail, Union County, NC Wet Pond 1 Pre-Dev TOC P2^0.5 s^0.4 SEGMENT ID B C 284 382.5 0.0422 0.0147 3.314 1.96 Compute Tt 0.02 +0.05 4.71 6.28 Pipe Pipe 1.77 3.14 D E ESP Associates, Inc. Po Box 7030 Charlotte NC 28241 Wet Pond 1 Pre-Dev TOC The Grove at Chestnut Park - Pond 1 - TOC Calcs Pre-Dev 4/27/2020 NCDENR BMP Design Manual, May 2013 Type II 24-hr 100-YR 24-HR Rainfall=7.78"The Grove at Chestnut Park - Wet Pond No. 1 Printed 4/27/2020Prepared by ESP Associates, Inc. HydroCAD® 10.00-24 s/n 03281 © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment PRE: Pre-Development Runoff = 50.79 cfs @ 12.10 hrs, Volume= 3.672 af, Depth= 5.77" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-150.00 hrs, dt= 0.01 hrs Type II 24-hr 100-YR 24-HR Rainfall=7.78" Area (ac) CN Description 1.590 96 Gravel surface, HSG C 6.050 79 50-75% Grass cover, Fair, HSG C 7.640 83 Weighted Average 7.640 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 18.0 Direct Entry, Refer to TOC Calcs Pre-Dev Spreadsheet Type II 24-hr 1-YR 24-HR Rainfall=2.94"The Grove at Chestnut Park - Wet Pond No. 1 Printed 4/27/2020Prepared by ESP Associates, Inc. HydroCAD® 10.00-24 s/n 03281 © 2018 HydroCAD Software Solutions LLC Subcatchment PRE: Pre-Development Runoff Hydrograph Time (hours) 1501401301201101009080706050403020100Flow (cfs)14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Type II 24-hr 1-YR 24-HR Rainfall=2.94" Runoff Area=7.640 ac Runoff Volume=0.890 af Runoff Depth=1.40" Tc=18.0 min CN=83 12.58 cfs Type II 24-hr 2-YR 24-HR Rainfall=3.54"The Grove at Chestnut Park - Wet Pond No. 1 Printed 4/27/2020Prepared by ESP Associates, Inc. HydroCAD® 10.00-24 s/n 03281 © 2018 HydroCAD Software Solutions LLC Subcatchment PRE: Pre-Development Runoff Hydrograph Time (hours) 1501401301201101009080706050403020100Flow (cfs)19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 0 Type II 24-hr 2-YR 24-HR Rainfall=3.54" Runoff Area=7.640 ac Runoff Volume=1.205 af Runoff Depth=1.89" Tc=18.0 min CN=83 17.09 cfs Type II 24-hr 10-YR 24-HR Rainfall=5.17"The Grove at Chestnut Park - Wet Pond No. 1 Printed 4/27/2020Prepared by ESP Associates, Inc. HydroCAD® 10.00-24 s/n 03281 © 2018 HydroCAD Software Solutions LLC Subcatchment PRE: Pre-Development Runoff Hydrograph Time (hours) 1501401301201101009080706050403020100Flow (cfs)32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Type II 24-hr 10-YR 24-HR Rainfall=5.17" Runoff Area=7.640 ac Runoff Volume=2.119 af Runoff Depth=3.33" Tc=18.0 min CN=83 29.88 cfs Type II 24-hr 25-YR 24-HR Rainfall=6.16"The Grove at Chestnut Park - Wet Pond No. 1 Printed 4/27/2020Prepared by ESP Associates, Inc. HydroCAD® 10.00-24 s/n 03281 © 2018 HydroCAD Software Solutions LLC Subcatchment PRE: Pre-Development Runoff Hydrograph Time (hours) 1501401301201101009080706050403020100Flow (cfs)42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Type II 24-hr 25-YR 24-HR Rainfall=6.16" Runoff Area=7.640 ac Runoff Volume=2.700 af Runoff Depth=4.24" Tc=18.0 min CN=83 37.79 cfs Type II 24-hr 50-YR 24-HR Rainfall=6.96"The Grove at Chestnut Park - Wet Pond No. 1 Printed 4/27/2020Prepared by ESP Associates, Inc. HydroCAD® 10.00-24 s/n 03281 © 2018 HydroCAD Software Solutions LLC Subcatchment PRE: Pre-Development Runoff Hydrograph Time (hours) 1501401301201101009080706050403020100Flow (cfs)48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Type II 24-hr 50-YR 24-HR Rainfall=6.96" Runoff Area=7.640 ac Runoff Volume=3.177 af Runoff Depth=4.99" Tc=18.0 min CN=83 44.21 cfs Type II 24-hr 100-YR 24-HR Rainfall=7.78"The Grove at Chestnut Park - Wet Pond No. 1 Printed 4/27/2020Prepared by ESP Associates, Inc. HydroCAD® 10.00-24 s/n 03281 © 2018 HydroCAD Software Solutions LLC Subcatchment PRE: Pre-Development Runoff Hydrograph Time (hours) 1501401301201101009080706050403020100Flow (cfs)55 50 45 40 35 30 25 20 15 10 5 0 Type II 24-hr 100-YR 24-HR Rainfall=7.78" Runoff Area=7.640 ac Runoff Volume=3.672 af Runoff Depth=5.77" Tc=18.0 min CN=83 50.79 cfs Type II 24-hr 100-YR 24-HR Rainfall=7.78"The Grove at Chestnut Park - Wet Pond No. 1 Printed 4/27/2020Prepared by ESP Associates, Inc. HydroCAD® 10.00-24 s/n 03281 © 2018 HydroCAD Software Solutions LLC Events for Subcatchment PRE: Pre-Development Event Rainfall (inches) Runoff (cfs) Volume (acre-feet) Depth (inches) 1-YR 24-HR 2.94 12.58 0.890 1.40 2-YR 24-HR 3.54 17.09 1.205 1.89 10-YR 24-HR 5.17 29.88 2.119 3.33 25-YR 24-HR 6.16 37.79 2.700 4.24 50-YR 24-HR 6.96 44.21 3.177 4.99 100-YR 24-HR 7.78 50.79 3.672 5.77 B. Post-Development ESP Associates, Inc. 3475 Lakemont Blvd. Fort Mill, SC 29708 Phone 803-802-2440 Fax 803-802-2515 Time of Concentration (Tc) or Travel Time (Tt) Project By Date Location Checked Date Circle One: Present Developed 1. SHEET FLOW 1. Surface description (table 3-1)…………………………… 2. Manning's roughness coefficient, n (table 3-1)…………….. 3. Flow length, L (total L ≤ 300 ft)………………………....ft 4. Two-year 24-hour rainfall, P ………...…………………..in 5. Land slope, s …………………....……………………….ft/ft 6. Tt = 0.007 (nL)^0.8 …...………...hr 0.07 2. SHALLOW CONCENTRATED FLOW 7. Surface description (paved or unpaved)……………....… 8. Flow length, L …………….……….…......……...…….....ft 9. Watercourse slope, s …………….……..........……….ft/ft 10. Average velocity, V (figure 3-1)……………………….… 11. Tt = L …...……..hr 0.02 3. CHANNEL FLOW 12. Channel type (Pipe or Open Channel) 13. Cross sectional flow area, a ……………................……ft² 14. Wetted perimeter, pw ……………………..….…...…..ft 15. Hydraulic radius r = a/pw ……………..ft 16. Channel slope, s …………...…………….…………...ft/ft 17. Manning's roughness coefficient, n …...……….....…....... 18. V = [1.49 r^(2/3) s^(1/2)] / n Compute V …………..ft/s 19. Flow length, L …………….……………………………..ft 20. Tt = L …...……...hr 0.05 21. Watershed or subarea Tc or Tt (add Tt in steps 6, 11, and 19)Hr = 0.14 Min = 8.4 Reference:Urban Hydrology for Small Watersheds Rainfall, P, taken from Technical Release 55, Soil Conservation Service U.S. Department of Agriculture, June 1986 Compute Tt 0.02 +0.00 4.71 6.28 Pipe Pipe 1.77 3.14 C D 190 50 0.0252 0.0200 2.561 2.28 P2^0.5 s^0.4 SEGMENT ID B 4/24/2020 4/24/2020 SEGMENT ID A RCT MRR The Grove at Chestnut Park Indian Trail, Union County, NC Post-Dev TOC Unpaved 3600 V 0.005 0.012 0.012 4.57 5.53 521 302 Compute Tt 0.03 +0.02 Unpaved 3600 V SEGMENT ID Compute Tt 0.07 +0.00 Grass-Short Woods-Light 0.15 0.4 53 21 3.54 3.54 0.0400 0.0654 NCDENR BMP Design Manual, July 2007 Compute r 0.38 0.50 0.005 ESP Associates, Inc. Po Box 7030 Charlotte NC 28241 Post-Dev TOC The Grove at Chestnut Park - Pond 1 - TOC Calcs Post-Dev 4/27/2020 NCDENR BMP Design Manual, May 2013 Type II 24-hr 100-YR 24-HR Rainfall=7.78"The Grove at Chestnut Park - Wet Pond No. 1 Printed 4/27/2020Prepared by ESP Associates, Inc. HydroCAD® 10.00-24 s/n 03281 © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment POST: Post-Development Runoff = 72.57 cfs @ 11.99 hrs, Volume= 4.069 af, Depth= 6.59" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-150.00 hrs, dt= 0.01 hrs Type II 24-hr 100-YR 24-HR Rainfall=7.78" Area (ac) CN Description * 4.960 98 Impervious 2.450 74 >75% Grass cover, Good, HSG C 7.410 90 Weighted Average 2.450 33.06% Pervious Area 4.960 66.94% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 8.4 Direct Entry, Refer to TOC Calcs Post-Dev Spreadsheet Type II 24-hr 100-YR 24-HR Rainfall=7.78"The Grove at Chestnut Park - Wet Pond No. 1 Printed 4/27/2020Prepared by ESP Associates, Inc. HydroCAD® 10.00-24 s/n 03281 © 2018 HydroCAD Software Solutions LLC Summary for Pond WP1: Wet Pond No. 1 Inflow Area = 7.410 ac, 66.94% Impervious, Inflow Depth = 6.59" for 100-YR 24-HR event Inflow = 72.57 cfs @ 11.99 hrs, Volume= 4.069 af Outflow = 28.11 cfs @ 12.12 hrs, Volume= 2.853 af, Atten= 61%, Lag= 7.8 min Primary = 28.11 cfs @ 12.12 hrs, Volume= 2.853 af Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routing by Stor-Ind method, Time Span= 0.00-150.00 hrs, dt= 0.01 hrs Peak Elev= 689.72' @ 12.12 hrs Surf.Area= 12,612 sf Storage= 98,746 cf Plug-Flow detention time= 818.2 min calculated for 2.852 af (70% of inflow) Center-of-Mass det. time= 723.6 min ( 1,499.1 - 775.5 ) Volume Invert Avail.Storage Storage Description #1 672.00' 127,877 cf Custom Stage Data (Prismatic) Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 672.00 0 0 0 673.00 117 59 59 674.00 435 276 335 675.00 787 611 946 676.00 1,238 1,013 1,958 677.00 1,782 1,510 3,468 678.00 2,396 2,089 5,557 679.00 3,084 2,740 8,297 680.00 3,852 3,468 11,765 681.00 4,691 4,272 16,037 682.00 5,592 5,142 21,178 683.00 6,555 6,074 27,252 684.00 7,580 7,068 34,319 685.00 8,664 8,122 42,441 686.00 12,085 10,375 52,816 687.00 12,229 12,157 64,973 688.00 12,371 12,300 77,273 689.00 12,511 12,441 89,714 690.00 12,651 12,581 102,295 691.00 12,791 12,721 115,016 692.00 12,931 12,861 127,877 Device Routing Invert Outlet Devices #1 Primary 681.50'24.0" Round outlet pipe L= 19.0' RCP, sq.cut end projecting, Ke= 0.500 Inlet / Outlet Invert= 681.50' / 681.28' S= 0.0116 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 3.14 sf #2 Device 1 686.00'2.0" Vert. low flow orifice C= 0.600 #3 Device 1 688.25'30.0" W x 6.0" H Vert. Rectangular Weir C= 0.600 #4 Device 1 689.25'60.0" x 60.0" Horiz. top of riser C= 0.600 Limited to weir flow at low heads #5 Secondary 691.00'10.0' long x 10.0' breadth Top of Wall Type II 24-hr 100-YR 24-HR Rainfall=7.78"The Grove at Chestnut Park - Wet Pond No. 1 Printed 4/27/2020Prepared by ESP Associates, Inc. HydroCAD® 10.00-24 s/n 03281 © 2018 HydroCAD Software Solutions LLC Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=27.69 cfs @ 12.12 hrs HW=689.72' (Free Discharge) 1=outlet pipe (Passes 27.69 cfs of 40.64 cfs potential flow) 2=low flow orifice (Orifice Controls 0.20 cfs @ 9.18 fps) 3=Rectangular Weir (Orifice Controls 6.63 cfs @ 5.30 fps) 4=top of riser (Weir Controls 20.86 cfs @ 2.23 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=672.00' (Free Discharge) 5=Top of Wall ( Controls 0.00 cfs) Type II 24-hr 1-YR 24-HR Rainfall=2.94"The Grove at Chestnut Park - Wet Pond No. 1 Printed 4/27/2020Prepared by ESP Associates, Inc. HydroCAD® 10.00-24 s/n 03281 © 2018 HydroCAD Software Solutions LLC Pond WP1: Wet Pond No. 1 Inflow Outflow Primary Secondary Hydrograph Time (hours) 1501401301201101009080706050403020100Flow (cfs)24 22 20 18 16 14 12 10 8 6 4 2 0 Inflow Area=7.410 ac Peak Elev=685.91' Storage=51,890 cf 22.82 cfs 0.00 cfs 0.00 cfs 0.00 cfs Type II 24-hr 2-YR 24-HR Rainfall=3.54"The Grove at Chestnut Park - Wet Pond No. 1 Printed 4/27/2020Prepared by ESP Associates, Inc. HydroCAD® 10.00-24 s/n 03281 © 2018 HydroCAD Software Solutions LLC Pond WP1: Wet Pond No. 1 Inflow Outflow Primary Secondary Hydrograph Time (hours) 1501401301201101009080706050403020100Flow (cfs)32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Inflow Area=7.410 ac Peak Elev=686.95' Storage=64,412 cf 29.04 cfs 0.10 cfs 0.10 cfs 0.00 cfs Type II 24-hr 10-YR 24-HR Rainfall=5.17"The Grove at Chestnut Park - Wet Pond No. 1 Printed 4/27/2020Prepared by ESP Associates, Inc. HydroCAD® 10.00-24 s/n 03281 © 2018 HydroCAD Software Solutions LLC Pond WP1: Wet Pond No. 1 Inflow Outflow Primary Secondary Hydrograph Time (hours) 1501401301201101009080706050403020100Flow (cfs)50 45 40 35 30 25 20 15 10 5 0 Inflow Area=7.410 ac Peak Elev=688.49' Storage=83,329 cf 45.91 cfs 1.15 cfs 1.15 cfs 0.00 cfs Type II 24-hr 25-YR 24-HR Rainfall=6.16"The Grove at Chestnut Park - Wet Pond No. 1 Printed 4/27/2020Prepared by ESP Associates, Inc. HydroCAD® 10.00-24 s/n 03281 © 2018 HydroCAD Software Solutions LLC Pond WP1: Wet Pond No. 1 Inflow Outflow Primary Secondary Hydrograph Time (hours) 1501401301201101009080706050403020100Flow (cfs)60 55 50 45 40 35 30 25 20 15 10 5 0 Inflow Area=7.410 ac Peak Elev=688.85' Storage=87,851 cf 56.07 cfs 3.62 cfs 3.62 cfs 0.00 cfs Type II 24-hr 50-YR 24-HR Rainfall=6.96"The Grove at Chestnut Park - Wet Pond No. 1 Printed 4/27/2020Prepared by ESP Associates, Inc. HydroCAD® 10.00-24 s/n 03281 © 2018 HydroCAD Software Solutions LLC Pond WP1: Wet Pond No. 1 Inflow Outflow Primary Secondary Hydrograph Time (hours) 1501401301201101009080706050403020100Flow (cfs)70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Inflow Area=7.410 ac Peak Elev=689.37' Storage=94,375 cf 64.24 cfs 8.84 cfs 8.84 cfs 0.00 cfs Type II 24-hr 100-YR 24-HR Rainfall=7.78"The Grove at Chestnut Park - Wet Pond No. 1 Printed 4/27/2020Prepared by ESP Associates, Inc. HydroCAD® 10.00-24 s/n 03281 © 2018 HydroCAD Software Solutions LLC Pond WP1: Wet Pond No. 1 Inflow Outflow Primary Secondary Hydrograph Time (hours) 1501401301201101009080706050403020100Flow (cfs)80 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 Inflow Area=7.410 ac Peak Elev=689.72' Storage=98,746 cf 72.57 cfs 28.11 cfs 28.11 cfs 0.00 cfs Type II 24-hr 100-YR 24-HR Rainfall=7.78"The Grove at Chestnut Park - Wet Pond No. 1 Printed 4/27/2020Prepared by ESP Associates, Inc. HydroCAD® 10.00-24 s/n 03281 © 2018 HydroCAD Software Solutions LLC Stage-Area-Storage for Pond WP1: Wet Pond No. 1 Elevation (feet) Surface (sq-ft) Storage (cubic-feet) 672.00 0 0 672.20 23 12 672.40 47 23 672.60 70 35 672.80 94 47 673.00 117 59 673.20 181 114 673.40 244 169 673.60 308 224 673.80 371 279 674.00 435 335 674.20 505 457 674.40 576 579 674.60 646 701 674.80 717 823 675.00 787 946 675.20 877 1,148 675.40 967 1,350 675.60 1,058 1,553 675.80 1,148 1,755 676.00 1,238 1,958 676.20 1,347 2,260 676.40 1,456 2,562 676.60 1,564 2,864 676.80 1,673 3,166 677.00 1,782 3,468 677.20 1,905 3,886 677.40 2,028 4,304 677.60 2,150 4,721 677.80 2,273 5,139 678.00 2,396 5,557 678.20 2,534 6,105 678.40 2,671 6,653 678.60 2,809 7,201 678.80 2,946 7,749 679.00 3,084 8,297 679.20 3,238 8,991 679.40 3,391 9,684 679.60 3,545 10,378 679.80 3,698 11,071 680.00 3,852 11,765 680.20 4,020 12,619 680.40 4,188 13,474 680.60 4,355 14,328 680.80 4,523 15,182 681.00 4,691 16,037 681.20 4,871 17,065 681.40 5,051 18,093 681.60 5,232 19,121 681.80 5,412 20,150 682.00 5,592 21,178 682.20 5,785 22,393 Elevation (feet) Surface (sq-ft) Storage (cubic-feet) 682.40 5,977 23,607 682.60 6,170 24,822 682.80 6,362 26,037 683.00 6,555 27,252 683.20 6,760 28,665 683.40 6,965 30,078 683.60 7,170 31,492 683.80 7,375 32,905 684.00 7,580 34,319 684.20 7,797 35,943 684.40 8,014 37,568 684.60 8,230 39,192 684.80 8,447 40,817 685.00 8,664 42,441 685.20 9,348 44,516 685.40 10,032 46,591 685.60 10,717 48,666 685.80 11,401 50,741 686.00 12,085 52,816 686.20 12,114 55,247 686.40 12,143 57,678 686.60 12,171 60,110 686.80 12,200 62,541 687.00 12,229 64,973 687.20 12,257 67,433 687.40 12,286 69,892 687.60 12,314 72,353 687.80 12,343 74,812 688.00 12,371 77,273 688.20 12,399 79,761 688.40 12,427 82,249 688.60 12,455 84,737 688.80 12,483 87,225 689.00 12,511 89,714 689.20 12,539 92,230 689.40 12,567 94,746 689.60 12,595 97,262 689.80 12,623 99,778 690.00 12,651 102,295 690.20 12,679 104,839 690.40 12,707 107,383 690.60 12,735 109,927 690.80 12,763 112,471 691.00 12,791 115,016 691.20 12,819 117,588 691.40 12,847 120,160 691.60 12,875 122,732 691.80 12,903 125,304 692.00 12,931 127,877 Type II 24-hr 100-YR 24-HR Rainfall=7.78"The Grove at Chestnut Park - Wet Pond No. 1 Printed 4/27/2020Prepared by ESP Associates, Inc. HydroCAD® 10.00-24 s/n 03281 © 2018 HydroCAD Software Solutions LLC Events for Pond WP1: Wet Pond No. 1 Event Inflow (cfs) Outflow (cfs) Primary (cfs) Secondary (cfs) Elevation (feet) Storage (cubic-feet) 1-YR 24-HR 22.82 0.00 0.00 0.00 685.91 51,890 2-YR 24-HR 29.04 0.10 0.10 0.00 686.95 64,412 10-YR 24-HR 45.91 1.15 1.15 0.00 688.49 83,329 25-YR 24-HR 56.07 3.62 3.62 0.00 688.85 87,851 50-YR 24-HR 64.24 8.84 8.84 0.00 689.37 94,375 100-YR 24-HR 72.57 28.11 28.11 0.00 689.72 98,746 C. Pond Calculations Basin ID:Required Designer Input=Project Name:Project # :Designer:Date: 04/24/20Rev 1:4.96 ac216,057.60 sf2.45 ac106,722.00 sf0.00 ac7.41 ac 322,779.60 sfPerform Water Balance Calcs.66.94%1.00-inI = 66.94%Rv = 0.65V(design) = 0.40-ac-ft17,549.24-cfVmp =42,749.94-cfTotal Impervious Area:Total Pervious Area:Percent BUA:WQv = (1 x 0.43 x 13.33)/12Calculate The Design VolumeDesign Rainfall:Total Area:Determine the Runoff Coefficient (Rv) for the 1-in rainfallRv = 0.05 + 0.9 x (I)WQv = Design Rainfall x Rv x Onsite Drainage Area Rv is 0.43Design Rainfall is 1 InchDrainage Area is 7.41 AcresR. TurnerWet Detention Basin WorksheetWet Pond No. 1The Grove at Chestnut ParkHT35.400Basin Drainage Area SummaryCalculate The Required Main Pool VolumeDetermine the Water Quality Volume (WQv)Total Future Impervious Area: V(forebay) = 20% of Vmp =8,549.99-cf686.00-ft685.00-ftRequired Permanent Pool Volume:51,299.92-cfForebay Crest Elevation =685.00-ftElev. Forebay Area Main Bay Area Total Area Forebay Incr. Vol. Forebay Accumulated Vol.Main Bay Incr. Vol.Main Bay Accumulated Vol.Total Accumulated Vol.672.00 .00 sf .00 sf .00 sf 0.00-cf 0.00-cf 0.00-cf 0.00-cf0.00-cf673.00 .00 sf 117.00 sf 117.00 sf 0.00-cf 0.00-cf 58.50-cf 58.50-cf58.50-cf674.00 .00 sf 435.00 sf 435.00 sf 0.00-cf 0.00-cf 276.00-cf 334.50-cf334.50-cf675.00 .00 sf 787.00 sf 787.00 sf 0.00-cf 0.00-cf 611.00-cf 945.50-cf945.50-cf676.00 64.00 sf 1,174.00 sf 1,238.00 sf 32.00-cf 32.00-cf 980.50-cf 1,926.00-cf1,958.00-cf677.00 183.00 sf 1,599.00 sf 1,782.00 sf 123.50-cf 155.50-cf 1,386.50-cf 3,312.50-cf3,468.00-cf678.00 335.00 sf 2,061.00 sf 2,396.00 sf 259.00-cf 414.50-cf 1,830.00-cf 5,142.50-cf5,557.00-cf679.00 519.00 sf 2,565.00 sf 3,084.00 sf 427.00-cf 841.50-cf 2,313.00-cf 7,455.50-cf8,297.00-cf680.00 735.00 sf 3,117.00 sf 3,852.00 sf 627.00-cf 1,468.50-cf 2,841.00-cf 10,296.50-cf11,765.00-cf681.00 983.00 sf 3,708.00 sf 4,691.00 sf 859.00-cf 2,327.50-cf 3,412.50-cf 13,709.00-cf16,036.50-cf682.00 1,261.00 sf 4,331.00 sf 5,592.00 sf 1,122.00-cf 3,449.50-cf 4,019.50-cf 17,728.50-cf21,178.00-cf683.00 1,567.00 sf 4,988.00 sf 6,555.00 sf 1,414.00-cf 4,863.50-cf 4,659.50-cf 22,388.00-cf27,251.50-cf684.00 1,903.00 sf 5,677.00 sf 7,580.00 sf 1,735.00-cf 6,598.50-cf 5,332.50-cf 27,720.50-cf34,319.00-cf685.00 2,266.00 sf 6,398.00 sf 8,664.00 sf 2,084.50-cf 8,683.00-cf 6,037.50-cf 33,758.00-cf42,441.00-cf686.00 .00 sf 12,085.00 sf 12,085.00 sf 0.00-cf 8,683.00-cf 9,241.50-cf 42,999.50-cf51,682.50-cf% Forebay =20.19%Required PPE = 685.96-ftProposed PPE =686.00-ftElev.Incr. Vol. Accumul. Vol.686.000.00 cf51,682.50 cf687.0012,157.00 cf63,839.50 cf688.0012,300.00 cf76,139.50 cf689.0012,441.00 cf88,580.50 cf690.0012,581.00 cf101,161.50 cf691.0012,721.00 cf113,882.50 cf692.0012,861.00 cf126,743.50 cf12,651.00 sf12,931.00 sfBasin Permanent Pool Stage/Storage12,229.00 sf12,511.00 sfBasin Detention Stage/Storage Above Permanent Pool ElevationContour Area12,085.00 sf12,371.00 sf12,791.00 sfAssumed Elev. Of Permanent Pool:Elevation at Bottom of Littoral Shelf:Calculate the Permanent Pool Elevation from Proposed Contours with ForebayCalculate The Required Forebay Volume PPE = 686.00-ftP.P. Perimeter = 490.00-ftVpp = 42,999.50-cfApp = 12,085.00-sfBottom of Shelf Elev = 685.00-ftA(bottom of shelf) = 8,664.00-sfV(shelf) = 2,450.00-cfDavg = 4.68-ftCalculate the Average Depth of the Pond See Town of Indian Trail Post Construction Storm Water Ordinance - Section 3.303.B1-year, 24-hour Storm Pre-Development Runoff Volume =37,635.84-cf(See Hydraflow Hydrographs)1-year, 24-hour Storm Post-Development Runoff Volume =56,130.00-cf(See Hydraflow Hydrographs)Difference =18,494.16-cfVpp = 51,682.50-cfStorm Water Volume Control Volume = 70,176.66-cfStorm Water Volume Control Elevation = 687.51-ftC = 0.6A = 3.14 in2g = 32.2 ft/secH = 0.76 ftOrifice Diameter = 2.00 inQout = 0.09 cfsDrawdown Time = 2.34 daysOK1" Design Volume =17,549.24-cf1" Design Elevation =687.44-cfC = 0.6A = 3.14 in2g = 32.2 ft/secH = 0.72 ftOrifice Diameter = 2.00 inQout = 0.09 cfsDrawdown Time = 2.28 daysOKDetermine The Orifice Size of the Riser StructureCheck 1" Design Volume:2. Type II 24-hr 100-YR 24-HR Rainfall=7.78"The Grove at Chestnut Park - Wet Pond No. 1 Printed 4/27/2020Prepared by ESP Associates, Inc. HydroCAD® 10.00-24 s/n 03281 © 2018 HydroCAD Software Solutions LLC Summary for Pond WP1: Wet Pond No. 1 Inflow Area = 7.410 ac, 66.94% Impervious, Inflow Depth = 6.59" for 100-YR 24-HR event Inflow = 72.57 cfs @ 11.99 hrs, Volume= 4.069 af Outflow = 28.11 cfs @ 12.12 hrs, Volume= 2.853 af, Atten= 61%, Lag= 7.8 min Primary = 28.11 cfs @ 12.12 hrs, Volume= 2.853 af Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routing by Stor-Ind method, Time Span= 0.00-150.00 hrs, dt= 0.01 hrs Peak Elev= 689.72' @ 12.12 hrs Surf.Area= 12,612 sf Storage= 98,746 cf Plug-Flow detention time= 818.2 min calculated for 2.852 af (70% of inflow) Center-of-Mass det. time= 723.6 min ( 1,499.1 - 775.5 ) Volume Invert Avail.Storage Storage Description #1 672.00' 127,877 cf Custom Stage Data (Prismatic) Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 672.00 0 0 0 673.00 117 59 59 674.00 435 276 335 675.00 787 611 946 676.00 1,238 1,013 1,958 677.00 1,782 1,510 3,468 678.00 2,396 2,089 5,557 679.00 3,084 2,740 8,297 680.00 3,852 3,468 11,765 681.00 4,691 4,272 16,037 682.00 5,592 5,142 21,178 683.00 6,555 6,074 27,252 684.00 7,580 7,068 34,319 685.00 8,664 8,122 42,441 686.00 12,085 10,375 52,816 687.00 12,229 12,157 64,973 688.00 12,371 12,300 77,273 689.00 12,511 12,441 89,714 690.00 12,651 12,581 102,295 691.00 12,791 12,721 115,016 692.00 12,931 12,861 127,877 Device Routing Invert Outlet Devices #1 Primary 681.50'24.0" Round outlet pipe L= 19.0' RCP, sq.cut end projecting, Ke= 0.500 Inlet / Outlet Invert= 681.50' / 681.28' S= 0.0116 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 3.14 sf #2 Device 1 686.00'2.0" Vert. low flow orifice C= 0.600 #3 Device 1 688.25'30.0" W x 6.0" H Vert. Rectangular Weir C= 0.600 #4 Device 1 689.25'60.0" x 60.0" Horiz. top of riser C= 0.600 Limited to weir flow at low heads #5 Secondary 691.00'10.0' long x 10.0' breadth Top of Wall Type II 24-hr 100-YR 24-HR Rainfall=7.78"The Grove at Chestnut Park - Wet Pond No. 1 Printed 4/27/2020Prepared by ESP Associates, Inc. HydroCAD® 10.00-24 s/n 03281 © 2018 HydroCAD Software Solutions LLC Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=27.69 cfs @ 12.12 hrs HW=689.72' (Free Discharge) 1=outlet pipe (Passes 27.69 cfs of 40.64 cfs potential flow) 2=low flow orifice (Orifice Controls 0.20 cfs @ 9.18 fps) 3=Rectangular Weir (Orifice Controls 6.63 cfs @ 5.30 fps) 4=top of riser (Weir Controls 20.86 cfs @ 2.23 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=672.00' (Free Discharge) 5=Top of Wall ( Controls 0.00 cfs) TOTAL DRAINAGE AREA:7.41AC POND X-SEC AREA AT TOP OF POND:12,931SQ FT 0.30 ACPERMANENT POOL POND X-SEC AREA:12,0850.28 AC BOTTOM OF POND ELEV:672.00 INFILTRATION RATE (Kh):0.10FT/DAY (CLAY LINER) POND X-SEC AREA AT BOTTOM:0SQ FT 0.00 ACHYDRAULIC GRADIENT (Gh): 1 HEAD/DISTANCE RUNOFF RATE:0.65PERM POOL ELEVATION686FT. APPROX. STORAGE VOL. TO PERM. POOL: 1.94 ACRE-FEET TO PERMANENT POOL ELEV.JULYAUGUSTSEPTEMBEROCTOBERNOVEMBERDECEMBERJANUARYFEBRUARYMARCHAPRILMAYJUNEDAYS/MONTH313130313031312931303130PRECIPITATION (IN.)3.963.723.483.363.243.483.723.844.442.643.843.36EVAPORATION (IN.)4.84.53.32.41.51.11.21.52.53.74.44.6RUNOFF (AC-FT)1.381.291.211.171.131.211.291.341.550.921.341.17POND PRECIPITATION (AC-FT)0.0980.0920.0860.0830.0800.0860.0920.0950.1100.0650.0950.083EVAPORATION (AC-FT)0.1190.1110.0820.0590.0370.0270.0300.0370.0620.0920.1090.114INFILTRATION (AC-FT/DAY)0.860.860.830.860.830.860.860.800.860.830.860.83MONTHLY BALANCE (AC-FT):0.500.420.380.330.340.410.500.590.730.060.460.31RUNNING BALANCE OF RETAINED POND VOLUME (AC-FT)0.50 0.91 0.38 0.33 0.34 0.41 0.50 0.59 0.73 0.06 0.46 0.31POND WATER SURFACE ELEVATION (FT.)686.1686.0686.0686.0686.0686.0686.0686.0686.0686.0686.0686.0WATER SURFACE WITH RESPECT TO PERM. POOL ELEVATION (FT.)0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0JANUARYFEBRUARYMARCHAPRILMAYJUNEJULYAUGUSTSEPTEMBEROCTOBERNOVEMBERDECEMBERDAYS/MONTH312931303130313130313031PRECIPITATION (IN.)3.723.844.442.643.843.363.963.723.483.363.243.48EVAPORATION (IN.)1.21.52.53.74.44.64.84.53.32.41.51.1RUNOFF (AC-FT)1.291.341.550.921.341.171.381.291.211.171.131.21POND PRECIPITATION (AC-FT)0.0920.0950.1100.0650.0950.0830.0980.0920.0860.0830.0800.086EVAPORATION (AC-FT)0.0300.0370.0620.0920.1090.1140.1190.1110.0820.0590.0370.027INFILTRATION (AC-FT/DAY)0.860.800.860.830.860.830.860.860.830.860.830.86MONTHLY BALANCE (AC-FT):0.500.590.730.060.460.310.500.420.380.330.340.41RUNNING BALANCE OF RETAINED POND VOLUME (AC-FT)0.00 0.59 1.32 1.38 1.85 1.94 1.94 1.94 1.94 1.94 1.94 1.94POND WATER SURFACE ELEVATION (FT.)686.0686.0686.0686.0686.0686.0686.0686.0686.0686.0686.0686.0WATER SURFACE WITH RESPECT TO PERM. POOL ELEVATION (FT.)0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0THE GROVE AT CHESTNUT PARKTOWN OF INDIAN TRAIL, UNION COUNTY, NCWET POND NO. 1 - WATER BALANCE THE GROVE AT CHESTNUT PARK Unit wt. of concrete (pcf) =150 lb/ft3 Unit wt. of H2O =62.4 lb/ft3 TOP OF RISER ELEV. = 689.25 ft INV. OUT OF RISER ELEV. = 681.50 ft INT. WIDTH OF RISER = 60 in INT. LENGTH OF RISER = 60 in WALL THICK. OF RISER = 6 in BASE THICK. OF RISER = 6 in VOL. OF RISER = 297.0 ft3 BUOYANT FORCE =18532.8 lbs Vol. of Riser x Unit wt. of H2O VOL. CONC. IN RISER =103.25 ft3 SINKING FORCE OF RISER = 9044.7 lbs Vol. of Conc. x (Unit wt. of Conc. - Unit wt. of H 2O) CONC. PAD THICKNESS =30 in CONC. PAD WIDTH/LENGTH =8 ft VOL. OF CONC. PAD =160.00 ft3 L x W x H / Pad Thickness SINKING FORCE OF PAD =14016 lbs Vol. of Pad x (Unit wt. of Conc. - Unit wt. of H 2O) TOTAL SINKING FORCE =23060.7 lbs F.S. = 1.24 OK F.S. MUST BE GREATER THAN 1.10 CONCRETE ANCHOR BUOYANCY CALCULATIONS WET POND NO. 1 JB#C3 Factor of safety = SINKING FORCE BUOYANT FORCE D. Post-Development Bypass Area (CB#C1 and CB#C2) Type II 24-hr 100-YR 24-HR Rainfall=7.78"The Grove at Chestnut Park - Wet Pond No. 1 Printed 4/24/2020Prepared by ESP Associates, Inc. HydroCAD® 10.00-24 s/n 03281 © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment BYPASS: Post-Dev Bypass (C1 & C2) Runoff = 2.64 cfs @ 11.96 hrs, Volume= 0.145 af, Depth= 7.54" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-150.00 hrs, dt= 0.01 hrs Type II 24-hr 100-YR 24-HR Rainfall=7.78" Area (ac) CN Description * 0.230 98 CB#C1 and CB#C2 0.230 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Minimum Time of Concentration Type II 24-hr 1-YR 24-HR Rainfall=2.94"The Grove at Chestnut Park - Wet Pond No. 1 Printed 4/24/2020Prepared by ESP Associates, Inc. HydroCAD® 10.00-24 s/n 03281 © 2018 HydroCAD Software Solutions LLC Subcatchment BYPASS: Post-Dev Bypass (C1 & C2) Runoff Hydrograph Time (hours) 1501401301201101009080706050403020100Flow (cfs)1 0 Type II 24-hr 1-YR 24-HR Rainfall=2.94" Runoff Area=0.230 ac Runoff Volume=0.052 af Runoff Depth=2.71" Tc=5.0 min CN=98 0.98 cfs Type II 24-hr 2-YR 24-HR Rainfall=3.54"The Grove at Chestnut Park - Wet Pond No. 1 Printed 4/24/2020Prepared by ESP Associates, Inc. HydroCAD® 10.00-24 s/n 03281 © 2018 HydroCAD Software Solutions LLC Subcatchment BYPASS: Post-Dev Bypass (C1 & C2) Runoff Hydrograph Time (hours) 1501401301201101009080706050403020100Flow (cfs)1 0 Type II 24-hr 2-YR 24-HR Rainfall=3.54" Runoff Area=0.230 ac Runoff Volume=0.063 af Runoff Depth=3.31" Tc=5.0 min CN=98 1.19 cfs Type II 24-hr 10-YR 24-HR Rainfall=5.17"The Grove at Chestnut Park - Wet Pond No. 1 Printed 4/24/2020Prepared by ESP Associates, Inc. HydroCAD® 10.00-24 s/n 03281 © 2018 HydroCAD Software Solutions LLC Subcatchment BYPASS: Post-Dev Bypass (C1 & C2) Runoff Hydrograph Time (hours) 1501401301201101009080706050403020100Flow (cfs)1 0 Type II 24-hr 10-YR 24-HR Rainfall=5.17" Runoff Area=0.230 ac Runoff Volume=0.095 af Runoff Depth=4.93" Tc=5.0 min CN=98 1.75 cfs Type II 24-hr 25-YR 24-HR Rainfall=6.16"The Grove at Chestnut Park - Wet Pond No. 1 Printed 4/24/2020Prepared by ESP Associates, Inc. HydroCAD® 10.00-24 s/n 03281 © 2018 HydroCAD Software Solutions LLC Subcatchment BYPASS: Post-Dev Bypass (C1 & C2) Runoff Hydrograph Time (hours) 1501401301201101009080706050403020100Flow (cfs)2 1 0 Type II 24-hr 25-YR 24-HR Rainfall=6.16" Runoff Area=0.230 ac Runoff Volume=0.113 af Runoff Depth=5.92" Tc=5.0 min CN=98 2.08 cfs Type II 24-hr 50-YR 24-HR Rainfall=6.96"The Grove at Chestnut Park - Wet Pond No. 1 Printed 4/24/2020Prepared by ESP Associates, Inc. HydroCAD® 10.00-24 s/n 03281 © 2018 HydroCAD Software Solutions LLC Subcatchment BYPASS: Post-Dev Bypass (C1 & C2) Runoff Hydrograph Time (hours) 1501401301201101009080706050403020100Flow (cfs)2 1 0 Type II 24-hr 50-YR 24-HR Rainfall=6.96" Runoff Area=0.230 ac Runoff Volume=0.129 af Runoff Depth=6.72" Tc=5.0 min CN=98 2.36 cfs Type II 24-hr 100-YR 24-HR Rainfall=7.78"The Grove at Chestnut Park - Wet Pond No. 1 Printed 4/24/2020Prepared by ESP Associates, Inc. HydroCAD® 10.00-24 s/n 03281 © 2018 HydroCAD Software Solutions LLC Subcatchment BYPASS: Post-Dev Bypass (C1 & C2) Runoff Hydrograph Time (hours) 1501401301201101009080706050403020100Flow (cfs)2 1 0 Type II 24-hr 100-YR 24-HR Rainfall=7.78" Runoff Area=0.230 ac Runoff Volume=0.145 af Runoff Depth=7.54" Tc=5.0 min CN=98 2.64 cfs Type II 24-hr 100-YR 24-HR Rainfall=7.78"The Grove at Chestnut Park - Wet Pond No. 1 Printed 4/24/2020Prepared by ESP Associates, Inc. HydroCAD® 10.00-24 s/n 03281 © 2018 HydroCAD Software Solutions LLC Events for Subcatchment BYPASS: Post-Dev Bypass (C1 & C2) Event Rainfall (inches) Runoff (cfs) Volume (acre-feet) Depth (inches) 1-YR 24-HR 2.94 0.98 0.052 2.71 2-YR 24-HR 3.54 1.19 0.063 3.31 10-YR 24-HR 5.17 1.75 0.095 4.93 25-YR 24-HR 6.16 2.08 0.113 5.92 50-YR 24-HR 6.96 2.36 0.129 6.72 100-YR 24-HR 7.78 2.64 0.145 7.54 E. Total Post-Development Flows Type II 24-hr 100-YR 24-HR Rainfall=7.78"The Grove at Chestnut Park - Wet Pond No. 1 Printed 4/27/2020Prepared by ESP Associates, Inc. HydroCAD® 10.00-24 s/n 03281 © 2018 HydroCAD Software Solutions LLC Summary for Reach Total: Post-Dev Total Total Post-Development Discharges [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 7.640 ac, 67.93% Impervious, Inflow Depth = 4.71" for 100-YR 24-HR event Inflow = 28.55 cfs @ 12.12 hrs, Volume= 2.997 af Outflow = 28.55 cfs @ 12.12 hrs, Volume= 2.997 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-150.00 hrs, dt= 0.01 hrs Type II 24-hr 1-YR 24-HR Rainfall=2.94"The Grove at Chestnut Park - Wet Pond No. 1 Printed 4/27/2020Prepared by ESP Associates, Inc. HydroCAD® 10.00-24 s/n 03281 © 2018 HydroCAD Software Solutions LLC Reach Total: Post-Dev Total Inflow Outflow Hydrograph Time (hours) 1501401301201101009080706050403020100Flow (cfs)1 0 Inflow Area=7.640 ac 0.98 cfs 0.98 cfs Type II 24-hr 2-YR 24-HR Rainfall=3.54"The Grove at Chestnut Park - Wet Pond No. 1 Printed 4/27/2020Prepared by ESP Associates, Inc. HydroCAD® 10.00-24 s/n 03281 © 2018 HydroCAD Software Solutions LLC Reach Total: Post-Dev Total Inflow Outflow Hydrograph Time (hours) 1501401301201101009080706050403020100Flow (cfs)1 0 Inflow Area=7.640 ac 1.19 cfs 1.19 cfs Type II 24-hr 10-YR 24-HR Rainfall=5.17"The Grove at Chestnut Park - Wet Pond No. 1 Printed 4/27/2020Prepared by ESP Associates, Inc. HydroCAD® 10.00-24 s/n 03281 © 2018 HydroCAD Software Solutions LLC Reach Total: Post-Dev Total Inflow Outflow Hydrograph Time (hours) 1501401301201101009080706050403020100Flow (cfs)1 0 Inflow Area=7.640 ac 1.75 cfs 1.75 cfs Type II 24-hr 25-YR 24-HR Rainfall=6.16"The Grove at Chestnut Park - Wet Pond No. 1 Printed 4/27/2020Prepared by ESP Associates, Inc. HydroCAD® 10.00-24 s/n 03281 © 2018 HydroCAD Software Solutions LLC Reach Total: Post-Dev Total Inflow Outflow Hydrograph Time (hours) 1501401301201101009080706050403020100Flow (cfs)4 3 2 1 0 Inflow Area=7.640 ac 3.73 cfs 3.73 cfs Type II 24-hr 50-YR 24-HR Rainfall=6.96"The Grove at Chestnut Park - Wet Pond No. 1 Printed 4/27/2020Prepared by ESP Associates, Inc. HydroCAD® 10.00-24 s/n 03281 © 2018 HydroCAD Software Solutions LLC Reach Total: Post-Dev Total Inflow Outflow Hydrograph Time (hours) 1501401301201101009080706050403020100Flow (cfs)10 9 8 7 6 5 4 3 2 1 0 Inflow Area=7.640 ac 9.08 cfs 9.08 cfs Type II 24-hr 100-YR 24-HR Rainfall=7.78"The Grove at Chestnut Park - Wet Pond No. 1 Printed 4/27/2020Prepared by ESP Associates, Inc. HydroCAD® 10.00-24 s/n 03281 © 2018 HydroCAD Software Solutions LLC Reach Total: Post-Dev Total Inflow Outflow Hydrograph Time (hours) 1501401301201101009080706050403020100Flow (cfs)30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 Inflow Area=7.640 ac 28.55 cfs 28.55 cfs Type II 24-hr 100-YR 24-HR Rainfall=7.78"The Grove at Chestnut Park - Wet Pond No. 1 Printed 4/27/2020Prepared by ESP Associates, Inc. HydroCAD® 10.00-24 s/n 03281 © 2018 HydroCAD Software Solutions LLC Events for Reach Total: Post-Dev Total Event Inflow (cfs) Outflow (cfs) Elevation (feet) Storage (cubic-feet) 1-YR 24-HR 0.98 0.98 0.00 0 2-YR 24-HR 1.19 1.19 0.00 0 10-YR 24-HR 1.75 1.75 0.00 0 25-YR 24-HR 3.73 3.73 0.00 0 50-YR 24-HR 9.08 9.08 0.00 0 100-YR 24-HR 28.55 28.55 0.00 0 The Grove at Chestnut Park Prepared by ESP Associates, Inc. Pre- Wet Bypass Post Pre vs Post Development Pond Area Development Difference (cfs) (cfs) (cfs) (cfs) (cfs) 1-yr Storm 12.58 0.00 0.98 0.98 -11.60 2-yr Storm 17.09 0.10 1.19 1.29 -15.80 10-yr Storm 29.88 1.15 1.75 2.90 -26.98 25-yr Storm 37.79 3.62 2.08 5.70 -32.09 50-yr Storm 44.21 8.84 2.36 11.20 -33.01 100-yr Storm 50.79 28.11 2.64 30.75 -20.04 Pre. Vs Post. Development Discharge Summary Table F. Watershed Schematic BYPASS Post-Dev Bypass (C1 & C2) POST Post-Development PRE Pre-Development Total Post-Dev Total WP1 Wet Pond No. 1 Routing Diagram for The Grove at Chestnut Park - Wet Pond No. 1 Prepared by ESP Associates, Inc., Printed 4/27/2020 HydroCAD® 10.00-24 s/n 03281 © 2018 HydroCAD Software Solutions LLC Subcat Reach Pond Link 11. Appendix 11A. Runoff Coefficients 11B. Rainfall Data NOAA Atlas 14, Volume 2, Version 3 Location name: Indian Trail, North Carolina, USA* Latitude: 35.0623°, Longitude: -80.6596° Elevation: 668.06 ft** * source: ESRI Maps ** source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF_tabular | PF_graphical | Maps_&_aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Duration Average recurrence interval (years) 1 2 5 10 25 50 100 200 500 1000 5-min 0.416 (0.384‑0.452) 0.492 (0.453‑0.535) 0.571 (0.525‑0.621) 0.629 (0.576‑0.682) 0.694 (0.634‑0.752) 0.740 (0.672‑0.801) 0.781 (0.706‑0.846) 0.818 (0.736‑0.886) 0.859 (0.766‑0.933) 0.888 (0.786‑0.966) 10-min 0.665 (0.613‑0.722) 0.787 (0.724‑0.856) 0.914 (0.840‑0.995) 1.01 (0.922‑1.09) 1.11 (1.01‑1.20) 1.18 (1.07‑1.28) 1.24 (1.12‑1.34) 1.30 (1.17‑1.40) 1.36 (1.21‑1.48) 1.40 (1.24‑1.52) 15-min 0.831 (0.766‑0.902) 0.989 (0.910‑1.08) 1.16 (1.06‑1.26) 1.27 (1.17‑1.38) 1.40 (1.28‑1.52) 1.49 (1.36‑1.62) 1.57 (1.42‑1.70) 1.64 (1.47‑1.77) 1.71 (1.53‑1.86) 1.76 (1.55‑1.91) 30-min 1.14 (1.05‑1.24) 1.37 (1.26‑1.49) 1.64 (1.51‑1.79) 1.84 (1.69‑2.00) 2.08 (1.90‑2.25) 2.25 (2.04‑2.43) 2.40 (2.17‑2.60) 2.55 (2.29‑2.76) 2.72 (2.43‑2.96) 2.84 (2.52‑3.09) 60-min 1.42 (1.31‑1.54) 1.71 (1.58‑1.87) 2.11 (1.94‑2.29) 2.40 (2.20‑2.60) 2.77 (2.53‑3.00) 3.04 (2.77‑3.30) 3.31 (2.99‑3.58) 3.57 (3.21‑3.87) 3.91 (3.48‑4.24) 4.15 (3.67‑4.51) 2-hr 1.64 (1.51‑1.80) 1.99 (1.82‑2.18) 2.47 (2.26‑2.70) 2.83 (2.58‑3.09) 3.30 (2.99‑3.59) 3.65 (3.30‑3.98) 4.01 (3.60‑4.36) 4.36 (3.89‑4.75) 4.82 (4.26‑5.26) 5.17 (4.53‑5.65) 3-hr 1.75 (1.60‑1.92) 2.11 (1.93‑2.32) 2.63 (2.40‑2.89) 3.04 (2.77‑3.32) 3.58 (3.24‑3.92) 4.01 (3.61‑4.38) 4.44 (3.98‑4.84) 4.89 (4.34‑5.33) 5.50 (4.82‑6.00) 5.98 (5.18‑6.53) 6-hr 2.10 (1.92‑2.30) 2.53 (2.32‑2.78) 3.16 (2.89‑3.47) 3.66 (3.34‑4.00) 4.33 (3.93‑4.72) 4.86 (4.38‑5.29) 5.41 (4.84‑5.89) 5.97 (5.29‑6.50) 6.76 (5.90‑7.34) 7.37 (6.37‑8.01) 12-hr 2.48 (2.28‑2.72) 3.00 (2.76‑3.30) 3.76 (3.45‑4.13) 4.37 (3.99‑4.79) 5.21 (4.72‑5.69) 5.90 (5.30‑6.42) 6.60 (5.88‑7.18) 7.34 (6.47‑7.98) 8.38 (7.27‑9.10) 9.22 (7.89‑10.0) 24-hr 2.94 (2.72‑3.18) 3.54 (3.28‑3.84) 4.45 (4.11‑4.82) 5.17 (4.77‑5.60) 6.16 (5.66‑6.67) 6.96 (6.38‑7.53) 7.78 (7.11‑8.43) 8.64 (7.86‑9.37) 9.84 (8.90‑10.7) 10.8 (9.72‑11.7) 2-day 3.46 (3.20‑3.74) 4.16 (3.86‑4.51) 5.19 (4.80‑5.63) 6.01 (5.54‑6.51) 7.13 (6.56‑7.72) 8.03 (7.37‑8.70) 8.96 (8.19‑9.71) 9.93 (9.04‑10.8) 11.3 (10.2‑12.3) 12.4 (11.1‑13.5) 3-day 3.66 (3.40‑3.95) 4.40 (4.08‑4.76) 5.46 (5.06‑5.90) 6.30 (5.82‑6.81) 7.46 (6.88‑8.06) 8.39 (7.71‑9.07) 9.35 (8.57‑10.1) 10.4 (9.44‑11.2) 11.7 (10.7‑12.8) 12.9 (11.6‑14.0) 4-day 3.87 (3.60‑4.17) 4.64 (4.31‑5.00) 5.73 (5.32‑6.18) 6.60 (6.11‑7.11) 7.80 (7.19‑8.41) 8.76 (8.06‑9.45) 9.74 (8.94‑10.5) 10.8 (9.85‑11.6) 12.2 (11.1‑13.2) 13.4 (12.1‑14.5) 7-day 4.47 (4.18‑4.80) 5.34 (5.00‑5.72) 6.50 (6.08‑6.97) 7.44 (6.94‑7.97) 8.73 (8.11‑9.35) 9.76 (9.04‑10.5) 10.8 (10.00‑11.6) 11.9 (11.0‑12.8) 13.5 (12.3‑14.5) 14.7 (13.4‑15.9) 10-day 5.13 (4.81‑5.48) 6.10 (5.72‑6.52) 7.35 (6.87‑7.85) 8.32 (7.77‑8.89) 9.65 (8.98‑10.3) 10.7 (9.94‑11.4) 11.7 (10.9‑12.6) 12.8 (11.9‑13.7) 14.3 (13.2‑15.4) 15.5 (14.2‑16.7) 20-day 6.87 (6.47‑7.30) 8.10 (7.64‑8.62) 9.57 (9.01‑10.2) 10.7 (10.1‑11.4) 12.3 (11.5‑13.1) 13.5 (12.7‑14.4) 14.8 (13.8‑15.7) 16.1 (14.9‑17.1) 17.8 (16.5‑19.0) 19.1 (17.7‑20.5) 30-day 8.42 (7.96‑8.92) 9.90 (9.36‑10.5) 11.5 (10.9‑12.2) 12.8 (12.1‑13.5) 14.4 (13.6‑15.3) 15.7 (14.8‑16.7) 17.0 (15.9‑18.0) 18.2 (17.1‑19.4) 19.9 (18.6‑21.2) 21.2 (19.7‑22.6) 45-day 10.6 (10.1‑11.1) 12.4 (11.8‑13.0) 14.2 (13.5‑14.9) 15.6 (14.8‑16.4) 17.4 (16.5‑18.2) 18.7 (17.7‑19.7) 20.1 (18.9‑21.1) 21.4 (20.1‑22.5) 23.1 (21.7‑24.3) 24.3 (22.8‑25.7) 60-day 12.6 (12.1‑13.2) 14.7 (14.1‑15.4) 16.7 (15.9‑17.4) 18.2 (17.3‑19.0) 20.1 (19.1‑21.0) 21.5 (20.5‑22.6) 22.9 (21.8‑24.1) 24.3 (23.0‑25.5) 26.1 (24.6‑27.4) 27.4 (25.8‑28.9) 1 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical Precipitation Frequency Data Server https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.0623&... 1 of 4 4/7/2020, 11:07 AM Back to Top Maps & aerials Small scale terrain Precipitation Frequency Data Server https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.0623&... 2 of 4 4/7/2020, 11:07 AM NOAA Atlas 14, Volume 2, Version 3 Location name: Indian Trail, North Carolina, USA* Latitude: 35.0623°, Longitude: -80.6596° Elevation: 668.06 ft** * source: ESRI Maps ** source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF_tabular | PF_graphical | Maps_&_aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hour)1 Duration Average recurrence interval (years) 1 2 5 10 25 50 100 200 500 1000 5-min 4.99 (4.61‑5.42) 5.90 (5.44‑6.42) 6.85 (6.30‑7.45) 7.55 (6.91‑8.18) 8.33 (7.61‑9.02) 8.88 (8.06‑9.61) 9.37 (8.47‑10.2) 9.82 (8.83‑10.6) 10.3 (9.19‑11.2) 10.7 (9.43‑11.6) 10-min 3.99 (3.68‑4.33) 4.72 (4.34‑5.14) 5.48 (5.04‑5.97) 6.04 (5.53‑6.55) 6.64 (6.07‑7.19) 7.07 (6.43‑7.66) 7.45 (6.73‑8.06) 7.78 (7.00‑8.42) 8.15 (7.27‑8.85) 8.39 (7.43‑9.13) 15-min 3.32 (3.06‑3.61) 3.96 (3.64‑4.30) 4.63 (4.25‑5.04) 5.09 (4.66‑5.52) 5.61 (5.12‑6.08) 5.97 (5.42‑6.46) 6.27 (5.68‑6.79) 6.54 (5.88‑7.09) 6.84 (6.10‑7.43) 7.02 (6.22‑7.64) 30-min 2.28 (2.10‑2.47) 2.73 (2.51‑2.97) 3.29 (3.02‑3.58) 3.69 (3.38‑4.00) 4.15 (3.80‑4.50) 4.49 (4.08‑4.87) 4.80 (4.35‑5.20) 5.09 (4.58‑5.52) 5.44 (4.86‑5.91) 5.69 (5.03‑6.19) 60-min 1.42 (1.31‑1.54) 1.71 (1.58‑1.87) 2.11 (1.94‑2.29) 2.40 (2.20‑2.60) 2.77 (2.53‑3.00) 3.04 (2.77‑3.30) 3.31 (2.99‑3.58) 3.57 (3.21‑3.87) 3.91 (3.48‑4.24) 4.15 (3.67‑4.51) 2-hr 0.822 (0.754‑0.898) 0.994 (0.912‑1.09) 1.23 (1.13‑1.35) 1.41 (1.29‑1.54) 1.65 (1.50‑1.80) 1.83 (1.65‑1.99) 2.00 (1.80‑2.18) 2.18 (1.95‑2.37) 2.41 (2.13‑2.63) 2.59 (2.27‑2.82) 3-hr 0.582 (0.532‑0.639) 0.702 (0.643‑0.772) 0.876 (0.801‑0.962) 1.01 (0.921‑1.11) 1.19 (1.08‑1.30) 1.34 (1.20‑1.46) 1.48 (1.32‑1.61) 1.63 (1.45‑1.78) 1.83 (1.60‑2.00) 1.99 (1.73‑2.17) 6-hr 0.351 (0.321‑0.385) 0.423 (0.388‑0.464) 0.528 (0.483‑0.579) 0.611 (0.557‑0.668) 0.723 (0.655‑0.788) 0.812 (0.732‑0.884) 0.903 (0.808‑0.983) 0.998 (0.884‑1.09) 1.13 (0.986‑1.23) 1.23 (1.06‑1.34) 12-hr 0.206 (0.189‑0.226) 0.249 (0.229‑0.274) 0.312 (0.286‑0.342) 0.363 (0.331‑0.397) 0.433 (0.392‑0.472) 0.489 (0.440‑0.533) 0.548 (0.488‑0.596) 0.610 (0.537‑0.663) 0.696 (0.603‑0.755) 0.766 (0.655‑0.832) 24-hr 0.122 (0.113‑0.132) 0.148 (0.137‑0.160) 0.185 (0.171‑0.201) 0.215 (0.199‑0.233) 0.257 (0.236‑0.278) 0.290 (0.266‑0.314) 0.324 (0.296‑0.351) 0.360 (0.328‑0.390) 0.410 (0.371‑0.445) 0.450 (0.405‑0.489) 2-day 0.072 (0.067‑0.078) 0.087 (0.080‑0.094) 0.108 (0.100‑0.117) 0.125 (0.115‑0.135) 0.149 (0.137‑0.161) 0.167 (0.153‑0.181) 0.187 (0.171‑0.202) 0.207 (0.188‑0.225) 0.235 (0.212‑0.256) 0.257 (0.231‑0.281) 3-day 0.051 (0.047‑0.055) 0.061 (0.057‑0.066) 0.076 (0.070‑0.082) 0.088 (0.081‑0.095) 0.104 (0.096‑0.112) 0.117 (0.107‑0.126) 0.130 (0.119‑0.141) 0.144 (0.131‑0.156) 0.163 (0.148‑0.177) 0.179 (0.161‑0.194) 4-day 0.040 (0.037‑0.043) 0.048 (0.045‑0.052) 0.060 (0.055‑0.064) 0.069 (0.064‑0.074) 0.081 (0.075‑0.088) 0.091 (0.084‑0.098) 0.102 (0.093‑0.110) 0.112 (0.103‑0.121) 0.127 (0.116‑0.138) 0.139 (0.126‑0.151) 7-day 0.027 (0.025‑0.029) 0.032 (0.030‑0.034) 0.039 (0.036‑0.041) 0.044 (0.041‑0.047) 0.052 (0.048‑0.056) 0.058 (0.054‑0.062) 0.064 (0.060‑0.069) 0.071 (0.065‑0.076) 0.080 (0.073‑0.086) 0.087 (0.080‑0.094) 10-day 0.021 (0.020‑0.023) 0.025 (0.024‑0.027) 0.031 (0.029‑0.033) 0.035 (0.032‑0.037) 0.040 (0.037‑0.043) 0.045 (0.041‑0.048) 0.049 (0.045‑0.052) 0.053 (0.049‑0.057) 0.060 (0.055‑0.064) 0.065 (0.059‑0.069) 20-day 0.014 (0.013‑0.015) 0.017 (0.016‑0.018) 0.020 (0.019‑0.021) 0.022 (0.021‑0.024) 0.026 (0.024‑0.027) 0.028 (0.026‑0.030) 0.031 (0.029‑0.033) 0.033 (0.031‑0.036) 0.037 (0.034‑0.040) 0.040 (0.037‑0.043) 30-day 0.012 (0.011‑0.012) 0.014 (0.013‑0.015) 0.016 (0.015‑0.017) 0.018 (0.017‑0.019) 0.020 (0.019‑0.021) 0.022 (0.020‑0.023) 0.024 (0.022‑0.025) 0.025 (0.024‑0.027) 0.028 (0.026‑0.029) 0.029 (0.027‑0.031) 45-day 0.010 (0.009‑0.010) 0.012 (0.011‑0.012) 0.013 (0.012‑0.014) 0.014 (0.014‑0.015) 0.016 (0.015‑0.017) 0.017 (0.016‑0.018) 0.019 (0.018‑0.020) 0.020 (0.019‑0.021) 0.021 (0.020‑0.023) 0.023 (0.021‑0.024) 60-day 0.009 (0.008‑0.009) 0.010 (0.010‑0.011) 0.012 (0.011‑0.012) 0.013 (0.012‑0.013) 0.014 (0.013‑0.015) 0.015 (0.014‑0.016) 0.016 (0.015‑0.017) 0.017 (0.016‑0.018) 0.018 (0.017‑0.019) 0.019 (0.018‑0.020) 1 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical Precipitation Frequency Data Server https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.0623&... 1 of 4 4/7/2020, 11:06 AM Back to Top Maps & aerials Small scale terrain Precipitation Frequency Data Server https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.0623&... 2 of 4 4/7/2020, 11:06 AM Large scale terrain Large scale map Large scale aerial + – 3km 2mi + – 100km 60mi + – 100km 60mi Precipitation Frequency Data Server https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.0623&... 3 of 4 4/7/2020, 11:06 AM Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questions@noaa.gov Disclaimer Precipitation Frequency Data Server https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.0623&... 4 of 4 4/7/2020, 11:06 AM 11C. Faircloth Skimmer Design