Loading...
HomeMy WebLinkAbout20190992 Ver 2_U2719_Buffer Auth Mod Request 05052020_20200506M SUTZ., yd .w'm.,m HO'P y �y STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION Roy COOPER GOVERNOR May 5, 2020 NC Environmental Quality Division of Water Resources Transportation Permitting Branch 1617 Mail Service Center Raleigh, NC 27699 ATTN: Mr. Rob Ridings, NCDOT Project Coordinator J. ERIC BOYETTE SECRETARY Subject: Request for Modification to the Neuse Buffer Authorization for U-2719 — Improve Existing I-440 Beltline, from south of SR 1313 (Walnut Street) to north of SR 1728 (Wade Avenue) Reference: Regional General Permit Number 31 Verification (Action ID: SAW-2012-01414) dated August 21, 2019 401 Water Quality Certification and Neuse Buffer Authorization (DWR Project No. 20190992) dated August 26, 2019 Dear Sir: The North Carolina Department of Transportation (NCDOT) requests modification to the existing Riparian Buffer Authorization for the widening and improving of I-440/US 1 from SR 1313 to SR 1728 (TIP R-2719) in Wake County. This project is currently under construction. This modification will result in no changes to the previously permitted wetland and stream impacts. This modification results in an additional 2,619 square feet (sq ft) of riparian buffer impacts in Zone 1 and 2,027 sq ft in Zone 2. The total project impacts for U-2719 include 1,499 If of permanent stream impacts, 6991f of temporary stream impacts, 0.04 ac of permanent wetland impacts, no temporary wetland impacts, no hand clearing in wetlands, and 121,936 sq ft of buffer impacts (80,491 sq ft in Zone 1 and 41,445 sq ft in Zone 2). Please see the enclosed revised buffer drawings and updated impact summary sheets which reflect the changes in impacts as well as the following updated tables and explanation. Explanation of Buffer Impact Site Modification Being Requested Site 4 (Sheet 12/12B): Site 4 allowable buffer impacts have changed as a result of the need for an overhead utility relocation and access road adjacent to Jones Franklin Road. There is an increase in the allowable buffer impacts in both zones due to the relocation of the overhead line Mailing Address: Location: NC DEPARTMENT OF TRANSPORTATION Telephone: (919) 707-6000 1000 BIRCH RIDGE DRIVE ENVIRONMENTAL ANALYSIS UNIT Customer Service: 1-877-368-4968 RALEIGH NC 27610 1598 MAIL SERVICE CENTER RALEIGH NC 27699-1598 Website: www.ncdot.gov and need for a guy wire required for a turn in the line. The impacts have been minimized by placing these in locations where the buffers are currently actively maintained by mowing. This is an ongoing and continued use and will not be changed by the utility line. The increase in allowable buffer impacts at Site 4 in Zone one is 2,609 sq ft and 2,027 sq ft in Zone 2. This makes the total allowable impact in Zone 15,604 sq ft and Zone 2 is 4,248 sq ft for Site 4. Revised Permit Impact Tables The following tables illustrate the updates to the impacts that were previously provided in the electronic PCN. Revised U-2719 Jurisdictional Resources Impacts Riparian Wetland Non- Riparian Isolated Stream Of) Riparian Impact Type Temp./ Wetland Wetlands Ponds Buffer Perm. Temp./ (ac) (ac) Perm. Temp. (sq ft) (ac) Perm. Zone 1/2 (ac) Neuse River Basin 0.0/ 0.0 0.0 1.25 1499 699 80,491/ (HUC 0.04 41,445 03020201 Bolded impact amounts represent a change from the 464 (SAW-2012-01414) issued on August 21, 2019 and 401 WQC (20190992) issued August 26, 2019. Revised U-2719 Riparian Buffer Impacts Mitigation Allowable 9 Total Wetlands Impacts requirements with Allowable Impacts in Requiring (s ft) mitigation Buffers^ Mitigation Zone 1 Impact 36,666 43,825 80,491 50 36,666 Zone 2 Impact 20,060 21,385 41,445 25 20,060 ^ Allowable, non-mitigable buffer impacts have been deducted from wetlands in buffers. Bolded impact amounts represent a change from the 404 (SAW-2012-01414) issued on August 21, 2019 and 401 WQC (20190992) issued August 26, 2019. There is an increase in allowable impacts based on the additional impacts of the utility relocation at Site 4 on Plansheet 12/1213. The additional buffer impacts have been illustrated as allowable due to the fact that the area of impact is currently maintained and there should be no change in existing and ongoing use of the buffer. Compensatory Mitigation No compensatory mitigation is proposed because the change in buffer impact is considered allowable due to the existing and continued use of the buffers. Table 1 below illustrates the current summary of impacts requiring mitigation which has not changed since the original permit application. 2 ❑-2719 Proposed C ni ertsatot Mitii afion No Chan es Riparian Non- Isolated Riparian Buffer Riparian Mitigation Type Wetland Riparian Wetlands Stream Calculations ft Buffer Zone I Zone 2 (lie) Wetland (ac) 00 Total ac Og ft Meuse Basin 36,666 x 20,060 x (HUC 3020201) 0302 0.0 0.0 0.0 860 3.0 = 1.5 = 140,089 109,998 30,090 Bolded mitiaalion amounts renmsent a chanve from the 404 (SAW-2012-01414) issued on Auvusl 21. 2019 and 401 WQC (20190992) issued August 26, 2019. No changes are proposed regarding compensatory mitigation for the project since the 404/401 Authorizations dated August 21, 2019 and August 26, 2019, respectively. Thank you for your assistance with this project. If you have any questions or need additional information, please contact Jason Dilday at either j Idilday@ncdot.gov or (919) 707-611 L Sincerely, Jason Dig ltaBysignedby Jason D11day d Date:2020.05.05 11,1� 1 y 09A4.06.04'00' Jason Dilday Environmental Senior Specialist LA _71.9- 12 I FrFN 101 HDR NE F4116 u 2 a.,I; d thl, seN N .1— 1— -N. I F. E oo* 00 U-E— .... I.... -d- ILLC -To- FIX RLQ#Om D— �F- Ml— SAA-P F -OSCD- Sr S—OiOOM oll cs -am it -UA- Sr S1&2V+2&Aii wM SZ—P -uA- sc 9.2,6-&?z 2F IT 3 Is smp��� wi 111IM1111111111M, 9.9FOR W-wir -a memo U O1111111i, . . . . . . . . . . . . WFW Mg vr_-- j it A,O AW fill Acm- M . . . . . . . . . . - SX �\ cOti qA CULVERT INLET STABILIZATI N CLASS 'II' RIP RAP EST.83 TONS 85 SY GEOTEXTILE SEE SHEET 2D-2 SEE DETAIL 'AX' m DETAIL AY1 CULVERT OUTLET STABILIZATION ( Not to Scale) \EXISTING BANK 1.5:1 or FLATTER 2' THICK CL II RIP -RAP PROPOSED EXCAVATION CLASS II RIP RAP CULVERT Length = 88 ft GEOTEXTILE MIN. 1' (downstream of TUCK end of culvert) Type of Liner= CL II Rip -Rap - Keyed -In EXISTING GROUND STA. 39 + 01 —Y10— LT iKl DETAIL AX CULVERT INLET STABILIZATION ( Not to Scale) Natural Bed Elevation Natural Natural Ground Ground 2' Geotextile > on banks only Channel Bed Length= 30 Ft. (Variable) Type of Liner= CL II Rip -Rap - Keyed -In STA. 41 + 4 8 —Y10— RT DETAIL AY2 CULVERT OUTLET STABILIZATION ( Not to Scale) Natural 1.5:1 or Flatter Natural _ Ground \ Proposed Ground \Excavation\ ,( 2' Thick Length = 88 ft \ CL II Rip -Rap (downstream of �� Geotextile end of culvert) Channel Bed Width Varies (Variable) Type of Liner= CL II Rip -Rap - Keyed -In STA. 39 + 01 —Y10— LT i \ / PROJECT REFERENCE NO. SHEET NO. U-2719 12B RW SHEET NO. ROADWAY DESIGN HYDRAULICS / ENGINEER ENGINEER h \ � INC®Ni1pLE E Il�LANS P ^ 00 NOT USE FOR / W ACQUISITION FILL SW) i STAIN N DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED \♦� /\/ HDR Engineering, Inc. of the Carolinas J N. .B.E.L.Sle St, ice se Raleigh, : C. 27601 N.C.B.E.L.S. License Number: F-0116 F-0116 LANEi / 12.5 25 \ / GRAPH \ 30 , C aI 2 �\ ONC ISTI 340.7 FACILI c INV= -o 90 TLET CHA 341.0 IMPRO T WITH j CLASS 'II P SST. 368 TON 4W SY GEO-TE SEE SHEET 213-2 SEE DETAILS AY1' & E ECM SITE 3 LEGEND MITIGABLE IMPACTS ZONE 1 ALLOWABLE IMPACTS ZONE 1 \\\\\\ ALLOWABLE IMPACTS ZONE 2 — — — — - EXISTING TRANSPORTATION FACILITY BUFFER DRAWING SHEET OF RIPARIAN BUFFER IMPACTS SUMMARY IMPACTS BUFFER TYPE ALLOWABLE MITIGABLE REPLACEMENT Site Station Structure ROAD PARALLEL No. (From/To) Size / Type BRIDGE ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 CROSSING IMPACT (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) 1 SAK - 230+75 -L1A- Lt Rip Rap at 18" Outlet X 1272 1272 3 SX - 245+72 -L1A- Culvert Clean Out X 1753 212 1965 Bank Stabilization X 3612 1923 5535 4 SW - 41 +85 -Y10- Rt Rip Rap in Stream X 5604 4248 9852 3711 3711 6* X 7 ST - 284+75 -L1- Rt Outlet Stabilizaton X X 408 408 1052 871 1923 8** SV - 286+00 -L 1- Rt 9 SU - 284+50 -L1- Lt Bank Stabilization X 3931 1346 5277 12 SS - 17+50-Y25RB- Lt Channel Imp./Bank Stab. X 6199 3968 10167 13 SR -16+20-Y25RC- Rt Roadway Fill/Outlet Stabilization X 8902 7738 16640 14 SO - 15+79-Y25RD- Roadway Fill X X 6846 1384 8230 14827 7423 22250 15 SP - 11 +90 -Y29E- 30" CSP X 3767 3730 7497 16 SN - 365+75 -L3- Rt 36" WSP & 36" CSP X X 3379 367 3746 775 206 981 17 SC - 433+33 -L3- 8' x 8' Culvert Extension/Stab. X 3660 1592 5252 18 SAN - 433+00 -L3- Rt 2' Base Lateral Ditch X 3035 2070 5105 19 SE - 466+00 -L3- 48" RCP Extension X 2179 926 3105 20 SW - 18+75 -Y9- 14' x 7' RCBC X 5146 3035 8181 21 SC - 38+70-Y35RA- Rt Bank Stabilization X 433 406 839 TOTALS*: 43825 21385 65210 36666 20060 56726 0 0 NOTES- * POND OWC BUFFER IMPACTS REMOVED DUE TO CITY OF RALEIGH CONTRACT ** SITE 8 BUFFER IMPACTS REMOVED DUE TO UTILITY EASEMENT MAINTENANCE AND 4C DISCUSSION 2018 Feb