Loading...
HomeMy WebLinkAbout19910445 All Versions_Complete File_19910322i To: John Dorney Planning Branch DIVISION OF ENVIRONMENTAL MANAGEMENT CAMA MAJOR PERMIT APPLICATION REVIEW q? 11415 r? 41111 ? c, MAR 1991 c a ?`t , X QUA, ? Fl'ann;n? B -iTY . of, WETLAND MTIIGATION SITE SUCCESS FORM • APPLICANT/PROJECT NAME : Port Cape Fear • DEM #: WQC#: MAP #: 91445 2583 42 • COUNTY: New Hanover • LOCATION OF MITIGATION SITE (LAT. AND LONG.) • DIRECTIONS TO MITIGATION SITE: MITIGATION HAS BEEN DONE BUT ? no vicinity map NO REPORTS HAVE BEEN SENT TO • ACREAGE AND TYPE OF WETLAND IMPACTED: DEM. 4600 sq. ft.---marsh • ACREAGE AND TYPE OF WETLAND MITIGATED: 5000 sq. ft.-smooth cordgrass marsh • DESCRIPTION OF MITIGATION(IN FILE): Plant Spartina alterniflora on 2 ft. centers (actually done on 1 ft centers after negotiations with COE) • DESCRIPTION OF VEGETATION(IN FILE): Spartina alterniflora • SUCCESS CRITERIA STATED(if any): based on a comparison with adjacent marsh • WHAT IS THE PROJECT STATUS?(mark one): RESTORATION, ENHANCEMENT, CREATION, PRESERVATION • MONITORING PLAN: 5 years with reports to regulatory agancies. • WHICH REGULATORY AGENCIES ARE INVOLVED?: DEM, DCM, COE • TYPE OF DEVELOPMENT(mark the ones that apply): RURAL, URBAN, PUBLIC, PRIVATE, COMMERCIAL 49 FIELD INFORMATION • DESCRIPTION OF VEGETATION(AT SITE): • SURFACE WATER LEVEL OBSERVATIONS: • SURFACE AND GROUNDWATER RELATIONSHIPS: • HAVE MITIGATION REQUIREMENTS BEEN MET?: 0 DESCRIPTION OF SOIL SAMPLE TAKEN: COUNTY: /V,-(,/ APPLICANT: f" ? PERMIT NUMBER: REASON DONE: V,?l / ? ,:? c? C4;-111/r TOTAL # OF ACRES AND TYPE OF WETLAND: LOCATION: d OTHER INFO: 4I ?r 6 J L? ? nn f/ 'i T LG ? ,o//, U R U J? A Ir State of North Carolina Department of Environment, Health, and Natural Resources Division of Environmental Management 512 North Salisbury Street 0 Raleigh, North Carolina 27611 James G. Martin, Governor March 22, 1991 George T. Everett, Ph.D. William W. Cobey, Jr., Secretary Director Port Cape Fear,-Inc. c/o Leon S. Jernigan,Jr. Needham, Jernigan & Associates, Inc. Rt. 1, Box 36-10 Winnabow, NC 28749 Dear Mr. Jernigan: Subject: Certification Pursuant to Section 401 of the Federal Clean Water Act, Proposed boat basin enlargement. New Hanover County Attached hereto are two (2) copies-of Certification No. 2583 issued to Port Cape Fear, Inc. dated March 22, 1991. If we can be of further assistance, do not hesitate to contact us. Sincerely, George T. Everett I/ Le, 'i Director Attachments cc: Wilmington District Corps of Engineers Wilmington Regional Office /Mr. John Dorney Mr. John Parker Central Files Pollution Prevention Pays P.O. Box 27687, Raleigh, North Carolina 27611-7687 Telephone 919-733-7015 An Equal Oooortunitv Affirmative Action Employer NORTH CAROLINA New Hanover County CERTIFICATION THIS CERTIFICATION is issued in conformity with the requirements of Section 401 Public Laws 92-500 and 95-217 of the United States and subject to the North Carolina Division of Environmental Management Regulations in 15 NCAC 2H, Section .0500 to Port Cape Fear, Inc. pursuant to an application filed on the 7 day of November, 1990 to enlarge a boat basin. The Application provides adequate assurance that the discharge of fill material into the waters of the Cape Fear River in conjunction with the proposed boat basin enlargement in New Hanover County will not result in a violation of applicable•Water Quality:.Standards and discharge guidelines. Therefore, the State of North Carolina certifies that this activity will not violate Sections 301, 302, 303, 306, 307 of PL 92-500 and PL 95-217 if conducted in accordance with the application and conditions hereinafter set forth. Condition(s) of Certification: 1. That the activity be conducted in such a manner as to prevent significant increase in turbidity outside the area of construction or construction related discharge (increases such that the turbidity in the Stream is 25 NTU's or less are not considered significant). 2. That mitigation follow the revised mitigation plan for Port Cape Fear (21 January 1991) except that monitoring shall be for 5 years after planting. Violations of any condition herein set forth shall result in revocation of this Certification. This Certification shall become null and void unless the above conditions are made conditions of the Federal Permit. This the 22 day of March, 1991. DIVISION OF ENVIRONMENTAL MANAGEMENT George T. Everett, Director WQC# 2583 JA kJ T)TVISION OF ENVIRONMENTAL MANAGEMENT July 10, 1991 MEMORANDUM TO: George Matt(h?'i??s FROM: John Dorne?-!? RE: Modification of Po Cape Fear Mitigation Plan The planned modification of the above mentioned plan as described in Robert Needham's letter to Bob Stroud on 4 June 1991 is acceptable to the Division of Environmental Management since it poses no significant water quality issues. I believe that an additional individual 401 Certification would not be necessary since there would be no significant impact of this change. If the Division of Coastal management needs a modification of the 401 which is signed by (for) our Director, please notify Ron Ferrell since I will be on vacation until July 25. JRD/kls Matthis.mem/D-6 cc: Jim Gregson Central Files NORTH CAROLINA New Hanover County CERTIFICATION THIS CERTIFICATION is issued in conformity with the requirements of section 401 Public Laws 92-500 and 95-217 of the United States and subject to the North Carolina Division of Environmental Management Regulations in 15 NCAC 2H, Section .0500 to Port Cape Fear, Inc. pursuant to an application filed on the 7 day of November, 1990 to enlarge a boat basin. The Application provides adequate assurance that the discharge of fill material into the waters of the Cape Fear River in conjunction with,the proposed boat basin enlargement in New Hanover County will not result in a violation of applicable' Water Quality?:_Standards and discharge guidelines. Therefore, the State of North Carolina certifies that this activity will not violate Sect ions .301, 302; 303, 306, 307 of PL 92-500 and PL 95-217 if conducted: in accordance with the application and conditions hereinafter set forth. Condition(s) of Certification: 1. That_the activity be conducted in such a manner as to prevent significant increase>in turbidity outside the.area -of construction or construction related discharge (:increases such that the ..turbidity 'in the Stream is-25 NTU's or less are not considered significant). 2. That mitigation follow the revised mitigation plan for Port Cape Fear (21 January 1991) except that monitoring shall be for 5 years after planting. Violations of any condition herein set forth shall result in revocation of this Certification. This Certification shall become null'and void unless the above conditions are made conditions of the Federal Permit. This the 22 day of March, 1991. DIVISION OF ENVIRONMENTAL MANAGEMENT George T. Everett, Director WQC# 2583 !y Needham, Jernigan & Associates, Inc. Environmental Consultants Robert N. Needham (919) 371-6082 Leon S. Jernigan, Jr., Ph.D. (919) 894-7882 Rt. 1, Box 36-10, Winnabow, N.C. 28479 Revised Mitigation Plan for Port Cape Fear (21 Jan 1991) Port Cape Fear needs to be enlarged and deepened in order to accomodate larger boats in need of repair and maintenance. A permit for deepening the existing basin has already been approved, but additional approval is needed for the enlargement of the southeastern portion of the basin. This enlargement will take place primarily in uplands except for a narrow fringe of marsh along the edge of the basin and around the upland pennisula on the west side of the entrance channel. This fringe is dominanted primarily by smooth cordgrass ( in alterniflora). A few other species are intermixed in some places. These other species include: common reed (Phragnites ausLrwhia), salt meadow cordgrass