Loading...
HomeMy WebLinkAbout20091312 Ver 1_More Info Received_20091217LETTER OF TRAN M 9'%WK S I T T A L DICKSON community Infrastructure consultants 720 Corporate Center Drive Raleigh, North Carolina 27607 919.782.0495 tel. 919.782.9672 fax TO: 401 Permitting Review Unit DATE: 12-16-09 2321 Crabtree Blvd., Suite 250 Mail Service Center 1650 RE: Newland By-Pass Channel Project Raleigh, NC 27699-1650 Design Development Plans ATTENTION: Ian McMillan We are sending via: ? Overnight ® Regular Mail ? Pick-up ? Hand Delivered The following items: ? Correspondence ® Plans ? Specifications ? Other as listed below: COPIES DATE NO. DESCRIPTION 2 Dec 15, 2009 Design Development Plans (Final Design) - (24"x36") 2 Dec 15, 2009 Design Development Plans (Final Design) - (11 "x17") 1 Dec 15, 2009 CD with TIFF Image of Plans DEC 1 7 2009 DENR - wATFR QUALITy THESE ARE TRANSMITTED as checked below: ® For Approval ? As Requested ? Approved as Submitted ? Returned for Corrections ? For Your Use ® For Review and Comment ? Approved as Noted ? Forward to Subcontractor REMARKS: Please let me know if you have any questions or need anything further. As you know we are under a tight schedule and certainly would appreciate an assistance you could provide in keeping this moving. Thanks for your help with our request. H COPY TO: 80499.00.RA SIGNED: 01-1,3i*,1- WD[ ?_Z' I < S C, community infrastructure consultants December 16, 2009 Mr. Gray Hauser, PE NCDENR - Division of Land Resources - Land Quality Section 1612 Mail Service Center Raleigh, North Carolina 27699-1612 RE: Town of Newland Flood By-Pass Channel & Pineola Street Floodplain Improvements Trout Buffer Variance Request Dear Mr. Hauser: WK Dickson requests review and comment on any possible issues that may emerge with respect to the trout buffer requirements associated with the proposed Flood By-Pass Channel & Pineola Street Floodplain Improvements project in Newland, North Carolina. The project is located along the North Toe River as shown on the included set of design plans. The North Toe River is classified as trout (Tr) waters. As part of the proposed project, land-disturbing activities will be performed within the 25-foot trout buffer zone. The following is a description of the proposed project: • Install a 60-foot wide, 536-foot long grass-lined earthen by-pass channel to divert flows around the area currently constricting flood flows. This by-pass channel is located approximately 1,400 feet downstream of Pineola Street (US Highway 194). • Install a floodplain bench along the left and right overbank in the vicinity of Pineola Street. These floodplain improvements also include a greenway trail in the right overbank which ties into the existing parks that are located on either side of Pineola Street. The purpose of these floodplain benches is to lower the tailwater elevation on the Pineola Street culverts to improve hydraulic performance and also reduce upstream flood elevations. • Install a new headwall with a beveled upstream face at the Pineola Street (Highway 194) box culverts. Beveling the front face of the culvert requires securing a new concrete headwall that will reduce energy losses through the culvert and reduce upstream water surface elevations. • Install a 42-foot long pedestrian steel truss footbridge that ties in the existing upstream park with the proposed greenway and existing downstream park. • Improve local drainage at Old Cranberry Street. Currently, the road overtops approximately 20+ times per year. • Install 387 linear feet of 12" diameter PVC closed drainage system to collect runoff from the Newland Shopping Center. This new closed drainage system will outfall into the recently constructed extended detention wetland. • Install 274 linear feet of 8" diameter PVC closed drainage system to collect runoff from the proposed greenway. ? t'xtlr„ r7€?i?E? • Replace the existing undersized closed drainage system at Cranberry Street with 294 linear feet of 42" diameter RCP and 126 linear feet of 48" RCP. The existing closed drainage system does not meet minimum NCDOT design standards for a local collector road. As you are aware, several of the listed items are proposed to take place within the 25-foot buffer as shown on the attached plans. Efforts were made to minimize impacts within this trout buffer zone. The following items document the efforts to minimize adverse impacts to water quality and improve trout habitat: • Remove existing rip-rap banks: The project will be removing over 300-feet of rip-rap on the left and right banks of the North Toe River. The seven (7) to twelve (12) foot high channel banks will be reshaped and a floodplain bench installed at the bankfull flood elevation. The left bank will be naturally vegetated and the right bank will include a 1 foot wide grass buffer located adjacent to the greenway. Removing this rip-rap bank will reduce the quantity of rock exposed to sunlight and should help reduce water temperatures after flood events. • Create a floodplain bench: A floodplain bench is proposed approximately four (4) feet above the existing channel invert. This will allow the more frequent flood events to access this floodplain bench in efforts to reduce in town flooding. • Install boulder toes: Boulder toes are proposed to replace the rip-rap banks. The footer rocks will be set 18 inches below the channel bottom for stability purposes. This will provide some habitat improvements over the existing rip-rap banks. • Plant native vegetation on the south bank of the channel: As shown on the separately attached plans, the project will provide some new plantings to enhance the shading of the North Toe River. Additional plantings have been placed on either side of the proposed by-pass channel located 1400 feet downstream of Pineola Street. Efforts were made to reduce the widths per your direction however this resulted in increased flood elevations in the downtown business district. Therefore you will see the existing and proposed toes very close to each other. We thank you in advance for your timely response and cooperation. Please feel free to contact us with any questions that you may have concerning this project. Sincerely, W.K. Dickson & Co., Inc. David Kiker, PE Attachments (2) 1. 24" x 36" set of design plans 2. Financial Responsibility /Ownership Form 3. Erosion Control Narrative with By-Pass Channel Design Calcs J, FINANCIAL RESPONSIBILITY/OWNERSHIP FORM SEDIMENTATION POLLUTION CONTROL ACT EXPRESS PERMITTING OPTION 08012007 No person may initiate any land-disturbing activity on one or more acres as covered by the Act before this form and an acceptable erosion and sedimentation control plan have been completed and approved by the Land Ouality Section, N.C. Department of Environment and Natural Resources. (Please type or print and, if the question is not applicable or the e-mail and/or fax information unavailable, place N/A in the blank) Part A. 1. Project Name Town of Newland - Flood By-Pass Channel & Pinola Street FbW- plain Improvements 2. Location of land-disturbing activity: County Avery City or Township Newland Highway/Street ?ineola St & Old Cranberry St Latitude 36° 05' 05.07° Longitude 81 ° 55' 54.58° 3. Approximate date land-disturbing activity will commence: March 2010 4. Purpose of development (residential, commercial, industrial, institutional, etc.): Public Flood Reduction 5. Total acreage disturbed or uncovered (including off-site borrow and waste areas): 4.73 6. Amount of fee enclosed: $ 1.575 The Express Permitting application fee is a dual charge. The normal fee of $65.00 per acre is assessed without a ceiling amount. In addition, the Express Permitting supplement is $250.00 per acre up to eight acres, after which the Express Permitting supplemental fee is a faced $2,000.00 (Example: 9 acres total is $2,585). NOTE: Both fees are rounded up to the next whole acre and need to be paid by separate checks to NCDENR. 7. Has an erosion and sediment control plan been filed? Yes No Enclosed X 8. Person to contact should erosion and sediment control issues arise during land-disturbing activity: Name Keith Hoilman E-mail Address newlandwaterworks@yahoo.com Telephone 828-733-2023 Cell # Fax # 828-733-2069 9. Landowner(s) of Record (attach accompanied page to list additional owners): See plans and attached spreadsheet Name Telephone Fax Number Current Mailing Address City State Zip Current Street Address city state Zip 10. Deed Book No. Page No. Provide a copy of the most current deed. Part B. 1. Person(s) or firm(s) who are financially responsible for the land-disturbing activity (Provide a comprehensive list of all responsible parties on an attached sheet): Brenda Pittman brenda at7newlandgov com Name E-mail Address 301 Cranberry Street 01 Cranberry t Current Mailing Address Current Street Address Newland NC 28657 1 Newland NC 28657 City state zip I City state Zip Telephone 828-733-2023 Fax Number 828-733-2069 2. (a) If the Financially Responsible Party is not a resident of North Carolina, give name and street address of the designated North Carolina Agent: Name Current Mailing Address E-mail Address Current Street Address City State . Zip Telephone City State Zip Fax Number (b) If the Financially Responsible Party is a Partnership or other person engaging in business under an assumed name, attach a COPY Of the Cerdficabs of Assumed Name. If the Financially Responsible Party is a Corporation, give name and street address of the Registered Agent: Name of Registered Agent Current Mailing Address E-mail Address Current Street Address city state zip city State Zip Telephone Fax Number (c) In order to facilitate Express Permitting, it is necessary to be able to contact the Engineer or other consultant who can assist in providing any necessary information regarding the plan and its preparation: WK Dickson and Co.. Inc. dikikerOwkdickson.com Engineering Firm or other consultant E-mail Address Dave Kiker 919-782-0495 919-782-9672 Individual contact person (type or print) Telephone Fax Number The above information is true and correct to the best of my knowledge and belief and was provided by me under oath (This form must be signed by the Financially Responsible Person if an individual or his attomey-in- fact, or if not an individual, by an officer, director, partner, or registered agent with the authority to execute instruments for the Financially Responsible Person). I agree to provide corrected information should there be any change in the information provided herein. Brenda Pittman Town of Newland Manager Type or print name Tide or Authority Signature Date 1, LY1 a Notary Public of the Countyof Ave-viq State of North Carolina, reby certify that brP11 O&2- Vt Thq-j1 Ln appeared personally before me this-day-and being duly sworn acknowledged that the above form was executed by him. Witnese\- lhand and nWoal seal, this _-_LL _day of &-ZMbVY. 20_Cft Notary My commission expires V tai SEDIMENT/EROSION CONTROL PERMIT APPLICATION FOR FLOOD BY-PASS CHANNEL & PINEOLA STREET FLOODPLAIN IMPROVEMENTS PROJECT NEWLAND, NORTH CAROLINA PREPARED FOR NCDENR DIVISION OF WATER RESOURCES PREPARED BY W.K. DICKSON & CO., INC. 720 CORPORATE CENTER DRIVE RALEIGH, NC 27607 DECEMBER 9, 2009 DAVID J. KIKER, PE INTRODUCTION Table of Contents Page Introduction ....................................................................................................................... 1 Project Need ................................................................................................................. 2 Existing Conditions ....................................................................................................... 2 Erosion Control Plan .......................................................................................................... 3 Overview and Construction Sequencing ......................................................................... 3 Erosion Control Measures .............................................................................................. 4 Channel Stability Analysis .............................................................................................. 5 List of Tables Table No. Page 1 Permissible Shear Stresses for Boulder Toe ......................................................... 5 2 Permissible Velocities for Greenway and Floodplain Bench ................................ 5 3 Outlet Protection at Culverts and Ditch Outfall .................................................. 6 4 Channel Liner Summary .................................................................................... 7 5 Hydraulic Summary at Proposed Footbridge ....................................................... 7 6 By-Pass Channel Design Summary ..................................................................... 8 List of Appendices Appendix A Project Overview Map and USGS Quad Map Appendix B Vicinity Map Appendix C Limits of Disturbance Overview Map and Notification of affected property owners Appendix D NRCS Soil Survey Map and Geotech Report Appendix E Sediment Trap Sizing Calculations Appendix F Rip-Rap Pad Calculations Appendix G Channel Liner Calculations Appendix H HEC-RAS Output Appendix I Erosion and Sedimentation Control Plan Preliminary Review Checklist, technical specifications Appendix I Technical Specifications Flood By-Pass Channel & Pineola Street Floodplain Improvements Project WK Dickson INTRODUCTION This narrative supports the request for a sediment and erosion control permit for the proposed Flood By- Pass Channel & Pineola Street Floodplain Improvements project in Newland, North Carolina. WK Dickson is submitting this request on behalf of the Town of Newland and the North Carolina Department of Environmental and Natural Resources - Division of Water Resources (NCDENR-DWQ). As a result of the severe flooding experienced in this area, the State of North Carolina through Senate Bill 7 developed a series of projects intended to alleviate future flooding. One of these projects is the Newland Flood By-Pass Channel & Pineola Street Floodplain Improvements project. The proposed project will reduce 100-year flood elevations by approximately 1.5 feet by constructing a by-pass channel and creating a floodplain bench for floodwaters to access. As shown on the separately attached set of design plans, the project is composed of the following: • Install a 60-foot wide, 536-foot long grass-lined earthen by-pass channel to divert flows around the area currently constricting flood flows. This by-pass channel is located approximately 1,400 feet downstream of Pineola Street (US Highway 194). • Install a floodplain bench along the left and right overbank in the vicinity of Pineola Street. These floodplain improvements also include 810 linear feet of greenway trail in the right overbank which ties together two existing parks that are located on either side of Pineola Street. The purpose of these floodplain benches is to lower the tailwater elevation on the Pineola Street culverts to improve hydraulic performance and also reduce upstream flood elevations. • Retrofit the existing headwall with a beveled upstream face at the Pineola Street (Highway 194) box culverts. Retrofitting a beveled front face to the concrete headwall will reduce energy losses through the culvert and will reduce upstream water surface elevations. • Install a 43-feet long pedestrian steel truss footbridge that ties in the existing upstream park with the proposed greenway and existing downstream park. • Plant trout-habitat-friendly trees on the south bank of the channel to provide shade for trout. • Install boulder toe protection on the right channel bank to provide additional protection for the proposed footbridge abutment. • Install 387 linear feet of 12" diameter PVC closed drainage system to collect runoff from the Newland Shopping Center. This new closed drainage system will outfall into the recently constructed extended detention wetland designed to treat water quality. • Install 274 linear feet of 8" diameter PVC closed drainage system to collect runoff from the proposed greenway. • Replace the existing undersized closed drainage system at Old Cranberry Street with 294 linear feet of 42" diameter RCP and 126 linear feet of 48" RCP. The existing closed drainage system does not meet minimum NCDOT design standards for a local collector road. Currently the road overtops approximately 20 times per year and does not meet minimum NCDOT design standards. Although the main purpose of the project is to reduce flooding, measures have been taken to design a project that is stable long term and requires minimal maintenance. Some of those design measures include: Set the slope of the grass lined by-pass channel to 0.4 feet/feet to minimize the 10- and 100-year channel velocities. The 10- and 100-year velocities are 4.3 and 5.9 feet/second. Oversize the boulder toes along the proposed floodplain bench and greenway trail to minimize potential for bank erosion. These boulders will be approximately 3'x3'x2' in size and will include a footer boulder that will be set 18-inches below the channel bottom. The boulders have been oversized to exceed the permissible shear stress that would be experienced in the channel during a 100-year flood event. Flood By-Pass Channel & Pineola Street Floodplain Improvements Project WK Dickson INTRODUCTION Project Need In September 2004, remnants of Tropical Storm Frances and Hurricane Ivan caused severe flooding in western North Carolina. One area that experienced some of the worst flooding was the Town of Newland. As many as thirty-five (35) businesses and six (6) residential structures experienced flooding. Additionally, numerous roads in the downtown area overtopped. Flooding in the downtown area is exacerbated by the following three downstream floodplain conditions: High channel banks that approach 12 to 15 feet in height for the first 300 feet downstream of Pineola Street (State Highway 194). The banks are this high due to fill placed to raise the rear of the commercial lots adjacent to the channel. Natural bank heights approach 4 to 5 feet for the area immediately downstream of Town. Pineola Street (State Highway 194) roadway crossing with four 11-foot by 8-foot reinforced concrete box culverts (RCBCs). A natural floodplain constriction located approximately 1500 feet downstream of Pineola Street from Hurricane Ivan Pineola Street (State Highway 194). This v floodplain constriction is vulnerable to debris accumulation and also causes upstream flood elevations to be higher than would be expected. Debris accumulation on the right floodplain approached 6 feet in height after remnants of Hurricane Ivan passed through. The attached plans reflect the erosion control plan that was developed for the recommended alternative developed to reduce flooding in the Town of Newland. Existing Conditions The project site is composed of two sub-project areas that flank the North Toe River (see Appendix A). A vicinity map has been included in Appendix B. The first project area is located in the highly developed downtown area of Newland and is referred to as the Pineola Street Floodplain Improvements project. This area is bordered by existing businesses at Pineola Street, including the Ugly Mugg Coffee Shop, Advanced Auto and the Newland Shopping. The existing channel banks downstream of Pineola Street are currently covered with Class I rip-rap. The second project area is in a very rural area of Town located approximately 1300 feet downstream of Pineola Street and is referred to as the proposed Flood By-Pass Channel project. The area of the proposed by-pass channel is currently undeveloped with landuse of woods and grass. The total limit of disturbance for these two areas is 4.73 acres (see Appendix Q. A review of the NRCS soils mapping shows that the soil is widely varied at the site, with the predominant soils groups consisting of Nikwasi (loam) and Porters (gravelly loam). Porters is a well draining soils with a Hydrology Soil Group classification of "B" and Nikwasi is a poorly draining soil with a Hydrology Soil Group classification of "B/D" for use in NRCS hydrologic calculations. An NRCS soil survey map has been included along with soil boring results in Appendix D. Flood By-Pass Channel & Pineola Street Floodplain Improvements Project WK Dickson 2 EROSION CONTROL PLAN Overview and Construction Sequencing The separately attached plans and this narrative outline the erosion control measures that will be implemented to meet NCDENR erosion control requirements for the project. A detailed description of the erosion control measures and construction sequencing has been provided in the separately attached plans. It should be noted that due to the extensive grading associated with the proposed by-pass channel area, this erosion control for this project area will be handled in a two phased plan. The erosion control improvements in the downtown area will be constructed in a single-phased approach. The following sections provide additional clarification of how the erosion control measures will be phased into the construction of the different project areas. A more detailed description of the construction sequencing is provided in the Erosion Control Plan section of the separately attached plans. By-Pass Channel Erosion Control The By-Pass Channel Erosion Control will be broken into two phases to control erosion during the initial clearing and grubbing of the site, with additional measures installed following completion of the grading until the site is stabilized. Phase 1 erosion control measures will include silt fencing to keep runoff onsite, and a series of diversion ditches that outlet to three temporary sediment traps to treat runoff from exposed surfaces. The Phase 1 erosion control measures will remain in place until construction is complete and site is stabilized. The Phase 2 erosion control measures will be installed after rough grading is complete and will remain in place until the site is stabilized. Initial grading will include a 3 foot high berm that will separate the downstream by-pass channel from the upstream floodplain of the North Toe River. The purpose of this berm is to reduce the potential the by-pass channel will be activated prior to the temporary and permanent seeding being in place. The Phase 2 erosion control measures incorporate several additional diversion ditches and rip rap lined channels. Upon completion of the removal of this 3 foot high berm this area will be seeded and mulch At the downstream end of the bypass channel a concrete level spreader dissipates energy and treats runoff before it enters the North Toe River. This BMP needs to be installed after the site has been stabilized. Upon completion of the level spreader all temporary diversion ditches shall be removed or replaced with permanent ditches and corresponding liners. Pineola Street Grading Erosion Control Erosion control for the grading associated with the Pineola Street floodplain improvements will be installed as work proceeds. The proposed plans call for the contractor to create a bench to work off and all construction equipment to remain out of the channel. As the drainage basin is larger than 9 square miles, a pump around will not be required. In lieu of this, an innovative construction sequence will prevent fines from leaving the project area: • Set boulder toe and chink (offset) boulders from an upstream to downstream direction. • Install 8 oz geotextile filter fabric on back side of boulders to prevent fines from leaving site. • All work done behind the boulder toe should not result in fines leaving the banks and entering the channel. • Since drainage area is larger than 5 square mile a pump around is not required. • Contractor shall be required to take additional measures if the originally proposed measures do not adequately stabilize site. Hood By-Pass Channel & Pineola Street Floodplain Improvements Project WK Dickson EROSION CONTROL PLAN As work progresses along the River, subsequent boulder toes will be added with filter fabric to keep disturbed sediment from leaving the work area. Along with this in-stream stabilization, inlet protection and riprap culvert protection will be used for the closed drainage system adjacent to the asphalt path on the North side of the North Toe River. See below for a discussion of each erosion control measure used. Old Cranberry Street Closed-System Erosion Control Erosion control for the Old Cranberry Street closed-system will consist of temporary block and gravel inlet protection around the proposed drop inlets, culvert inlet protection at the upstream end of the system, and culvert outlet protection in the form of a rip rap pad. Because the channel invert is being lowered 6 inches at the upstream face of the system, inlet protection is being proposed. Design for this culvert inlet and outlet protection is included with this report as Appendix F. Erosion Control Measures The following erosion control devices will be used to stabilize the site and minimize onsite sediment loss. Sediment Traps Three sediment traps have been proposed onsite. These traps were design for the following criteria as taken from the North Carolina Erosion and Sediment Control Planning and Design Manual, revised March 2009: • Maximum drainage area - 5.0 acres • Basin shape - Length to width ration greater than 2.0 • Minimum depth - 3.5 feet, 1.5 feet excavated below grade • Maximum weir height - 3.5 feet above adjacent grade • Minimum volume - 3600 cubic feet/acre disturbed • Discharge and treatment capacity for the 10-year, 24-hour storm event Appendix E shows the in-house spreadsheets and calculations used to size the sediment traps for this project. Silt Fence Silt fence (NCDENR E&SC Std. 6.62.1) shall be placed in several areas onsite as shown on the Erosion and Sediment Control plan sheets. In all locations of proposed silt fence, the drainage area is less than '/4-acre per 100 linear feet of fencing. Temporary Gravel Construction Entrance/Exit Several temporary construction entrances (NCDENR E&SC Std. 6.06.1) will be provided at various locations throughout the project as shown on the Erosion and Sediment Control plan sheets. The construction entrances will provide a buffer area where vehicles can drop their mud and sediment to avoid transporting it onto public roads, to control erosion from surface runoff and to help control dust. Block and Gravel Inlet Protection (Temporary) Block and gravel inlet protection (NCDENR E&SC Std. 6.52.1) will be provided at all inlets as shown on the Erosion and Sediment Control plan sheets. The inlet protection will help prevent sediment from entering storm drains before stabilizing the contributing watershed. This practice allows early use of the storm drain system. Flood By-Pass Channel & Pineola Street Floodplain Improvements Project WK Dickson 4 EROSION CONTROL PLAN Channel Stability Analysis A detailed hydraulic evaluation was completed to determine what stabilization measures would be required for the proposed by-pass channel, outlet protection at culverts, abutment protection at the pedestrian footbridge, and greenway and floodplain improvements. The following is a summary of this evaluation. Proposed Greenway and Floodplain Bench Design The proposed greenway and floodplain bench were designed to reduce flood levels along the North Toe River. To construct the greenway and floodplain bench, two walls are proposed along the toe of the channel and at an elevation just above the bankfull flood elevation. The lower wall is composed of geogrid lifts, an underdrain system and a boulder fagade. Large boulders with an approximate size of 3 feet by 3 feet by 2 feet are proposed for this fagade. The following table summarizes the shear stresses the channel and floodplain bench will experience along with the shear stress the proposed boulder toe can withstand: Table 1 -Permissible Shear Stresses for Boulder Toe Flood Event Maximum Shear Stress at Maximum Shear Stress at Permissible Shear Wall along Toe of Channel Wall along Floodplain Stress (lb/sq ft) (lb/sq ft) Bench (lb/sq ft) 10-Year Flood 2.5 0.75 >10 100-Year Flood 3.2 1.0 >10 Class II rip-rap can withstand a shear stress of 4.5 pounds per square foot based on specifications provided in the North Carolina Department of Environment and Natural Resources (NCDENR) Erosion and Sediment Control Planning and Design Manual. The maximum weight of a Class II boulder is approximately 250 pounds. The boulders proposed for the construction of the main channel wall will each weigh approximately 2250 pounds. A permissible shear stress for the boulders used in this project was not calculated but it is anticipated that these boulders may exceed a shear stress of 10 pounds per square foot. As shown in Table 1, the proposed wall can withstand the shear stresses imposed by the 100-year flood. Shear stresses for flood events larger than the 100-year flood will not significantly increase relative to the 100-year flood because it will access the floodplain at these higher elevations. It can therefore be concluded that the proposed walls have been designed to hold up in larger flood events. A check was made to determine if the proposed cover for the floodplain bench and greenway trail could withstand the velocities from a 10-year flood. Table 2 summarizes the flood velocities experienced on the grass-lined left floodplain bench and asphalt covered right greenway trail. Table 2 - Permissible Velocities for Greenway and Floodplain Bench Cross Section (Stream Station) Left Overbank Velocity (ft/sec) Right Overbank Velocity (ft/sec) 374223 3.71 7.13 374295 3.21 7.13 374382 3.31 7.31 374436 2.65 5.89 Pineola Street (State Highway 194) 374508 N/A 1.15 374558 N/A 6.64 Flood By-Pass Channel & Pineola Street Floodplain Improvements Project WK Dickson EROSION CONTROL PLAN The permissible velocity for grass with the flat floodplain bench and silty soils is 4.5 foot per second (NCDENR Erosion and Sediment Control Planning and Design Manual). The permissible velocity for an asphalt covered trail is well in excess of 7.1 foot per second. As shown in Tablet, the velocities on the floodplain bench and greenway trail are well below the permissible velocities that will cause erosion. Rip-Rap Pad Design The rip-rap outlet protection, shown on the plans and details, was designed using the New York Department of Transportation (NYDOT) method along with Figures 8.06c and 8.06d found in the NCDENR Erosion and Sediment Control Planning and Design Manual. Based on a culvert diameter and flow velocity, the figures can be used to calculate a rip-rap pad length; width and stone size (see Appendix F). The following table summarizes the outlet protection of culverts outfalls for this project: Table 3 - Outlet Protection at Culverts and Ditch Outfall Location Culvert Size (in) 10-Year Peak Flow (cfs) Pad Length (ft) Pad Width (ft) Pad Depth (in) NCDOT Rip-Rap Size Rip-Rap Weight (tons) PAD #1 24 20 12 7 24 Class II 10.5 PAD #2 48 112 24 14 24 Class II 35.5 PAD #3 12 4 10 6 18 Class II 5.5 PAD #4 12 4 10 6 18 Class B 5.5 PAD #5 8 2 10 6 18 Class B 5.5 PAD #6 42 80 21 12 24 Class 1 33.5 Because the outlet of the PAD #2 is located in an existing pool, the outlet protection will be buried and treated like a buried riffle grade control structure. By burying the structure at the bottom of the pool, the energy leaving the 48-inch diameter RCP will be dissipated both within the pool and by using the buried riffle grade control structure, as needed. Pools are very shallow along this run of the North Toe River therefore at this location; the buried riffle grade control structure will be buried just below the bottom of the existing pool. This particular application is used to minimize the adverse impacts to the existing pools along the North Toe River which are important to the trout habitat. A new, open ditch is proposed in the left overbank near cross section 373275. This ditch will collect runoff from the hillside slope drains, Railroad Street and the contributing drainage area. It is proposed that the last 15 feet of this ditch be lined with Class B rip-rap to help drop the invert of the ditch to the invert of the North Toe River. Channel Liner for Open Ditches Ditches with velocities over 4.5 ft per second have been lined with a permanent vegetative lining or a rip-rap liner. An in-house spreadsheet (Appendix G) along with Dodsons's Hydrocalc Hydraulics computer model was used to determine a liner that could be used to handle all ditches that exceeded the permissible velocity and shear stress. The plans call for the immediate stabilization of the ditch to prevent sediment from entering the downstream receiving systems. All ditches consist of 4:1 Ditch slopes range from project: side slopes, which helps to reduce the shear stresses that would cause erosion. 11 % to 17%. The following table shows the proposed liners called out for this Flood By-Pass Channel & Pineola Street Floodplain Improvements Project WK Dickson EROSION CONTROL PLAN Table 4 - Channel Liner Summary Ditch Location Channel Slope (ft/ft) 10-Year Channel Velocity (ft/s) 10-Year Shear Stress (lb/sq ft) Liner RR Channel #1 0.136 3.59 1.87 Class B RR Channel #2 0.124 2.64 1.16 Class B RR Channel #3 0.170 3.31 1.16 Class B RR Channel #4 0.172 3.41 1.82 Class B RR Channel #5 0.112 4.45 2.52 Class Hydraulic Evaluation at Pedestrian Footbridge A field walk and hydraulic evaluation of the channel was performed for the proposed pedestrian footbridge to determine if mitigative measures are needed to prevent excessive scour at the abutments. Due to the following factors it was concluded that the channel is not subject to significant vertical change and that the potential for scour at this crossing is minimal: The proposed footbridge is located approximately 130 feet upstream of Pineola Street and 145 feet downstream of Ash Street. The proximity of the two road crossings limits the potential for a significant change in grade due to headcut or downcut along the channel. A field walk of the channel revealed very shallow pools along the thalweg of the channel for several hundred feet in either direction of the proposed footbridge. The Pineola Street culverts at are causing flood waters to back up behind the road. As a result channel velocities and shear stresses are relatively low for the 10- through 100-year flood events. The energy grade is extremely flat upstream of Pineola Street which is resulting in low shear stresses at the proposed location of the footbridge. These low shear stresses and channel velocities indicate that the potential for significant scour are low. The following is a summary of the hydraulics taken from the proposed conditions HEC-RAS model (see Appendix H) for the channel area at the location of the proposed footbridge: Table 5 - Hydraulic Summary at Proposed Footbridge 10-Year Channel Velocity (ft/sec) 100-Year Channel Velocity (ft/sec) 10-Year Shear Stress (lb/sq ft) 100-Year Shear Stress (lb/sq ft) 2.3 1.7 0.23 0.10 As summarized in the Table 5, velocities and shear stresses are extremely low for all significant flood events. The low channel velocities and shear stresses are causing the cobbles and gravels to fall out at the large point bar located at the confluence of the North Toe River and Kentucky Creek. This indicates that the channel is not subject to degrading and the abutments are not vulnerable to significant vertical change. A large depositional point bar does indicate that there is potential for lateral movement. Lateral movement is not occurring at this time however the significant bank protection in the form of roots from trees has prevented the channel from moving significantly. At this time the toe of the channel is unstable and mitigative measures in the form of a boulder toe is proposed to reduce lateral movement in the right overbank. By-Pass Channel Design The design of the grass-lined, earthen by-pass channel was based on limiting the velocity in the 10-year flood event to 4.5 feet per second and the shear stresses to 0.70 pounds per square foot. As shown in Appendix I, the silty soils, flat slope and grass coverage allow for a permissible shear stress of 0.70 pounds per square foot. Per the NCDENR Erosion and Sediment Control Planning and Design Manual, Flood By-Pass Channel & Pineola Street Floodplain Improvements Project WK Dickson EROSION CONTROL PLAN the allowable velocity for Kentucky Bluegrass on silty soils with a flat slope is 4.5 feet per second. As shown in the following table, the 10-year velocities and the shear stresses in the by-pass channel are less than the maximum permissible limits: Table 6 - By-Pass Channel Design Summary Storm Event Maximum Velocity (ft/sec) Permissible Velocity (ft/sec) Maximum Shear Stress (lb/sq ft)) Permissible Shear Stress (lb/sq ft) 10-Year Flood 4.3 4.5 0.55 0.70 100-Year Flood 5.9 4.5 0.95 0.70 A check was made on the 100-year velocity to confirm the velocities would not be excessively high and cause severe erosion in the grass-lined by-pass channel. As shown in Table 6, the 100-year flood event is slightly above the acceptable limits for a stable channel. Two grade control structures have been proposed along the by-pass channel to minimize the channel's susceptibility to erosion in a 100-year flood. At the downstream end, a concrete level spreader is proposed to create diffuse flow from the runoff of Old Cranberry Street. This structure will also act as a grade control structure for the proposed by-pass channel. In addition, a buried log floodplain sill will be installed approximately 185 feet upstream of the concrete level spreader. This buried log floodplain sill will act as a second grade control structure for to minimize erosion in a 100-year flood. Flood By-Pass Channel & Pineola Street Floodplain Improvements Project WK Dickson co ca y> G L = _ U? y ? x x x x Z c x w x w y _ U `? a J O c Q ? c t COT s C3 ? 00 O J c J- j v _ v 01 ? of _ CC? G ? ? VJ V 715, _ II C.0 NT y tl f. 7 > v L v? s = y ?- ^ c c E N ? E i ! O • C ? c c a U O W ' co N N co N a, , ,- c v. - c fn ? U O Q N ? C? vaNriNq?, - - T 3 r c O ¢ p t O - z _ Ly F?z3c¢_ c y a v ci 06 H N U 1 60 7 U C ? Y a - - C: 0 ? O L C N ( O J V b ? $ a2 c n G a N C c0 co 0) Ca (n C 3 C r C t R Y CD - N a) a U) 0 •? a O a) a) ?0 V ZO ? 3 a1 r 0) iC co L a? a) Z N d - II a) a) a) r 0 ? ca 3 C C.U) C 5 E ' « C OL in cn = U 6 1 J A a) m H a W D U II II II II p "a H > a (n z U) E a) U) n ? c d J ? N C C d C 3 ? J L N cn ? In O ? O _T ? ? co O) U a> d' ? ° a N - - U CV EM O Q M d N C C O U U C C ? ? c L U N m •p ? m N N = 3 d ? ai a c ca C t ? d Q a N J a o 0 m L U c w v T ? co ? O r c o d °o ? 0 c y y O L O C', - cn ca 0