Memorandum To: Ken Averette, NCDWQ
Fayetteville Regional Office
From: Art C. King, DEO'a~
NCDOT Highway Div. 8
Subject: Revision to PCN for SR-1538 Montgomery County
\A'y
1 - [t)~ ~/
d /y
LYNDO TIPPETT ~~8,(,,.
SECRETARY Cy
Included are the revisions we discussed to the PCN for SR-1538 in Montgomery County. The
District Engineer has decided to replace the entire pipe at this location rather than using the "no
build" option, or just adding two additional joints to the existing pipe. Please insert these
revisions into the PCN previously submitted for this project.
If you have any questions, or require additional information please contact me.
CC: Sonia Gregory,
401 Wetlands Unit
P.O. BOY 1067, ABERDEEN NORTH C~~ROLIN~128315
PHONE (910) 944-234-I Fr~Y (910) 944-5623
2. Individually list wetland impacts. Types of impacts include, but aze not limited to
mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams,
sepazately list impacts due to both structure and flooding.
Wetland Impact
Site Number
(indicate on map)
Type of Impact Type of Wetland
(e.g., forested, marsh,
herbaceous, bog, etc.) Located within
100-year
Floodplain
es/no Distance to
Nearest
Stream
linear feet Area of
Impact
(acres)
NA
Total Wetland Impact (acres)
3. List the total acreage (estimated) of all existing wetlands on the property:
4. Individually list all intermittent and perennial stream unpacts. Be sure to identify temporary
impacts. Stream impacts include, but are not limited to placement of fill or culverts, dam
construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib
walls, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed,
plans and profiles showing the linear footprint for both the original and relocated streams
must be included. To calculate acreage, multiply length X width, then divide by 43,560.
Stream Impact Average Impact Area
Number Stream Name Type of Impact Perennial or Stream Width Length of
(indicate on map) Intermittent? Before Impact (lineaz feet) pact
acres)
1 UT of Dry Creek Perm. p 3-4' 24'
" temp " 20'
2 UT of Dry Creek Perm I 1-3' 20'
" " Temp 20
Perm=44'
Temp=40~
Total Stream Impact (by length and acreage) Total=84
Rip-Rap40'
5. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic
Ocean and any other water of the U.S.). Open water impacts include, but are not limited to
fill, excavation, dyed ins, floodin , e, bulkheads, etc.
Open Water Impact
Name of Waterbody Type of Waterbody Area of
Site Number (if applicable) Type of Impact (lake, pond, estuary, sound, bay, Impact
indicate on ma ocean, etc. acres)
NA
Page 8 of 12
ST~EAn'I IMPACT
RIPE LENGTH =60' ,
L-EN'aTN OF EXIST PIPE=40
NET' 1 MPACT
60=40 = 2~' ,
ATE $ARRIEK.
57>~L SHEET' PILING
~T.!'11PER`(1pU5 FABRIC
,pip
s ~,~ Q
~~>; ~
,,
~ 15~
~'~'4,0
,. ,
EXISTING 4p' DE 24nIcrP
PROPOSED 60 of 24~RCP
~ BflawE~ _
OR ~1, S-~T' PiuNG
~'
j/oT~S :
I) Ir(sTi~u. T~Po~~eY teems , Di rE~r
s~rfZEAm ~,onl BY PumPrn~ ~/gTEK
ARAVnlA h/a2x AREA.
Z~ PumP ~nJrAuv~D RRFA To SILT SFIG
~1o J~riIoYE EXt577lJC~ PIPE .
3~ J-J57~Al,L PIP>= F}IJA BACXF'1L.L.
4. 12Em~~E T mDoRARY ,D1Y~.S1an1
L~Y-CES.
5
SILT BAG
E~IFRGY DtsslDRrpR
~:JP RAF
~~To ~ PL~~
Z4~~ IzEl~fFb2CED CaJC~rE PIPE ~EPLACI~Y1EIVr
Slr~ No. Z
1hon1T-GomER~r Coin-521538
~~s SEcTon~
Nrs
Paws DAB: 3 ~- Zcn~
Sum 8Y: 12ocx~~u+ar-~ Da'r~To,~
for ToSCALE