Loading...
HomeMy WebLinkAbout20191251 Ver 3_Ocracoke sandbag shift LOR May 2020_20200501ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON C. DAVIS Director Mr. Paul Williams N.C. Department of Transportation 113 Airport Road Edenton, NC 27932 NORTH CAROLINA Environmental Quality May 1, 2020 RE: Refinement of CAMA Major Permit No. 24-03, Dune Maintenance, NC 12 on Ocracoke Island, Hyde County. Dear Mr. Williams: This letter is in response to the N.C. Department of Transportation (NCDOT) letter dated April 20, 2020 regarding the NC 12 Ocracoke Island Dune Reconstruction project, including three drawings dated April 9, 2020. Previously, the Minor Modification of CAMA Major Permit No. 24-03 that was issued on April 3, 2020 authorized NCDOT to shift the 1,005-foot section of sandbags on Sheet 9 southward by approximately 200 linear feet from the alignment that was approved by the Minor Modification that was issued on January 31, 2020. NCDOT now proposes to shift the 1,005-foot section of sandbags on Sheet 9 southward for an additional 300 linear feet from the alignment that was approved by the Minor Modification that was issued on April 3, 2020. The total linear footage of sandbags on Sheet 9 will remain the same. Please be advised that through this Letter of Refinement, the N.C. Division of Coastal Management (DCM) conveys its determination that the revision as described in your letter dated April 20, 2020 is consistent with existing State rules and regulations and is in keeping with the original purpose and intent of CAMA Major Permit No. 24-03. This Letter of Refinement shall be attached to the original of Permit No. 24-03, which was issued on 2/19/03, and all subsequent modifications, renewals and letters of refinement, including but not limited to the Emergency Major Modification issued on 9/26/19, the Emergency Minor Modification issued on 10/22/19, the Minor Modification issued on 1/31/20, and the Minor Modification issued on 4/3/20, and copies of all documents shall be readily available on site when a Division representative inspects the project for compliance. All conditions and stipulations of the active permit remain in force unless altered herein. This approval does not eliminate the need to obtain any additional permits, approvals or authorizations that may be required. Nothing in this permit authorizes any activity that has not received approval from the National Park Service (NPS) for work within the Cape Hatteras National Seashore. A Special Use Permit was issued by NPS on 5/1/20 authorizing the current proposal by NCDOT, including the updated alignment of the sandbags. F NORTH CAPIOURA Q North Carolina Department of Environmental Quality I Division of Coastal Management Morehead City Office 1 400 Commerce Avenue I Morehead City, North Carolina 28557 252.8082808 Letter of Refinement, Major Permit No. 24-03 NC 12 Ocracoke Island Dune Reconstruction May 1, 2020 Page 2 of 2 Please contact Greg Daisey at (252) 207-3656 if you have any questions or concerns. cc: Greg Daisey, NCDCM Cathy Brittingham, NCDCM Kyle Barnes, USACE Garcy Ward, DWR Sabrina Henry, NPS Sincere vC Jonathan Howell Major Permits Coordinator DEQ�� North Carolina Department of Environmental Quality I Division of Coastal Management Morehead City Office 1 400 Commerce Avenue I Morehead City, North Carolina 28557 252.8082808