HomeMy WebLinkAbout20190661 Ver 1_Bank Approval Letter_20200504
May 4, 2020
Wildlands Holdings III, LLC
Attn: Shawn Wilkerson
1430 South Mint Street, Suite 104
Charlotte, NC 28203
(via electronic mail: swilkerson@wildlandseng.com)
Re: Thoroughfare Swamp BPDP and MBI Approval
Dear Mr. Wilkerson,
The Division of Water Resources (DWR) received a draft Bank Parcel Development Package (BPDP)
for the Sassarixa Swamp II Mitigation Site (Site) in 2019, for review and approval under the terms and
conditions of the Wildlands Holdings III, LLC (Wildlands) Sassarixa Swamp II Mitigation Banking
Instrument for Riparian Buffer Mitigation and Nutrient Offsets (MBI) received on September 4, 2019.
Effective May 4, 2020, the MBI was made and entered into by Wildlands acting as the Bank Sponsor,
and the DWR. Katie Merritt, with DWR, reviewed the BPDP and MBI documents and provided
comments and recommendations. DWR received a revised BPDP and MBI that addressed all
comments and recommendations. The table below summarizes the timeline of the BPDP and MBI:
Project Site Name DWR Project
ID #
Initial Draft
Received
Revised Draft Received
(Final Draft)
Public Notice
Date
Sassarixa Swamp II
BPDP
2019-0661 September 4, 2019 December 9, 2019 April 15, 2020
Sassarixa Swamp II
MBI
2019-0661 September 4, 2019 December 9, 2019 April 15, 2020
The closing date for the public notice was April 29, 2020. DWR received no comments regarding
the subject BPDP or MBI documents. These documents are now approved and can be found online
at the following links:
Sassarixa Swamp MBI:
https://edocs.deq.nc.gov/WaterResources/DocView.aspx?id=1164745&dbid=0&repo=WaterResources
Sassarixa Swamp BPDP:
https://edocs.deq.nc.gov/WaterResources/DocView.aspx?id=1145529&dbid=0&repo=WaterResources
Sassarixa Swamp II
Wildlands
May 4, 2020
Page 2 of 2
Please feel free to call Katie Merritt at (919) 707-3637 if you have any questions regarding this
correspondence.
Sincerely,
Katie Merritt
401 & Buffer Permitting Branch
cc: DWR File Copy (Katie Merritt)