Loading...
HomeMy WebLinkAbout20190661 Ver 1_Bank Approval Letter_20200504 May 4, 2020 Wildlands Holdings III, LLC Attn: Shawn Wilkerson 1430 South Mint Street, Suite 104 Charlotte, NC 28203 (via electronic mail: swilkerson@wildlandseng.com) Re: Thoroughfare Swamp BPDP and MBI Approval Dear Mr. Wilkerson, The Division of Water Resources (DWR) received a draft Bank Parcel Development Package (BPDP) for the Sassarixa Swamp II Mitigation Site (Site) in 2019, for review and approval under the terms and conditions of the Wildlands Holdings III, LLC (Wildlands) Sassarixa Swamp II Mitigation Banking Instrument for Riparian Buffer Mitigation and Nutrient Offsets (MBI) received on September 4, 2019. Effective May 4, 2020, the MBI was made and entered into by Wildlands acting as the Bank Sponsor, and the DWR. Katie Merritt, with DWR, reviewed the BPDP and MBI documents and provided comments and recommendations. DWR received a revised BPDP and MBI that addressed all comments and recommendations. The table below summarizes the timeline of the BPDP and MBI: Project Site Name DWR Project ID # Initial Draft Received Revised Draft Received (Final Draft) Public Notice Date Sassarixa Swamp II BPDP 2019-0661 September 4, 2019 December 9, 2019 April 15, 2020 Sassarixa Swamp II MBI 2019-0661 September 4, 2019 December 9, 2019 April 15, 2020 The closing date for the public notice was April 29, 2020. DWR received no comments regarding the subject BPDP or MBI documents. These documents are now approved and can be found online at the following links: Sassarixa Swamp MBI: https://edocs.deq.nc.gov/WaterResources/DocView.aspx?id=1164745&dbid=0&repo=WaterResources Sassarixa Swamp BPDP: https://edocs.deq.nc.gov/WaterResources/DocView.aspx?id=1145529&dbid=0&repo=WaterResources Sassarixa Swamp II Wildlands May 4, 2020 Page 2 of 2 Please feel free to call Katie Merritt at (919) 707-3637 if you have any questions regarding this correspondence. Sincerely, Katie Merritt 401 & Buffer Permitting Branch cc: DWR File Copy (Katie Merritt)