Loading...
HomeMy WebLinkAbout20031281 Ver 1_COMPLETE FILE_20031014Certificate of Completion G\ DWQ Project No.: 3 1 a County: Applicant: r L SK Project Name: S Date of Issuance of 401 Water Quality Certification: O CXZL Oc -f-cA9c-,-r 1-7 d-C903 Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1621 Mail Service Center, Raleigh, NC, 27699-1621. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, Oc-v-e t ^-Q_ L hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality. Certification and Buffer Rules, the approved plans and ecifications, and her supporting materials. Signature: Date: Agent's Certification JUN 1 2005 DENR - WATER QL)AC..IrY WETLANDS AND STORMWATER BRANCH hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: If this project was designed by a Certified Professional I, , as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Registration No.: Date: 0?O? W AT ,?9pG co r O '< Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P. E. Director Division of Water Quality Coleen H. Sullins, Deputy Director Division of Water Quality October 17, 2003 DWO Project # 03-1281 Hyde County Page 1 of 2 Dorene L. Sutton PO Box 145 40 Sytron Lane Ocracoke, NC 27960 Subject Property: 39 Styron Lane, Ocracoke, NC 27960 Pamlico Sound [03-03-13, 29-(40.5), SA HQW (high quality water)] APPROVAL for the use of the "General" MAJOR VARIANCE; From the Neuse and Tar-Pamlico Riparian Buffer Rules for the Construction of Residential Structures on Existing Lots within the Coastal Counties as defined by the Coastal Area Management Act with ADDITIONAL CONDITIONS Dear Mr. Sutton: 'You have our approval, in accordance with the conditions listed below, to impact approximately 950 square feet (ft) of the protected riparian buffers for the purpose of removing an existing house from one lot and constructing an addition to an existing house on the adjacent, subject property as described within your application dated September 10, 2003. This letter shall act as your approval for the use of the "General" Major Variance; From the Neuse and Tar-Pamlico Riparian Buffer Rules for the Construction of Residential Structures on Existing Lots within the Coastal Counties as defined by the Coastal Area Management Act with ADDITIONAL CONDITIONS as approved by the Water Quality Committee (WQC) of the Environmental Management Commission (EMC) on May 10, 2001. In addition, you should get any other required federal, state or local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control and CAMA permits. This approval shall expire when the variance expires on April 11, 2006 unless the variance is renewed before that time by the EMC. This approval is only valid for the purpose and design that you described in your variance request. If you change your project, you must notify us and you may be required to send us a new request for approval. If the property is sold, the new owner must be given a copy of this approval and is thereby responsible for complying with all conditions. For this approval to be valid, you must follow the conditions listed below. Conditions: 1. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. 2. Diffuse Flow All new stormwater drainage shall be directed to vegetated areas as diffuse flow at non-erosive velocities prior to entering the protected riparian buffers as identified within 15A NCAC 2B .0259(5). No new ditching or piping of stormwater through the protected buffers is allowed. If you do not accept any of the conditions of this approval, you may ask for and adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition that conforms to Chapter North Carolina Division of Water Quality, 401 Wetlands Certification Unit, 1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address) 2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location) 919-733-1786 (phone), 919-733-6893 (fax), hftp://h2o.enr.state.nc.us/ncwetlands/ Ms. Sutton Page 2 of 2 October 17, 2003 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. This approval and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under the Tar-Pamlico River Riparian Buffer Protection Rules (15A NCAC 2B.0259 (9)(b)). Please call Mr. Bob Zarzecki at 919-733-9726 or Mr. Tom Steffens at 252-946-6481 if you have any questions or require copies of our rules or procedural materials. Sincerely, Alan W. Klimek, P.E. Director, DWQ Attachments: Coastal General Variance Certificate of Completion cc: Tom Steffens, DWQ Washington Regional Office DCM Washington District Office File copy Central Files DWQ Project No. 031281 October 17, 2003 bz OFFICE USE ONLY: Date Received _ ,_ _... __ _. _ _?!. ?-v'"° ¦ ?' '"' "` Request 003 _ ( State of North Carolina Department of Environment and Natural Resources _ Y AR V ®W Q Division of Water Quality Variance Request Form - for Minor Variances Protection and Maintenance of Riparian Areas Rules NOTE: This form may be photocopied far use as an original. Please identify which Riparian Area (Buffer) Protection Rule applies. ? Neuse River Basin: Nutrient Sensitive Waters Management Strategy Protection and Maintenance of Riparian Areas.Rule (15A NCAC 02B .0233) Tar-Pamilco River Basin: Nutrient Sensitive.Waters Management Strategy Protection and Maintenance of Riparian Areas Rule (15A NCAC 02B.0259) ? Catawba River Basin: Protection and Maintenance of Existing Riparian Buffers (15A NCAC 02B .0243) WET P Part 1: General Information OCT 14 2003 (Please include attachments if the room provided is insufficient.) WATER QUAt'11YSECTION 1. Applicant's name (the corporation, individual, eta who owns the property): 2. Print Owner/Signing Official (person legally/ responsible for the property and its compliance) Name: Title: _.. _.__Qs r2.n. r"._... _.__. __.. _.. __._....._---...._ _ _.... __ . _._ Street address: City, State, tip: Telephone: 351"1 L.._ . _ Fax: 3, Contact person who can answer questions about the proposed project: Name: Telephone: S_ _._ _u bc? u e-._ Fax: Email: 4. Project Name (Subdivision, facility, or establishment name - consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Version 2 November 2002 5. Project Location: Street address: City, State, Zip: Q cccoksZ f N _. _.. _a ?.? O- ... .._ County: Latitude/longitude: .---- _ 6. Directions to site from nearest major intersection (Also, attach an 8 %2 x 1.1 copy of the USGS topographic map indicating the location of the site): 7. Stream to be impacted by the proposed activity: Stream name (for unnamed streams label as "UT" to the nearest named stream): U.._.. Stream classification [as identified within the Schedule of Classifications 15A NCAC 2B .0315 (Meuse) or.0316 (Tar-Pamlico)]: 0.31 _ _?. 8. Which of the following permitsiapprovals will be required or have been received already for this project? Required: Received: Date received: Permit Type: CAMA Major _?C. _7-9'3 rl - t -0 3(1 03 CAMA Minor 401 Certification/404 Permit On-site Wastewater Permit NPDES Permit (including stormwater) Non-discharge Permit . Water Supply Watershed Variance )C _ .. T 1-0'5 1- -03 (o v oOthers (specify), G _? . widtt?,h Part 2: Proposed Activity (Please include attachments if the room provided is insufficient) 1. Description of proposed activity [Also, please attach a map of sufficient detail (such as a plat map or site plan) to accurately delineate the boundaries of the land to be utilized in carrying out the activity, the location and dimension of any disturbance in the riparian buffers associated with the activity, and the extent of riparian buffers on the land. Include the area of buffer impact in ft2J: ( e !m o v e-._ a r ct? ?.a,?2 cr! v' 4 2. State reasons why this plan for the proposed activity cannot be practically accomplished, reduced or reconfigured to better minimize or eliminate disturbance to the riparian buffers: Variance Request Form, page 2 Version 2: November 2000 3. Description of any best management practices to be used to control impacts associated with the proposed activity (i.e., control of runoff from impervious surfaces to provide diffuse flow, - re-planting vegetation or enhancement of existing vegetation, etc.): ' ? ??? vw-car e-- 4. Please provide an explanation of the following: (1) The practical difficulties or hardships that would result from the strict application of this Rule. t VY\ J i rL f? (2) How these difficulties or hardships result from conditions that are unique to the property involved. T1 L (3) If economic hardship is the major consideration, then include a specific explanation of the economic hardships and the proportion of the hardship to the entire value of the project. Part 3: Deed Restrictions By your signature in Part 5 of this application, you certify that all structural stormwater best management practices required by this variance shall be located in recorded stormwater easements, that the easements will run with the land, that the easements cannot be changed or deleted without concurrence from the State, and that the easements will be recorded prior to the sale of any lot. Part 4: Agent Authorization If you wish to designate submittal authority to another individual or firm so that they may provide information on your behalf, please complete this section: Designated agent (individual orfirm): -__i Mailing address: _ City, State, Zip: Telephone: Fax: Email: Part 5: Applicant's Certification Variance Request Form, page 3 Version 2 November 2000 en ?- _S -??'------._ ..---- -- -- _ (print or type name of person listed in Part I, Item 2), certify that the information included on this permit application form is correct, that the project will be constructed in conformance with the approved plans and that the deed restrictions in accordance with Part 5 of this form will be recorded with all required permit conditions. Signature: Date: Title: pYU_ .- -- _ ._.___..._ __.. Variance Request Form, page 4 Version 2: November 2000 FERRY OFFICE 1 PAMLICO SOUND NPS L 1 KPH PAMUCO SHORES P GUARD ISSIITTOOR CTR COAST STATION PUBLIC PARKING d N Q' i Nor x7n Pond f C? /I \ " ? PAMLICO SOUND FERRY DOCKS CEDAR IS. i NATIONAL SWAN QUARTER SERVICE ? ? R ? k4 1z MUSSNS RIDGE \ Q C\ _ • • • HOWARD WAHAS CEMETERY G? - BRITISH CEMETERY OYSTER CREEK _ / \O. m 4r, SILVER LAKE w55 EL &E LA HARBOR wwcs PATH \ v ) FIG \O ? /? / OCRACOKE _ \u \ f LIGHTHOUSE \9O p° I y C? - T 1 1`L G 0 SRUGKrS ?' - SOUND •,?J 1T 1 MEDICAL ' SHORES 7r_ ASSE?.sLYOF 3 •. ? CENTER q SUNSET VILLAGE GOD CHURCH i i j AY p E•r1 5W? \ I t ••??syw¢ a ? gI ?? 1 i ?i?? WIDG EON COOP RD \ WOO DS ELECTRIC RDA i q TRENTWOOD CEDAR D i \'mm U WHHIE RLDUN RD • ;s <J OCRACOKE VILLAGE ?` SCALE 1'=800 FEET (.pp-j - - • ' • • - • . ?DI=D _ BeAC_ _ _ J 12 .. • ' WAHAB aD ,ESi Po1?R ?' I ' iy RESTROOMS(HIPS VsilmsCw*w) iT VILLAGE UPLAND _ u g [3 PUBLIC SERVICES • ANNEX TRENT x CHURCH/CEMETERY t ? • w n O MEDICAL CENTER OCRACOKE HISTORIC DISTRICT S% HORSE va RD , g uA' ?\ ABC STORE ? 9 _Aacsod aRaE OUR STREETS ARE NOT YET MARKED WITH STREET SIGNS. I JACKSON \ DUNES PLEASE USE LANDMARKS TO FIND YOUR WAY. COMMUNITY CENTER ©2003 Village Print, Ocracoke Island, AIC Map provided by CEDAR LA 9 p _ , POST oFFK E ? us SFEAIFF'S OFFICE & NATURE TRAIL 7 MILES NPS CAMPGROUND 3 MILES PONY PASTURE 7 S M E RECYCLWG CENTER S FERRY A HA S 12 BEACH ACCESS VARIOUS Ocracoke Island, NC 3MUES TO BEACH SOUTH PaN RD RAMP 72 4WD ONLY s: AIRSTRIP C3 , r PUBLIC PARKING ? - O 4WD ONL ONLY (BEACH AccESS (REACH ACCESS) Left a s 84 a.*%% Pir ap eMns&Wcftn sM! point f'' ; ... y . C HATMAS NAT SH4244MRR ?'e<st [??rA 51. E : ?d Y .? -? L 4 ?. s+? a?l?ti?-]] ... • • C? - - - - - ? -