HomeMy WebLinkAboutNCC201554_ESC Approval Submitted_20200504NA C'
ROY COOPER
Governor
�Y- a ,w
MICHAEL S. REGAN
Secretary
S. DANIEL SMITH
Director
NORTH CAROLINA
Environmental Quality
January 7, 2020
LETTER OF APPROVAL WITH MODIFICATIONS
Rise Boone, LLC
Attention: Richard G. Hunter, Chief Financial Officer
129 North Patterson St
Valdosta, GA 31601
RE: Project Name: ASU Justice Hall Demolition
Acres Approved: 0.95
Project ID: WATAU-2020-005
County: Watauga
City: Boone
Address: Stadium Heights Drive
River Basin: New
--Stream-Classification:-C;-.TT +_. - - - -- -- --
Submitted By: Rise Boone, LLC
Date Received by LQS: December 23, 2019
Plan Type: New
Dear Mr, Hunter:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable
with modifications and hereby issue this letter of Approval with Modifications. The modifications required for
approval are listed on the attached page. This plan approval shall expire three (3) years following the date of
approval, if no land -disturbing activity has been undertaken, as is required by Title, 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of
Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater
General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on
the above named project. The NOI form may be accessed at deq.nc.gov/NCGOI. Please direct questions about
the NOI form to Annette Lucas at Annette.Iucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After
you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. A
$100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in
Raleigh.
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at
the job site:
North Carolina Department of Gnvironmental Quality I Division of Energy, Minemi aaul i .and Resources
4� Winston-Salem Regional OI'lice 1450 Hanes Mill Road, Suite 300 I Winston-Salem, Nuiih Carolina 27105
wQE 336.776-9800
Letter of Approval with Performance Reservations
Rise Boone, LLC
January 7, 2020
Page 2 of 3 ;
1. The approved E&SC plan as well as any approved deviation.
2. The NCGQ I permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure
compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing
natural resources and adjoining properties. If, following the commencement of this project, the erosion and
sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of
1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and
implementation of the revisions to insure compliancewiththe Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality
laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -
disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
—...�esp , ded_:...eu aye req. '�::11.t-arnende"fffi'here
the information included on the form.. In addition, it would be helpful if you notify this office of the proposed
starting date for this project. Please notify us if you plan to have a preconstructionconference.
Your cooperation is appreciated.
Sincerely,
Tamera Eplin, ,l'E, CPESC
Regional Eng`meer
Land Quality Section-
Enclosures: Certificate of Approval
Modifications Required for Approval
NCGOI Fact Sheet
c: Stanley D. Lindsey and Associates, Ltd.
Attention: Steven Doe, PE
1347 Harding Place, Suite 201
Charlotte, NC 28204
Inspection Department
Letter of Approval with Performance Reservations
Rise Boone, LLC
January 7, 2020
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: ASU Justice Hall Demolition
Project ID; WATAU-2020-005
County: Watauga
Modifications pursuant to applicable North Carolina General Statutes and/or Regulations:
1. Any off -site borrow and waste required for this project must come from a site with an
approved erosion control plan, a site regulated under the Mining Act of 1971, or a landfill
regulated by the Division of Solid Waste Management. Trash/debris from demolition
activities or generated by any activities on site must be disposed of at a facility regulated by
the Division of Solid Waste Management or per Division of Solid Waste Management or
Division of Water Resources rules and regulations. [15A NCAC 4B .0110]
2. If it is found additional area will be required for stockpiling of topsoil, contractor staging,
temporary access, haul roads, erosion control measures or other land -disturbing activities
associated with this project, a revised erosion control plan reflecting the additional area must
be submitted to this office. [15A NCAC 4B .0118]
3. Additional measures may be required - The applicant is responsible for the control of
sediment on -site. If the approved erosion and sedimentation control measures prove
insufficient, the applicant must take those additional steps necessary to stop sediment from
leaving this site. [15A NCAC 4B .0115]
Ref: G.S. 113A-54.1 through G.S. 113A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit NCG 010000 NPDES for Construction Activities