Loading...
HomeMy WebLinkAboutNCS000349_Inspection Report_20070918 Compliance Inspection Report Permit:NCS000349 Effective: 05/01/02 Expiration: 04/30/07 Owner: North Carolina Renewable Power-Lumberton LLC SOC: Effective: Expiration: Facility: North Carolina Renewable Power Lumberton, L County: Robeson 1866 Hestertown Rd Region: Fayetteville Lumberton NC 28358 Contact Person:Ciaran McManus Title: O&M Manager Phone: 984-218-6300 Directions to Facility: System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On-Site Representative(s): Related Permits: Inspection Date: 09/18/2007 Entry Time 11:15AM Exit Time: 12:30PM Primary Inspector:Trent Allen Phone: 910-433-3300 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Stormwater Discharge, Individual Facility Status: Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCS000349 Owner-Facility:North Carolina Renewable Power-Lumberton LLC Inspection Date: 09/18/2007 Inspection Type:Compliance Evaluation Reason for Visit: Routine Inspection Summary: The site has several different outfalls that discharge into a single ditch and the samples are taken at the last outfall so a representative sample will be taken. All qualitative monitoring and analytical monitoring was conducted as required by the permit. There was a completed and updated stormwater pollution prevention plan in place. Page 2 of 3 Permit: NCS000349 Owner-Facility:North Carolina Renewable Power-Lumberton LLC Inspection Date: 09/18/2007 Inspection Type:Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑ #Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ #Does the Plan include a"Narrative Description of Practices"? ❑ ❑ ❑ #Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ #Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ #Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ #Does the facility provide all necessary secondary containment? ❑ ❑ ❑ #Does the Plan include a BMP summary? ❑ ❑ ❑ #Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ #Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ #Does the facility provide and document Employee Training? 0 ❑ ❑ ❑ #Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ # Is the Plan reviewed and updated annually? 0 ❑ ❑ ❑ #Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ ❑ ❑ Comment: Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ #Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ #Were all outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ #Has the facility evaluated all illicit(non stormwater)discharges? 0 ❑ ❑ ❑ Comment: Page 3 of 3