HomeMy WebLinkAboutNCS000349_Inspection Report_20070918 Compliance Inspection Report
Permit:NCS000349 Effective: 05/01/02 Expiration: 04/30/07 Owner: North Carolina Renewable Power-Lumberton
LLC
SOC: Effective: Expiration: Facility: North Carolina Renewable Power Lumberton, L
County: Robeson 1866 Hestertown Rd
Region: Fayetteville
Lumberton NC 28358
Contact Person:Ciaran McManus Title: O&M Manager Phone: 984-218-6300
Directions to Facility:
System Classifications:
Primary ORC: Certification: Phone:
Secondary ORC(s):
On-Site Representative(s):
Related Permits:
Inspection Date: 09/18/2007 Entry Time 11:15AM Exit Time: 12:30PM
Primary Inspector:Trent Allen Phone: 910-433-3300
Secondary Inspector(s):
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Stormwater Discharge, Individual
Facility Status: Compliant ❑ Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page 1 of 3
Permit: NCS000349 Owner-Facility:North Carolina Renewable Power-Lumberton LLC
Inspection Date: 09/18/2007 Inspection Type:Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
The site has several different outfalls that discharge into a single ditch and the samples are taken at the last outfall so a
representative sample will be taken. All qualitative monitoring and analytical monitoring was conducted as required by the
permit. There was a completed and updated stormwater pollution prevention plan in place.
Page 2 of 3
Permit: NCS000349 Owner-Facility:North Carolina Renewable Power-Lumberton LLC
Inspection Date: 09/18/2007 Inspection Type:Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑
#Does the Plan include a General Location (USGS) map? ❑ ❑ ❑
#Does the Plan include a"Narrative Description of Practices"? ❑ ❑ ❑
#Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑
#Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑
#Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑
#Does the facility provide all necessary secondary containment? ❑ ❑ ❑
#Does the Plan include a BMP summary? ❑ ❑ ❑
#Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑
#Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑
#Does the facility provide and document Employee Training? 0 ❑ ❑ ❑
#Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑
# Is the Plan reviewed and updated annually? 0 ❑ ❑ ❑
#Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ ❑ ❑
Comment:
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑
Comment:
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑
#Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ❑
Comment:
Permit and Outfalls Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑
#Were all outfalls observed during the inspection? ❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑
#Has the facility evaluated all illicit(non stormwater)discharges? 0 ❑ ❑ ❑
Comment:
Page 3 of 3