February 17, 2020
LETTER OF APPROVAL
Trustees of Wake Tech Community College
Attn: R. Scott Rails, Secretary to the Board of Trustees
9101 Fayetteville Road
Raleigh, NC 27603
RE: Project Name: WAKE Technical Community College Learning Way Connection & Bus Lot
Acres Approved: 1.39
Project ID: WAKE-2019-099
County: WAKE, City: Middle Creek, Address: Daffodil Drive
River Basin: Neuse, Stream Classification: Other
Submitted By: The John R. McAdams Company, Inc.
Date Received by LQS: February 14, 2020
Plan Type: Revised
Dear Mr. Rails:
The subject erosion and sedimentation control plan has been approved. The enclosed Certificate of
Approval must be posted at the job site. This plan approval shall expire three (3) years following the date
of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice
of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction
Stormwater General Permit. This form MUST be submitted and COC issued prior to the commencement
of any land disturbing activity on the above -named project. The NOI form may be accessed at
deq.nc.gov/N000I. Please direct questions about the NOI form to Annette Lucas at
Annette.Lucas a ncdcringov or Paul Clark at Paul.Clark,ci,tied enr.gov. After you submit a complete and
correct NO[ Form, a COC will be emailed to you within three business days. Initially, DEMLR will not
charge a fee for coverage under the NCGO1 permit. However, a S100 fee will soon be charged annually.
This fee is to be sent to the DEMLR Stonmwater Central Office staff in Raleigh.
Title 15A NCAC 4B.01 18(a) and the NCGOI permit require that the following documentation be kept on
file at the job site:
I. The approved E&SC plan as well as any approved deviation.
2. The NCGO I permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Ncrtl:Carnlin:rEtepa.tnlentoFEntiitm[nen:alQusl•IV Di•.isiennfLnerq}.4liiacral.mriLarn;Gcsnurres
� �) R,sle.(bRegionalOf(it y 16213MEWServiteCcnlcr ;800 Nii rot tDrive 8aleigh.NtntftCat olina?it,On
Letter of Approval
Trustees of Wake Tech Community College
February 17, 2020
Page 2 of)
Also, this letter gives the notice required by G.S. 1 13A-61.1(a) of our right of periodic inspection to insure
compliance with the approved plan.
Title 15A NCAC 413.0118(a) requires that a copy of the approved erosion control plan be on file at the job
site. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to
insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project, it is
determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the
Sedimentation Pollution Control Act of 1973 (North Carolina General Statute I I3A-51 through 66), this
office may require revisions to the plan and implementation of the revisions to ensure compliance with the
Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water
quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to
this land -disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended form ifthere is any change
in the information included on the form. This permit allows for a land -disturbance, as called for on the
application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit
and would require a revised plan and additional application fee. In addition, it would be helpful if you notify
this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction
conference.
Your cooperation is appreciated.
Sincerely,
Sally Castle, El
Regional Engineering Associate
Land Quality Section
Enclosures: Certificate of Approval
NPDES NCGO1 Fact Sheet
cc: Mark Hamlett, PE (hamlett(iDmcadamsco.com) Electronic Copy
Regional Office file